MI20260125
rev 0Building
0 trades
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Click any row to save it for later
| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR Building ASBE0047-005 | $40.00 | $23.65 | $63.65 |
| BOILERMAKER Building BOIL0169-002 | $43.50 | $37.64 | $81.14 |
| BRICKLAYER Building BRMI0009-018 | $35.14 | $24.20 | $59.34 |
| CARPENTER Building CARP0706-011 (Excluding Acoustical Ceiling Installation, Drywall Hanging, Form Work, Metal Stud Installation, and Soft Floor Layer - Carpet) | $35.86 | $23.69 | $59.55 |
| CARPENTER Building CARP0706-019 (Acoustical Ceiling Installation, Form Work, Metal Stud Installation, and Lather Drywall Hanging) | $35.86 | $23.69 | $59.55 |
| CARPENTER Building SUMI2011-050 (Floor Laying-Carpet Only) | $19.59 | $7.57 | $27.16 |
| CEMENT MASON/CONCRETE FINISHER Building PLAS0016-038 | $25.47 | $12.38 | $37.85 |
| ELECTRICIAN Building ELEC0058-005 (Excludes Low Voltage Wiring) | $51.32 | $28.44 | $79.76 |
| ELECTRICIAN Building ELEC0058-005 (Low Voltage Wiring Only) Installer | $30.12 | $14.57 | $44.69 |
| GLAZIER Building SUMI2011-050 | $16.95 | $4.74 | $21.69 |
| GROUP 2 Building ENGI0324-022 | $43.93 | $25.25 | $69.18 |
| GROUP 3 Building ENGI0324-022 | $41.28 | $25.25 | $66.53 |
| GROUP 4 Building ENGI0324-022 | $39.57 | $25.25 | $64.82 |
| GROUP 5 Building ENGI0324-022 | $33.71 | $25.25 | $58.96 |
| GROUP 6 Building ENGI0324-022 | $31.23 | $25.25 | $56.48 |
| IRONWORKER, REINFORCING Building IRON0025-010 | $36.55 | $33.37 | $69.92 |
| IRONWORKER, STRUCTURAL Building IRON0025-009 (Metal Building Erection Only) | $30.02 | $27.43 | $57.45 |
| IRONWORKER, STRUCTURAL Building IRON0025-010 Scope differs by code/WD | $36.55 | $35.93 | $72.48 |
| LABORER Common or General; Mason Tender - Brick; Mason Tender - Cement/Concrete; and Pipelayer Building LABO1098-031 | $26.20 | $13.45 | $39.65 |
| LABORER: Landscape & Irrigation Building SUMI2011-050 | $12.84 | 0.00 | $12.84 |
| MILLWRIGHT Building CARP1102-003 | $42.92 | $39.13 | $82.05 |
| OPERATOR: Bulldozer Building SUMI2011-050 | $22.34 | $1.22 | $23.56 |
| OPERATOR: Grader/Blade Building SUMI2011-050 | $24.04 | $6.03 | $30.07 |
| OPERATOR: Power Equipment GROUP 1 Building ENGI0324-022 | $47.28 | $25.25 | $72.53 |
| OPERATOR: Roller Building SUMI2011-050 | $28.02 | $7.07 | $35.09 |
| OPERATOR: Tractor Building SUMI2011-050 | $19.60 | $7.31 | $26.91 |
| PAINTER: Brush, Roller and Spray Building PAIN1474-007 | $23.79 | $12.02 | $35.81 |
| PAINTER: Drywall Finishing/Taping Building PAIN1474-007 | $23.79 | $12.02 | $35.81 |
| PIPEFITTER Building PLUM0085-008 (Excludes HVAC Pipe and System Installation) | $45.50 | $21.75 | $67.25 |
| PIPEFITTER Building PLUM0085-008 (HVAC Pipe Installation Only) | $45.50 | $21.75 | $67.25 |
| PIPEFITTER Building PLUM0636-005 (Includes HVAC Pipe Installation; Excludes HVAC System Installation) | $41.96 | $40.85 | $82.81 |
| PLASTERER Building BRMI0009-018 | $33.09 | $26.58 | $59.67 |
| PLUMBER Building PLUM0085-008 (Excluding HVAC Pipe and System Installation) | $43.50 | $22.10 | $65.60 |
| PLUMBER Building PLUM0098-006 (Excluding HVAC Pipe & System Installation) | $36.69 | $32.74 | $69.43 |
| ROOFER Building SUMI2011-050 | $15.73 | $7.41 | $23.14 |
| Sandblaster Building LABO1098-031 | $26.73 | $13.45 | $40.18 |
| SHEET METAL WORKER Building SHEE0007-021 (Excluding HVAC Duct & System Installation) | $26.83 | $23.78 | $50.61 |
| SHEET METAL WORKER Building SHEE0007-021 (HVAC Duct & System Installation) | $26.83 | $23.78 | $50.61 |
| SPRINKLER FITTER Building SFMI0669-003 (Fire Sprinklers) | $41.34 | $27.39 | $68.73 |
| Technician Building ELEC0058-005 | $37.62 | $14.80 | $52.42 |
| TILE SETTER Building BRMI0009-018 | $31.43 | $21.13 | $52.56 |
| TRUCK DRIVER, Includes Dump and Tandem Truck Building SUMI2011-050 | $15.65 | $3.12 | $18.77 |
| TRUCK DRIVER: Flatbed Truck Building SUMI2011-050 | $16.80 | $3.97 | $20.77 |
No trade rates match your search and filter selection.
Building