PA20260080
rev 2Building
0 trades
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Click any row to save it for later
| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL Building ASBE0023-008 (Duct, Pipe & Mechanical System Insulation) | $40.00 | $29.81 | $69.81 |
| Bobcat/Skid Steer/Skid Loader, Drill, Gradall, Grader/Blade, Paver Building ENGI0066-041 (Asphalt, Aggregate, and Concrete) | $36.87 | $21.32 | $58.19 |
| BOILERMAKER Building BOIL0154-003 | $48.28 | $33.17 | $81.45 |
| BRICKLAYER Building BRPA0009-044 (Including Pointing, Caulking, Cleaning) | $34.14 | $22.00 | $56.14 |
| CARPENTER Building CARP0423-007 (Scaffold Building and Floor Laying-Hardwood Only) | $33.01 | $18.09 | $51.10 |
| CARPENTER Building CARP0423-008 (Includes Acoustical Ceiling Installation, Batt Insulation, Drywall Hanging, Metal Stud Installation, Floor Laying-Carpet and Vinyl, Form Work and Gutter Installation; Excludes Scaffold Building and Floor Laying-Hardwood Floors.) | $33.01 | $18.09 | $51.10 |
| CEMENT MASON/CONCRETE FINISHER Building PLAS0526-015 | $31.77 | $21.89 | $53.66 |
| ELECTRICIAN Building ELEC0005-014 (Includes Alarm Installation, Installation of Sound and Communication System and Low Voltage Wiring; Excludes HVAC Temperature Control Installation) | $49.11 | $36.79 | $85.90 |
| ELECTRICIAN Building SUPA2011-038 (HVAC/Temperature Controls Installation Only) | $34.86 | $18.55 | $53.41 |
| GLAZIER Building PAIN0751-002 | $25.40 | $25.47 | $50.87 |
| Hoist, Pump Building ENGI0066-041 | $29.70 | $21.32 | $51.02 |
| IRONWORKER Ornamental, Reinforcing, Rigger, Structural Building IRON0003-022 | $38.89 | $34.54 | $73.43 |
| LABORER (Mason Tender-Brick) Building LABO0824-002 | $29.56 | $17.05 | $46.61 |
| LABORER Mason Tender - Cement/Concrete Building LABO0125-005 | $30.24 | $12.05 | $42.29 |
| LABORER: Common or General Building SUPA2011-038 | $17.53 | $10.02 | $27.55 |
| MASON - STONE Building BRPA0009-044 | $34.14 | $22.00 | $56.14 |
| MILLWRIGHT Building CARP0443-004 | $43.00 | $23.44 | $66.44 |
| Oiler Building ENGI0066-041 | $29.70 | $21.32 | $51.02 |
| OPERATOR: Forklift, All Types Building SUPA2011-038 | $23.69 | $13.13 | $36.82 |
| PAINTER Building PAIN0057-035 (Brush, Roller, and Spray Only) | $30.56 | $23.72 | $54.28 |
| PAINTER Building PAIN0057-035 (Drywall Finishing/Taping Only) | $32.39 | $23.26 | $55.65 |
| PIPEFITTER Building PLUM0520-018 | $41.36 | $29.45 | $70.81 |
| PLASTERER Building PLAS0526-025 | $29.20 | $12.86 | $42.06 |
| PLUMBER Building SUPA2011-038 (HVAC Pipe Installation Only) | $30.44 | $18.73 | $49.17 |
| PLUMBER (Industrial) Building PLUM0354-009 | $47.75 | $26.55 | $74.30 |
| PLUMBER, Excludes HVAC Pipe Installation and Work on Industrial Sites Building SUPA2011-038 | $30.14 | $18.83 | $48.97 |
| POWER EQUIPMENT OPERATOR Backhoe/Excavator/Trackhoe, Bulldozer, Crane* Loader, Mechanic Building ENGI0066-041 | $36.87 | $21.32 | $58.19 |
| Roller Building ENGI0066-041 | $32.25 | $21.32 | $53.57 |
| ROOFER, Excludes Waterproofing Building SUPA2011-038 | $33.50 | $20.66 | $54.16 |
| ROOFER: Waterproofing Only Building SUPA2011-038 | $29.50 | $21.10 | $50.60 |
| SHEET METAL WORKER Building SHEE0012-012 (HVAC Duct Installation Only) | $39.50 | $30.79 | $70.29 |
| SHEET METAL WORKER, Excludes HVAC Duct Installation Building SUPA2011-038 | $31.38 | $19.73 | $51.11 |
| TILE FINISHER Building BRPA0009-011 | $28.76 | $17.16 | $45.92 |
| TILE SETTER Building BRPA0009-011 | $35.64 | $21.63 | $57.27 |
| TRUCK DRIVER: Dump Truck Building SUPA2011-038 | $23.36 | $7.60 | $30.96 |
No trade rates match your search and filter selection.
Building