De Soto

1 wage determination 8 trade rates

Popular Trades In De Soto

Trade Rates

Click any row to save it for later

Same trade names can appear multiple times when classification codes or coverage language differ. Compare the code badge, any italic scope text, and WD reference to identify the right line.
Trade & Classification Rate Fringe Total
LABORER: Common or General Heavy
SUFL2009-140
$9.34 $1.85 $11.19
LABORER: Pipelayer Heavy
SUFL2009-140
$11.58 0.00 $11.58
OPERATOR: Backhoe/Excavator Heavy
SUFL2009-140
$12.25 $1.33 $13.58
OPERATOR: Bulldozer Heavy
SUFL2009-140
$13.30 $1.92 $15.22
OPERATOR: Loader Heavy
SUFL2009-140
$14.13 $1.94 $16.07
PAINTER: Brush and Spray Heavy
PAIN0088-009 Scope differs by code/WD
$20.21 $12.38 $32.59
PAINTER: Brush and Spray Heavy
PAIN0452-010 Scope differs by code/WD
$27.00 $14.78 $41.78
TRUCK DRIVER: Distributor, Dump, Lowboy and Tandem Heavy
SUFL2009-140
$14.00 0.00 $14.00

Wage Determinations

Heavy

0 trades

Applies to

De Soto, Hardee, Hendry, Okeechobee in Florida.