Midland County in Michigan.

1 wage determination 43 trade rates

Popular Trades In Midland County in Michigan.

Trade Rates

Click any row to save it for later

Same trade names can appear multiple times when classification codes or coverage language differ. Compare the code badge, any italic scope text, and WD reference to identify the right line.
Trade & Classification Rate Fringe Total
ASBESTOS WORKER/HEAT & FROST INSULATOR Building
SUMI2011-063
$16.19 $4.53 $20.72
BOILERMAKER Building
BOIL0169-002
$43.50 $37.64 $81.14
BRICKLAYER Building
SUMI2011-063
$21.43 $5.72 $27.15
CARPENTER Building
CARP0706-022 (Acoustical Ceiling Installation and Metal Stud Installation)
$35.86 $23.69 $59.55
CARPENTER Building
SUMI2011-063 (Drywall Hanging Only)
$18.98 0.00 $18.98
CARPENTER (Form Work Only) Building
SUMI2011-063
$20.00 $1.22 $21.22
CARPENTER, Excludes Acoustical Ceiling Installation, Drywall Hanging, Form Work, and Metal Stud Installation Building
SUMI2011-063
$20.38 $4.88 $25.26
CEMENT MASON/CONCRETE FINISHER Building
PLAS0016-039
$25.47 $12.38 $37.85
ELECTRICIAN Building
ELEC0557-005 (Excludes Low Voltage Wiring)
$39.50 $10.00 $49.50
ELECTRICIAN Building
ELEC0692-023 (Excludes Low Voltage Wiring)
$40.00 $10.18 $50.18
FLOOR LAYER: Carpet Building
SUMI2011-063
$19.27 $7.57 $26.84
GLAZIER Building
SUMI2011-063
$16.95 $4.74 $21.69
GROUP 2 Building
ENGI0324-022
$43.93 $25.25 $69.18
GROUP 3 Building
ENGI0324-022
$41.28 $25.25 $66.53
GROUP 4 Building
ENGI0324-022
$39.57 $25.25 $64.82
GROUP 5 Building
ENGI0324-022
$33.71 $25.25 $58.96
GROUP 6 Building
ENGI0324-022
$31.23 $25.25 $56.48
IRONWORKER REINFORCING Building
IRON0025-003
$36.55 $33.37 $69.92
IRONWORKER, STRUCTURAL Building
SUMI2011-063
$19.75 $11.54 $31.29
LABORER Common or General; Mason Tender - Cement/Concrete; and Pipelayer Building
LABO1098-032
$27.68 $13.45 $41.13
LABORER: Landscape & Irrigation Building
SUMI2011-063
$12.84 0.00 $12.84
LABORER: Mason Tender - Brick Building
SUMI2011-063
$14.25 $3.89 $18.14
MILLWRIGHT Building
CARP1102-003
$42.92 $39.13 $82.05
OPERATOR: Bulldozer Building
SUMI2011-063
$22.34 $1.22 $23.56
OPERATOR: Grader/Blade Building
SUMI2011-063
$24.04 $6.03 $30.07
OPERATOR: Power Equipment GROUP 1 Building
ENGI0324-022
$47.28 $25.25 $72.53
OPERATOR: Roller Building
SUMI2011-063
$28.02 $7.07 $35.09
OPERATOR: Tractor Building
SUMI2011-063
$19.60 $7.31 $26.91
PAINTER: Brush, Roller and Spray Building
PAIN1803-001
$29.23 $19.11 $48.34
PAINTER: Drywall Finishing/Taping Building
PAIN1803-001
$30.22 $22.22 $52.44
PIPEFITTER Building
PLUM0085-004 (Excludes HVAC Pipe and System Installation)
$45.50 $21.75 $67.25
PIPEFITTER Building
PLUM0085-004 (HVAC Pipe Installation Only)
$45.50 $21.75 $67.25
PLASTERER Building
PLAS0016-039
$26.32 $12.88 $39.20
PLUMBER Building
PLUM0085-004 (Excluding HVAC Pipe and System Installation)
$43.50 $22.10 $65.60
ROOFER Building
SUMI2011-063
$15.73 $7.41 $23.14
Sandblaster Building
LABO1098-032
$28.21 $13.45 $41.66
SHEET METAL WORKER Building
SHEE0007-020 (HVAC Duct & System Installation)
$26.83 $23.78 $50.61
SHEET METAL WORKER, Excludes HVAC Duct and Unit Installation Building
SUMI2011-063
$17.57 $11.51 $29.08
SPRINKLER FITTER Building
SFMI0669-003 (Fire Sprinklers)
$41.34 $27.39 $68.73
STRUCTURAL Building
IRON0025-003 (Metal Building Erection Only)
$30.02 $27.43 $57.45
TILE SETTER Building
BRMI0009-021
$31.43 $21.13 $52.56
TRUCK DRIVER, Includes Dump and Tandem Truck Building
SUMI2011-063
$15.65 $3.12 $18.77
TRUCK DRIVER: Flatbed Truck Building
SUMI2011-063
$14.40 $2.31 $16.71

Wage Determinations