| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL Building ASBE0023-008 (Duct, Pipe & Mechanical System Insulation) | $40.00 | $29.81 | $69.81 |
| BOILERMAKER Building BOIL0013-008 | $55.00 | $35.48 | $90.48 |
| BRICKLAYER Building BRPA0005-062 (Including Pointing, Caulking, and Cleaning) | $33.99 | $16.87 | $50.86 |
| BRICKLAYER Residential BRPA0001-018 | $45.45 | $30.16 | $75.61 |
| CARPENTER Building CARP0287-011 (Including Drywall Hanging, Metal Stud Installation, Form Work and Scaffold Building) | $36.84 | $20.19 | $57.03 |
| CARPENTER Residential CARP0167-005 | $45.13 | $29.04 | $74.17 |
| CEMENT MASON/CONCRETE FINISHER Building SUPA2011-060 | $23.69 | $16.56 | $40.25 |
| ELECTRICIAN Building ELEC0143-010 (Includes Alarm Installation, Installation of Sound and Communication Systems, HVAC/Temperature Controls Installation, and Low Voltage Wiring) | $40.00 | $27.42 | $67.42 |
| ELEVATOR MECHANIC Building ELEV0059-004 | $58.70 | $38.44 | $97.14 |
| FLOOR LAYER: Carpet Only Building SUPA2011-060 | $25.71 | $12.02 | $37.73 |
| GLAZIER Building SUPA2011-060 | $25.05 | $8.58 | $33.63 |
| Hoist Building ENGI0542-032 (Single Drum), Forklift (under 20 ft., excludes masonry work) | $41.88 | $30.03 | $71.91 |
| Hoist Building ENGI0542-032 (With Two Towers), Forklift (20 ft and over, excludes masonry work) | $44.61 | $30.83 | $75.44 |
| IRONWORKER, STRUCTURAL, REINFORCING AND ORNAMENTAL Building IRON0404-022 | $37.26 | $32.63 | $69.89 |
| LABORER Common or General Residential LABO0413-011 | $39.10 | $26.69 | $65.79 |
| LABORER Concrete Worker Building LABO1180-016 | $24.61 | $17.18 | $41.79 |
| LABORER: Common/General, Including Landscaping Building SUPA2011-060 | $20.19 | $8.45 | $28.64 |
| LABORER: Forklift Building SUPA2011-060 (Masonry Work Only) | $24.31 | $8.49 | $32.80 |
| LABORER: Mason Tender - Cement/Concrete Building SUPA2011-060 | $17.89 | $8.28 | $26.17 |
| Mason Tender- Brick Building LABO1180-016 | $26.91 | $17.18 | $44.09 |
| MILLWRIGHT Building CARP0443-003 | $43.00 | $23.44 | $66.44 |
| Oiler Building ENGI0542-032 | $39.42 | $29.30 | $68.72 |
| OPERATOR: Backhoe/Excavator/Trackhoe Building SUPA2011-060 | $38.35 | $18.48 | $56.83 |
| OPERATOR: Backhoe/Excavator/Trackhoe Residential ENGI0542-010 | $50.80 | $28.89 | $79.69 |
| OPERATOR: OPERATOR: Bobcat/Skid Steer/Skid Loader Building SUPA2011-060 | $26.41 | $16.58 | $42.99 |
| OPERATOR: OPERATOR: Drill Building SUPA2011-060 | $27.43 | $16.94 | $44.37 |
| OPERATOR: OPERATOR: Gradall Building SUPA2011-060 | $32.70 | $18.43 | $51.13 |
| OPERATOR: OPERATOR: Grader/Blade Building SUPA2011-060 | $32.51 | $17.98 | $50.49 |
| OPERATOR: OPERATOR: Hydro Mulch Building SUPA2011-060 | $26.41 | $16.58 | $42.99 |
| OPERATOR: OPERATOR: Loader Building SUPA2011-060 | $27.05 | $14.52 | $41.57 |
| OPERATOR: OPERATOR: Paver Building SUPA2011-060 (Asphalt, Aggregate, and Concrete) | $30.39 | $15.05 | $45.44 |
| OPERATOR: PAINTER: Spray Only Building SUPA2011-060 | $27.89 | $13.53 | $41.42 |
| OPERATOR: PLUMBER Building SUPA2011-060 (HVAC Unit Installation Only) | $27.02 | $13.02 | $40.04 |
| OPERATOR: ROOFER: Waterproofing Only Building SUPA2011-060 | $28.60 | $18.02 | $46.62 |
| OPERATOR: SHEET METAL WORKER, Excludes HVAC Duct Installation Building SUPA2011-060 | $28.66 | $25.92 | $54.58 |
| OPERATOR: TILE FINISHER Building SUPA2011-060 | $20.70 | $8.51 | $29.21 |
| OPERATOR: TILE SETTER Building SUPA2011-060 | $24.30 | $11.79 | $36.09 |
| OPERATOR: TRUCK DRIVER: Dump Truck Building SUPA2011-060 | $20.86 | $4.84 | $25.70 |
| PAINTER: Brush and Roller Only Building PAIN0411-005 | $25.84 | $16.30 | $42.14 |
| PAINTER: Brush and Roller Only Residential PAIN0021-010 | $25.84 | $16.30 | $42.14 |
| PIPEFITTER Building PLUM0520-023 (Excludes HVAC Pipe Installation) | $43.35 | $29.56 | $72.91 |
| PLUMBER Building PLUM0520-024 (Includes HVAC Pipe Installation, Exludes HVAC Unit Installation) | $43.35 | $29.56 | $72.91 |
| PLUMBER Residential PLUM0690-013 | $64.73 | $37.21 | $101.94 |
| POWER EQUIPMENT OPERATOR Crane Building ENGI0542-032 | $47.14 | $31.58 | $78.72 |
| POWER EQUIPMENT OPERATOR Mechanic Building ENGI0066-044 | $36.87 | $21.32 | $58.19 |
| Pump Building ENGI0066-044 | $32.25 | $21.32 | $53.57 |
| ROOFER Building ROOF0030-014 (Excludes Waterproofing) | $40.33 | $32.62 | $72.95 |
| ROOFER Residential ROOF0030-015 | $31.25 | $21.75 | $53.00 |
| SHEET METAL WORKER Building SHEE0019-017 (HVAC Duct Installation Only) | $45.02 | $44.09 | $89.11 |
| SPRINKLER FITTER Building SFPA0669-004 (Fire Sprinklers) | $49.75 | $30.26 | $80.01 |
No trade rates match your search and filter selection.