| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| Arapahoe Highway SUCO2011-001 | $18.70 | $3.85 | $22.55 |
| Arapahoe, Broomfield, Clear Creek, Elbert, Gilpin Highway SUCO2011-001 Scope differs by code/WD | $16.67 | $4.27 | $20.94 |
| Arapahoe, Broomfield, Clear Creek, Elbert, Gilpin Highway SUCO2011-001 Scope differs by code/WD | $16.96 | $4.04 | $21.00 |
| Arapahoe, Broomfield, Clear Creek, Elbert, Gilpin, Jefferson Highway SUCO2011-001 | $16.69 | $5.45 | $22.14 |
| Arapahoe, Broomfield, Clear Creek, Elbert, Gilpin, Jefferson, Park Highway SUCO2011-001 Scope differs by code/WD | $19.27 | $5.08 | $24.35 |
| Arapahoe, Broomfield, Clear Creek, Elbert, Gilpin, Jefferson, Park Highway SUCO2011-001 Scope differs by code/WD | $35.13 | $6.83 | $41.96 |
| Arapahoe, Broomfield, Clear Creek, Elbert, Gilpin, Jefferson, Park Highway SUCO2011-001 Scope differs by code/WD | $12.89 | $3.20 | $16.09 |
| Arapahoe, Broomfield, Clear Creek, Elbert, Gilpin, Jefferson, Park Highway SUCO2011-001 Scope differs by code/WD | $16.29 | $6.14 | $22.43 |
| Araphaoe, Broomfield, Elbert, Gilpin, Park Highway SUCO2011-001 | $15.24 | $3.81 | $19.05 |
| Asbestos Workers/Insulator Heavy ASBE0028-001 (Includes application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems) | $36.98 | $16.82 | $53.80 |
| Asphalt Shoveler Highway SUCO2011-001 | $21.21 | $4.25 | $25.46 |
| Asphalt Spreader Highway SUCO2011-001 | $18.58 | $4.65 | $23.23 |
| BOILERMAKER Heavy SUCO2001-006 | $17.60 | $0.00 | $17.60 |
| BRICKLAYER Heavy BRCO0007-004 Scope differs by code/WD | $42.37 | $12.86 | $55.23 |
| BRICKLAYER Heavy BRCO0007-006 Scope differs by code/WD | $32.93 | $14.29 | $47.22 |
| BRICKLAYER Residential BRCO0007-007 | $41.91 | $12.49 | $54.40 |
| Broomfield, Clear Creek, Elbert, Gilpin Highway SUCO2011-001 Scope differs by code/WD | $19.11 | $5.46 | $24.57 |
| Broomfield, Clear Creek, Elbert, Gilpin Highway SUCO2011-001 Scope differs by code/WD | $18.37 | $3.00 | $21.37 |
| CARPENTER Residential SUCO2001-002 (Excluding drywall hanging/framing, metal stud work and form building/setting) | $16.36 | $1.38 | $17.74 |
| CARPENTER Excludes Form Work Adams Highway SUCO2011-001 | $16.61 | $3.88 | $20.49 |
| Carpenters: All Other Work Heavy SUCO2001-006 | $15.14 | $3.37 | $18.51 |
| Carpenters: Cement Mason/Concrete Finisher Heavy SUCO2001-006 | $17.31 | $2.85 | $20.16 |
| Carpenters: Form Building and Setting Heavy SUCO2001-006 | $16.97 | $2.74 | $19.71 |
| Carpenters: IRONWORKER, REINFORCING Heavy SUCO2001-006 | $18.83 | $3.90 | $22.73 |
| Cement Mason/Concrete Finisher Residential SUCO2001-002 | $16.80 | $0.00 | $16.80 |
| CEMENT MASON/CONCRETE FINISHER Adams Highway SUCO2011-001 | $16.05 | $3.00 | $19.05 |
| Clear Creek Highway SUCO2011-001 Scope differs by code/WD | $15.70 | $2.14 | $17.84 |
| Clear Creek Highway SUCO2011-001 Scope differs by code/WD | $14.98 | $3.16 | $18.14 |
| Clear Creek Highway SUCO2011-001 Scope differs by code/WD | $13.14 | $3.20 | $16.34 |
| Common or General Adams Highway SUCO2011-001 | $16.29 | $4.25 | $20.54 |
| Concrete Saw Highway SUCO2011-001 (Hand Held) Adams | $16.29 | $5.20 | $21.49 |
| Drywall Finisher/Taper Residential SUCO2001-002 | $13.00 | $0.00 | $13.00 |
| Drywall Hanger/Framer Residential SUCO2001-002 (Including metal stud work) | $17.13 | $2.63 | $19.76 |
| ELECTRICIAN Heavy ELEC0012-011 Scope differs by code/WD | $35.40 | $16.06 | $51.46 |
| ELECTRICIAN Heavy ELEC0068-001 Scope differs by code/WD | $46.80 | $19.53 | $66.33 |
| ELECTRICIAN Heavy ELEC0111-007 Scope differs by code/WD | $31.75 | $13.25 | $45.00 |
| ELECTRICIAN Heavy ELEC0113-002 Scope differs by code/WD | $40.70 | $18.47 | $59.17 |
| ELECTRICIAN Residential ELEC0012-012 (Including Low Voltage Wiring and Installation of Fire Alarms, Security Systems and Communications Systems) | $35.40 | $16.06 | $51.46 |
| ELECTRICIAN Residential ELEC0068-014 (Including Low Voltage Wiring and Installation of Fire Alarms, Security Systems and Communication Systems) | $31.96 | $12.50 | $44.46 |
| ELECTRICIAN Residential ELEC0111-011 (Including Low Voltage Wiring and Installation of Fire Alarms, Security Systems and Communication Systems) | $31.75 | $13.25 | $45.00 |
| ELECTRICIAN Residential ELEC0113-007 (Including Low Voltage Wiring and Installation of Fire Alarms, Security Systems and Communication Systems) | $34.90 | $17.25 | $52.15 |
| ELECTRICIAN Highway ELEC0111-003 (Traffic Signalization Only) Clear Creek | $38.97 | $7.80 | $46.77 |
| ELECTRICIAN Excludes Traffic Signal Installation Adams Highway SUCO2011-001 | $31.00 | $14.01 | $45.01 |
| FENCE ERECTOR Highway SUCO2011-001 | $13.02 | $3.20 | $16.22 |
| Form Work Only Adams Highway SUCO2011-001 | $16.78 | $3.57 | $20.35 |
| FORM WORKER Arapahoe Highway SUCO2011-001 | $15.30 | $3.90 | $19.20 |
| Formbuilder/Formsetter Residential SUCO2001-002 | $12.78 | $1.98 | $14.76 |
| GLAZIER Residential PAIN0930-001 | $37.26 | $13.15 | $50.41 |
| GUARDRAIL INSTALLER Adams Highway SUCO2011-001 | $12.89 | $3.45 | $16.34 |
| HIGHWAY/PARKING LOT STRIPING:Painter Adams, Arapahoe, Broomfield, Clear Creek, Elbert, Gilpin, Park Highway SUCO2011-001 | $12.62 | $3.21 | $15.83 |
| IRONWORKER, REINFORCING Adams Highway SUCO2011-001 | $22.14 | $0.77 | $22.91 |
| IRONWORKER, STRUCTURAL Heavy IRON0024-003 | $39.21 | $22.84 | $62.05 |
| IRONWORKER, STRUCTURAL Residential IRON0024-001 | $39.21 | $12.50 | $51.71 |
| IRONWORKER, STRUCTURAL Highway SUCO2011-001 | $18.22 | $6.01 | $24.23 |
| Jefferson Highway SUCO2011-001 Scope differs by code/WD | $16.88 | $3.81 | $20.69 |
| Jefferson Highway SUCO2011-001 Scope differs by code/WD | $18.02 | $3.42 | $21.44 |
| Jefferson Highway SUCO2011-001 Scope differs by code/WD | $26.78 | $5.44 | $32.22 |
| Jefferson Highway SUCO2011-001 Scope differs by code/WD | $15.19 | $4.72 | $19.91 |
| Jefferson Highway SUCO2011-001 Scope differs by code/WD | $14.21 | $3.21 | $17.42 |
| Jefferson Highway SUCO2011-001 Scope differs by code/WD | $16.51 | $4.27 | $20.78 |
| Jefferson Highway SUCO2011-001 Scope differs by code/WD | $16.29 | $4.25 | $20.54 |
| Jefferson Highway SUCO2011-001 Scope differs by code/WD | $9.73 | $3.05 | $12.78 |
| LABORER Asphalt Raker Adams, Arapahoe, Broomfield, Clear Creek, Elbert, Gilpin, Jefferson Highway SUCO2011-001 | $16.29 | $4.25 | $20.54 |
| Laborers: Brick Finishers/Tenders Residential SUCO2001-002 | $11.25 | $0.00 | $11.25 |
| Laborers: Common Heavy SUCO2001-006 | $11.22 | $2.92 | $14.14 |
| Laborers: Common Residential SUCO2001-002 | $8.86 | $0.00 | $8.86 |
| Laborers: Concrete/Mason Tenders Residential SUCO2001-002 | $10.00 | $0.00 | $10.00 |
| Laborers: Flagger Heavy SUCO2001-006 | $8.91 | $3.80 | $12.71 |
| Laborers: Landscape Heavy SUCO2001-006 | $12.56 | $3.21 | $15.77 |
| Laborers: PAINTER Residential SUCO2001-002 (Excludes drywall finishing and taping): Brush, Roller and Spray | $13.62 | $3.39 | $17.01 |
| Laborers: Pipelayer Heavy LABO0086-001 | $18.68 | $6.78 | $25.46 |
| Landscape and Irrigation Adams, Arapahoe, Broomfield, Elbert, Gilpin, Jefferson, Park Highway SUCO2011-001 | $12.26 | $3.16 | $15.42 |
| Line Construction: Groundman Heavy ELEC0111-001 | $27.39 | $21.25 | $48.64 |
| Line Construction: Line Equipment Operator Heavy ELEC0111-001 | $44.27 | $21.25 | $65.52 |
| Line Construction: Lineman and Welder Heavy ELEC0111-001 | $61.46 | $24.25 | $85.71 |
| Mason Tender- Cement/Concrete Adams Highway SUCO2011-001 | $17.71 | $2.83 | $20.54 |
| PAINTER (Spray Only) Highway SUCO2011-001 | $16.99 | $2.87 | $19.86 |
| Painters: Brush, Roller & Spray Heavy SUCO2001-006 | $15.81 | $3.26 | $19.07 |
| Park Highway SUCO2011-001 Scope differs by code/WD | $17.28 | $5.38 | $22.66 |
| Park Highway SUCO2011-001 Scope differs by code/WD | $17.09 | $2.85 | $19.94 |
| Park Highway SUCO2011-001 Scope differs by code/WD | $19.98 | $2.89 | $22.87 |
| Park Highway SUCO2011-001 Scope differs by code/WD | $17.41 | $1.86 | $19.27 |
| Park Highway SUCO2011-001 Scope differs by code/WD | $15.64 | $2.46 | $18.10 |
| Park Highway SUCO2011-001 Scope differs by code/WD | $15.08 | $3.10 | $18.18 |
| Park Highway SUCO2011-001 Scope differs by code/WD | $9.42 | $3.21 | $12.63 |
| Park Highway SUCO2011-001 Scope differs by code/WD | $12.76 | $3.20 | $15.96 |
| PIPEFITTER Heavy PLUM0208-004 | $44.15 | $22.43 | $66.58 |
| PIPEFITTER Residential PLUM0208-002 (Excluding HVAC pipe) | $44.15 | $22.43 | $66.58 |
| Pipelayer Highway SUCO2011-001 | $13.55 | $2.41 | $15.96 |
| PLUMBER Heavy PLUM0003-005 | $50.68 | $20.15 | $70.83 |
| PLUMBER Residential PLUM0003-002 (Including HVAC Pipe) | $23.24 | $5.35 | $28.59 |
| PLUMBER Residential PLUM0145-005 (Plumbers include HVAC pipe) & PIPEFITTERS (exclude HVAC pipe) | $41.32 | $16.01 | $57.33 |
| PLUMBER/PIPEFITTER Plumbers Residential PLUM0058-011 (include HVAC pipe) & Pipefitters (exclude HVAC pipe) | $41.40 | $17.17 | $58.57 |
| Plumbers and Pipefitters Heavy PLUM0058-002 Scope differs by code/WD | $45.90 | $17.17 | $63.07 |
| Plumbers and Pipefitters Heavy PLUM0058-008 Scope differs by code/WD | $45.90 | $17.17 | $63.07 |
| Plumbers and Pipefitters Heavy PLUM0145-002 Scope differs by code/WD | $41.32 | $16.01 | $57.33 |
| POWER EQUIPMENT OPERATOR: Arapahoe Highway SUCO2011-001 Scope differs by code/WD | $22.68 | $8.72 | $31.40 |
| POWER EQUIPMENT OPERATOR: Arapahoe Highway SUCO2011-001 Scope differs by code/WD | $24.59 | $6.24 | $30.83 |
| POWER EQUIPMENT OPERATOR: Arapahoe Highway SUCO2011-001 Scope differs by code/WD | $18.23 | $4.28 | $22.51 |
| POWER EQUIPMENT OPERATOR: Arapahoe Highway SUCO2011-001 Scope differs by code/WD | $22.67 | $8.73 | $31.40 |
| POWER EQUIPMENT OPERATOR: Arapahoe Highway SUCO2011-001 Scope differs by code/WD | $22.67 | $8.72 | $31.39 |
| POWER EQUIPMENT OPERATOR: Arapahoe Highway SUCO2011-001 Scope differs by code/WD | $26.80 | $4.84 | $31.64 |
| POWER EQUIPMENT OPERATOR: Arapahoe Highway SUCO2011-001 Scope differs by code/WD | $22.67 | $8.72 | $31.39 |
| POWER EQUIPMENT OPERATOR: Arapahoe Highway SUCO2011-001 Scope differs by code/WD | $19.62 | $5.27 | $24.89 |
| POWER EQUIPMENT OPERATOR: Arapahoe Highway SUCO2011-001 Scope differs by code/WD | $18.94 | $5.27 | $24.21 |
| POWER EQUIPMENT OPERATOR: Arapahoe Highway SUCO2011-001 Scope differs by code/WD | $15.79 | $2.48 | $18.27 |
| POWER EQUIPMENT OPERATOR: Arapahoe Highway SUCO2011-001 Scope differs by code/WD | $16.00 | $2.60 | $18.60 |
| POWER EQUIPMENT OPERATOR: Arapahoe Highway SUCO2011-001 Scope differs by code/WD | $15.10 | $3.77 | $18.87 |
| POWER EQUIPMENT OPERATOR: Arapahoe, Broomfield, Clear Creek, Elbert, Gilpin, Jefferson Highway SUCO2011-001 | $20.30 | $5.51 | $25.81 |
| POWER EQUIPMENT OPERATOR: Arapahoe, Broomfield, Clear Creek, Elbert, Gilpin, Jefferson, Park Highway SUCO2011-001 | $26.90 | $5.59 | $32.49 |
| POWER EQUIPMENT OPERATOR: Arapahoe, Broomfield, Clear Creek, Elbert, Gilpin, Park Highway SUCO2011-001 Scope differs by code/WD | $24.04 | $7.35 | $31.39 |
| POWER EQUIPMENT OPERATOR: Arapahoe, Broomfield, Clear Creek, Elbert, Gilpin, Park Highway SUCO2011-001 Scope differs by code/WD | $23.73 | $8.41 | $32.14 |
| POWER EQUIPMENT OPERATOR: Arapahoe, Broomfield, Clear Creek, Elbert, Gilpin, Park Highway SUCO2011-001 Scope differs by code/WD | $19.36 | $4.07 | $23.43 |
| POWER EQUIPMENT OPERATOR: Asphalt Laydown Adams, Arapahoe, Broomfield, Clear Creek, Elbert, Gilpin, Jefferson Highway SUCO2011-001 | $22.67 | $8.75 | $31.42 |
| POWER EQUIPMENT OPERATOR: Asphalt Paver Highway SUCO2011-001 | $24.97 | $6.13 | $31.10 |
| POWER EQUIPMENT OPERATOR: Asphalt Roller Adams Highway SUCO2011-001 | $24.20 | $7.70 | $31.90 |
| POWER EQUIPMENT OPERATOR: Asphalt Spreader Adams, Arapahoe, Broomfield, Clear Creek, Elbert, Gilpin, Park Highway SUCO2011-001 | $22.67 | $8.67 | $31.34 |
| POWER EQUIPMENT OPERATOR: Backhoe/Trackhoe Adams Highway SUCO2011-001 | $20.31 | $4.24 | $24.55 |
| POWER EQUIPMENT OPERATOR: Bobcat/Skid Loader Adams, Broomfield, Clear Creek, Elbert, Gilpin Highway SUCO2011-001 | $15.37 | $4.28 | $19.65 |
| POWER EQUIPMENT OPERATOR: Boom Highway SUCO2011-001 | $22.67 | $8.72 | $31.39 |
| POWER EQUIPMENT OPERATOR: Broom/Sweeper Adams, Broomfield, Clear Creek, Elbert, Gilpin, Park Highway SUCO2011-001 | $22.70 | $8.07 | $30.77 |
| POWER EQUIPMENT OPERATOR: Broomfield, Clear Creek, Elbert, Gilpin Highway SUCO2011-001 Scope differs by code/WD | $23.41 | $7.67 | $31.08 |
| POWER EQUIPMENT OPERATOR: Broomfield, Clear Creek, Elbert, Gilpin Highway SUCO2011-001 Scope differs by code/WD | $22.19 | $6.48 | $28.67 |
| POWER EQUIPMENT OPERATOR: Broomfield, Clear Creek, Elbert, Gilpin Highway SUCO2011-001 Scope differs by code/WD | $23.20 | $8.33 | $31.53 |
| POWER EQUIPMENT OPERATOR: Broomfield, Clear Creek, Elbert, Gilpin Highway SUCO2011-001 Scope differs by code/WD | $24.67 | $6.02 | $30.69 |
| POWER EQUIPMENT OPERATOR: Broomfield, Clear Creek, Elbert, Gilpin Highway SUCO2011-001 Scope differs by code/WD | $16.47 | $5.27 | $21.74 |
| POWER EQUIPMENT OPERATOR: Broomfield, Clear Creek, Elbert, Gilpin, Park Highway SUCO2011-001 Scope differs by code/WD | $23.90 | $7.93 | $31.83 |
| POWER EQUIPMENT OPERATOR: Broomfield, Clear Creek, Elbert, Gilpin, Park Highway SUCO2011-001 Scope differs by code/WD | $18.19 | $5.27 | $23.46 |
| POWER EQUIPMENT OPERATOR: Broomfield, Clear Creek, Elbert, Gilpin, Park Highway SUCO2011-001 Scope differs by code/WD | $14.74 | $3.68 | $18.42 |
| POWER EQUIPMENT OPERATOR: Bulldozer Adams Highway SUCO2011-001 | $25.20 | $6.72 | $31.92 |
| POWER EQUIPMENT OPERATOR: Concrete Pump Highway SUCO2011-001 | $21.60 | $5.21 | $26.81 |
| POWER EQUIPMENT OPERATOR: Crane Adams, Park Highway SUCO2011-001 | $22.82 | $8.72 | $31.54 |
| POWER EQUIPMENT OPERATOR: Drill Adams, Arapahoe, Broomfield, Clear Creek, Elbert, Gilpin, Park Highway SUCO2011-001 | $20.48 | $4.71 | $25.19 |
| POWER EQUIPMENT OPERATOR: Dump Truck Adams Highway SUCO2011-001 | $16.68 | $5.27 | $21.95 |
| POWER EQUIPMENT OPERATOR: Forklift Highway SUCO2011-001 | $15.91 | $4.68 | $20.59 |
| POWER EQUIPMENT OPERATOR: Grader/Blade Adams Highway SUCO2011-001 | $23.94 | $8.23 | $32.17 |
| POWER EQUIPMENT OPERATOR: Guardrail/Post Driver Highway SUCO2011-001 | $16.07 | $4.41 | $20.48 |
| POWER EQUIPMENT OPERATOR: Jefferson Highway SUCO2011-001 Scope differs by code/WD | $22.84 | $7.69 | $30.53 |
| POWER EQUIPMENT OPERATOR: Jefferson Highway SUCO2011-001 Scope differs by code/WD | $23.34 | $8.06 | $31.40 |
| POWER EQUIPMENT OPERATOR: Jefferson Highway SUCO2011-001 Scope differs by code/WD | $21.99 | $5.60 | $27.59 |
| POWER EQUIPMENT OPERATOR: Jefferson Highway SUCO2011-001 Scope differs by code/WD | $16.85 | $4.28 | $21.13 |
| POWER EQUIPMENT OPERATOR: Jefferson Highway SUCO2011-001 Scope differs by code/WD | $22.18 | $8.36 | $30.54 |
| POWER EQUIPMENT OPERATOR: Jefferson Highway SUCO2011-001 Scope differs by code/WD | $23.55 | $6.68 | $30.23 |
| POWER EQUIPMENT OPERATOR: Jefferson Highway SUCO2011-001 Scope differs by code/WD | $20.65 | $5.74 | $26.39 |
| POWER EQUIPMENT OPERATOR: Jefferson Highway SUCO2011-001 Scope differs by code/WD | $23.28 | $7.73 | $31.01 |
| POWER EQUIPMENT OPERATOR: Jefferson Highway SUCO2011-001 Scope differs by code/WD | $23.06 | $7.76 | $30.82 |
| POWER EQUIPMENT OPERATOR: Jefferson Highway SUCO2011-001 Scope differs by code/WD | $23.56 | $8.72 | $32.28 |
| POWER EQUIPMENT OPERATOR: Jefferson Highway SUCO2011-001 Scope differs by code/WD | $22.64 | $8.43 | $31.07 |
| POWER EQUIPMENT OPERATOR: Jefferson Highway SUCO2011-001 Scope differs by code/WD | $19.46 | $6.04 | $25.50 |
| POWER EQUIPMENT OPERATOR: Jefferson Highway SUCO2011-001 Scope differs by code/WD | $16.97 | $4.78 | $21.75 |
| POWER EQUIPMENT OPERATOR: Jefferson Highway SUCO2011-001 Scope differs by code/WD | $19.80 | $6.42 | $26.22 |
| POWER EQUIPMENT OPERATOR: Jefferson Highway SUCO2011-001 Scope differs by code/WD | $15.13 | $3.89 | $19.02 |
| POWER EQUIPMENT OPERATOR: Jefferson Highway SUCO2011-001 Scope differs by code/WD | $17.57 | $5.27 | $22.84 |
| POWER EQUIPMENT OPERATOR: Loader Highway SUCO2011-001 (Front End) Adams | $23.09 | $8.72 | $31.81 |
| POWER EQUIPMENT OPERATOR: Lowboy Truck Adams, Arapahoe, Broomfield, Clear Creek, Elbert, Gilpin, Park Highway SUCO2011-001 | $17.25 | $5.27 | $22.52 |
| POWER EQUIPMENT OPERATOR: Mechanic Highway SUCO2011-001 | $26.48 | $3.50 | $29.98 |
| POWER EQUIPMENT OPERATOR: Mechanic Adams Highway SUCO2011-001 | $22.82 | $8.72 | $31.54 |
| POWER EQUIPMENT OPERATOR: Multi-Purpose Speciality and Hoisting Truck Adams, Broomfield, Clear Creek, Elbert, Gilpin, Park Highway SUCO2011-001 | $17.49 | $3.17 | $20.66 |
| POWER EQUIPMENT OPERATOR: Oiler Adams, Jefferson Highway SUCO2011-001 | $21.97 | $8.72 | $30.69 |
| POWER EQUIPMENT OPERATOR: Park Highway SUCO2011-001 Scope differs by code/WD | $22.67 | $8.72 | $31.39 |
| POWER EQUIPMENT OPERATOR: Park Highway SUCO2011-001 Scope differs by code/WD | $22.84 | $8.72 | $31.56 |
| POWER EQUIPMENT OPERATOR: Park Highway SUCO2011-001 Scope differs by code/WD | $20.81 | $6.58 | $27.39 |
| POWER EQUIPMENT OPERATOR: Park Highway SUCO2011-001 Scope differs by code/WD | $22.46 | 0.00 | $22.46 |
| POWER EQUIPMENT OPERATOR: Park Highway SUCO2011-001 Scope differs by code/WD | $22.67 | $8.72 | $31.39 |
| POWER EQUIPMENT OPERATOR: Park Highway SUCO2011-001 Scope differs by code/WD | $16.52 | $3.13 | $19.65 |
| POWER EQUIPMENT OPERATOR: Park Highway SUCO2011-001 Scope differs by code/WD | $20.36 | $3.04 | $23.40 |
| POWER EQUIPMENT OPERATOR: Park Highway SUCO2011-001 Scope differs by code/WD | $15.40 | $3.21 | $18.61 |
| POWER EQUIPMENT OPERATOR: Roller/Compactor Highway SUCO2011-001 (Dirt and Grade Compaction) Adams | $16.70 | $3.30 | $20.00 |
| POWER EQUIPMENT OPERATOR: Rotomill Highway SUCO2011-001 | $16.22 | $4.41 | $20.63 |
| POWER EQUIPMENT OPERATOR: Screed Adams Highway SUCO2011-001 | $27.89 | $3.50 | $31.39 |
| POWER EQUIPMENT OPERATOR: Semi/Trailer Truck Adams, Broomfield, Clear Creek, Elbert, Gilpin, Jefferson, Park Highway SUCO2011-001 | $18.39 | $4.13 | $22.52 |
| POWER EQUIPMENT OPERATOR: Single Axle Highway SUCO2011-001 (Includes Pickup and Pilot Car) Adams, Jefferson | $13.93 | $3.68 | $17.61 |
| POWER EQUIPMENT OPERATOR: Tractor Highway SUCO2011-001 | $13.13 | $2.95 | $16.08 |
| POWER EQUIPMENT OPERATOR: TRUCK DRIVER Distributor Adams Highway SUCO2011-001 | $15.80 | $5.27 | $21.07 |
| POWER EQUIPMENT OPERATOR: Truck Mounted Attenuator Highway SUCO2011-001 | $12.43 | $3.22 | $15.65 |
| POWER EQUIPMENT OPERATOR: Water Truck Adams Highway SUCO2011-001 | $17.50 | $5.19 | $22.69 |
| Power equipment operators: Backhoe Heavy SUCO2001-006 | $16.36 | $2.48 | $18.84 |
| Power equipment operators: Backhoe Residential SUCO2001-002 | $12.98 | $3.31 | $16.29 |
| Power equipment operators: Blade: Finish Heavy ENGI0009-001 | $34.58 | $15.20 | $49.78 |
| Power equipment operators: Blade: Rough Heavy ENGI0009-001 | $34.05 | $15.20 | $49.25 |
| Power equipment operators: Bulldozer Heavy ENGI0009-001 | $34.05 | $15.20 | $49.25 |
| Power equipment operators: Bulldozer Residential ENGI0009-007 | $34.05 | $14.25 | $48.30 |
| Power equipment operators: Cranes: 141 tons and over Heavy ENGI0009-001 | $38.63 | $15.20 | $53.83 |
| Power equipment operators: Cranes: 50 tons and under Heavy ENGI0009-001 | $34.77 | $15.20 | $49.97 |
| Power equipment operators: Cranes: 51 to 90 tons Heavy ENGI0009-001 | $35.07 | $15.20 | $50.27 |
| Power equipment operators: Cranes: 91 to 140 tons Heavy ENGI0009-001 | $36.27 | $15.20 | $51.47 |
| Power equipment operators: Forklift Heavy ENGI0009-001 | $34.58 | $15.20 | $49.78 |
| Power equipment operators: Front End Loader Heavy SUCO2001-006 | $17.24 | $3.23 | $20.47 |
| Power equipment operators: Front End Loader Residential SUCO2001-002 | $16.50 | $0.00 | $16.50 |
| Power equipment operators: Mechanic Heavy ENGI0009-001 | $35.58 | $15.20 | $50.78 |
| Power equipment operators: Motor Grader: Blade-finish Residential ENGI0009-007 | $34.58 | $14.25 | $48.83 |
| Power equipment operators: Motor Grader: Blade-rough Residential ENGI0009-007 | $34.05 | $14.25 | $48.30 |
| Power equipment operators: Oiler Heavy ENGI0009-001 | $34.14 | $15.20 | $49.34 |
| Power equipment operators: Roller: Self-propelled all types over 5 tons Residential ENGI0009-007 | $34.05 | $14.25 | $48.30 |
| Power equipment operators: Roller: Self-propelled rubber tires under 5 tons Residential ENGI0009-007 | $33.62 | $14.25 | $47.87 |
| Power equipment operators: ROOFER Residential SUCO2001-002 | $14.73 | $0.00 | $14.73 |
| Power equipment operators: Scraper: Single bowl including pups 40 cubic yards and tandem bowls and over Single bowl including pups 40 cubic yards and tandem bowls and over Residential ENGI0009-007 | $34.41 | $14.25 | $48.66 |
| Power equipment operators: Scraper: Single bowl under 40 cubic yards Heavy ENGI0009-001 | $35.20 | $15.20 | $50.40 |
| Power equipment operators: Scraper: Single bowl under 40 cubic yards Residential ENGI0009-007 | $34.21 | $14.25 | $48.46 |
| Power equipment operators: Scraper: Single bowl, including pups 40 cubic yards and over and tandem bowls Heavy ENGI0009-001 | $35.41 | $15.20 | $50.61 |
| Power equipment operators: Sheet Metal Worker All Other Work Residential SUCO2001-002 | $17.30 | $4.05 | $21.35 |
| Power equipment operators: Skid Loader Heavy SUCO2001-006 | $15.37 | $4.41 | $19.78 |
| Power equipment operators: SPRINKLER FITTER Residential SUCO2001-002 | $18.47 | $3.74 | $22.21 |
| Power equipment operators: Trackhoe Heavy ENGI0009-001 | $35.20 | $15.20 | $50.40 |
| Power equipment operators: Water Wagon Residential ENGI0009-007 | $34.05 | $14.25 | $48.30 |
| Sheet metal worker Heavy SHEE0009-002 | $43.05 | $22.65 | $65.70 |
| Sheet metal worker HVAC Duct and Installation of HVAC Systems Residential SHEE0009-003 | $43.05 | $22.65 | $65.70 |
| Traffic Control Highway SUCO2011-001 (Flagger) Adams, Arapahoe, Broomfield, Clear Creek, Elbert, Gilpin | $9.55 | $3.05 | $12.60 |
| Traffic Control Highway SUCO2011-001 (Sets Up/Moves Barrels, Cones, Install Signs, Arrow Boards and Place Stationary Flags) (Excludes Flaggers) Adams, Arapahoe, Broomfield, Elbert, Gilpin, Jefferson | $12.43 | $3.22 | $15.65 |
| Traffic Signalization Electrician Adams, Arapahoe, Broomfield, Elbert, Gilpin, Park Highway SUCO2011-001 | $27.25 | $7.10 | $34.35 |
| Traffic Signalization Groundsman Adams Highway SUCO2011-001 | $13.96 | $2.80 | $16.76 |
| Truck drivers: Pickup Heavy TEAM0455-002 | $26.96 | $4.87 | $31.83 |
| Truck drivers: Tandem/Semi and Water Heavy TEAM0455-002 | $27.59 | $4.87 | $32.46 |
No trade rates match your search and filter selection.
Heavy
Applies to
Adams, Arapahoe, Boulder, Broomfield, Denver, Douglas, El Paso, Jefferson, Larimer, Mesa +2 more
Residential
Applies to
Adams, Arapahoe, Boulder, Broomfield, Denver, Douglas, El Paso, Jefferson, Larimer, Mesa +2 more
Highway
Applies to
Adams, Arapahoe, Broomfield, Clear Creek, Elbert, Gilpin, Jefferson, Park in Colorado.