MI20260001
rev 2Highway
160 trades
Applies to
Alcona, Alger, Allegan, Alpena, Antrim, Arenac, Baraga, Barry, Bay, Benzie +73 more
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Get an email when wage determinations covering Calhoun County, Michigan are modified.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Click a row to save its rate for later, then export your selections from the Saved panel.
| Save | Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR Building ASBE0047-002 | $40.00 | $23.65 | $63.65 | |
| BOILERMAKER Building BOIL0169-001 | $43.50 | $36.74 | $80.24 | |
| BRICKLAYER Building BRMI0009-031 | $35.21 | $24.26 | $59.47 | |
| CARPENTER Residential SUMI2010-010 | $18.81 | $6.38 | $25.19 | |
| CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND FORM WORK Building CARP0525-003 | $28.29 | $21.42 | $49.71 | |
| CARPENTER, INCLUDES FORM WORK Heavy CARP0525-006 | $28.29 | $21.42 | $49.71 | |
| CARPENTER: PILEDRIVER Highway CARP0004-005 (LIVINGSTON (TOWNSHIPS OF BRIGHTON, DEERFIELD, GENOA, HARTLAND, OCEOLA & TYRONE), MACOMB, MONROE, OAKLAND, SANILAC, ST. CLAIR AND WAYNE COUNTIES) | $41.37 | $28.69 | $70.06 | |
| CARPENTER: PILEDRIVER (REMAINDER OF STATE) Highway CARP0004-004 | $35.57 | $21.54 | $57.11 | |
| CEMENT MASON/CONCRETE FINISHER Residential SUMI2010-010 | $19.27 | $5.85 | $25.12 | |
| CEMENT MASON/CONCRETE FINISHER Heavy PLAS0016-020 | $22.31 | $12.83 | $35.14 | |
| CEMENT MASON/CONCRETE FINISHER Building SUMI2011-004 | $25.23 | $1.80 | $27.03 | |
| CEMENT MASON/CONCRETE FINISHER: ZONE 1 Highway PLAS0514-001 (ZONE 1: GENESEE, LIVINGSTON, MACOMB, MONROE, OAKLAND, SAGINAW, WASHTENAW AND WAYNE COUNTIES ZONE 2: ALCONA, ALGER, ALLEGAN, ALPENA, ANTRIM, ARENAC, BARAGA, BARRY, BAY, BENZIE, BERRIEN, BRANCH, CALHOUN, CASS, CHARLEVOIX, CHEBOYGAN, CHIPPEWA, CLARE, CLINTON, CRAWFORD, DELTA, DICKINSON, EATON, EMMET, GLADWIN, GOGEBIC, GRAND TRAVERSE, GRATIOT, HILLSDALE, HOUGHTON, HURON, INGHAM, IONIA, IOSCO, IRON, ISABELLA, JACKSON, KALAMAZOO, KALKASKA, KENT, KEWEENAW, LAK | $33.00 | $18.51 | $51.51 | |
| CEMENT MASON/CONCRETE FINISHER: ZONE 2 Highway PLAS0514-001 (ZONE 1: GENESEE, LIVINGSTON, MACOMB, MONROE, OAKLAND, SAGINAW, WASHTENAW AND WAYNE COUNTIES ZONE 2: ALCONA, ALGER, ALLEGAN, ALPENA, ANTRIM, ARENAC, BARAGA, BARRY, BAY, BENZIE, BERRIEN, BRANCH, CALHOUN, CASS, CHARLEVOIX, CHEBOYGAN, CHIPPEWA, CLARE, CLINTON, CRAWFORD, DELTA, DICKINSON, EATON, EMMET, GLADWIN, GOGEBIC, GRAND TRAVERSE, GRATIOT, HILLSDALE, HOUGHTON, HURON, INGHAM, IONIA, IOSCO, IRON, ISABELLA, JACKSON, KALAMAZOO, KALKASKA, KENT, KEWEENAW, LAK | $31.50 | $18.51 | $50.01 | |
| ELECTRICIAN Residential ELEC0445-004 | $18.00 | $7.44 | $25.44 | |
| ELECTRICIAN Heavy ELEC0445-007 | $41.00 | $25.74 | $66.74 | |
| ELECTRICIAN Building ELEC0445-011 | $41.00 | $25.74 | $66.74 | |
| FLAG PERSON Highway SUMI2002-001 | $10.10 | 0.00 | $10.10 | |
| INVOLVING A SWING STAGE, BOATSWAIN CHAIR OR SPIDER: PAINTER: ALL OTHER WORK, INCLUDING MAINTENANCE OF INDUSTRIAL PLANT Highway PAIN1803-003 (ALCONA, ALPENA, ANTRIM, ARENAC, BAY, BENZIE, CHARLEVOIX, CHEBOYGAN, CLARE, CRAWFORD, EMMET, GLADWIN, GRAND TRAVERSE, GRATIOT, IOSCO, ISABELLA, KALKASKA, LAKE, LEELANAU, MANISTEE, MASON, MIDLAND, MISSAUKEE, MONTMORENCY AND OGEMAW COUNTIES; OSCEOLA COUNTY (NORTH OF HWY. #10); OSCODA, OTSEGO, PRESQUE ISLE, ROSCOMMON, SAGINAW AND WEXFORD COUNTIES) FOOTNOTES: SPRAY PAINTING, SANDBLASTING, BLOWDOWN ASSOCIATED WITH SPRAYING AND BLASTING, WATER BLASTING AND WORK INSIDE TANKS, VESSELS, TANK TRAILERS, RAILROAD CARS, SEWERS, SMOKE STACKS, BOILERS OR OTHER SPACES HAVING LIMITED EGRESS NOT INCLUDING BUILDINGS, OPENTOP TANKS, PITS, ETC.: $1.25 PER HOUR ADDITIONAL | $29.35 | $19.05 | $48.40 | |
| IRONWORKER - PRE-ENGINEERED METAL BUILDING ERECTOR Highway IRON0008-007 (ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT COUNTIES) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY & CHRISTMAS DAY | $23.70 | $6.95 | $30.65 | |
| IRONWORKER - PRE-ENGINEERED METAL BUILDING ERECTOR Highway IRON0008-007 (ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT COUNTIES) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY & CHRISTMAS DAY | $23.70 | $6.95 | $30.65 | |
| IRONWORKER - PRE-ENGINEERED METAL BUILDING ERECTOR: BAY, GENESEE, LAPEER, LIVINGSTON Highway IRON0025-002 (EAST OF BURKHARDT ROAD), MACOMB, MIDLAND, OAKLAND, SAGINAW, ST. CLAIR, THE UNIVERSITY OF MICHIGAN, WASHTENAW (EAST OF U.S. 23) & WAYNE (ALCONA, ALPENA, ARENAC, BAY, CHEBOYGAN, CLARE, CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LIVINGSTON, MACOMB, MIDLAND, MONTMORENCY, OAKLAND, OGEMAW, OSCODA, OTSEGO, PRESQUE ISLE, ROSCOMMON, SAGINAW, SANILAC, SHIAWASSEE, S | $30.02 | $28.13 | $58.15 | |
| IRONWORKER - PRE-ENGINEERED METAL BUILDING ERECTOR: BAY, GENESEE, LAPEER, LIVINGSTON Highway IRON0025-002 (EAST OF BURKHARDT ROAD), MACOMB, MIDLAND, OAKLAND, SAGINAW, ST. CLAIR, THE UNIVERSITY OF MICHIGAN, WASHTENAW (EAST OF U.S. 23) & WAYNE (ALCONA, ALPENA, ARENAC, BAY, CHEBOYGAN, CLARE, CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LIVINGSTON, MACOMB, MIDLAND, MONTMORENCY, OAKLAND, OGEMAW, OSCODA, OTSEGO, PRESQUE ISLE, ROSCOMMON, SAGINAW, SANILAC, SHIAWASSEE, S | $30.02 | $28.13 | $58.15 | |
| IRONWORKER - PRE-ENGINEERED METAL BUILDING ERECTOR: IRONWORKER: ORNAMENTAL AND STRUCTURAL Highway IRON0025-002 (ALCONA, ALPENA, ARENAC, BAY, CHEBOYGAN, CLARE, CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LIVINGSTON, MACOMB, MIDLAND, MONTMORENCY, OAKLAND, OGEMAW, OSCODA, OTSEGO, PRESQUE ISLE, ROSCOMMON, SAGINAW, SANILAC, SHIAWASSEE, ST. CLAIR, TUSCOLA, WASHTENAW AND WAYNE COUNTIES:) | $36.55 | $35.93 | $72.48 | |
| IRONWORKER - PRE-ENGINEERED METAL BUILDING ERECTOR: IRONWORKER: ORNAMENTAL AND STRUCTURAL Highway IRON0025-002 (ALCONA, ALPENA, ARENAC, BAY, CHEBOYGAN, CLARE, CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LIVINGSTON, MACOMB, MIDLAND, MONTMORENCY, OAKLAND, OGEMAW, OSCODA, OTSEGO, PRESQUE ISLE, ROSCOMMON, SAGINAW, SANILAC, SHIAWASSEE, ST. CLAIR, TUSCOLA, WASHTENAW AND WAYNE COUNTIES:) | $36.55 | $35.93 | $72.48 | |
| IRONWORKER - PRE-ENGINEERED METAL BUILDING ERECTOR: IRONWORKER: REINFORCING Highway IRON0025-002 (ALCONA, ALPENA, ARENAC, BAY, CHEBOYGAN, CLARE, CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LIVINGSTON, MACOMB, MIDLAND, MONTMORENCY, OAKLAND, OGEMAW, OSCODA, OTSEGO, PRESQUE ISLE, ROSCOMMON, SAGINAW, SANILAC, SHIAWASSEE, ST. CLAIR, TUSCOLA, WASHTENAW AND WAYNE COUNTIES:) | $36.55 | $32.87 | $69.42 | |
| IRONWORKER - PRE-ENGINEERED METAL BUILDING ERECTOR: IRONWORKER: REINFORCING Highway IRON0025-002 (ALCONA, ALPENA, ARENAC, BAY, CHEBOYGAN, CLARE, CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LIVINGSTON, MACOMB, MIDLAND, MONTMORENCY, OAKLAND, OGEMAW, OSCODA, OTSEGO, PRESQUE ISLE, ROSCOMMON, SAGINAW, SANILAC, SHIAWASSEE, ST. CLAIR, TUSCOLA, WASHTENAW AND WAYNE COUNTIES:) | $36.55 | $32.87 | $69.42 | |
| IRONWORKER, ORNAMENTAL Building SUMI2011-004 | $18.48 | $7.93 | $26.41 | |
| IRONWORKER, STRUCTURAL Residential IRON0025-014 | $36.55 | $29.51 | $66.06 | |
| IRONWORKER: ALL OTHER WORK Highway IRON0055-005 (LENAWEE AND MONROE COUNTIES:) | $33.00 | $27.20 | $60.20 | |
| IRONWORKER: GENERAL CONTRACTS $10,000,000 OR GREATER Highway IRON0008-007 (ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT COUNTIES) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY & CHRISTMAS DAY | $39.91 | $32.32 | $72.23 | |
| IRONWORKER: GENERAL CONTRACTS $10,000,000 OR GREATER Highway IRON0008-007 (ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT COUNTIES) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY & CHRISTMAS DAY | $39.91 | $32.32 | $72.23 | |
| IRONWORKER: GENERAL CONTRACTS LESS THAN $10,000,000 Highway IRON0008-007 (ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT COUNTIES) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY & CHRISTMAS DAY | $39.91 | $32.32 | $72.23 | |
| IRONWORKER: GENERAL CONTRACTS LESS THAN $10,000,000 Highway IRON0008-007 (ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT COUNTIES) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY & CHRISTMAS DAY | $39.91 | $32.32 | $72.23 | |
| IRONWORKER: INCLUDING PRE-ENGINEERED METAL BUILDING ERECTOR (BERRIEN AND CASS COUNTIES:) Highway IRON0292-003 | $31.75 | $22.84 | $54.59 | |
| IRONWORKER: REINFORCING Heavy IRON0025-011 | $36.55 | $34.04 | $70.59 | |
| IRONWORKER: REINFORCING Building IRON0025-005 | $36.55 | $29.51 | $66.06 | |
| IRONWORKER: STRUCTURAL Heavy IRON0025-011 | $36.55 | $34.04 | $70.59 | |
| IRONWORKER: STRUCTURAL Building IRON0025-005 | $36.55 | $29.51 | $66.06 | |
| LABORER Heavy LABO0355-010 (COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - CEMENT/CONCRETE) (EXCLUDES OPEN CUT CONSTRUCTION) | $27.21 | $13.45 | $40.66 | |
| LABORER Building LABO0355-022 (COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; SANDBLASTER) | $27.21 | $13.45 | $40.66 | |
| LABORER ((1) COMMON OR GENERAL) Heavy LABO0334-007 | $22.42 | $12.95 | $35.37 | |
| LABORER ((2) MASON TENDER-CEMENT/CONCRETE) Heavy LABO0334-007 | $22.55 | $12.95 | $35.50 | |
| LABORER ((4) GRADE CHECKER) Heavy LABO0334-007 | $22.73 | $12.55 | $35.28 | |
| LABORER ((5) PIPELAYER) Heavy LABO0334-007 | $22.85 | $12.95 | $35.80 | |
| LABORER ((7) LANDSCAPER) Heavy LABO0334-007 | $18.41 | $12.95 | $31.36 | |
| LABORER, AREA 1: GROUP 1 Highway LABO0465-001 | $35.51 | $14.45 | $49.96 | |
| LABORER, AREA 1: GROUP 2 Highway LABO0465-001 | $31.96 | $14.45 | $46.41 | |
| LABORER, AREA 1: GROUP 3 Highway LABO0465-001 | $35.82 | $14.45 | $50.27 | |
| LABORER, AREA 1: GROUP 4 Highway LABO0465-001 | $35.90 | $14.45 | $50.35 | |
| LABORER, AREA 1: GROUP 5 Highway LABO0465-001 | $36.11 | $14.45 | $50.56 | |
| LABORER, AREA 1: GROUP 6 Highway LABO0465-001 | $36.41 | $14.45 | $50.86 | |
| LABORER, AREA 2: GROUP 1 Highway LABO0465-001 | $33.37 | $14.45 | $47.82 | |
| LABORER, AREA 2: GROUP 2 Highway LABO0465-001 | $30.03 | $14.45 | $44.48 | |
| LABORER, AREA 2: GROUP 3 Highway LABO0465-001 | $33.81 | $14.45 | $48.26 | |
| LABORER, AREA 2: GROUP 4 Highway LABO0465-001 | $34.16 | $14.45 | $48.61 | |
| LABORER, AREA 2: GROUP 5 Highway LABO0465-001 | $34.03 | $14.45 | $48.48 | |
| LABORER, AREA 2: GROUP 6 Highway LABO0465-001 | $34.37 | $14.45 | $48.82 | |
| LABORER, AREA 3: GROUP 1 Highway LABO0465-001 | $32.62 | $14.45 | $47.07 | |
| LABORER, AREA 3: GROUP 2 Highway LABO0465-001 | $33.83 | $14.45 | $48.28 | |
| LABORER, AREA 3: GROUP 3 Highway LABO0465-001 | $33.12 | $14.45 | $47.57 | |
| LABORER, AREA 3: GROUP 4 Highway LABO0465-001 | $33.56 | $14.45 | $48.01 | |
| LABORER, AREA 3: GROUP 5 Highway LABO0465-001 | $33.18 | $14.45 | $47.63 | |
| LABORER, AREA 3: GROUP 6 Highway LABO0465-001 | $33.61 | $14.45 | $48.06 | |
| LABORER, AREA 4: GROUP 1 Highway LABO0465-001 | $33.52 | $13.45 | $46.97 | |
| LABORER, AREA 4: GROUP 2 Highway LABO0465-001 | $33.73 | $13.45 | $47.18 | |
| LABORER, AREA 4: GROUP 3 Highway LABO0465-001 | $34.02 | $13.45 | $47.47 | |
| LABORER, AREA 4: GROUP 4 Highway LABO0465-001 | $34.46 | $13.45 | $47.91 | |
| LABORER, AREA 4: GROUP 5 Highway LABO0465-001 | $34.08 | $13.45 | $47.53 | |
| LABORER, AREA 4: GROUP 6 Highway LABO0465-001 | $34.51 | $13.45 | $47.96 | |
| LABORER: COMMON OR GENERAL Residential SUMI2010-010 | $16.87 | $5.46 | $22.33 | |
| LABORER: LANDSCAPE Residential SUMI2010-010 | $9.64 | $2.81 | $12.45 | |
| LABORER: LANDSCAPE & IRRIGATION Building SUMI2011-004 | $10.38 | $0.50 | $10.88 | |
| LABORER: MASON TENDER - CEMENT/CONCRETE Residential LABO0355-002 | $27.21 | $13.45 | $40.66 | |
| LABORER: PIPELAYER Residential SUMI2010-010 | $17.95 | $5.46 | $23.41 | |
| LABORERS - HAZARDOUS WASTE ABATEMENT: class a Highway LABO0005-006 Scope differs by code/WD | $17.64 | $12.90 | $30.54 | |
| LABORERS - HAZARDOUS WASTE ABATEMENT: class a Highway LABO0005-006 Scope differs by code/WD | $17.64 | $12.90 | $30.54 | |
| LABORERS - HAZARDOUS WASTE ABATEMENT: class a Highway LABO0005-006 Scope differs by code/WD | $17.64 | $12.90 | $30.54 | |
| LABORERS - HAZARDOUS WASTE ABATEMENT: class b Highway LABO0005-006 Scope differs by code/WD | $18.64 | $12.90 | $31.54 | |
| LABORERS - HAZARDOUS WASTE ABATEMENT: class b Highway LABO0005-006 Scope differs by code/WD | $18.64 | $12.90 | $31.54 | |
| LABORERS - HAZARDOUS WASTE ABATEMENT: class b Highway LABO0005-006 Scope differs by code/WD | $18.64 | $12.90 | $31.54 | |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, GENESEE, LAPEER AND SHIAWASSEE COUNTIES - ZONE 7 Highway LABO0005-006 (LEVELS A, B OR C) | $24.20 | $13.80 | $38.00 | |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, GENESEE, LAPEER AND SHIAWASSEE COUNTIES - ZONE 7 Highway LABO0005-006 (LEVELS A, B OR C) | $24.20 | $13.80 | $38.00 | |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, GENESEE, LAPEER AND SHIAWASSEE COUNTIES - ZONE 7 Highway LABO0005-006 (LEVELS A, B OR C) | $24.20 | $13.80 | $38.00 | |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, HILLSDALE, JACKSON AND LENAWEE COUNTIES - ZONE 4 Highway LABO0005-006 (LEVELS A, B OR C) | $27.13 | $14.95 | $42.08 | |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, HILLSDALE, JACKSON AND LENAWEE COUNTIES - ZONE 4 Highway LABO0005-006 (LEVELS A, B OR C) | $27.13 | $14.95 | $42.08 | |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, HILLSDALE, JACKSON AND LENAWEE COUNTIES - ZONE 4 Highway LABO0005-006 (LEVELS A, B OR C) | $27.13 | $14.95 | $42.08 | |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, MACOMB AND WAYNE COUNTIES - ZONE 1 (LEVELS A, B OR C) Highway LABO0005-006 Scope differs by code/WD | $29.93 | $16.90 | $46.83 | |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, MACOMB AND WAYNE COUNTIES - ZONE 1 (LEVELS A, B OR C) Highway LABO0005-006 Scope differs by code/WD | $29.93 | $16.90 | $46.83 | |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, MACOMB AND WAYNE COUNTIES - ZONE 1 (LEVELS A, B OR C) Highway LABO0005-006 Scope differs by code/WD | $29.93 | $16.90 | $46.83 | |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, MONROE COUNTY - ZONE 4 (LEVELS A, B OR C) Highway LABO0005-006 Scope differs by code/WD | $31.75 | $14.90 | $46.65 | |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, MONROE COUNTY - ZONE 4 (LEVELS A, B OR C) Highway LABO0005-006 Scope differs by code/WD | $31.75 | $14.90 | $46.65 | |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, MONROE COUNTY - ZONE 4 (LEVELS A, B OR C) Highway LABO0005-006 Scope differs by code/WD | $31.75 | $14.90 | $46.65 | |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, SANILAC AND ST. CLAIR COUNTIES - ZONE 5 (LEVELS A, B OR C) Highway LABO0005-006 Scope differs by code/WD | $26.21 | $16.62 | $42.83 | |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, SANILAC AND ST. CLAIR COUNTIES - ZONE 5 (LEVELS A, B OR C) Highway LABO0005-006 Scope differs by code/WD | $26.21 | $16.62 | $42.83 | |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, SANILAC AND ST. CLAIR COUNTIES - ZONE 5 (LEVELS A, B OR C) Highway LABO0005-006 Scope differs by code/WD | $26.21 | $16.62 | $42.83 | |
| LABORERS - OPEN CUT: GROUP 1 Highway LABO0334-001 (ZONE 4 - ALCONA, ALLEGAN, ALPENA, ANTRIM, ARENAC, BARRY, BAY, BENZIE, BERRIEN, BRANCH, CALHOUN, CASS, CHARLEVOIX, CHEBOYGAN, CLARE, CRAWFORD, EMMET, GLADWIN, GRAND TRAVERSE, GRATIOT AND HURON COUNTIES; IONIA COUNTY (EXCEPT THE CITY OF PORTLAND); IOSCO, ISABELLA, KALAMAZOO, KALKASKA, KENT, LAKE,LEELANAU, MANISTEE, MASON, MECOSTA, MIDLAND, MISSAUKEE, MONTCALM, MONTMORENCY, MUSKEGON, NEWAYGO, OCEANA, OGEMAW, OSCEOLA, OSCODA, OTSEGO, OTTAWA, PRESQUE ISLE, ROSCO | $28.72 | $18.45 | $47.17 | |
| LABORERS - OPEN CUT: GROUP 1 CONSTRUCTION LABORER Highway LABO0334-001 (ZONE 2 - LIVINGSTON COUNTY (EAST OF M-151 (OAK GROVE RD.)); MONROE AND WASHTENAW COUNTIES) SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, DEMOLITION AND REMOVAL OF CONCRETE AND UNDERGROUND APPURTENANCES, GRADING, PAVING, SEWERS, UTILITIES AND IMPROVEMENTS; RETENTION, OXIDATION, FLOCCULATION AND IRRIGATION FACILITIES, AND ALSO INCLUDING BUT NOT LIMITED TO UNDERGROUND PIPING, CONDUITS, STEEL SHEETING FOR UNDERGROUND CONSTRUCTION, AND ALL WORK INCIDENTAL THERETO, AND GENERAL EXCAVATION. FOR ALL AREAS EXCEPT THE UPPER PENINSULA, OPEN CUT CONSTRUCTION WORK SHALL ALSO BE CONSTRUED TO MEAN WATERFRONT WORK, PIERS, DOCKS, SEAWALLS, BREAKWALLS, MARINAS AND ALL INCIDENTAL WORK. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY STRUCTURAL MODIFICATIONS, ALTERATIONS, ADDITIONS AND REPAIRS TO BUILDINGS, OR HIGHWAY WORK, INCLUDING ROADS, STREETS, BRIDGE CONSTRUCTION AND PARKING LOTS OR STEEL ERECTION WORK AND EXCAVATION FOR THE BUILDING ITSELF AND BACK FILLING INSIDE OF AND WITHIN 5 FT. OF THE BUILDING AND FOUNDATIONS, FOOTINGS AND PIERS FOR THE BUILDING. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY WORK COVERED UNDER TUNNEL, SHAFT AND CAISSON WORK | $32.10 | $17.45 | $49.55 | |
| LABORERS - OPEN CUT: GROUP 1 CONSTRUCTION LABORER Highway LABO0334-001 (ZONE 3 - CLINTON, EATON, GENESEE, HILLSDALE AND INGHAM COUNTIES; IONIA COUNTY (CITY OF PORTLAND); JACKSON, LAPEER AND LENAWEE COUNTIES; LIVINGSTON COUNTY (WEST OF M-151 OAK GROVE RD.); SANILAC, ST. CLAIR AND SHIAWASSEE COUNTIES) SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, DEMOLITION AND REMOVAL OF CONCRETE AND UNDERGROUND APPURTENANCES, GRADING, PAVING, SEWERS, UTILITIES AND IMPROVEMENTS; RETENTION, OXIDATION, FLOCCULATION AND IRRIGATION FACILITIES, AND ALSO INCLUDING BUT NOT LIMITED TO UNDERGROUND PIPING, CONDUITS, STEEL SHEETING FOR UNDERGROUND CONSTRUCTION, AND ALL WORK INCIDENTAL THERETO, AND GENERAL EXCAVATION. FOR ALL AREAS EXCEPT THE UPPER PENINSULA, OPEN CUT CONSTRUCTION WORK SHALL ALSO BE CONSTRUED TO MEAN WATERFRONT WORK, PIERS, DOCKS, SEAWALLS, BREAKWALLS, MARINAS AND ALL INCIDENTAL WORK. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY STRUCTURAL MODIFICATIONS, ALTERATIONS, ADDITIONS AND REPAIRS TO BUILDINGS, OR HIGHWAY WORK, INCLUDING ROADS, STREETS, BRIDGE CONSTRUCTION AND PARKING LOTS OR STEEL ERECTION WORK AND EXCAVATION FOR THE BUILDING ITSELF AND BACK FILLING INSIDE OF AND WITHIN 5 FT. OF THE BUILDING AND FOUNDATIONS, FOOTINGS AND PIERS FOR THE BUILDING. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY WORK COVERED UNDER TUNNEL, SHAFT AND CAISSON WORK. . | $30.29 | $17.45 | $47.74 | |
| LABORERS - OPEN CUT: GROUP 1 CONSTRUCTION LABORER Highway LABO0334-001 (ZONE 1 - MACOMB, OAKLAND AND WAYNE COUNTIES) SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, DEMOLITION AND REMOVAL OF CONCRETE AND UNDERGROUND APPURTENANCES, GRADING, PAVING, SEWERS, UTILITIES AND IMPROVEMENTS; RETENTION, OXIDATION, FLOCCULATION AND IRRIGATION FACILITIES, AND ALSO INCLUDING BUT NOT LIMITED TO UNDERGROUND PIPING, CONDUITS, STEEL SHEETING FOR UNDERGROUND CONSTRUCTION, AND ALL WORK INCIDENTAL THERETO, AND GENERAL EXCAVATION. FOR ALL AREAS EXCEPT THE UPPER PENINSULA, OPEN CUT CONSTRUCTION WORK SHALL ALSO BE CONSTRUED TO MEAN WATERFRONT WORK, PIERS, DOCKS, SEAWALLS, BREAKWALLS, MARINAS AND ALL INCIDENTAL WORK. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY STRUCTURAL MODIFICATIONS, ALTERATIONS, ADDITIONS AND REPAIRS TO BUILDINGS, OR HIGHWAY WORK, INCLUDING ROADS, STREETS, BRIDGE CONSTRUCTION AND PARKING LOTS OR STEEL ERECTION WORK AND EXCAVATION FOR THE BUILDING ITSELF AND BACK FILLING INSIDE OF AND WITHIN 5 FT. OF THE BUILDING AND FOUNDATIONS, FOOTINGS AND PIERS FOR THE BUILDING. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY WORK COVERED UNDER TUNNEL, SHAFT AND CAISSON WORK | $29.98 | $22.75 | $52.73 | |
| LABORERS - OPEN CUT: GROUP 1 CONSTRUCTION LABORER Highway LABO0334-001 (ZONE 5 - ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC, MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT COUNTIES) SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, DEMOLITION AND REMOVAL OF CONCRETE AND UNDERGROUND APPURTENANCES, GRADING, PAVING, SEWERS, UTILITIES AND IMPROVEMENTS; RETENTION, OXIDATION, FLOCCULATION AND IRRIGATION FACILITIES, AND ALSO INCLUDING BUT NOT LIMITED TO UNDERGROUND PIPING, CONDUITS, STEEL SHEETING FOR UNDERGROUND CONSTRUCTION, AND ALL WORK INCIDENTAL THERETO, AND GENERAL EXCAVATION. FOR ALL AREAS EXCEPT THE UPPER PENINSULA, OPEN CUT CONSTRUCTION WORK SHALL ALSO BE CONSTRUED TO MEAN WATERFRONT WORK, PIERS, DOCKS, SEAWALLS, BREAKWALLS, MARINAS AND ALL INCIDENTAL WORK. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY STRUCTURAL MODIFICATIONS, ALTERATIONS, ADDITIONS AND REPAIRS TO BUILDINGS, OR HIGHWAY WORK, INCLUDING ROADS, STREETS, BRIDGE CONSTRUCTION AND PARKING LOTS OR STEEL ERECTION WORK AND EXCAVATION FOR THE BUILDING ITSELF AND BACK FILLING INSIDE OF AND WITHIN 5 FT. OF THE BUILDING AND FOUNDATIONS, FOOTINGS AND PIERS FOR THE BUILDING. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY WORK COVERED UNDER TUNNEL, SHAFT AND CAISSON WORK | $29.98 | $22.75 | $52.73 | |
| LABORERS - OPEN CUT: GROUP 2 Highway LABO0334-001 (ZONE 4 - ALCONA, ALLEGAN, ALPENA, ANTRIM, ARENAC, BARRY, BAY, BENZIE, BERRIEN, BRANCH, CALHOUN, CASS, CHARLEVOIX, CHEBOYGAN, CLARE, CRAWFORD, EMMET, GLADWIN, GRAND TRAVERSE, GRATIOT AND HURON COUNTIES; IONIA COUNTY (EXCEPT THE CITY OF PORTLAND); IOSCO, ISABELLA, KALAMAZOO, KALKASKA, KENT, LAKE,LEELANAU, MANISTEE, MASON, MECOSTA, MIDLAND, MISSAUKEE, MONTCALM, MONTMORENCY, MUSKEGON, NEWAYGO, OCEANA, OGEMAW, OSCEOLA, OSCODA, OTSEGO, OTTAWA, PRESQUE ISLE, ROSCO | $30.72 | $18.45 | $49.17 | |
| LABORERS - OPEN CUT: GROUP 3 Highway LABO0334-001 (ZONE 4 - ALCONA, ALLEGAN, ALPENA, ANTRIM, ARENAC, BARRY, BAY, BENZIE, BERRIEN, BRANCH, CALHOUN, CASS, CHARLEVOIX, CHEBOYGAN, CLARE, CRAWFORD, EMMET, GLADWIN, GRAND TRAVERSE, GRATIOT AND HURON COUNTIES; IONIA COUNTY (EXCEPT THE CITY OF PORTLAND); IOSCO, ISABELLA, KALAMAZOO, KALKASKA, KENT, LAKE,LEELANAU, MANISTEE, MASON, MECOSTA, MIDLAND, MISSAUKEE, MONTCALM, MONTMORENCY, MUSKEGON, NEWAYGO, OCEANA, OGEMAW, OSCEOLA, OSCODA, OTSEGO, OTTAWA, PRESQUE ISLE, ROSCO | $26.72 | $18.45 | $45.17 | |
| LABORERS - TUNNEL, SHAFT AND CAISSON: GROUP 1 Highway LABO0259-001 (AREA 2) | $32.13 | $17.95 | $50.08 | |
| LABORERS - TUNNEL, SHAFT AND CAISSON: GROUP 1 Highway LABO0259-001 (AREA 1) | $30.13 | $22.75 | $52.88 | |
| LABORERS - TUNNEL, SHAFT AND CAISSON: GROUP 2 Highway LABO0259-001 (AREA 2) | $34.40 | $17.95 | $52.35 | |
| LABORERS - TUNNEL, SHAFT AND CAISSON: GROUP 2 Highway LABO0259-001 (AREA 1) | $32.13 | $22.75 | $54.88 | |
| LABORERS - TUNNEL, SHAFT AND CAISSON: GROUP 3 Highway LABO0259-001 (AREA 2) | $28.00 | $17.45 | $45.45 | |
| LABORERS - TUNNEL, SHAFT AND CAISSON: GROUP 3 Highway LABO0259-001 (AREA 1) | $28.13 | $22.75 | $50.88 | |
| LANDSCAPE LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER AND SKIDSTEER (OR EQUIVALENT) Heavy LABO0334-012 | $29.93 | $9.10 | $39.03 | |
| LANDSCAPE LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER Heavy LABO0334-012 | $27.71 | $9.10 | $36.81 | |
| LINE CONSTRUCTION: GROUNDMAN/DRIVER Highway ELEC0017-005 | $33.32 | $18.40 | $51.72 | |
| LINE CONSTRUCTION: JOURNEYMAN SIGNAL TECH, COMMUNICATIONS TECH, TOWER TECH & FIBER OPTIC SPLICERS Highway ELEC0017-005 | $49.26 | $23.66 | $72.92 | |
| LINE CONSTRUCTION: JOURNEYMAN SPECIALIST JOURNEYMAN SPECIALIST: REFERS TO A CREW OF ONLY ONE PERSON WORKING ALONE Highway ELEC0017-005 | $56.65 | $26.09 | $82.74 | |
| LINE CONSTRUCTION: OPERATOR B OPERATOR B: SHALL BE PROFICIENT IN OPERATING ANY 2 OF THE ABOVE MENTIONED PIECES OF EQUIPMENT LISTED UNDER OPERATOR A Highway ELEC0017-005 | $38.98 | $20.26 | $59.24 | |
| LINE PROTECTOR Highway SUMI2002-001 (ZONE 2: STATEWIDE (EXCLUDING GENESEE, MACOMB, MONROE, OAKLAND, WASHTENAW AND WAYNE) | $25.03 | $14.45 | $39.48 | |
| LINE PROTECTOR Highway SUMI2002-001 (ZONE 1: GENESEE, MACOMB, MONROE, OAKLAND, WASHTENAW AND WAYNE) | $26.63 | $14.45 | $41.08 | |
| MILLWRIGHT Building CARP1102-001 | $40.04 | $26.47 | $66.51 | |
| OPERATOR: BACKHOE/EXCAVATOR Residential SUMI2010-010 | $19.94 | $5.46 | $25.40 | |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER Residential SUMI2010-010 | $17.66 | $7.65 | $25.31 | |
| OPERATOR: BULLDOZER Building SUMI2011-004 | $19.68 | $6.64 | $26.32 | |
| OPERATOR: COMPACTOR Building SUMI2011-004 | $17.68 | $6.70 | $24.38 | |
| OPERATOR: CRANE Heavy SUMI2010-051 | $25.26 | $5.00 | $30.26 | |
| OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 2 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK Heavy ENGI0326-005 (OVER 20' LIFT) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. SWING BOOM TRUCK OPERATOR OVER 12 TONS-$.50 PER HOUR | $41.32 | $25.25 | $66.57 | |
| OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 3 BOOM TRUCK Heavy ENGI0326-005 (NON-SWINGING) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. SWING BOOM TRUCK OPERATOR OVER 12 TONS-$.50 PER HOUR | $41.32 | $25.25 | $66.57 | |
| OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 4 FORK TRUCK Heavy ENGI0326-005 (20' LIFT AND UNDER FOR MASONRY WORK) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. SWING BOOM TRUCK OPERATOR OVER 12 TONS-$.50 PER HOUR | $35.46 | $25.25 | $60.71 | |
| OPERATOR: POWER EQUIPMENT, SEWER RELINING: GROUP 1 Highway ENGI0324-008 (ALCONA, ALGER, ALLEGAN, ALPENA, ANTRIM, ARENAC, BARAGA, BARRY, BAY, BENZIE, BERRIEN, BRANCH, CALHOUN, CASS, CHARLEVOIX, CHEBOYGAN, CHIPPEWA, CLARE, CLINTON, CRAWFORD, DELTA, DICKINSON, EATON, EMMET, GENESEE, GLADWIN, GOGEBIC, GRAND TRAVERSE, GRATIOT, HILLSDALE, HOUGHTON, HURON, INGHAM, IONIA, IOSCO, IRON, ISABELLA, JACKSON, KALAMAZOO, KALKASKA, KENT, KEWEENAW, LAKE, LAPEER, LEELANAU, LENAWEE, LIVINGSTON, LUCE, MACKINAC, MACOMB, MANISTEE, MAR | $37.37 | $15.44 | $52.81 | |
| OPERATOR: POWER EQUIPMENT, SEWER RELINING: GROUP 2 Highway ENGI0324-008 (ALCONA, ALGER, ALLEGAN, ALPENA, ANTRIM, ARENAC, BARAGA, BARRY, BAY, BENZIE, BERRIEN, BRANCH, CALHOUN, CASS, CHARLEVOIX, CHEBOYGAN, CHIPPEWA, CLARE, CLINTON, CRAWFORD, DELTA, DICKINSON, EATON, EMMET, GENESEE, GLADWIN, GOGEBIC, GRAND TRAVERSE, GRATIOT, HILLSDALE, HOUGHTON, HURON, INGHAM, IONIA, IOSCO, IRON, ISABELLA, JACKSON, KALAMAZOO, KALKASKA, KENT, KEWEENAW, LAKE, LAPEER, LEELANAU, LENAWEE, LIVINGSTON, LUCE, MACKINAC, MACOMB, MANISTEE, MAR | $35.33 | $15.44 | $50.77 | |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: COMPRESSOR, WELDER AND FORKLIFT Highway ENGI0324-007 (ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT COUNTIES:) | $43.30 | $25.00 | $68.30 | |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: CRANE OPERATOR, MAIN BOOM & JIB 120' OR LONGER Highway ENGI0324-007 (ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT COUNTIES:) | $49.77 | $25.00 | $74.77 | |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: CRANE OPERATOR, MAIN BOOM & JIB 140' OR LONGER Highway ENGI0324-007 (ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT COUNTIES:) | $50.07 | $24.60 | $74.67 | |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: CRANE OPERATOR, MAIN BOOM & JIB 220' OR LONGER Highway ENGI0324-007 (ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT COUNTIES:) | $50.66 | $25.00 | $75.66 | |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 1 Highway ENGI0324-004 (AREA 2) | $55.02 | $28.25 | $83.27 | |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 1 Highway ENGI0324-004 (AREA 1) | $55.02 | $28.25 | $83.27 | |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 1- ENGINEER WHEN OPERATING COMBINATION OF BOOM AND JIB 400' OR LONGER Highway ENGI0324-003 (ALCONA, ALPENA, ARENAC, BAY, CHEBOYGAN, CLARE, CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LENAWEE, LIVINGSTON, MACOMB, MIDLAND, MONROE, MONTMORENCY, OAKLAND, OGEMAW, OSCODA, OTSEGO, PRESQUE ISLE, ROSCOMMON, SAGINAW, ST. CLAIR, SANILAC, SHIAWASSEE, TUSCOLA, WASHTENAW AND WAYNE COUNTIES:) FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $55.42 | $28.25 | $83.67 | |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 10- TOWER CRANE & DERRICK OPERATOR Highway ENGI0324-003 (WHERE OPERATOR'S WORK STATION IS 50 FT. OR MORE ABOVE FIRST SUB-LEVEL) ON A CRANE THAT REQUIRES AN OILER (ALCONA, ALPENA, ARENAC, BAY, CHEBOYGAN, CLARE, CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LENAWEE, LIVINGSTON, MACOMB, MIDLAND, MONROE, MONTMORENCY, OAKLAND, OGEMAW, OSCODA, OTSEGO, PRESQUE ISLE, ROSCOMMON, SAGINAW, ST. CLAIR, SANILAC, SHIAWASSEE, TUSCOLA, WASHTENAW AND WAYNE COUNTIES:) FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $52.70 | $28.25 | $80.95 | |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 11- ENGINEER WHEN OPERATING COMBINATION OF BOOM AND JIB 120' OR LONGER Highway ENGI0324-003 (ALCONA, ALPENA, ARENAC, BAY, CHEBOYGAN, CLARE, CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LENAWEE, LIVINGSTON, MACOMB, MIDLAND, MONROE, MONTMORENCY, OAKLAND, OGEMAW, OSCODA, OTSEGO, PRESQUE ISLE, ROSCOMMON, SAGINAW, ST. CLAIR, SANILAC, SHIAWASSEE, TUSCOLA, WASHTENAW AND WAYNE COUNTIES:) FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $50.97 | $28.25 | $79.22 | |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 13- CRANE OPERATOR; JOB MECHANIC AND 3 DRUM HOIST AND EXCAVATOR Highway ENGI0324-003 (ALCONA, ALPENA, ARENAC, BAY, CHEBOYGAN, CLARE, CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LENAWEE, LIVINGSTON, MACOMB, MIDLAND, MONROE, MONTMORENCY, OAKLAND, OGEMAW, OSCODA, OTSEGO, PRESQUE ISLE, ROSCOMMON, SAGINAW, ST. CLAIR, SANILAC, SHIAWASSEE, TUSCOLA, WASHTENAW AND WAYNE COUNTIES:) FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $50.61 | $28.25 | $78.86 | |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 14- CRANE OPERATOR ON A CRANE THAT REQUIRES AN OILER Highway ENGI0324-003 (ALCONA, ALPENA, ARENAC, BAY, CHEBOYGAN, CLARE, CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LENAWEE, LIVINGSTON, MACOMB, MIDLAND, MONROE, MONTMORENCY, OAKLAND, OGEMAW, OSCODA, OTSEGO, PRESQUE ISLE, ROSCOMMON, SAGINAW, ST. CLAIR, SANILAC, SHIAWASSEE, TUSCOLA, WASHTENAW AND WAYNE COUNTIES:) FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $51.61 | $28.25 | $79.86 | |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 15- HOISTING OPERATOR; 2 DRUM HOIST AND RUBBER TIRED BACKHOE Highway ENGI0324-003 (ALCONA, ALPENA, ARENAC, BAY, CHEBOYGAN, CLARE, CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LENAWEE, LIVINGSTON, MACOMB, MIDLAND, MONROE, MONTMORENCY, OAKLAND, OGEMAW, OSCODA, OTSEGO, PRESQUE ISLE, ROSCOMMON, SAGINAW, ST. CLAIR, SANILAC, SHIAWASSEE, TUSCOLA, WASHTENAW AND WAYNE COUNTIES:) FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $49.97 | $28.25 | $78.22 | |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 16- FORKLIFT AND 1 DRUM HOIST Highway ENGI0324-003 (ALCONA, ALPENA, ARENAC, BAY, CHEBOYGAN, CLARE, CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LENAWEE, LIVINGSTON, MACOMB, MIDLAND, MONROE, MONTMORENCY, OAKLAND, OGEMAW, OSCODA, OTSEGO, PRESQUE ISLE, ROSCOMMON, SAGINAW, ST. CLAIR, SANILAC, SHIAWASSEE, TUSCOLA, WASHTENAW AND WAYNE COUNTIES:) FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $46.77 | $28.25 | $75.02 | |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 17- COMPRESSOR OR WELDER OPERATOR Highway ENGI0324-003 (ALCONA, ALPENA, ARENAC, BAY, CHEBOYGAN, CLARE, CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LENAWEE, LIVINGSTON, MACOMB, MIDLAND, MONROE, MONTMORENCY, OAKLAND, OGEMAW, OSCODA, OTSEGO, PRESQUE ISLE, ROSCOMMON, SAGINAW, ST. CLAIR, SANILAC, SHIAWASSEE, TUSCOLA, WASHTENAW AND WAYNE COUNTIES:) FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $32.29 | $15.40 | $47.69 | |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 18- OILER Highway ENGI0324-003 (ALCONA, ALPENA, ARENAC, BAY, CHEBOYGAN, CLARE, CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LENAWEE, LIVINGSTON, MACOMB, MIDLAND, MONROE, MONTMORENCY, OAKLAND, OGEMAW, OSCODA, OTSEGO, PRESQUE ISLE, ROSCOMMON, SAGINAW, ST. CLAIR, SANILAC, SHIAWASSEE, TUSCOLA, WASHTENAW AND WAYNE COUNTIES:) FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $35.78 | $28.25 | $64.03 | |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 2 Highway ENGI0324-004 (AREA 2) | $52.15 | $28.25 | $80.40 | |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 2 Highway ENGI0324-004 (AREA 1) | $52.15 | $28.25 | $80.40 | |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 3 Highway ENGI0324-004 (AREA 2) | $50.61 | $28.25 | $78.86 | |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 3 Highway ENGI0324-004 (AREA 1) | $50.61 | $28.25 | $78.86 | |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 3- ENGINEER WHEN OPERATING COMBINATION OF BOOM AND JIB 300' OR LONGER Highway ENGI0324-003 (ALCONA, ALPENA, ARENAC, BAY, CHEBOYGAN, CLARE, CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LENAWEE, LIVINGSTON, MACOMB, MIDLAND, MONROE, MONTMORENCY, OAKLAND, OGEMAW, OSCODA, OTSEGO, PRESQUE ISLE, ROSCOMMON, SAGINAW, ST. CLAIR, SANILAC, SHIAWASSEE, TUSCOLA, WASHTENAW AND WAYNE COUNTIES:) FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $53.92 | $28.25 | $82.17 | |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 4 Highway ENGI0324-004 (AREA 2) | $46.77 | $28.25 | $75.02 | |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 4 Highway ENGI0324-004 (AREA 1) | $46.77 | $28.25 | $75.02 | |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 5 Highway ENGI0324-004 (AREA 2) | $32.29 | $15.40 | $47.69 | |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 5 Highway ENGI0324-004 (AREA 1) | $32.29 | $15.40 | $47.69 | |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 5- ENGINEER WHEN OPERATING COMBINATION OF BOOM AND JIB 220' OR LONGER Highway ENGI0324-003 (ALCONA, ALPENA, ARENAC, BAY, CHEBOYGAN, CLARE, CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LENAWEE, LIVINGSTON, MACOMB, MIDLAND, MONROE, MONTMORENCY, OAKLAND, OGEMAW, OSCODA, OTSEGO, PRESQUE ISLE, ROSCOMMON, SAGINAW, ST. CLAIR, SANILAC, SHIAWASSEE, TUSCOLA, WASHTENAW AND WAYNE COUNTIES:) FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $52.42 | $28.25 | $80.67 | |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 6 Highway ENGI0324-004 (AREA 2) | $35.78 | $28.25 | $64.03 | |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 6 Highway ENGI0324-004 (AREA 1) | $35.78 | $28.25 | $64.03 | |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 7- ENGINEER WHEN OPERATING COMBINATION OF BOOM AND JIB 140' OR LONGER Highway ENGI0324-003 (ALCONA, ALPENA, ARENAC, BAY, CHEBOYGAN, CLARE, CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LENAWEE, LIVINGSTON, MACOMB, MIDLAND, MONROE, MONTMORENCY, OAKLAND, OGEMAW, OSCODA, OTSEGO, PRESQUE ISLE, ROSCOMMON, SAGINAW, ST. CLAIR, SANILAC, SHIAWASSEE, TUSCOLA, WASHTENAW AND WAYNE COUNTIES:) FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $52.15 | $28.25 | $80.40 | |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 9- TOWER CRANE & DERRICK OPERATOR Highway ENGI0324-003 (WHERE OPERATOR'S WORK STATION IS 50 FT. OR MORE ABOVE FIRST SUB-LEVEL) (ALCONA, ALPENA, ARENAC, BAY, CHEBOYGAN, CLARE, CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LENAWEE, LIVINGSTON, MACOMB, MIDLAND, MONROE, MONTMORENCY, OAKLAND, OGEMAW, OSCODA, OTSEGO, PRESQUE ISLE, ROSCOMMON, SAGINAW, ST. CLAIR, SANILAC, SHIAWASSEE, TUSCOLA, WASHTENAW AND WAYNE COUNTIES:) FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $51.70 | $28.25 | $79.95 | |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: MECHANIC WITH TRUCK AND TOOLS Highway ENGI0324-007 (ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT COUNTIES:) | $48.90 | $25.00 | $73.90 | |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: OILER AND FIREMAN Highway ENGI0324-007 (ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT COUNTIES:) | $41.76 | $25.00 | $66.76 | |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: REGULAR OPERATOR Highway ENGI0324-007 (ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT COUNTIES:) | $47.12 | $25.00 | $72.12 | |
| OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 1 (AREA 1:) Highway ENGI0324-005 | $45.98 | $25.25 | $71.23 | |
| OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 1 (AREA 2:) Highway ENGI0324-005 | $45.98 | $25.25 | $71.23 | |
| OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 2 (AREA 1:) Highway ENGI0324-005 | $41.25 | $25.25 | $66.50 | |
| OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 2 (AREA 2:) Highway ENGI0324-005 | $41.25 | $25.25 | $66.50 | |
| OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 3 (AREA 1:) Highway ENGI0324-005 | $40.52 | $25.25 | $65.77 | |
| OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 3 (AREA 2:) Highway ENGI0324-005 | $40.52 | $25.25 | $65.77 | |
| OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 4 (AREA 1:) Highway ENGI0324-005 | $39.95 | $25.25 | $65.20 | |
| OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 4 (AREA 2:) Highway ENGI0324-005 | $39.95 | $25.25 | $65.20 | |
| OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 5 (AREA 1:) Highway ENGI0324-005 | $30.35 | $12.10 | $42.45 | |
| OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 5 (AREA 2:) Highway ENGI0324-005 | $30.35 | $12.10 | $42.45 | |
| OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK Building ENGI0324-002 (OVER 20' LIFT) 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 | |
| OPERATOR: POWER EQUIPMENT: GROUP 5 BOOM TRUCK Building ENGI0324-002 (NON-SWINGING) FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 | |
| OPERATOR: POWER EQUIPMENT: GROUP 6 FORK TRUCK Building ENGI0324-002 (20' LIFT AND UNDER FOR MASONRY WORK) FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.37 | $25.25 | $58.62 | |
| OPERATOR: TRACTOR Building SUMI2011-004 | $19.10 | $8.48 | $27.58 | |
| PAINTER Highway PAIN0022-002 (HILLSDALE, JACKSON AND LENAWEE COUNTIES; LIVINGSTON COUNTY (EAST OF THE EASTERN CITY LIMITS OF HOWELL, NOT INCLUDING THE CITY OF HOWELL, NORTH TO THE GENESEE COUNTY LINE AND SOUTH TO THE WASHTENAW COUNTY LINE); MACOMB, MONROE, OAKLAND, WASHTENAW AND WAYNE COUNTIES) FOOTNOTES: FOR ALL SPRAY WORK AND JOURNEYMAN RIGGING FOR SPRAY WORK, ALSO BLOWING OFF, $0.80 PER HOUR ADDITIONAL (APPLIES ONLY TO WORKERS DOING RIGGING FOR SPRAY WORK ON OFF THE FLOOR WORK. DOES NOT INCLUDE SETTING UP OR MOVING RIGGING ON FLOOR SURFACES, NOR DOES IT APPLY TO WORKERS ENGAGED IN COVERING UP OR TENDING SPRAY EQUIPMENT. FOR ALL SANDBLASTING AND SPRAY WORK PERFORMED ON HIGHWAY BRIDGES, OVERPASSES, TANKS OR STEEL, $0.80 PER HOUR ADDITIONAL. FOR ALL BRUSHING, CLEANING AND OTHER PREPARATORY WORK (OTHER THAN SPRAYING OR STEEPLEJACK WORK) AT SCAFFOLD HEIGHTS OF FIFTY (50) FEET FROM THE GROUND OR HIGHER, $0.50 PER HOUR ADDITIONAL. FOR ALL PREPARATORIAL WORK AND PAINTING PERFORMED ON OPEN STEEL UNDER FORTY (40) FEET WHEN NO SCAFFOLDING IS INVOLVED, $0.50 PER HOUR ADDITIONAL. FOR ALL SWING STAGE WORK-WINDOW JACKS AND WINDOW BELTS-EXTERIOR AND INTERIOR, $0.50 PER HOUR ADDITIONAL. FOR ALL SPRAY WORK AND SANDBLASTER WORK TO A SCAFFOLD HEIGHT OF FORTY (40) FEET ABOVE THE FLOOR LEVEL, $0.80 PER HOUR ADDITIONAL. FOR ALL PREPARATORIAL WORK AND PAINTING ON ALL HIGHWAY BRIDGES OR OVERPASSES UP TO FORTY (40) FEET IN HEIGHT, $0.50 PER HOUR ADDITIONAL. FOR ALL STEEPLEJACK WORK PERFORMED WHERE THE ELEVATION IS FORTY (40) FEET OR MORE, $1.25 PER HOUR ADDITIONAL | $25.06 | $14.75 | $39.81 | |
| PAINTER Highway PAIN0845-003 (CLINTON COUNTY; EATON COUNTY (DOES NOT INCLUDE THE TOWNSHIPS OF BELLEVUE AND OLIVET); INGHAM COUNTY; IONIA COUNTY (EAST OF HWY. M 66); LIVINGSTON COUNTY (WEST OF THE EASTERN CITY LIMITS OF HOWELL, INCLUDING THE CITY OF HOWELL, NORTH TO THE GENESEE COUNTY LINE AND SOUTH TO THE WASHTENAW COUNTY LINE); AND SHIAWASSEE COUNTY (TOWNSHIPS OF BENNINGTON, LAINGSBURY AND PERRY)) | $25.49 | $13.74 | $39.23 | |
| PAINTER Highway PAIN0845-015 (MUSKEGON COUNTY; NEWAYGO COUNTY (EXCEPT THE TOWNSHIPS OF BARTON, BIG PRAIRIE, BROOKS, CROTON, ENSLEY, EVERETT, GOODWELL, GRANT, HOME, MONROE, NORWICH AND WILCOX); OCEANA COUNTY; OTTAWA COUNTY (EXCEPT THE TOWNSHIPS OF ALLENDALE, BLENDONE, CHESTER, GEORGETOWN, HOLLAND, JAMESTOWN, OLIVE, PARK, POLKTON, PORT SHELDON, TALLMADGE, WRIGHT AND ZEELAND):) | $25.49 | $13.74 | $39.23 | |
| PAINTER Highway PAIN0845-018 (ALLEGAN COUNTY (TOWNSHIPS OF DORR, FILLMORE, HEATH, HOPKINS, LAKETOWN, LEIGHTON, MANLIUS, MONTEREY, OVERISEL, SALEM, SAUGATUCK AND WAYLAND); IONIA COUNTY (WEST OF HWY. M-66); KENT, MECOSTA AND MONTCALM COUNTIES; NEWAYGO COUNTY (TOWNSHIPS OF BARTON, BIG PRAIRIE, BROOKS, CROTON, ENSLEY, EVERETT, GOODWELL, GRANT, HOME, MONROE, NORWICH AND WILCOX); OSCEOLA COUNTY (SOUTH OF HWY. #10); OTTAWA COUNTY (TOWNSHIPS OF ALLENDALE, BLENDONE, CHESTER, GEORGETOWN, HOLLAND, JAMESTOWN, OLIVE, PARK, POLK | $25.49 | $13.74 | $39.23 | |
| PAINTER Highway PAIN1011-003 (ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC, MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT COUNTIES) FOOTNOTES: HIGH PAY (BRIDGES, OVERPASSES, WATERTOWER): 30 TO 80 FT.: $.65 PER HOUR ADDITIONAL. 80 FT. AND OVER: $1.30 PER HOUR ADDITIONAL | $24.66 | $14.99 | $39.65 | |
| PAINTER Highway PAIN1474-002 (HURON COUNTY; LAPEER COUNTY (EAST OF HWY. M-53); ST. CLAIR, SANILAC AND TUSCOLA COUNTIES) ADDITIONAL. WORK WITH ANY HAZARDOUS MATERIAL: $1.00 PER HOUR ADDITIONAL. SANDBLASTING, STEAM CLEANING AND ACID CLEANING: $1.00 PER HOUR ADDITIONAL. LADDER WORK AT OR ABOVE 40 FT., SCAFFOLD WORK AT OR ABOVE 40 FT., SWING STAGE, BOATSWAIN CHAIR, WINDOW JACKS AND ALL WORK PERFORMED OVER A FALLING HEIGHT OF 40 FT.: $1.00 PER HOUR ADDITIONAL. SPRAY GUN WORK, PICK PULLERS AND THOSE HANDLING NEEDLES, BLOWING OFF BY AIR PRESSURE, AND ANY PERSON RIGGING (SETTING UP AND MOVING OFF THE GROUND): $1.00 PER HOUR ADDITIONAL. STEEPLEJACK, TANKS, GAS HOLDERS, STACKS, FLAG POLES, RADIO TOWERS AND BEACONS, POWER LINE TOWERS, BRIDGES, ETC.: $1.00 PER HOUR ADDITIONAL, PAID FROM THE GROUND UP | $23.79 | $12.02 | $35.81 | |
| PAINTER: BRUSH & ROLLER Heavy PAIN0312-014 | $21.75 | $11.94 | $33.69 | |
| PAINTER: BRUSH AND ROLLER Highway PAIN0312-001 (EXCLUDES: ALLEGAN COUNTY (TOWNSHIPS OF DORR, FILLMORE, HEATH, HOPKINS, LAKETOWN, LEIGHTON, MANLIUS, MONTEREY, OVERISEL, SALEM, SAUGATUCK AND WAYLAND); INCLUDES: BARRY, BERRIEN, BRANCH, CALHOUN, CASS, HILLSDALE, KALAMAZOO, ST. JOSEPH, VAN BUREN) | $23.74 | $13.35 | $37.09 | |
| PAINTER: BRUSH AND ROLLER Residential PAIN0312-011 | $21.75 | $11.94 | $33.69 | |
| PAINTER: BRUSH AND ROLLER Building PAIN0845-013 Scope differs by code/WD | $27.07 | $16.46 | $43.53 | |
| PAINTER: BRUSH AND ROLLER Building PAIN0845-013 Scope differs by code/WD | $27.07 | $16.46 | $43.53 | |
| PAINTER: DRYWALL FINISHING/TAPING Building PAIN0845-013 Scope differs by code/WD | $27.32 | $16.72 | $44.04 | |
| PAINTER: DRYWALL FINISHING/TAPING Building PAIN0845-013 Scope differs by code/WD | $27.32 | $16.72 | $44.04 | |
| PAINTER: SPRAY Heavy PAIN0312-014 | $22.75 | $11.94 | $34.69 | |
| PAINTER: SPRAY Building PAIN0845-013 Scope differs by code/WD | $27.07 | $16.56 | $43.63 | |
| PAINTER: SPRAY Building PAIN0845-013 Scope differs by code/WD | $27.07 | $16.56 | $43.63 | |
| PAINTER: SPRAY, SANDBLAST, SIGN PAINTING Highway PAIN0312-001 (EXCLUDES: ALLEGAN COUNTY (TOWNSHIPS OF DORR, FILLMORE, HEATH, HOPKINS, LAKETOWN, LEIGHTON, MANLIUS, MONTEREY, OVERISEL, SALEM, SAUGATUCK AND WAYLAND); INCLUDES: BARRY, BERRIEN, BRANCH, CALHOUN, CASS, HILLSDALE, KALAMAZOO, ST. JOSEPH, VAN BUREN) | $24.94 | $13.35 | $38.29 | |
| PAVEMENT MARKING MACHINE: GROUP 2 ZONE 1: GENESEE, MACOMB, MONROE, OAKLAND, WASHTENAW AND WAYNE Highway SUMI2002-001 | $31.96 | $14.45 | $46.41 | |
| PAVEMENT MARKING MACHINE: GROUP 2 ZONE 2: STATEWIDE Highway SUMI2002-001 (EXCLUDING GENESEE, MACOMB, MONROE, OAKLAND, WASHTENAW AND WAYNE) | $30.03 | $14.45 | $44.48 | |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) Residential PLUM0333-014 | $31.35 | $22.90 | $54.25 | |
| PLASTERER Building PLAS0016-007 | $21.18 | $12.43 | $33.61 | |
| PLUMBER Heavy PLUM0333-007 | $38.79 | $23.08 | $61.87 | |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION Residential SUMI2010-010 | $26.17 | $7.55 | $33.72 | |
| PLUMBER/PIPEFITTER - GAS DISTRIBUTION PIPELINE:: ALL OTHER WORK: Highway PLUM0190-003 (ALCONA, ALGER, ALLEGAN, ALPENA, ANTRIM, ARENAC, BARAGA, BARRY, BAY, BENZIE, BERRIEN, BRANCH, CALHOUN, CASS, CHARLEVOIX, CHEBOYGAN, CHIPPEWA, CLARE, CLINTON, CRAWFORD, DELTA, DICKINSON, EATON, EMMET, GENESEE, GLADWIN, GOGEBIC, GRAND TRAVERSE, GRATIOT, HILLSDALE, HOUGHTON, HURON, INGHAM, IONIA, IOSCO, IRON, ISABELLA, JACKSON, KALAMAZOO, KALKASKA, KENT, KEWEENAW, LAKE, LAPEER, LEELANAU, LENAWEE, LIVINGSTON, LUCE, MACKINAC, MACOMB, | $24.19 | $12.28 | $36.47 | |
| PLUMBER/PIPEFITTER - GAS DISTRIBUTION PIPELINE:: WELDING IN CONJUNCTION WITH GAS DISTRIBUTION PIPELINE WORK Highway PLUM0190-003 (ALCONA, ALGER, ALLEGAN, ALPENA, ANTRIM, ARENAC, BARAGA, BARRY, BAY, BENZIE, BERRIEN, BRANCH, CALHOUN, CASS, CHARLEVOIX, CHEBOYGAN, CHIPPEWA, CLARE, CLINTON, CRAWFORD, DELTA, DICKINSON, EATON, EMMET, GENESEE, GLADWIN, GOGEBIC, GRAND TRAVERSE, GRATIOT, HILLSDALE, HOUGHTON, HURON, INGHAM, IONIA, IOSCO, IRON, ISABELLA, JACKSON, KALAMAZOO, KALKASKA, KENT, KEWEENAW, LAKE, LAPEER, LEELANAU, LE | $33.03 | $20.19 | $53.22 | |
| POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION Heavy ENGI0325-013 (INCLUDING SEWER): GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 | $65.77 | |
| POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION Heavy ENGI0325-013 (INCLUDING SEWER): GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 | |
| POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION Heavy ENGI0325-013 (INCLUDING SEWER): GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, GRADER/ BLADE, LOADER, ROLLER, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 | |
| POWER EQUIPMENT OPERATOR: Underground Construction Heavy ENGI0325-013 (Including Sewer)- GROUP 4 : BROOM/ SWEEPER, FORK TRUCK, TRACTOR, BOBCAT/ SKID STEER /SKID LOADER | $39.95 | $25.25 | $65.20 | |
| POWER EQUIPMENT OPERATORS - GAS DISTRIBUTION AND DUCT INSTALLATION WORK: GROUP 1 BACKHOE, CRANE, GRADER, MECHANIC, DOZER Highway ENGI0325-012 (D-6 EQUIVALENT OR LARGER), SIDE BOOM (D-4 EQUIVALENT OR LARGER), TRENCHER(EXCEPT SERVICE), ENDLOADER (2 YD. CAPACITY OR GREATER). SCOPE OF WORK: THE CONSTRUCTION, INSTALLATION, TREATING AND RECONDITIONING OF PIPELINES TRANSPORTING GAS VAPORS WITHIN CITIES, TOWNS, SUBDIVISIONS, SUBURBAN AREAS, OR WITHIN PRIVATE PROPERTY BOUNDARIES, UP TO AND INCLUDING PRIVATE METER SETTINGS OF PRIVATE INDUSTRIAL, GOVERNMENTAL OR OTHER PREMISES, MORE COMMONLY REFERRED TO AS ""DISTRIBUTION WORK,"" STARTING FROM THE FIRST METERING STATION, CONNECTION, SIMILAR OR RELATED FACILITY, OF THE MAIN OR CROSS COUNTRY PIPELINE AND INCLUDING DUCT INSTALLATION | $39.78 | $25.25 | $65.03 | |
| POWER EQUIPMENT OPERATORS - GAS DISTRIBUTION AND DUCT INSTALLATION WORK: GROUP 2 DOZER Highway ENGI0325-012 (LESS THAN D-6 EQUIVALENT), ENDLOADER (UNDER 2 YD. CAPACITY), SIDE BOOM (UNDER D-4 CAPACITY), BACKFILLER, PUMPS (1 OR 2 OF 6-INCH DISCHARGE OR GREATER), BOOM TRUCK (WITH POWERED BOOM), TRACTOR (WHEEL TYPE OTHER THAN BACKHOE OR FRONT ENDLOADER). TAMPER (SELF-PROPELLED), BOOM TRUCK (WITH NON-POWERED BOOM), CONCRETE SAW (20 HP OR LARGER), PUMPS (2 TO 4 UNDER 6-INCH DISCHARGE), COMPRESSOR (2 OR MORE OR WHEN ONE IS USED CONTINUOUSLY INTO THE SECOND DAY) AND TRENCHER(SERVICE). OILER, HYDRAULIC PIPE PUSHING MACHINE, GREASE PERSON AND HYDROSTATIC TESTING OPERATOR. SCOPE OF WORK: THE CONSTRUCTION, INSTALLATION, TREATING AND RECONDITIONING OF PIPELINES TRANSPORTING GAS VAPORS WITHIN CITIES, TOWNS, SUBDIVISIONS, SUBURBAN AREAS, OR WITHIN PRIVATE PROPERTY BOUNDARIES, UP TO AND INCLUDING PRIVATE METER SETTINGS OF PRIVATE INDUSTRIAL, GOVERNMENTAL OR OTHER PREMISES, MORE COMMONLY REFERRED TO AS ""DISTRIBUTION WORK,"" STARTING FROM THE FIRST METERING STATION, CONNECTION, SIMILAR OR RELATED FACILITY, OF THE MAIN OR CROSS COUNTRY PIPELINE AND INCLUDING DUCT INSTALLATION | $36.05 | $25.25 | $61.30 | |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1 Building SHEE0007-004 (AREA 2: LEVEL D WHEN CAPPING LANDFILL) | $42.74 | $21.53 | $64.27 | |
| POWER EQUIPMENT OPERATORS:, AIRPORT, BRIDGE & HIGHWAY CONSTRUCTION: GROUP 1 Highway ENGI0324-006 (GENESEE, MACOMB, MONROE, OAKLAND, WASHTENAW, WAYNE, ALCONA, ALGER, ALLEGAN, ALPENA, ANTRIM, ARENAC, BARAGA, BARRY, BAY, BENZIE, BERRIEN, BRANCH, CALHOUN, CASS, CHARLEVOIX, CHEBOYGAN, CHIPPEWA, CLARE, CLINTON, CRAWFORD, DELTA, DICKINSON, EATON, EMMET, GLADWIN, GOGEBIC, GRAND TRAVERSE, GRATIOT, HILLSDALE, HOUGHTON, HURON, INGHAM, IONIA, IOSCO, IRON, ISABELLA, JACKSON, KALAMAZOO, KALKASKA, KENT, KEWEENAW, LAKE, LAPEE | $46.21 | $25.25 | $71.46 | |
| POWER EQUIPMENT OPERATORS:, AIRPORT, BRIDGE & HIGHWAY CONSTRUCTION: GROUP 2 Highway ENGI0324-006 (GENESEE, MACOMB, MONROE, OAKLAND, WASHTENAW, WAYNE, ALCONA, ALGER, ALLEGAN, ALPENA, ANTRIM, ARENAC, BARAGA, BARRY, BAY, BENZIE, BERRIEN, BRANCH, CALHOUN, CASS, CHARLEVOIX, CHEBOYGAN, CHIPPEWA, CLARE, CLINTON, CRAWFORD, DELTA, DICKINSON, EATON, EMMET, GLADWIN, GOGEBIC, GRAND TRAVERSE, GRATIOT, HILLSDALE, HOUGHTON, HURON, INGHAM, IONIA, IOSCO, IRON, ISABELLA, JACKSON, KALAMAZOO, KALKASKA, KENT, KEWEENAW, LAKE, LAPEE | $45.06 | $25.25 | $70.31 | |
| POWER EQUIPMENT OPERATORS:, AIRPORT, BRIDGE & HIGHWAY CONSTRUCTION: GROUP 3 Highway ENGI0324-006 (GENESEE, MACOMB, MONROE, OAKLAND, WASHTENAW, WAYNE, ALCONA, ALGER, ALLEGAN, ALPENA, ANTRIM, ARENAC, BARAGA, BARRY, BAY, BENZIE, BERRIEN, BRANCH, CALHOUN, CASS, CHARLEVOIX, CHEBOYGAN, CHIPPEWA, CLARE, CLINTON, CRAWFORD, DELTA, DICKINSON, EATON, EMMET, GLADWIN, GOGEBIC, GRAND TRAVERSE, GRATIOT, HILLSDALE, HOUGHTON, HURON, INGHAM, IONIA, IOSCO, IRON, ISABELLA, JACKSON, KALAMAZOO, KALKASKA, KENT, KEWEENAW, LAKE, LAPEE | $38.33 | $25.25 | $63.58 | |
| POWER EQUIPMENT OPERATORS:, AIRPORT, BRIDGE & HIGHWAY CONSTRUCTION: GROUP 4 Highway ENGI0324-006 (GENESEE, MACOMB, MONROE, OAKLAND, WASHTENAW, WAYNE, ALCONA, ALGER, ALLEGAN, ALPENA, ANTRIM, ARENAC, BARAGA, BARRY, BAY, BENZIE, BERRIEN, BRANCH, CALHOUN, CASS, CHARLEVOIX, CHEBOYGAN, CHIPPEWA, CLARE, CLINTON, CRAWFORD, DELTA, DICKINSON, EATON, EMMET, GLADWIN, GOGEBIC, GRAND TRAVERSE, GRATIOT, HILLSDALE, HOUGHTON, HURON, INGHAM, IONIA, IOSCO, IRON, ISABELLA, JACKSON, KALAMAZOO, KALKASKA, KENT, KEWEENAW, LAKE, LAPEE | $37.77 | $25.25 | $63.02 | |
| ROOFER Residential ROOF0070-016 | $33.98 | $18.51 | $52.49 | |
| ROOFER Building ROOF0070-002 | $33.98 | $18.51 | $52.49 | |
| SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION Residential SHEE0007-023 | $32.00 | $10.73 | $42.73 | |
| SIGN INSTALLER GROUP 1 (AREA 1) Highway TEAM0247-004 | $21.78 | $11.83 | $33.61 | |
| SIGN INSTALLER GROUP 1 (AREA 2) Highway TEAM0247-004 | $22.03 | $11.83 | $33.86 | |
| SPRINKLER FITTER (FIRE SPRINKLERS) Building SFMI0669-001 | $41.34 | $27.39 | $68.73 | |
| TILE FINISHER Building BRMI0009-031 | $26.24 | $21.13 | $47.37 | |
| TILE SETTER Building BRMI0009-031 | $27.35 | $22.20 | $49.55 | |
| TRUCK DRIVER EUCLIDS, DOUBLE BOTTOMS AND LOWBOYS Highway TEAM0007-004 (AREA 2) | $33.65 | $0.75 | $34.40 | |
| TRUCK DRIVER EUCLIDS, DOUBLE BOTTOMS AND LOWBOYS Highway TEAM0007-004 (AREA 1) | $33.55 | $0.75 | $34.30 | |
| TRUCK DRIVER TRUCKS UNDER 8 CU. YDS. (AREA 1) Highway TEAM0007-004 | $33.40 | $0.75 | $34.15 | |
| TRUCK DRIVER TRUCKS UNDER 8 CU. YDS. (AREA 2) Highway TEAM0007-004 | $33.50 | $0.75 | $34.25 | |
| TRUCK DRIVER TRUCKS, 8 CU. YDS. AND OVER (AREA 1) Highway TEAM0007-004 | $33.40 | $0.75 | $34.15 | |
| TRUCK DRIVER TRUCKS, 8 CU. YDS. AND OVER (AREA 2) Highway TEAM0007-004 | $33.50 | $0.75 | $34.25 | |
| TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK Building SUMI2011-004 | $17.26 | $11.42 | $28.68 | |
| TRUCK DRIVER, UNDERGROUND CONSTRUCTION: GROUP 1 Highway TEAM0247-010 (AREA 2) | $24.12 | $19.04 | $43.16 | |
| TRUCK DRIVER, UNDERGROUND CONSTRUCTION: GROUP 1 Highway TEAM0247-010 (AREA 1) | $23.82 | $19.04 | $42.86 | |
| TRUCK DRIVER, UNDERGROUND CONSTRUCTION: GROUP 2 Highway TEAM0247-010 (AREA 2) | $24.26 | $19.04 | $43.30 | |
| TRUCK DRIVER, UNDERGROUND CONSTRUCTION: GROUP 2 Highway TEAM0247-010 (AREA 1) | $23.91 | $19.04 | $42.95 | |
| TRUCK DRIVER, UNDERGROUND CONSTRUCTION: GROUP 3 Highway TEAM0247-010 (AREA 2) | $24.45 | $19.04 | $43.49 | |
| TRUCK DRIVER, UNDERGROUND CONSTRUCTION: GROUP 3 Highway TEAM0247-010 (AREA 1) | $24.12 | $19.04 | $43.16 | |
| TRUCK DRIVER: DUMP TRUCK Residential SUMI2010-010 | $17.00 | $5.71 | $22.71 | |
| TRUCK DRIVER: DUMP TRUCK Heavy SUMI2010-051 | $18.00 | $6.43 | $24.43 | |
| TRUCK DRIVER: LOWBOY TRUCK Building SUMI2011-004 | $14.50 | $0.44 | $14.94 | |
| TRUCK DRIVER: LOWBOY/SEMI-TRAILER TRUCK DAILY Heavy TEAM0007-011 | $33.55 | $0.75 | $34.30 | |
| TRUCK DRIVER: OFF THE ROAD TRUCK Heavy SUMI2010-051 | $20.82 | $3.69 | $24.51 | |
| TRUCK DRIVER: TRACTOR HAUL TRUCK Building SUMI2011-004 | $13.57 | $1.18 | $14.75 | |
| TRUCK DRIVER: TRACTOR HAUL TRUCK FOOTNOTE: A. $470.70 PER WEEK. B. $68.70 DAILY Heavy TEAM0007-011 | $33.30 | $0.75 | $34.05 |
No trade rates match your search and filter selection.
Highway
Applies to
Alcona, Alger, Allegan, Alpena, Antrim, Arenac, Baraga, Barry, Bay, Benzie +73 more
Residential
Heavy
Building