| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| (Excluding HVAC work) Building PLUM0208-005 | $43.40 | $22.11 | $65.51 |
| Asbestos Workers/Insulator Building ASBE0028-004 (Includes application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems | $36.98 | $16.82 | $53.80 |
| Asbestos Workers/Insulator Building ASBE0076-002 (Includes application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems) | $36.60 | $11.83 | $48.43 |
| BRICKLAYER Building BRCO0007-003 Scope differs by code/WD | $32.93 | $14.29 | $47.22 |
| BRICKLAYER Building BRCO0007-009 Scope differs by code/WD | $32.93 | $14.29 | $47.22 |
| BRICKLAYER Building BRCO0007-010 Scope differs by code/WD | $42.37 | $15.21 | $57.58 |
| CARPENTER Residential SUCO2001-004 | $17.86 | $0.00 | $17.86 |
| CARPENTER Excludes Form Work Highway SUCO2011-006 | $18.96 | $3.18 | $22.14 |
| CARPENTER Formbuilding/Formsetting, Drywall Hanging/Framing and Metal Stud Work Building CARP9901-007 | $33.11 | $12.17 | $45.28 |
| Carpenters: Acoustical Building SUCO2001-008 | $15.69 | $3.15 | $18.84 |
| Carpenters: All other Work Building SUCO2001-008 | $15.94 | $3.41 | $19.35 |
| Carpenters: All Other Work Heavy SUCO2001-005 | $15.72 | $0.00 | $15.72 |
| Carpenters: Cement Mason/Concrete Finisher Heavy SUCO2001-005 | $14.76 | $2.28 | $17.04 |
| Carpenters: Drywall Finisher/Taper Building SUCO2001-008 | $14.44 | $2.19 | $16.63 |
| Carpenters: Form Building and Setting Heavy SUCO2001-005 | $16.16 | $0.82 | $16.98 |
| Carpenters: Formbuilding/Formsetting, Drywall Hanging/Framing and Metal Stud Work Building CARP9901-006 | $33.11 | $12.17 | $45.28 |
| Carpenters: Laborer, common Building SUCO2001-008 | $9.75 | $0.00 | $9.75 |
| Carpenters: Laborer, common Heavy SUCO2001-005 | $11.11 | $3.80 | $14.91 |
| Carpenters: PAINTER Building SUCO2001-008 | $15.19 | $0.00 | $15.19 |
| Carpenters: PIPEFITTER Heavy SUCO2001-005 | $18.13 | $1.84 | $19.97 |
| CEMENT MASON/CONCRETE FINISHER Building PLAS0577-001 | $34.73 | $15.15 | $49.88 |
| CEMENT MASON/CONCRETE FINISHER Cheyenne, Logan, Morgan, Phillips, Sedgwick, Washington, Yuma Highway SUCO2011-006 | $19.22 | $2.74 | $21.96 |
| Dump Highway TEAM0455-001 (over 14 cu. yds up to and including 29 cu. yds) | $27.59 | $4.87 | $32.46 |
| Dump Highway TEAM0455-001 (over 30 cu.yds up to and including 38 cu. yds) | $27.93 | $4.87 | $32.80 |
| Dump Highway TEAM0455-001 (over 54 cu. yds up to and including 79 cu. yds) | $28.50 | $4.87 | $33.37 |
| Dump Highway TEAM0455-001 (over 6 cu. yds up to and including 14 cu. yds) | $27.25 | $4.87 | $32.12 |
| Dump Highway TEAM0455-001 (over 80 cu. yds up to and including 104 cu. yds) | $28.77 | $4.87 | $33.64 |
| Dump Highway TEAM0455-001 (up to 39 cu. yds up to and including 54 cu. yds) | $28.21 | $4.87 | $33.08 |
| Dump Highway TEAM0455-001 (up to and including 6 cu. yds.) | $27.10 | $4.87 | $31.97 |
| ELECTRICIAN Building ELEC0068-007 Scope differs by code/WD | $46.80 | $19.53 | $66.33 |
| ELECTRICIAN Building ELEC0111-006 Scope differs by code/WD | $31.75 | $13.25 | $45.00 |
| ELECTRICIAN Building ELEC0111-009 Scope differs by code/WD | $36.95 | $14.41 | $51.36 |
| ELECTRICIAN Building ELEC0111-013 Scope differs by code/WD | $31.75 | $13.25 | $45.00 |
| ELECTRICIAN Building ELEC0113-003 (Including low voltage wiring and installation of fire alarms, telephones, computers and temperature controls) | $40.70 | $18.47 | $59.17 |
| ELECTRICIAN Heavy ELEC0068-011 Scope differs by code/WD | $46.80 | $19.53 | $66.33 |
| ELECTRICIAN Heavy ELEC0111-008 Scope differs by code/WD | $31.75 | $13.25 | $45.00 |
| ELECTRICIAN Heavy ELEC0111-010 Scope differs by code/WD | $36.95 | $14.41 | $51.36 |
| ELECTRICIAN Heavy ELEC0113-004 Scope differs by code/WD | $40.70 | $18.47 | $59.17 |
| ELECTRICIAN Residential ELEC0012-013 (Including Low Voltage Wiring and Installation of Fire Alarms) | $35.40 | $16.06 | $51.46 |
| ELECTRICIAN Residential ELEC0068-015 (Including Low Voltage Wiring and Installation of Fire Alarms) | $31.96 | $12.50 | $44.46 |
| ELECTRICIAN Residential ELEC0111-012 (Including Low Voltage Wiring and Installation of Fire Alarms) | $31.75 | $13.25 | $45.00 |
| ELECTRICIAN Residential ELEC0111-015 (Including Low Voltage Wiring and Installation of Fire Alarms) | $36.95 | $14.41 | $51.36 |
| ELECTRICIAN Residential ELEC0113-008 (Including Low Voltage Wiring and Installation of Fire Alarms) | $34.90 | $17.25 | $52.15 |
| ELECTRICIAN Highway SUCO2011-006 | $28.06 | $8.76 | $36.82 |
| Electricians: Building ELEC0012-010 | $35.40 | $16.06 | $51.46 |
| Electricians: Heavy ELEC0012-006 | $35.40 | $16.06 | $51.46 |
| ELEVATOR MECHANIC Building ELEV0025-002 | $56.57 | $38.44 | $95.00 |
| Form Work Only Cheyenne, Kit Carson, Logan, Morgan, Phillips, Sedgwick, Washington, Yuma Highway SUCO2011-006 | $20.28 | $4.50 | $24.78 |
| GLAZIER Building PAIN0930-001 | $37.26 | $13.15 | $50.41 |
| HIGHWAY/PARKING LOT STRIPING: Asphalt Spreader Highway SUCO2011-006 | $22.67 | $8.72 | $31.39 |
| HIGHWAY/PARKING LOT STRIPING: Common or General Cheyenne, Lincoln, Logan, Morgan, Phillips, Sedgqick, Washington, Yuma Highway SUCO2011-006 | $12.44 | $3.53 | $15.97 |
| HIGHWAY/PARKING LOT STRIPING: Concrete Saw (Hand Held) Highway SUCO2011-006 | $16.00 | $6.14 | $22.14 |
| HIGHWAY/PARKING LOT STRIPING: HIGHWAY/PARKING LOT STRIPING:Painter Highway SUCO2011-006 | $12.90 | $3.07 | $15.97 |
| HIGHWAY/PARKING LOT STRIPING: IRONWORKER, REINFORCING Highway SUCO2011-006 | $21.12 | $3.89 | $25.01 |
| HIGHWAY/PARKING LOT STRIPING: IRONWORKER, STRUCTURAL Highway SUCO2011-006 | $16.76 | $6.01 | $22.77 |
| HIGHWAY/PARKING LOT STRIPING: LABORER Asphalt Raker Cheyenne, Kit Carson, Lincoln, Logan, Morgan, Phillips, Washington, Yuma Highway SUCO2011-006 | $17.02 | $5.79 | $22.81 |
| HIGHWAY/PARKING LOT STRIPING: Landscape and Irrigation Highway SUCO2011-006 | $12.81 | $3.16 | $15.97 |
| HIGHWAY/PARKING LOT STRIPING: Mason Tender- Cement/Concrete Highway SUCO2011-006 | $14.71 | $3.29 | $18.00 |
| HIGHWAY/PARKING LOT STRIPING: PAINTER (Spray Only) Highway SUCO2011-006 | $17.54 | $3.52 | $21.06 |
| HIGHWAY/PARKING LOT STRIPING: Sedgwick Highway SUCO2011-006 | $15.79 | $4.87 | $20.66 |
| HIGHWAY/PARKING LOT STRIPING: Traffic Control Highway SUCO2011-006 (Sets Up/Moves Barrels, Cones, Install Signs, Arrow Boards and Place Stationary Flags)(Excludes Flaggers) | $12.39 | $3.20 | $15.59 |
| HIGHWAY/PARKING LOT STRIPING: Traffic Control (Flagger) Highway SUCO2011-006 | $9.42 | $3.21 | $12.63 |
| HIGHWAY/PARKING LOT STRIPING: Truck Driver Highway SUCO2011-006 (Line Striping Truck) | $14.60 | $3.49 | $18.09 |
| Ironworker, reinforcing and structural Building IRON0024-002 | $39.21 | $12.50 | $51.71 |
| IRONWORKER, STRUCTURAL Residential IRON0024-001 | $39.21 | $12.50 | $51.71 |
| Kit Carson Highway SUCO2011-006 | $17.98 | $2.53 | $20.51 |
| LABORER Concrete/Mason Tenders Building LABO0720-003 | $21.10 | $7.89 | $28.99 |
| Laborers: Common Residential SUCO2001-004 | $10.33 | $0.00 | $10.33 |
| Lincoln Highway SUCO2011-006 Scope differs by code/WD | $20.98 | $3.89 | $24.87 |
| Lincoln Highway SUCO2011-006 Scope differs by code/WD | $21.00 | $1.40 | $22.40 |
| Line Construction: Groundmen Heavy ELEC0111-002 | $27.39 | $21.25 | $48.64 |
| Line Construction: Line Equipment Operator Heavy ELEC0111-002 | $44.27 | $21.25 | $65.52 |
| Line Construction: Lineman and Welder Heavy ELEC0111-002 | $61.36 | $24.25 | $85.61 |
| Painters: Brush, Spray & Roller Residential SUCO2001-004 | $15.00 | $0.00 | $15.00 |
| Painters: PLUMBER Residential SUCO2001-004 (Including HVAC pipe) | $18.06 | $2.78 | $20.84 |
| PIPEFITTER Building PLUM0208-005 (Excluding HVAC pipe) | $45.40 | $22.11 | $67.51 |
| PLUMBER Building PLUM0003-006 (Including HVAC Work) | $47.23 | $21.68 | $68.91 |
| PLUMBER Heavy PLUM0003-003 Scope differs by code/WD | $50.68 | $20.15 | $70.83 |
| PLUMBER Heavy PLUM0058-010 Scope differs by code/WD | $45.90 | $17.17 | $63.07 |
| PLUMBER Heavy PLUM0145-004 Scope differs by code/WD | $41.32 | $16.01 | $57.33 |
| PLUMBER Includes HVAC Work Heavy PLUM0058-012 | $45.90 | $17.17 | $63.07 |
| PLUMBER/PIPEFITTER Building PLUM0058-009 (Plumbers include HVAC work) (Pipefitters exclude HVAC work) | $47.60 | $18.10 | $65.70 |
| PLUMBER/PIPEFITTER PLUMBERS Building PLUM0145-001 (Including HVAC work) & PIPEFITTERS (Excluding HVAC work) | $41.32 | $16.01 | $57.33 |
| POWER EQUIPMENT OPERATOR: (6)-Crane (91-140 tons) Highway ENGI0009-015 | $37.34 | $15.20 | $52.54 |
| POWER EQUIPMENT OPERATOR: Asphalt Laydown Highway SUCO2011-006 | $24.56 | $6.68 | $31.24 |
| POWER EQUIPMENT OPERATOR: Asphalt Paver Highway SUCO2011-006 | $22.67 | $8.72 | $31.39 |
| POWER EQUIPMENT OPERATOR: Asphalt Plant Highway SUCO2011-006 | $21.13 | $2.16 | $23.29 |
| POWER EQUIPMENT OPERATOR: Asphalt Roller Cheyenne, Kit Carson, Lincoln, Logan, Morgan, Phillips, Washington, Yuma Highway SUCO2011-006 | $23.79 | $7.59 | $31.38 |
| POWER EQUIPMENT OPERATOR: Asphalt Spreader Highway SUCO2011-006 | $23.19 | $7.66 | $30.85 |
| POWER EQUIPMENT OPERATOR: Backhoe/Trackhoe Cheyenne, Lincoln, Logan, Morgan, Phillips, Sedgwick, Washington, Yuma Highway SUCO2011-006 | $25.88 | $4.18 | $30.06 |
| POWER EQUIPMENT OPERATOR: Bobcat/Skid Loader Highway SUCO2011-006 | $20.79 | $5.36 | $26.15 |
| POWER EQUIPMENT OPERATOR: Bulldozer Highway SUCO2011-006 | $29.99 | $2.90 | $32.89 |
| POWER EQUIPMENT OPERATOR: Chipper Highway SUCO2011-006 | $22.04 | $8.26 | $30.30 |
| POWER EQUIPMENT OPERATOR: Drill Highway SUCO2011-006 | $20.49 | $2.66 | $23.15 |
| POWER EQUIPMENT OPERATOR: Dump Truck Cheyenne, Logan, Morgan, Phillips, Washington, Yuma Highway SUCO2011-006 | $18.52 | $5.96 | $24.48 |
| POWER EQUIPMENT OPERATOR: Forklift Highway SUCO2011-006 | $18.30 | $2.01 | $20.31 |
| POWER EQUIPMENT OPERATOR: Grader/Blade Highway SUCO2011-006 | $19.02 | $4.20 | $23.22 |
| POWER EQUIPMENT OPERATOR: Guardrail/Post Driver Highway SUCO2011-006 | $16.07 | $4.41 | $20.48 |
| POWER EQUIPMENT OPERATOR: Kit Carson Highway SUCO2011-006 Scope differs by code/WD | $28.64 | $1.40 | $30.04 |
| POWER EQUIPMENT OPERATOR: Kit Carson Highway SUCO2011-006 Scope differs by code/WD | $16.74 | $4.20 | $20.94 |
| POWER EQUIPMENT OPERATOR: Lincoln Highway SUCO2011-006 | $14.15 | $3.83 | $17.98 |
| POWER EQUIPMENT OPERATOR: Loader Highway SUCO2011-006 (Front End) Cheyenne, Kit Carson, Lincoln, Logan, Morgan, Phillips, Washington, Yuma | $27.22 | $5.85 | $33.07 |
| POWER EQUIPMENT OPERATOR: Logan, Phillips, Sedgwick, Washington, Yuma Highway SUCO2011-006 | $15.80 | $4.67 | $20.47 |
| POWER EQUIPMENT OPERATOR: Lowboy Truck Highway SUCO2011-006 | $18.29 | $4.87 | $23.16 |
| POWER EQUIPMENT OPERATOR: Mechanic Highway SUCO2011-006 | $17.79 | $3.51 | $21.30 |
| POWER EQUIPMENT OPERATOR: Mechanic Cheyenne, Lincoln, Logan, Morgan, Phillips, Washington, Yuma Highway SUCO2011-006 | $20.52 | $5.49 | $26.01 |
| POWER EQUIPMENT OPERATOR: Multi-Purpose Specialty & Hoisting Truck Highway SUCO2011-006 | $18.79 | $3.49 | $22.28 |
| POWER EQUIPMENT OPERATOR: Oiler Highway SUCO2011-006 | $22.54 | $9.22 | $31.76 |
| POWER EQUIPMENT OPERATOR: Pickup and Pilot Car Highway SUCO2011-006 | $14.04 | $3.49 | $17.53 |
| POWER EQUIPMENT OPERATOR: Roller/Compactor Highway SUCO2011-006 (Dirt and Grade Compaction) | $16.52 | $4.87 | $21.39 |
| POWER EQUIPMENT OPERATOR: Scraper Highway SUCO2011-006 | $19.93 | $5.38 | $25.31 |
| POWER EQUIPMENT OPERATOR: Screed Cheyenne, Lincoln, Logan, Morgan, Phillips, Sedgwick, Washington, Yuma Highway SUCO2011-006 | $21.30 | $6.40 | $27.70 |
| POWER EQUIPMENT OPERATOR: Sedgwick Highway SUCO2011-006 Scope differs by code/WD | $27.48 | $4.87 | $32.35 |
| POWER EQUIPMENT OPERATOR: Sedgwick Highway SUCO2011-006 Scope differs by code/WD | $21.09 | $4.87 | $25.96 |
| POWER EQUIPMENT OPERATOR: Sedgwick Highway SUCO2011-006 Scope differs by code/WD | $18.92 | $6.19 | $25.11 |
| POWER EQUIPMENT OPERATOR: Sedqwick Highway SUCO2011-006 | $23.92 | $9.22 | $33.14 |
| POWER EQUIPMENT OPERATOR: Semi Truck Cheyenne, Kit Carson, Lincoln, Morgan Highway SUCO2011-006 | $17.58 | $4.67 | $22.25 |
| POWER EQUIPMENT OPERATOR: Tractor Highway SUCO2011-006 | $16.83 | $2.95 | $19.78 |
| POWER EQUIPMENT OPERATOR: TRUCK DRIVER Distributor Highway SUCO2011-006 | $17.98 | $5.27 | $23.25 |
| POWER EQUIPMENT OPERATOR: Water Truck Highway SUCO2011-006 | $14.88 | $2.07 | $16.95 |
| Power equipment operators: Backhoe Heavy SUCO2001-005 | $15.93 | $3.58 | $19.51 |
| Power equipment operators: Bobcat/Skid Loader Heavy SUCO2001-005 | $20.22 | $4.41 | $24.63 |
| Power equipment operators: Bulldozer Heavy SUCO2001-005 | $15.08 | $4.44 | $19.52 |
| Power equipment operators: Excavator Heavy SUCO2001-005 | $15.39 | $0.00 | $15.39 |
| Power equipment operators: Front End Loader Heavy SUCO2001-005 | $15.86 | $3.59 | $19.45 |
| Power equipment operators: Mechanic Heavy ENGI0009-004 | $35.58 | $15.20 | $50.78 |
| Power equipment operators: Motor Grader: Blade-finish Heavy ENGI0009-004 | $35.58 | $15.20 | $50.78 |
| Power equipment operators: Motor Grader: Blade-rough Heavy ENGI0009-004 | $35.03 | $15.20 | $50.23 |
| Power equipment operators: Roller: self-propelled, all types over 5 tons Heavy ENGI0009-004 | $35.03 | $15.20 | $50.23 |
| Power equipment operators: Roller: self-propelled, rubber tires under 5 tons Heavy ENGI0009-004 | $34.58 | $15.20 | $49.78 |
| Power equipment operators: Trackhoe Heavy ENGI0009-004 | $35.20 | $15.20 | $50.40 |
| ROOFER Building ROOF0058-001 | $32.90 | $6.18 | $39.08 |
| Sheet metal worker Building SHEE0009-001 (Includes HVAC duct and installation of HVAC systems) | $43.05 | $22.65 | $65.70 |
| TRUCK DRIVER Dump (over 104 cu. yds) Highway TEAM0455-001 | $29.06 | $4.87 | $33.93 |
No trade rates match your search and filter selection.
Building
Applies to
Alamosa, Archuleta, Baca, Bent, Chaffee, Cheyenne, Conejos, Costilla, Crowley, Custer +37 more
Heavy
Applies to
Alamosa, Archuleta, Baca, Bent, Chaffee, Cheyenne, Clear Creek, Conejos, Costilla, Crowley +42 more
Residential
Applies to
Alamosa, Archuleta, Baca, Bent, Chaffee, Cheyenne, Clear Creek, Conejos, Costilla, Crowley +42 more
Highway
Applies to
Cheyenne, Kit Carson, Lincoln, Logan, Morgan, Phillips, Sedgwick, Washington, Yuma in Colorado.