Sangamon

4 wage determinations 189 trade rates

Popular Trades In Sangamon

Track Sangamon County updates

Get an email when wage determinations covering Sangamon County, Illinois are modified.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Trade Rates

Click a row to save its rate for later, then export your selections from the Saved panel.

Same trade names can appear multiple times when classification codes or coverage language differ. Compare the code badge, any italic scope text, and WD reference to identify the right line.
Save Trade & Classification Rate Fringe Total
ASBESTOS WORKER/HEAT & FROST INSULATOR Building
ASBE0001-002
$43.48 $27.24 $70.72
BOILERMAKER Building
BOIL0363-001
$45.50 $35.30 $80.80
BRICKLAYER, CAULKER, CLEANER, POINTER & STONEMASON Building
BRIL0008-021
$33.49 $24.93 $58.42
CARPENTER Heavy
CARP0243-001 (CHAMPAIGN, EDGAR, AND VERMILION COUNTIES)
$37.85 $25.77 $63.62
CARPENTER Heavy
CARP0243-006 (COLES, CUMBERLAND, MOULTRIE, AND SHELBY COUNTIES)
$35.65 $27.97 $63.62
CARPENTER Heavy
CARP0270-004 (CHRISTIAN, MENARD, AND SANGAMON (EXCEPT ILLIOPOLIS) COUNTIES)
$32.15 $25.97 $58.12
CARPENTER Heavy
CARP0270-016 (MACON, MOULTRIE (NORTH OF RT #133), PIATT (SOUTHWESTERN HALF), SANGAMON (ILLIOPOLIS) AND SHELBY (MOWEAQUA & NORTH THEREOF) COUNTIES)
$35.05 $28.57 $63.62
CARPENTER Heavy
CARP0270-024 (BROWN, CASS, MORGAN, PIKE, AND SCOTT COUNTIES)
$35.05 $28.57 $63.62
CARPENTER - PILEDRIVER (BUILDING) Building
CARP0270-002
$32.64 $25.74 $58.38
CARPENTER (ADAMS COUNTY) Heavy
CARP0270-007
$31.55 $25.97 $57.52
CARPENTER (CLARK COUNTY) Heavy
CARP0243-014
$36.20 $21.92 $58.12
CARPENTER (DE WITT COUNTY) Heavy
CARP0237-021
$37.06 $31.16 $68.22
CARPENTER (DOUGLAS COUNTY) Heavy
CARP0243-009
$35.65 $27.97 $63.62
CARPENTER (LOGAN COUNTY) Heavy
CARP0270-021
$35.05 $28.57 $63.62
CARPENTER (MASON COUNTY) Heavy
CARP0237-012
$33.55 $30.07 $63.62
CARPENTER (RESIDENTIAL) Building
CARP0270-002
$28.48 $25.74 $54.22
CARPENTER (SCHUYLER COUNTY) Heavy
CARP0270-026
$32.15 $25.97 $58.12
CARPENTER AND LATHER (BUILDING) Building
CARP0270-002
$31.64 $25.74 $57.38
CEMENT MASON/CONCRETE FINISHER Building
PLAS0018-033 Scope differs by code/WD
$28.51 $21.93 $50.44
CEMENT MASON/CONCRETE FINISHER Building
PLAS0018-033 Scope differs by code/WD
$28.51 $21.93 $50.44
CEMENT MASON/CONCRETE FINISHER Heavy
BRIL0008-011 (LOGAN, MORGAN AND SCOTT COUNTIES)
$31.91 $21.93 $53.84
CEMENT MASON/CONCRETE FINISHER Heavy
PLAS0018-003 (DEWITT (NORTH OF ROUTE 10))
$38.75 $31.92 $70.67
CEMENT MASON/CONCRETE FINISHER Heavy
PLAS0018-021 (DE WITT (SOUTH OF ROUTE 10) & MACON COUNTIES)
$35.63 $31.88 $67.51
CEMENT MASON/CONCRETE FINISHER Heavy
PLAS0018-032 (ADAMS, BROWN, CASS, CHRISTIAN, MENARD, PIKE, AND SANGAMON COUNTIES)
$28.64 $24.57 $53.21
CEMENT MASON/CONCRETE FINISHER Heavy
PLAS0143-003 (CHAMPAIGN, CLARK, COLES, CUMBERLAND, DOUGLAS, EDGAR, MOULTRIE, PIATT, SHELBY, AND VERMILION COUNTIES)
$33.71 $18.91 $52.62
DREDGING: Heavy
SUIL2003-001 (FIREMAN, OILER, DECKHAND, & SCOWMAN (WITH DIPPER, HYDRAULIC OR OTHER FLOATING EQUIPMENT ENGAGED IN HYDRAULIC AND DIPPER DREDGING OPERATIONS) PIPELINE MEN (BOTH AFLOAT & ASHORE INCLUDING LOADING, UNLOADING, MAINTAINING, AND HANDLING PIPELINES FOR HYDRAULIC DREDGES AND SANDBOATS RANGEMAN, TANKERMAN, SWEEPMAN AND SERVICE TRUCK DRIVER)
$22.51 $7.61 $30.12
DREDGING: Heavy
SUIL2003-001 (LEAD DECKHAND) PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: a. $30.10 per day per employee for medical b. Eight paid holidays: A thru H
$29.68 $7.61 $37.29
DREDGING: ENGINEER AND MECHANIC Heavy
SUIL2003-002 (AREA IV: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE ST. PAUL, ROCK ISLAND AND CHICAGO DISTRICTS, CORPS OF ENGINEERS)
$44.78 $34.21 $78.99
DREDGING: ENGINEER AND MECHANIC Heavy
SUIL2003-002 (AREA III: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE HUNTINGTON DISTRICT, CORPS OF ENGINEERS)
$47.70 $31.75 $79.45
DREDGING: ENGINEER AND MECHANIC Heavy
SUIL2003-002 (AREA II: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE LOUISVILLE DISTRICT, CORPS OF ENGINEERS)
$47.70 $31.75 $79.45
DREDGING: ENGINEER AND MECHANIC Heavy
SUIL2003-002 (AREA I: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE ST. LOUIS DISTRICT, CORPS OF ENGINEERS)
$47.83 $31.75 $79.58
DREDGING: LEVERMEN AND BOATMAN Heavy
SUIL2003-002 (AREA 4: LEVERMAN. OPERATORS ON BACKHOES OVER 130,000 LBS., OPERATORS ON CRANES OVER 165 TONS, AND OPERATORS THAT ARE REQUIRED TO HAVE A LICENSE OR CERTIFICATION TO DO THE WORK ASSIGNED THEM SHALL RECEIVE 5% MORE THAN THE HIGHEST RATE OF PAY PER HOUR LISTED ON THIS AGREEMENT.)
$47.02 $34.21 $81.23
DREDGING: LEVERMEN AND BOATMAN Heavy
SUIL2003-002 (AREA 4: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE ST. PAUL, ROCK ISLAND AND CHICAGO DISTRICTS, CORPS OF ENGINEERS:)
$44.78 $34.21 $78.99
DREDGING: LEVERMEN AND BOATMAN Heavy
SUIL2003-002 (AREA 3: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE HUNTINGTON DISTRICT, CORPS OF ENGINEERS:)
$55.54 $31.75 $87.29
DREDGING: LEVERMEN AND BOATMAN Heavy
SUIL2003-002 (AREA 2: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE LOUISVILLE DISTRICT, CORPS OF ENGINEERS)
$55.54 $31.75 $87.29
DREDGING: LEVERMEN AND BOATMAN Heavy
SUIL2003-002 (AREA 1: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE ST. LOUIS DISTRICT, CORPS OF ENGINEERS)
$55.69 $31.75 $87.44
ELECTRICIAN Heavy
ELEC0034-012 (MASON (EXCEPT BATH, CRANE CREEK, KILBOURNE, LYNCHBURG, MASON CITY, & SALT CREEK TWPS) COUNTY)
$37.51 $21.67 $59.18
ELECTRICIAN Heavy
ELEC0146-003 (CHRISTIAN, COLES, CUMBERLAND, DE WITT (HARP, WAPELLA, BARNETT, CLINTONIA, DE WITT, TURNBRIDGE, TEXAS, CREEK & NIXON TWPS), DOUGLAS (ARCOLA, BURBON, GARRETT TWPS & THE PORTION OF TUSCOLA LYING WEST OF THE CITY OF TUSCOLA & ILLINOIS CENTRAL RAILROAD TRACKS), MACON, MOULTRIE, PIATT (GOOSE CREEK, WILLOW BRANCH, CERRO GORDO, BEMENT & UNITY TWPS), AND SHELBY COUNTIES)
$41.00 $20.68 $61.68
ELECTRICIAN Heavy
ELEC0193-004 (CASS, LOGAN, MASON (BATH, CRANE CREEK, KILBOURNE, LYNCHBURG, MASON CITY & SALT CREEK TWPS), MENARD, MORGAN, SANGAMON AND SCOTT COUNTIES)
$39.80 $23.08 $62.88
ELECTRICIAN (ADAMS COUNTY) Heavy
ELEC0034-015
$35.00 $20.67 $55.67
ELECTRICIAN (VERMILION COUNTY) Heavy
ELEC0538-008
$41.00 $27.36 $68.36
ELECTRICIAN Residential Construction Building
ELEC0193-005 (up to and including 4 stories)
$24.83 $17.12 $41.95
ELECTRICIANS: Heavy
ELEC0197-003
$41.25 $21.30 $62.55
GLAZIER Building
PAIN1168-002
$39.77 $22.73 $62.50
HYDRAULIC DREDGING: LAUNCH OPERATOR - VESSEL 800 HORSE- POWER OR LESS PAID HOLIDAYS Heavy
SUIL2003-001 (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: a. $30.10 per day per employee for medical b. Eight paid holidays: A thru H
$25.15 $7.61 $32.76
HYDRAULIC DREDGING: TUG ENGINEER PAID HOLIDAYS Heavy
SUIL2003-001 (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: a. paid holidays: A thru H
$26.49 $7.61 $34.10
HYDRAULIC DREDGING: TUG OPERATOR - VESSEL OVER 800 HORSE-POWER PAID HOLIDAYS Heavy
SUIL2003-001 (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: a. $30.10 per day per employee for medical b. Eight paid holidays: A thru H
$26.49 $7.61 $34.10
HYDRAULIC DREDGING:TUG WORKERS: FIREMAN, LINEMAN, OILER, DECKHAND, TANKERMAN. SCOWMAN Heavy
SUIL2003-001 (ON/OR WITH TUGBOATS, LAUNCHES, OR OTHER SELF-PROPELLED BOATS) PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: a. $30.10 per day per employee for medical b. Eight paid holidays: A thru H
$22.51 $7.61 $30.12
IRONWORKER Building
IRON0046-008
$36.20 $31.35 $67.55
IRONWORKER Heavy
IRON0022-006 (CLARK, COLES, CUMBERLAND, EDGAR, SHELBY, AND VERMILION COUNTIES)
$38.00 $26.39 $64.39
IRONWORKER Heavy
IRON0046-002 (BROWN, CASS, CHRISTIAN, DEWITT (WESTERN HALF), LOGAN, MACON (EXCEPT PORTION EAST OF DECATUR), MASON, MENARD, MORGAN, PIKE, SANGAMON, SCHUYLER (EASTERN HALF), SCOTT, AND SHELBY (WESTERN HALF) COUNTIES)
$37.60 $32.94 $70.54
IRONWORKER Heavy
IRON0577-004 (ADAMS AND SCHUYLER (WESTERN HALF) COUNTIES)
$36.30 $25.80 $62.10
IRONWORKER (MACON COUNTY (EAST OF DECATUR)) Heavy
IRON0380-003
$37.71 $29.65 $67.36
LABORER Heavy
LABO0159-003 (CLARK, COLES, CUMBERLAND, DOUGLAS, EDGAR, MACON, MOULTRIE, AND SHELBY COUNTIES)
$33.63 $31.76 $65.39
LABORER Heavy
LABO0477-002 (CASS, CHRISTIAN, LOGAN, MENARD, MORGAN, SANGAMON, AND SCOTT COUNTIES)
$34.04 $29.26 $63.30
LABORER Heavy
LABO0703-002 (CHAMPAIGN, DE WITT, PIATT, AND VERMILION COUNTIES)
$37.47 $28.77 $66.24
LABORER (ADAMS COUNTY) Heavy
LABO0231-009
$33.50 $29.33 $62.83
LABORER (ASBESTOS ABATEMENT WORKER) Building
LABO0477-003
$35.90 $29.26 $65.16
LABORER (BROWN, MASON, PIKE, AND SCHUYLER COUNTIES) Heavy
LABO0231-011
$33.50 $29.33 $62.83
LABORER (GENERAL LABORER) Building
LABO0477-003
$32.90 $29.26 $62.16
LINE CONSTRUCTION: GROUNDMAN Heavy
ELEC0193-010 (CLASS A) (CASS, LOGAN, MASON (TOWNSHIPS OF LYNCHBURG, BATH, KILBOURNE, CRANE CREEK, SALT CREEK, AND MASON), MENARD, MORGAN, SCOTT, AND SANGAMON COUNTIES)
$38.38 $18.82 $57.20
LINE CONSTRUCTION: GROUNDMAN - CLASS A Heavy
ELEC0702-002 (ALEXANDER, CLAY, CRAWFORD, EDWARDS, EFFINGHAM, FRANKLIN, FAYETTE (EXCLUDES PORTION NORTH AVENA), GALLATIN, HAMILTON, HARDIN, JACKSON, JASPER, JEFFERSON, JOHNSON, LAWRENCE, MARION, MASSAC, PERRY, POPE, PULASKI, RANDOLPH (EXCEPT RED BUD TWPS), RICHLAND, SALINE, UNION, WABASH, WAYNE, WHITE, AND WILLIAMSON COUNTIES; CLARK, COLES (SOUTHERN HALF), CUMBERLAND, MOULTRIE (WHITLEY TWP), AND SHELBY (EXCEPT WEST OF HOLLAND, PRAIRIE, RICHLAND, & WINDSOR TWPS) COU
$38.18 $19.92 $58.10
LINE CONSTRUCTION: GROUNDMAN - EQUIPMENT OPERATOR Heavy
ELEC0193-010 (CLASS I, ALL CRAWLER TYPE EQUIPMENT LARGER THAN D-4, 15 TON CRANE OR LARGER) (CASS, LOGAN, MASON (TOWNSHIPS OF LYNCHBURG, BATH, KILBOURNE, CRANE CREEK, SALT CREEK, AND MASON), MENARD, MORGAN, SCOTT, AND SANGAMON COUNTIES)
$56.61 $24.20 $80.81
LINE CONSTRUCTION: GROUNDMAN - EQUIPMENT OPERATOR CLASS II Heavy
ELEC0702-002 (ALL OTHER EQUIPMENT) (ALEXANDER, CLAY, CRAWFORD, EDWARDS, EFFINGHAM, FRANKLIN, FAYETTE (EXCLUDES PORTION NORTH AVENA), GALLATIN, HAMILTON, HARDIN, JACKSON, JASPER, JEFFERSON, JOHNSON, LAWRENCE, MARION, MASSAC, PERRY, POPE, PULASKI, RANDOLPH (EXCEPT RED BUD TWPS), RICHLAND, SALINE, UNION, WABASH, WAYNE, WHITE, AND WILLIAMSON COUNTIES; CLARK, COLES (SOUTHERN HALF), CUMBERLAND, MOULTRIE (WHITLEY TWP), AND SHELBY (EXCEPT WEST OF HOLLAND,
$46.49 $22.33 $68.82
LINE CONSTRUCTION: GROUNDMAN - TRUCK DRIVER Heavy
ELEC0193-010 (WITHOUT WINCH) (CASS, LOGAN, MASON (TOWNSHIPS OF LYNCHBURG, BATH, KILBOURNE, CRANE CREEK, SALT CREEK, AND MASON), MENARD, MORGAN, SCOTT, AND SANGAMON COUNTIES)
$40.36 $19.41 $59.77
LINE CONSTRUCTION: GROUNDMAN - TRUCK DRIVER Heavy
ELEC0193-010 (WITH WINCH, MAY OPERATE DIGGERS, 5TH WHEEL TYPE TRUCKS, CRAWLER-TYPE EQUIPMENT, D-4 AND SMALLER, BACKHOE 3/4 YARD AND UNDER, RUBBER TIRE AND CRAWLER W/END LOADER, AND MAY DRIVE BUCKET TRUCK AND LIVE BOOM TYPE LINE TRUCKS) (CASS, LOGAN, MASON (TOWNSHIPS OF LYNCHBURG, BATH, KILBOURNE, CRANE CREEK, SALT CREEK, AND MASON), MENARD, MORGAN, SCOTT, AND SANGAMON COUNTIES)
$42.85 $20.14 $62.99
LINE CONSTRUCTION: GROUNDMAN/EQUIPMENT OPERATOR Heavy
ELEC0051-003 (ALL CRAWLER TYPE EQUIPMENT LARGER THAN D-4, 15 TON CRANE OR LARGER) (ADAMS, BROWN, CASS, CHAMPAIGN, CHRISTIAN, DEWITT, DOUGLAS, EDGAR, LOGAN, MACON, MASON, MENARD, PIATT, SCHUYLER, SCOTT, VERMILION, COLES (EAST OAKLAND, HUMBOLDT, MORGAN, NORTH OKAW, AND SEVEN HICKORY TWPS), MORGAN, MOULTRIE (EXCEPT WHITLEY TWP), PIKE, SANGAMON, & SHELBY (THAT PORTION WEST OF HOLLAND, PRAIRIE, RICHLAND, AND WINDSOR TWPS) COUNTIES)
$52.63 $24.35 $76.98
LINE CONSTRUCTION: GROUNDMAN/TRUCK DRIVER Heavy
ELEC0051-003 (ADAMS, BROWN, CASS, CHAMPAIGN, CHRISTIAN, DEWITT, DOUGLAS, EDGAR, LOGAN, MACON, MASON, MENARD, PIATT, SCHUYLER, SCOTT, VERMILION, COLES (EAST OAKLAND, HUMBOLDT, MORGAN, NORTH OKAW, AND SEVEN HICKORY TWPS), MORGAN, MOULTRIE (EXCEPT WHITLEY TWP), PIKE, SANGAMON, & SHELBY (THAT PORTION WEST OF HOLLAND, PRAIRIE, RICHLAND, AND WINDSOR TWPS) COUNTIES)
$39.92 $20.22 $60.14
LINE CONSTRUCTION: HEAVY - EQUIPMENT OPERATOR CLASS I Heavy
ELEC0702-002 (ALL CRAWLER TYPE EQUIPMENT D-4 AND LARGER) (ALEXANDER, CLAY, CRAWFORD, EDWARDS, EFFINGHAM, FRANKLIN, FAYETTE (EXCLUDES PORTION NORTH AVENA), GALLATIN, HAMILTON, HARDIN, JACKSON, JASPER, JEFFERSON, JOHNSON, LAWRENCE, MARION, MASSAC, PERRY, POPE, PULASKI, RANDOLPH (EXCEPT RED BUD TWPS), RICHLAND, SALINE, UNION, WABASH, WAYNE, WHITE, AND WILLIAMSON COUNTIES; CLARK, COLES (SOUTHERN HALF), CUMBERLAND, MOULTRIE (WHITLEY TWP), AND SHELBY (EXCEPT
$52.13 $23.97 $76.10
LINE CONSTRUCTION: LINEMAN & SUBSTATION TECH Heavy
ELEC0193-010 (CASS, LOGAN, MASON (TOWNSHIPS OF LYNCHBURG, BATH, KILBOURNE, CRANE CREEK, SALT CREEK, AND MASON), MENARD, MORGAN, SCOTT, AND SANGAMON COUNTIES)
$62.90 $26.06 $88.96
LINE CONSTRUCTION: LINEMAN AND SUBSTATION TECHNICIAN Heavy
ELEC0051-003 (ADAMS, BROWN, CASS, CHAMPAIGN, CHRISTIAN, DEWITT, DOUGLAS, EDGAR, LOGAN, MACON, MASON, MENARD, PIATT, SCHUYLER, SCOTT, VERMILION, COLES (EAST OAKLAND, HUMBOLDT, MORGAN, NORTH OKAW, AND SEVEN HICKORY TWPS), MORGAN, MOULTRIE (EXCEPT WHITLEY TWP), PIKE, SANGAMON, & SHELBY (THAT PORTION WEST OF HOLLAND, PRAIRIE, RICHLAND, AND WINDSOR TWPS) COUNTIES)
$58.58 $26.29 $84.87
MARBLE, TILE & TERRAZZO WORKERS Building
BRIL0008-026
$32.20 $18.51 $50.71
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: NEW YORK:(ALBANY, HERKIMER, MONTGOMERY, SARATOGA AND SCHENECTADY COUNTIES))
$67.40 $33.55 $100.95
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: NEW YORK:(CATTARAUGUS, CHAUTAUGA, ERIE, NIAGARA AND ORLEANS COUNTIES))
$56.00 $36.81 $92.81
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: NEW YORK:(CAYUGA, JEFFERSON, MADISON, ONEIDA, OSWEGO AND ST. LAWRENCE COUNTIES))
$65.75 $33.40 $99.15
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: NEW YORK:(MONROE, ONTARIO AND WAYNE COUNTIES AND THE CITY OF ROCHESTER))
$65.20 $35.75 $100.95
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: OHIO:(ASHTABULA, CUYAHOGA, ERIE,LAKE, AND LORAIN COUNTIES))
$55.95 $16.81 $72.76
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: OHIO:(LUCAS, HENRY, OTTAWA, WOOD AND SANDUSKY COUNTIES))
$54.25 $16.81 $71.06
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: PENNSYLVANIA:(ERIE COUNTY):)
$53.00 $24.21 $77.21
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: WISCONSIN:INCLUDES ALL MARINE/FLOATING TYPE WORK ON PROJECTS IN THE SUPERIOR/DULUTH HARBOR, LAKE SUPERIOR.)
$57.15 $30.38 $87.53
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: ILLINOIS) Class I - Master Mechanic - assist and direct PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency
$73.95 $51.10 $125.05
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: INDIANA) Class I - Master Mechanic - assist and direct PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency
$57.90 $43.80 $101.70
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: MICHIGAN) Class I - Master Mechanic - assist and direct PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency
$53.00 $33.02 $86.02
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: MINNESOTA) Class I - Master Mechanic - assist and direct PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency
$57.80 $29.50 $87.30
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: NEW YORK:(ALBANY, HERKIMER, MONTGOMERY, SARATOGA AND SCHENECTADY COUNTIES))
$65.90 $33.55 $99.45
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: NEW YORK:(CATTARAUGUS, CHAUTAUGA, ERIE, NIAGARA AND ORLEANS COUNTIES))
$54.50 $36.81 $91.31
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: NEW YORK:(CAYUGA, JEFFERSON, MADISON, ONEIDA, OSWEGO AND ST. LAWRENCE COUNTIES))
$64.25 $33.40 $97.65
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: NEW YORK:(MONROE, ONTARIO AND WAYNE COUNTIES AND THE CITY OF ROCHESTER))
$63.70 $35.75 $99.45
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: OHIO:(ASHTABULA, CUYAHOGA, ERIE,LAKE, AND LORAIN COUNTIES))
$54.45 $16.81 $71.26
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: OHIO:(LUCAS, HENRY, OTTAWA, WOOD AND SANDUSKY COUNTIES))
$52.75 $16.81 $69.56
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: PENNSYLVANIA:(ERIE COUNTY):)
$51.50 $24.21 $75.71
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: WISCONSIN:INCLUDES ALL MARINE/FLOATING TYPE WORK ON PROJECTS IN THE SUPERIOR/DULUTH HARBOR, LAKE SUPERIOR.)
$55.65 $30.38 $86.03
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: ILLINOIS) Class II-A Crane/Backhoe Operator, 70 Ton or over Tug Operator, Mechanic/Welder, assistant engineer(hydraulic dredge), leverman (hydraulic dredge), diver tender PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency
$72.45 $51.10 $123.55
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: INDIANA) Class II-A Crane/Backhoe Operator, 70 Ton or over Tug Operator, Mechanic/Welder, assistant engineer(hydraulic dredge), leverman (hydraulic dredge), diver tender PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency
$56.40 $43.80 $100.20
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: MICHIGAN) Class II-A Crane/Backhoe Operator, 70 Ton or over Tug Operator, Mechanic/Welder, assistant engineer(hydraulic dredge), leverman (hydraulic dredge), diver tender PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency
$51.50 $33.02 $84.52
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: MINNESOTA) Class II-A Crane/Backhoe Operator, 70 Ton or over Tug Operator, Mechanic/Welder, assistant engineer(hydraulic dredge), leverman (hydraulic dredge), diver tender PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency
$56.30 $29.50 $85.80
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: NEW YORK:(ALBANY, HERKIMER, MONTGOMERY, SARATOGA AND SCHENECTADY COUNTIES))
$68.90 $33.55 $102.45
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: NEW YORK:(CATTARAUGUS, CHAUTAUGA, ERIE, NIAGARA AND ORLEANS COUNTIES))
$57.50 $36.81 $94.31
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: NEW YORK:(CAYUGA, JEFFERSON, MADISON, ONEIDA, OSWEGO AND ST. LAWRENCE COUNTIES))
$67.25 $33.40 $100.65
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: NEW YORK:(MONROE, ONTARIO AND WAYNE COUNTIES AND THE CITY OF ROCHESTER))
$66.70 $35.75 $102.45
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: OHIO:(ASHTABULA, CUYAHOGA, ERIE,LAKE, AND LORAIN COUNTIES))
$57.45 $16.81 $74.26
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: OHIO:(LUCAS, HENRY, OTTAWA, WOOD AND SANDUSKY COUNTIES))
$55.75 $16.81 $72.56
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: PENNSYLVANIA:(ERIE COUNTY):)
$54.50 $24.21 $78.71
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: WISCONSIN:INCLUDES ALL MARINE/FLOATING TYPE WORK ON PROJECTS IN THE SUPERIOR/DULUTH HARBOR, LAKE SUPERIOR.)
$58.65 $30.38 $89.03
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: ILLINOIS) Class II-B Friction, Lattice Boom, or any Crane Certifications PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency
$75.45 $51.10 $126.55
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: INDIANA) Class II-B Friction, Lattice Boom, or any Crane Certifications PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency
$59.40 $43.80 $103.20
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: MICHIGAN) Class II-B Friction, Lattice Boom, or any Crane Certifications PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency
$54.50 $33.02 $87.52
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: MINNESOTA) Class II-B Friction, Lattice Boom, or any Crane Certifications PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency
$59.30 $29.50 $88.80
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: NEW YORK:(ALBANY, HERKIMER, MONTGOMERY, SARATOGA AND SCHENECTADY COUNTIES))
$61.40 $33.55 $94.95
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: NEW YORK:(CATTARAUGUS, CHAUTAUGA, ERIE, NIAGARA AND ORLEANS COUNTIES))
$50.00 $36.81 $86.81
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: NEW YORK:(CAYUGA, JEFFERSON, MADISON, ONEIDA, OSWEGO AND ST. LAWRENCE COUNTIES))
$59.75 $33.40 $93.15
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: NEW YORK:(MONROE, ONTARIO AND WAYNE COUNTIES AND THE CITY OF ROCHESTER))
$59.20 $35.75 $94.95
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: OHIO:(ASHTABULA, CUYAHOGA, ERIE,LAKE, AND LORAIN COUNTIES))
$49.95 $16.81 $66.76
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: OHIO:(LUCAS, HENRY, OTTAWA, WOOD AND SANDUSKY COUNTIES))
$48.25 $16.81 $65.06
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: PENNSYLVANIA:(ERIE COUNTY):)
$47.00 $24.21 $71.21
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: WISCONSIN:INCLUDES ALL MARINE/FLOATING TYPE WORK ON PROJECTS IN THE SUPERIOR/DULUTH HARBOR, LAKE SUPERIOR.)
$51.15 $30.38 $81.53
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: ILLINOIS) Class III - Deck Equipment Operator (Machineryman) Maintenance of Crane (over 50 ton capacity) or Backhoe (115,000 pounds or more), Tug/launch operator, Loader/dozer and like equipment on Barge, breakwater wall, slip/dock, Scow, Deck Machinery, etc. PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency
$67.95 $51.10 $119.05
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: INDIANA) Class III - Deck Equipment Operator (Machineryman) Maintenance of Crane (over 50 ton capacity) or Backhoe (115,000 pounds or more), Tug/launch operator, Loader/dozer and like equipment on Barge, breakwater wall, slip/dock, Scow, Deck Machinery, etc. PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency
$51.90 $43.80 $95.70
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: MICHIGAN) Class III - Deck Equipment Operator (Machineryman) Maintenance of Crane (over 50 ton capacity) or Backhoe (115,000 pounds or more), Tug/launch operator, Loader/dozer and like equipment on Barge, breakwater wall, slip/dock, Scow, Deck Machinery, etc. PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency
$47.00 $33.02 $80.02
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: MINNESOTA) Class III - Deck Equipment Operator (Machineryman) Maintenance of Crane (over 50 ton capacity) or Backhoe (115,000 pounds or more), Tug/launch operator, Loader/dozer and like equipment on Barge, breakwater wall, slip/dock, Scow, Deck Machinery, etc. PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency
$51.80 $29.50 $81.30
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: NEW YORK:(ALBANY, HERKIMER, MONTGOMERY, SARATOGA AND SCHENECTADY COUNTIES))
$56.90 $33.55 $90.45
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: NEW YORK:(CATTARAUGUS, CHAUTAUGA, ERIE, NIAGARA AND ORLEANS COUNTIES))
$45.50 $36.81 $82.31
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: NEW YORK:(CAYUGA, JEFFERSON, MADISON, ONEIDA, OSWEGO AND ST. LAWRENCE COUNTIES))
$55.25 $33.40 $88.65
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: NEW YORK:(MONROE, ONTARIO AND WAYNE COUNTIES AND THE CITY OF ROCHESTER))
$54.70 $35.75 $90.45
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: OHIO:(ASHTABULA, CUYAHOGA, ERIE,LAKE, AND LORAIN COUNTIES))
$45.45 $16.81 $62.26
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: OHIO:(LUCAS, HENRY, OTTAWA, WOOD AND SANDUSKY COUNTIES))
$43.75 $16.81 $60.56
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: PENNSYLVANIA:(ERIE COUNTY):)
$42.50 $24.21 $66.71
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: WISCONSIN:INCLUDES ALL MARINE/FLOATING TYPE WORK ON PROJECTS IN THE SUPERIOR/DULUTH HARBOR, LAKE SUPERIOR.)
$46.65 $30.38 $77.03
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: ILLINOIS) Class IV - Deck Equipment Operator(Machineryman/Fireman) (Four equipment units or more) Off Road Trucks, Deck Hand, Tug Engineer and Crane Maintenance 50 ton capacity and under or Backhoe weighing 115,000 pounds or less, assistant tug operator. PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency
$63.45 $51.10 $114.55
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: INDIANA) Class IV - Deck Equipment Operator(Machineryman/Fireman) (Four equipment units or more) Off Road Trucks, Deck Hand, Tug Engineer and Crane Maintenance 50 ton capacity and under or Backhoe weighing 115,000 pounds or less, assistant tug operator. PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency
$47.40 $43.80 $91.20
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: MICHIGAN) Class IV - Deck Equipment Operator(Machineryman/Fireman) (Four equipment units or more) Off Road Trucks, Deck Hand, Tug Engineer and Crane Maintenance 50 ton capacity and under or Backhoe weighing 115,000 pounds or less, assistant tug operator. PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency
$42.50 $33.02 $75.52
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: MINNESOTA) Class IV - Deck Equipment Operator(Machineryman/Fireman) (Four equipment units or more) Off Road Trucks, Deck Hand, Tug Engineer and Crane Maintenance 50 ton capacity and under or Backhoe weighing 115,000 pounds or less, assistant tug operator. PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency
$47.30 $29.50 $76.80
MILLWRIGHT Building
CARP1051-006
$33.06 $29.36 $62.42
OPERATOR: POWER EQUIPMENT, GROUP 3 STRAIGHT FRAMED TRUCK AND TRUCK MOUNTED VAC UNIT, STARTING ENGINEER Heavy
ENGI0649-006 (3 TO 5 PIECES); TRAC AIR MACHINE W/O ATTACHMENTS; ROLLERS, 5 TONS & UNDER ON EARTH & GRAVEL; FORM GRADER; BULK CEMENT PLANT; OILERS. (MASON COUNTY) - ESCALATED RATE ON CRANE, DERRICK BOOMS, AND TOWER CRANES: ADDITIONAL $1.00 PER HOUR OVER SCALE WHEN CRANE OR DERRICK IS POSITIONED 50 FT. OR MORE ABOVE ADJACENT GROUND LEVEL OR WATER LEVEL. $.05 PER HOUR, PER FOOT, OVER 90 FEET INCLUDING JIB. OPERATING ENGINEERS WHO OPERATE LATTICE BOOM CRAWLER CRANES, LATTICE BOOM TRUCK CRANES, TELESCOPIC BOOM CRANES LESS THAN 17.5 TONS, TOWER CRANES, OVERHEAD CRANES AND HAVE BEEN CERTIFIED BY HTE NATIONAL COMMISSION FOR THE CERTIFICATION OF CRANE OPERATORS ON THE EQUIPMENT THEY OPERATE SHALL RECEIVE $1.60 PER HOUR OVER SCALE. A. ON DESIGNATED HAZARDOUS WASTE JOBS, OPERATORS SHALL RECEIVE: LEVEL A ADD $4.00 TO THE APPROPRIATE GROUP RATE; LEVELS B AND C ADD $3.00 TO THE APPROPRIATE GROUP RATE; AND LEVEL D ADD $2.00 TO THE APPROPRIATE GROUP RATE
$38.03 $43.42 $81.45
PAINTER Heavy
PAIN0090-002 (ADAMS, BROWN, CASS, LOGAN, MENARD, MORGAN, AND SCOTT COUNTIES) EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM ALL WORK OVER 40 FT. ABOVE FLOOR OR GROUND LEVEL - $1.00 PREMIUM
$32.23 $20.58 $52.81
PAINTER Heavy
PAIN0090-006 (SANGAMON COUNTY) EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM ALL WORK OVER 40 FT. ABOVE FLOOR OR GROUND LEVEL - $1.00 PREMIUM
$32.23 $20.58 $52.81
PAINTER Heavy
PAIN0363-001 (CHAMPAIGN, COLES, CUMBERLAND, DOUGLAS, AND VERMILION COUNTIES) EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM
$35.29 $14.50 $49.79
PAINTER: BLASTING, SPRAYING & PRESSURE WASHING Heavy
PAIN1705-002 (CLARK AND EDGAR COUNTIES) EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM BRUSH & ROLLER WORK OVER 30FT ABOVE GROUND OR FLOOR LEVEL - GROUND OR FLOOR LEVEL - $1.80 PREMIUM BLASTING, SPRAYING & PRESSURE WORK OVER 30FT ABOVE GROUND LEVEL - $2.30 PREMIUM
$28.37 $21.05 $49.42
PAINTER: BRIDGE EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM Heavy
PAIN0058-008
$32.45 $17.12 $49.57
PAINTER: BRUSH & ROLLER AND WALL COVERING DRYWALL PREPARING Heavy
PAIN1705-002 (CLARK AND EDGAR COUNTIES) EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM BRUSH & ROLLER WORK OVER 30FT ABOVE GROUND OR FLOOR LEVEL - GROUND OR FLOOR LEVEL - $1.80 PREMIUM BLASTING, SPRAYING & PRESSURE WORK OVER 30FT ABOVE GROUND LEVEL - $2.30 PREMIUM BLASTING, SPRAYING & PRESSURE WORK OVER 100FT ABOVE GROUND LEVEL - $3.30 PREMIUM
$27.37 $21.05 $48.42
PAINTER: BRUSH AND ROLLER Heavy
PAIN0288-002 (DE WITT, MACON, MOULTRIE, PIATT, AND SHELBY COUNTIES) EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM WORK OVER 50 FT. ABOVE GROUND OR FLOOR LEVEL - $1.00 PREMIUM
$30.50 $22.30 $52.80
PAINTER: BRUSH, SPRAY, PRESSURE ROLLER, SANDBLASTING, BRIDGES, & NEW STRUCTURAL STEEL WORK Heavy
PAIN0157-001 (FULTON, MARSHALL, MASON, PEORIA, SCHUYLER, TAZEWELL AND WOODFORD COUNTIES)
$40.00 $26.90 $66.90
PAINTER: BUILDING EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM ALL WORK OVER 40 FT. ABOVE FLOOR OR GROUND LEVEL - $1.00 PREMIUM Building
PAIN0090-004
$32.23 $20.58 $52.81
PAINTER: PAPERHANGING AND DRYWALL TAPING Heavy
PAIN0288-002 (DE WITT, MACON, MOULTRIE, PIATT, AND SHELBY COUNTIES) EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM WORK OVER 50 FT. ABOVE GROUND OR FLOOR LEVEL - $1.00 PREMIUM
$30.50 $22.30 $52.80
PAINTER: RESIDENTIAL EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM ALL WORK OVER 40 FT. ABOVE FLOOR OR GROUND LEVEL - $1.00 PREMIUM Building
PAIN0090-004
$29.73 $20.58 $50.31
PAINTER: SPRAY AND SANDBLASTING Heavy
PAIN0288-002 (DE WITT, MACON, MOULTRIE, PIATT, AND SHELBY COUNTIES) EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM WORK OVER 50 FT. ABOVE GROUND OR FLOOR LEVEL - $1.00 PREMIUM
$31.25 $22.30 $53.55
PILEDRIVERMAN Heavy
CARP0243-001 (CHAMPAIGN, EDGAR, AND VERMILION COUNTIES)
$37.85 $25.77 $63.62
PILEDRIVERMAN Heavy
CARP0243-006 (COLES, CUMBERLAND, MOULTRIE, AND SHELBY COUNTIES)
$35.65 $27.97 $63.62
PILEDRIVERMAN Heavy
CARP0270-004 (CHRISTIAN, MENARD, AND SANGAMON (EXCEPT ILLIOPOLIS) COUNTIES)
$33.15 $25.97 $59.12
PILEDRIVERMAN Heavy
CARP0270-016 (MACON, MOULTRIE (NORTH OF RT #133), PIATT (SOUTHWESTERN HALF), SANGAMON (ILLIOPOLIS) AND SHELBY (MOWEAQUA & NORTH THEREOF) COUNTIES)
$35.05 $28.57 $63.62
PILEDRIVERMAN Heavy
CARP0270-024 (BROWN, CASS, MORGAN, PIKE, AND SCOTT COUNTIES)
$35.05 $28.57 $63.62
PILEDRIVERMAN (ADAMS COUNTY) Heavy
CARP0270-007
$32.55 $25.97 $58.52
PILEDRIVERMAN (CLARK COUNTY) Heavy
CARP0243-014
$37.20 $21.92 $59.12
PILEDRIVERMAN (DE WITT COUNTY) Heavy
CARP0237-021
$37.06 $31.16 $68.22
PILEDRIVERMAN (DOUGLAS COUNTY) Heavy
CARP0243-009
$35.65 $27.97 $63.62
PILEDRIVERMAN (LOGAN COUNTY) Heavy
CARP0270-021
$35.05 $28.57 $63.62
PILEDRIVERMAN (MASON COUNTY) Heavy
CARP0237-012
$33.55 $30.07 $63.62
PLASTERER Building
PLAS0018-033 Scope differs by code/WD
$28.50 $19.12 $47.62
PLASTERER Building
PLAS0018-033 Scope differs by code/WD
$28.50 $19.12 $47.62
PLUMBER, PIPEFITTER, STEAMFITTER (BUILDING) Building
PLUM0137-002
$43.89 $25.71 $69.60
PLUMBER, PIPEFITTER, STEAMFITTER (RESIDENTIAL) Building
PLUM0137-002
$37.88 $25.71 $63.59
POWER EQUIPMENT OPERATOR GROUP 3 AIR COMPRESSOR, TRACK OR SELF-PROPELLED; BULK CEMENT BATCHING- PLANTS; CONVEYORS; CONCRETE MIERS Building
ENGI0965-003 (EXCEPT PLANT,PAVER,TOWER) FIREMENT, GENERATORS; GREASERS; LIGHT PLANTS; MECHANICAL THEATER; OILERS; POWER FROM GRADERS; POWER SUB-GRADER; PUG MILL, WHEN USED OTHER THAN ASPHALT OPERATION; ROLLERS (EXCEPT BITUMIN OUS); TRACTORS W/O POWER ATTACHMENTS REGARDLESS OF SIZE OR TYPE; TRUCK CRANE OILER; & DRIVER ( ONE MAN ); VIBRATORY HAMMER; WAT ER PUMP; WELDING MACHINE ( ONE 300 AMP OR OVER) COMBINATIONS OF FIVE OF ANY AIR COMPRESSORS; CONVEYORS, WELDING MACHINES, WATER PUMPS; LIGHT PLANTS OR GENERATORS SHALL BE IN BATTERIES OR WITH IN 300 FT. PREMIUM PAY- CRANES WITH BOOMS - 120-200 FT. 1.00 PER HOUR; $.02 PER FOOT FOR EACH FOOT ABOVE 200; MULTIPLE UNIT MACHINES- 1.00 PER HOUR; UNDERGROUND WORK- 1.00 PER HOUR; UNDER AIR PRESSURE- 1.00 PER HOUR; LONG BOOMS ON STATIONARY TOWER CRANES-1.00 PER HOUR. ABOVE LONG BOOM SCALE HAZARDOUS WASTE/ASBESTOS REMOVAL WORKERS RECEIVE THE FOLLOWING WAGES AND FRINGE BENEFITS: LEVEL A (HIGHEST LEVEL OF RESPIRATORY, SKIN, AND EYE PROTECTION) RECEIVES $2.00 PER HOUR ABOVE JOURNEYMAN. LEVEL B (SAME AS LEVEL A, BUT A LOWER LEVEL OF SKIN PROTECTION) RECEIVES $1.50 PER HOUR ABOVE JOURNEYMAN. LEVEL C (SAME AS LEVEL B, BUT A LOWER LEVEL OF RESPIRATORY PROTECTION) RECEIVES $1.00 PER HOUR ABOVE JOURNEYMAN
$34.30 $28.75 $63.05
POWER EQUIPMENT OPERATOR GROUP 3 AIR COMPRESSOR, TRACK OR SELF-PROPELLED; BULK CEMENT BATCHING- PLANTS; CONVEYORS; CONCRETE MIXERS Heavy
ENGI0965-002 (EXCEPT PLANT, PAVER, TOWER) FIREMENT, GENERATORS; GREASERS; LIGHT PLANTS; MECHANICAL THEATER; OILERS; POWER FROM GRADERS; POWER SUB-GRADER; PUG MILL, WHEN USED OTHER THAN ASPHALT OPERATION; ROOLERS (EXCEPT BITUMINOUS); TRACTORS W/O POWER ATTACHMENTS REGARDLESS OF SIZE OR TYPE; TRUCK CRANE OILER; & DRIVER (ONE MAN); VIBRATORY HAMMER; WATER PUMP; WELDING MACHINE (ONE 300 AMP OR OVER) COMBINATIONS OF FIVE OF ANY AIR COMPRESSORS; CONVEYORS, WELDING MACHINES, WATER PUMPS; LIGHT PLANTS OR GENERATORS SHALL BE IN BATTERIES OR WITH IN 300 FT. (ADAMS, BROWN, CASS, CHRISTIAN, DE WITT, LOGAN, MACON, MENARD, MORGAN, PIATT, PIKE, SANGAMON, SCHUYLER, SCOTT, AND SHELBY COUNTIES) PREMIUM PAY - CRANES WITH BOOMS 120-200 FT. 1.00 PER HOUR; .02 PER FOOT FOR EACH FOOT ABOVE 200 MULTIPLE UNIT MACHINE - 1.00 PER HOUR; UNDERGROUND WORK - 1.00 PER HOUR; UNDER AIR PRESSURE - 1.00 PER HOUR; HAZARDOUS WASTE OR ASBESTOS REMOVAL PROJECTS - 1.00 PER HOUR FOR LEVEL C WORK; 1.50 PER HOUR FOR LEVEL B WORK; 2.00 PER HOUR FOR LEVEL A WORK; LONG BOOM ON A STATIONARY CRANE 1.00 PER HOUR ABOVE LONG BOOM SCALE LEVEL A: (HIGHEST LEVEL OF REPIRATORY, SKIN, AND EYE PROTECTION) LEVEL B: (SAME AS LEVEL A, BUT A LOWER LEVEL OF SKIN PROTECTION) LEVEL C: (SAME AS LEVEL B, BUT A LOWER LEVEL OF RESPIRATORY PROTECTION)
$33.67 $30.20 $63.87
POWER EQUIPMENT OPERATOR GROUP 4 LATTICE BOOM CRAWLER CRANE, LATTICE BOOM TRUCK CRANE, TELESCOPIC TRUCK MOUNTED CRANE, TOWER CRANE Heavy
ENGI0965-002 (ADAMS, BROWN, CASS, CHRISTIAN, DE WITT, LOGAN, MACON, MENARD, MORGAN, PIATT, PIKE, SANGAMON, SCHUYLER, SCOTT, AND SHELBY COUNTIES) PREMIUM PAY - CRANES WITH BOOMS 120-200 FT. 1.00 PER HOUR; .02 PER FOOT FOR EACH FOOT ABOVE 200 MULTIPLE UNIT MACHINE - 1.00 PER HOUR; UNDERGROUND WORK - 1.00 PER HOUR; UNDER AIR PRESSURE - 1.00 PER HOUR; HAZARDOUS WASTE OR ASBESTOS REMOVAL PROJECTS - 1.00 PER HOUR FOR LEVEL C WORK; 1.50 PER HOUR FOR LEVEL B WORK; 2.00 PER HOUR FOR LEVEL A WORK; LONG BOOM ON A STATIONARY CRANE 1.00 PER HOUR ABOVE LONG BOOM SCALE LEVEL A: (HIGHEST LEVEL OF REPIRATORY, SKIN, AND EYE PROTECTION) LEVEL B: (SAME AS LEVEL A, BUT A LOWER LEVEL OF SKIN PROTECTION) LEVEL C: (SAME AS LEVEL B, BUT A LOWER LEVEL OF RESPIRATORY PROTECTION)
$48.81 $30.20 $79.01
ROOFER Building
ROOF0112-002
$36.00 $26.36 $62.36
SHEET METAL WORKER (BUILDING) Building
SHEE0218-003
$38.54 $30.37 $68.91
SHEET METAL WORKER (RESIDENTIAL) Building
SHEE0218-002
$26.73 $26.48 $53.21
TRUCK DRIVER, GROUP 1 Heavy
TEAM0026-004 (CHAMPAIGN, COLES, DEWITT, DOUGLAS, MOULTRIE (EAST OF A LINE FROM THE NORTHEAST CORNER OF THE COUNTY EXTENDING SOUTHEAST IN THE DIRECTION OF FINDLAY (SHELBY COUNTY) TO A POINT THAT INTERSECTS THE SHELBY COUNTY LINE), PIATT (EAST OF A LINE FROM WHERE THE DEWITT COUNTY LINE INTERSECTS ROUTE 10 IN A SOUTHEAST DIRECTION TOWARDS THE SOUTHEAST CORNER OF THE COUNTY), SHELBY (EAST OF AN IMAGINARY LINE BEGINNING AT THE NORTHEAST BORDER WITH MOULTRIE COUNTY EXTENDING SOUTHWEST IN TH
$45.29 $25.42 $70.71
TRUCK DRIVER, GROUP 1 Heavy
TEAM0279-003 (CHRISTIAN,MACON, MOULTRIE (WEST OF A LINE FROM THE NORTHEAST CORNER EXTENDING STRAIGHT SOUTHEAST INTHE DIRECTION OF FINDLAY - SHELBY COUNTY - TO A POINT THAT INTERSECTS THE SHELBY COUNTY LINE), PIATT (WEST OF A LINE FROME WHERE THE DEWITT COUNTY LINE INTERSECTS ROUTE 10 IN A SOUTHEAST DIRECTION TOWARDS THE SOUTHEAST CORNER OF THE COUNTY), SHELBY (WEST OF AN IMAGINARY LINE BEGINNING AT THE NORTHEAST BORDER WITH MOULTRIE COUNTY EXTENDING SOUTHWEST IN THE DIRECTION OF FINDL
$43.28 $27.56 $70.84
TRUCK DRIVER, GROUP 2 Heavy
TEAM0026-004 (CHAMPAIGN, COLES, DEWITT, DOUGLAS, MOULTRIE (EAST OF A LINE FROM THE NORTHEAST CORNER OF THE COUNTY EXTENDING SOUTHEAST IN THE DIRECTION OF FINDLAY (SHELBY COUNTY) TO A POINT THAT INTERSECTS THE SHELBY COUNTY LINE), PIATT (EAST OF A LINE FROM WHERE THE DEWITT COUNTY LINE INTERSECTS ROUTE 10 IN A SOUTHEAST DIRECTION TOWARDS THE SOUTHEAST CORNER OF THE COUNTY), SHELBY (EAST OF AN IMAGINARY LINE BEGINNING AT THE NORTHEAST BORDER WITH MOULTRIE COUNTY EXTENDING SOUTHWEST IN TH
$45.88 $25.42 $71.30
TRUCK DRIVER, GROUP 2 Heavy
TEAM0279-003 (CHRISTIAN,MACON, MOULTRIE (WEST OF A LINE FROM THE NORTHEAST CORNER EXTENDING STRAIGHT SOUTHEAST INTHE DIRECTION OF FINDLAY - SHELBY COUNTY - TO A POINT THAT INTERSECTS THE SHELBY COUNTY LINE), PIATT (WEST OF A LINE FROME WHERE THE DEWITT COUNTY LINE INTERSECTS ROUTE 10 IN A SOUTHEAST DIRECTION TOWARDS THE SOUTHEAST CORNER OF THE COUNTY), SHELBY (WEST OF AN IMAGINARY LINE BEGINNING AT THE NORTHEAST BORDER WITH MOULTRIE COUNTY EXTENDING SOUTHWEST IN THE DIRECTION OF FINDL
$43.86 $27.56 $71.42
TRUCK DRIVER, GROUP 2 (MASON COUNTY) Heavy
TEAM0627-003
$43.83 $24.27 $68.10
TRUCK DRIVER, GROUP 3 Heavy
TEAM0026-004 (CHAMPAIGN, COLES, DEWITT, DOUGLAS, MOULTRIE (EAST OF A LINE FROM THE NORTHEAST CORNER OF THE COUNTY EXTENDING SOUTHEAST IN THE DIRECTION OF FINDLAY (SHELBY COUNTY) TO A POINT THAT INTERSECTS THE SHELBY COUNTY LINE), PIATT (EAST OF A LINE FROM WHERE THE DEWITT COUNTY LINE INTERSECTS ROUTE 10 IN A SOUTHEAST DIRECTION TOWARDS THE SOUTHEAST CORNER OF THE COUNTY), SHELBY (EAST OF AN IMAGINARY LINE BEGINNING AT THE NORTHEAST BORDER WITH MOULTRIE COUNTY EXTENDING SOUTHWEST IN TH
$46.15 $25.42 $71.57
TRUCK DRIVER, GROUP 3 Heavy
TEAM0279-003 (CHRISTIAN,MACON, MOULTRIE (WEST OF A LINE FROM THE NORTHEAST CORNER EXTENDING STRAIGHT SOUTHEAST INTHE DIRECTION OF FINDLAY - SHELBY COUNTY - TO A POINT THAT INTERSECTS THE SHELBY COUNTY LINE), PIATT (WEST OF A LINE FROME WHERE THE DEWITT COUNTY LINE INTERSECTS ROUTE 10 IN A SOUTHEAST DIRECTION TOWARDS THE SOUTHEAST CORNER OF THE COUNTY), SHELBY (WEST OF AN IMAGINARY LINE BEGINNING AT THE NORTHEAST BORDER WITH MOULTRIE COUNTY EXTENDING SOUTHWEST IN THE DIRECTION OF FINDL
$44.15 $27.56 $71.71
TRUCK DRIVER, GROUP 3 Heavy
TEAM0916-003 (LOGAN, MENARD, MORGAN, PIKE, SANGAMON, SCHUYLER, SCOTT COUNTIES)
$46.25 $25.72 $71.97
TRUCK DRIVER, GROUP 3 (CLARK AND EDGAR COUNTIES) Heavy
TEAM0135-008
$39.18 $16.11 $55.29
TRUCK DRIVER, GROUP 3 (MASON COUNTY) Heavy
TEAM0627-003
$44.10 $24.27 $68.37
TRUCK DRIVER, GROUP 4 Heavy
TEAM0026-004 (CHAMPAIGN, COLES, DEWITT, DOUGLAS, MOULTRIE (EAST OF A LINE FROM THE NORTHEAST CORNER OF THE COUNTY EXTENDING SOUTHEAST IN THE DIRECTION OF FINDLAY (SHELBY COUNTY) TO A POINT THAT INTERSECTS THE SHELBY COUNTY LINE), PIATT (EAST OF A LINE FROM WHERE THE DEWITT COUNTY LINE INTERSECTS ROUTE 10 IN A SOUTHEAST DIRECTION TOWARDS THE SOUTHEAST CORNER OF THE COUNTY), SHELBY (EAST OF AN IMAGINARY LINE BEGINNING AT THE NORTHEAST BORDER WITH MOULTRIE COUNTY EXTENDING SOUTHWEST IN TH
$46.54 $25.42 $71.96
TRUCK DRIVER, GROUP 4 Heavy
TEAM0279-003 (CHRISTIAN,MACON, MOULTRIE (WEST OF A LINE FROM THE NORTHEAST CORNER EXTENDING STRAIGHT SOUTHEAST INTHE DIRECTION OF FINDLAY - SHELBY COUNTY - TO A POINT THAT INTERSECTS THE SHELBY COUNTY LINE), PIATT (WEST OF A LINE FROME WHERE THE DEWITT COUNTY LINE INTERSECTS ROUTE 10 IN A SOUTHEAST DIRECTION TOWARDS THE SOUTHEAST CORNER OF THE COUNTY), SHELBY (WEST OF AN IMAGINARY LINE BEGINNING AT THE NORTHEAST BORDER WITH MOULTRIE COUNTY EXTENDING SOUTHWEST IN THE DIRECTION OF FINDL
$44.53 $27.56 $72.09
TRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS Heavy
TEAM0627-003 (MASON COUNTY)
$44.49 $24.27 $68.76
TRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS Heavy
TEAM0916-003 (LOGAN, MENARD, MORGAN, PIKE, SANGAMON, SCHUYLER, SCOTT COUNTIES)
$46.60 $25.72 $72.32
TRUCK DRIVER, GROUP 4 LOW BOY; OIL DISTRIBUTORS Heavy
TEAM0135-008 (CLARK AND EDGAR COUNTIES) FOOTNOTE: A. $46.20 PER DAY
$39.44 $16.11 $55.55
TRUCK DRIVER, GROUP 5 Heavy
TEAM0026-004 (CHAMPAIGN, COLES, DEWITT, DOUGLAS, MOULTRIE (EAST OF A LINE FROM THE NORTHEAST CORNER OF THE COUNTY EXTENDING SOUTHEAST IN THE DIRECTION OF FINDLAY (SHELBY COUNTY) TO A POINT THAT INTERSECTS THE SHELBY COUNTY LINE), PIATT (EAST OF A LINE FROM WHERE THE DEWITT COUNTY LINE INTERSECTS ROUTE 10 IN A SOUTHEAST DIRECTION TOWARDS THE SOUTHEAST CORNER OF THE COUNTY), SHELBY (EAST OF AN IMAGINARY LINE BEGINNING AT THE NORTHEAST BORDER WITH MOULTRIE COUNTY EXTENDING SOUTHWEST IN TH
$47.64 $25.42 $73.06
TRUCK DRIVER, GROUP 5 Heavy
TEAM0279-003 (CHRISTIAN,MACON, MOULTRIE (WEST OF A LINE FROM THE NORTHEAST CORNER EXTENDING STRAIGHT SOUTHEAST INTHE DIRECTION OF FINDLAY - SHELBY COUNTY - TO A POINT THAT INTERSECTS THE SHELBY COUNTY LINE), PIATT (WEST OF A LINE FROME WHERE THE DEWITT COUNTY LINE INTERSECTS ROUTE 10 IN A SOUTHEAST DIRECTION TOWARDS THE SOUTHEAST CORNER OF THE COUNTY), SHELBY (WEST OF AN IMAGINARY LINE BEGINNING AT THE NORTHEAST BORDER WITH MOULTRIE COUNTY EXTENDING SOUTHWEST IN THE DIRECTION OF FINDL
$45.61 $27.56 $73.17
TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK Heavy
TEAM0135-008 (CLARK AND EDGAR COUNTIES) FOOTNOTE: A. $46.20 PER DAY
$39.44 $16.11 $55.55
TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK Heavy
TEAM0916-003 (LOGAN, MENARD, MORGAN, PIKE, SANGAMON, SCHUYLER, SCOTT COUNTIES)
$47.71 $25.72 $73.43
TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. (MASON COUNTY) Heavy
TEAM0627-003
$45.59 $24.27 $69.86
TRUCK DRIVER: GROUP 4: LOW BOY AND OIL DISTRIBUTORS Building
TEAM0916-001
$46.60 $25.72 $72.32
TRUCK DRIVER: GROUP 5: DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK Building
TEAM0916-001
$47.71 $25.72 $73.43

Wage Determinations

Heavy, Highway

87 trades

Applies to

Adams, Brown, Cass, Champaign, Christian, Clark, Coles, Cumberland, De Witt, Douglas +14 more

Heavy

66 trades

Applies to

Adams, Alexander, Bond, Boone, Brown, Bureau, Calhoun, Carroll, Cass, Champaign +92 more

Heavy

9 trades

Applies to

Adams, Alexander, Bond, Boone, Brown, Bureau, Calhoun, Carroll, Cass, Champaign +92 more