Woodford

6 wage determinations 526 trade rates

Popular Trades In Woodford

Track Woodford County updates

Get an email when wage determinations covering Woodford County, Illinois are modified.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Trade Rates

Click a row to save its rate for later, then export your selections from the Saved panel.

Same trade names can appear multiple times when classification codes or coverage language differ. Compare the code badge, any italic scope text, and WD reference to identify the right line.
Save Trade & Classification Rate Fringe Total
ASBESTOS ABATEMENT WORKER Building
LABO0231-004 (HANCOCK AND MCDONOUGH COUNTIES)
$35.25 $28.34 $63.59
ASBESTOS ABATEMENT WORKER Building
LABO0231-010 (BUILDING) (BROWN, MASON, PIKE, AND SCHUYLER COUNTIES)
$33.95 $27.28 $61.23
ASBESTOS ABATEMENT WORKER (ADAMS COUNTY) Building
LABO0231-007
$33.38 $25.06 $58.44
BASE MACHINE MEN Building
BRIL0006-009 (FULTON, HENDERSON, KNOX, MARSHALL, MCLEAN, WARREN, AND WOODFORD COUNTIES)
$31.13 $21.09 $52.22
BASE MACHINE MEN Building
BRIL0006-020 (BUREAU, DE WITT, HENRY, LA SALLE, LIVINGSTON, MERCER, PUTNAM, ROCK ISLAND AND STARK COUNTIES)
$33.90 $15.99 $49.89
BOILERMAKER Building
BOIL0060-001 (BUREAU, CARROLL, FULTON, HANCOCK, HENDERSON, HENRY, JO DAVIESS, KNOX, LA SALLE, LEE, LIVINGSTON, LOGAN, MCDONOUGH, MCLEAN, MARSHALL, MASON, MERCER, OGLE, PUTNAM, ROCK ISLAND, SCHUYLER, STARK, STEPHENSON, WARREN, WHITESIDE, AND WOODFORD COUNTIES)
$45.23 $32.76 $77.99
BOILERMAKER Building
BOIL0363-003 (ADAMS, BOND, BROWN, CALHOUN, CASS, CLINTON, GREENE, JERSEY, MACOUPIN, MENARD, MONROE, MONTGOMERY, MORGAN, PIKE, RANDOLPH, AND WASHINGTON COUNTIES)
$45.50 $35.30 $80.80
BOILERMAKER (BOONE, DE KALB, & WINNEBAGO COUNTIES) Building
BOIL0001-004
$53.10 $38.54 $91.64
BRICKLAYER Building
BRIL0006-001 (BUREAU, HENRY, LASALLE, LIVINGSTON, PUTNAM, AND STARK COUNTIES)
$40.20 $23.59 $63.79
BRICKLAYER Building
BRIL0006-005 (FULTON, HENDERSON, KNOX, MARSHALL, WARREN, AND WOODFORD COUNTIES)
$35.01 $23.14 $58.15
BRICKLAYER Building
BRIL0008-008 (ADAMS, BROWN, CASS, GREENE, HANCOCK, MACOUPIN (EXCEPT STAUNTON & MT. OLIVE), MORGAN, MCDONOUGH, PIKE, SCHUYLER, AND SCOTT COUNTIES)
$30.79 $21.69 $52.48
BRICKLAYER, CAULKER, CLEANER, POINTER & STONEMASON Building
BRIL0006-004 (MERCER AND ROCK ISLAND COUNTIES)
$29.51 $20.35 $49.86
BRICKLAYER, CAULKER, CLEANER, POINTER & STONEMASON Building
BRIL0006-008 (MCLEAN COUNTY)
$30.59 $23.19 $53.78
BRICKLAYER, CAULKER, CLEANER, POINTER & STONEMASON Building
BRIL0006-017 (CARROLL, JO DAVIESS, LEE, OGLE, STEPHENSON, WHITESIDE, AND WINNEBAGO COUNTIES)
$40.00 $24.72 $64.72
BRICKLAYER, CAULKER, CLEANER, POINTER & STONEMASON Building
BRIL0006-018 (BOONE COUNTY)
$43.80 $27.23 $71.03
BRICKLAYER, CAULKER, CLEANER, POINTER & STONEMASON Building
BRIL0008-002 (RANDOLPH COUNTY)
$30.79 $21.69 $52.48
BRICKLAYER, CAULKER, CLEANER, POINTER & STONEMASON Building
BRIL0008-010 (LOGAN, MASON, AND MENARD COUNTIES)
$33.49 $24.93 $58.42
BRICKLAYER: BRICKLAYER, MARBLE, TERRAZZO WORKER, AND TILE LAYER Building
BRIL0008-007 (BOND, CALHOUN, CLINTON, JERSEY, MACOUPIN (STAUNTON & MT. OLIVE), MONROE, MONTGOMERY, AND WASHINGTON COUNTIES)
$33.13 $22.05 $55.18
BRICKLAYER: INCLUDING CEMENT MASON (DE KALB COUNTY) Building
BRIL0021-005
$46.19 $29.74 $75.93
CABLE SPLICER Building
ELEC0145-002 (CARROLL (CHADWICK, MT. CARROLL, SAVANNA AND THOMPSON TWPS), HENRY (EXCEPT ANNAWAN, BURNS, CAMBRIDGE, GALVA, KEWANEE, WELLER, AND WESTERFIELD TWPS), JO DAVIESS (SAVANNA ORDANANCE DEPOT), MERCER (EXCEPT OHIO GROVE, NORTH HENDERSON, & SUEZ), WHITESIDE (REMAINDER), AND ROCK ISLAND COUNTIES)
$47.00 $28.64 $75.64
CARPENTER Building
CARP0174-004 (BUREAU, LA SALLE, MARSHALL, PUTNAM, AND STARK COUNTIES)
$39.00 $37.45 $76.45
CARPENTER Residential
SUIL1998-001
$13.72 0.00 $13.72
CARPENTER (GRUNDY COUNTY) Heavy
CARP0555-013
$49.76 $35.87 $85.63
CARPENTER (IROQUOIS AND KANKAKEE COUNTIES) Heavy
CARP0555-015
$42.65 $38.96 $81.61
CARPENTER (LASALLE, MARSHALL, AND PUTNAM COUNTIES) Heavy
CARP0174-001
$40.28 $38.95 $79.23
CARPENTER (LIVINGSTON, MCLEAN, AND FORD COUNTIES) Heavy
CARP0237-016
$37.06 $31.16 $68.22
CARPENTER (WOODFORD COUNTY) Heavy
CARP0237-010
$37.06 $31.16 $68.22
CARPENTER, LATHER, PILEDRIVER, AND MILLWRIGHT Building
CARP0640-001 (ALEXANDER, FRANKLIN, HARDIN, MASSAC, JACKSON, PERRY, POPE, JOHNSON, GALLATIN, PULASKI, SALINE, UNION, AND WILLIAMSON COUNTIES) DIVERS (RECEIVE 1 1/2 TIMES CARPENTER'S RATE PLUS FRINGE BENEFITS AND $25.00 PER DAY FOR EQUIPMENT)
$38.62 $18.90 $57.52
CARPENTER, LATHER, SOFT FLOOR LAYER Building
CARP0792-001 (BOONE, OGLE (NORTHERN HALF), AND WINNEBAGO COUNTIES)
$47.25 $37.87 $85.12
CARPENTER: CARPENTERS, LATHERS, CARPET, LINOLEUM, AND SOFT TILE LAYERS Building
CARP0004-008 (HENDERSON, HENRY, MERCER, AND ROCK ISLAND COUNTIES)
$34.25 $29.53 $63.78
CARPENTER: LATHER, PILEDRIVER AND MILLWRIGHT Building
CARP0500-004 (CLINTON (EXCLUDING BROOKSIDE TWP), MONROE RANDOLPH, AND WASHINGTON COUNTIES)
$41.36 $18.90 $60.26
CARPENTER: LATHER, PILEDRIVER, AND MILLWRIGHT Building
CARP0664-004 (BOND, CALHOUN, AND JERSEY COUNTIES)
$41.36 $18.90 $60.26
CARPENTER/LATHER Building
CARP0237-020 Scope differs by code/WD
$33.57 $29.10 $62.67
CARPENTER/LATHER Building
CARP0270-009 (HANCOCK, MCDONOUGH, AND WARREN COUNTIES)
$34.14 $28.60 $62.74
CARPENTER/LATHER Building
CARP0270-022 (BROWN, CASS, GREENE, MORGAN, PIKE, SCHUYLER, AND SCOTT COUNTIES)
$33.36 $28.60 $61.96
CARPENTER/LATHER (ADAMS COUNTY) Building
CARP0270-006
$31.39 $25.99 $57.38
CARPENTER/LATHER (FULTON AND MASON COUNTIES) Building
CARP0237-004
$34.30 $29.94 $64.24
CARPENTER/LATHER (KNOX COUNTY) Building
CARP0237-009
$34.30 $29.94 $64.24
CARPENTER/LATHER (LOGAN COUNTY) Building
CARP0270-020
$34.10 $28.60 $62.70
CARPENTER/LATHER (MACOUPIN AND MONTGOMERY COUNTIES) Building
CARP0270-013
$33.36 $28.60 $61.96
CARPENTER/LATHER (MENARD COUNTY) Building
CARP0270-001
$32.83 $27.45 $60.28
CARPENTER/LATHER (WOODFORD COUNTY) Building
CARP0237-015
$33.58 $29.10 $62.68
CARPENTER/LATHER: Building
CARP0790-001 (CARROLL, JO DAVIESS, LEE (WEST OF BROOKLYN ROAD), OGLE (REMAINDER OF SOUTHERN HALF), STEPHENSON, AND WHITESIDE)
$42.14 $37.12 $79.26
CARPENTER/LATHER: DEKALB, LEE Building
CARP0790-001 (EAST OF BROOKLYN ROAD), OGLE (TERRITORY WITHIN IL ROUTE 72, MERIDIAN ROAD & THE SOUTHERN OGLE COUNTY LINE)
$50.41 $38.53 $88.94
CARPET INSTALLER: CARPET, LINOLEUM, HARDWOOD AND TILE LAYER Building
CARP0500-004 (CLINTON (EXCLUDING BROOKSIDE TWP), MONROE RANDOLPH, AND WASHINGTON COUNTIES)
$36.08 $18.90 $54.98
CARPET INSTALLER: CARPET, LINOLEUM, HARDWOOD, AND TILE LAYER Building
CARP0640-001 (ALEXANDER, FRANKLIN, HARDIN, MASSAC, JACKSON, PERRY, POPE, JOHNSON, GALLATIN, PULASKI, SALINE, UNION, AND WILLIAMSON COUNTIES)
$36.08 $18.90 $54.98
CARPET INSTALLER: CARPET, LINOLEUM, HARDWOOD, AND TILE LAYER (BOND, CALHOUN, AND JERSEY COUNTIES) Building
CARP0664-004
$36.08 $18.90 $54.98
CATV INSTALLER Building
ELEC0176-013 (BUREAU, HENRY (ANAWAN, BURNS, CAMBRIDGE, CALVA, KEWANEE, WELLER, AND WESTERFIELD TWPS), LA SALLE (DEER PARK, EDEN, LA SALLE, PERU, UTICA, OTTAWA, SENECA, & VERMILION TWPS), PUTNAM (GRANVILLE, HENNEPIN, & SENACHWINE TWPS), & STARK (ELMIRA, GOSHEN, OSEOLA, PENN, AND TOULON TWPS) COUNTIES)
$37.50 $32.78 $70.28
CEMENT MASON Building
PLAS0090-002 (BOND, CALHOUN, CLINTON, GREENE, JERSEY, MACOUPIN, MONROE, AND MONTGOMERY (EXCLUDING THE TOWNS OF COALTON, COFFEN, FILLMORE, NOKOMIS, OHLMAN, WENOAH, WITT) COUNTIES)
$39.00 $30.60 $69.60
CEMENT MASON AND PLASTERER Building
PLAS0011-010 (BUREAU, LA SALLE, MARSHALL (EASTERN PART INCLUDING TOLUCA), PUTNAM, AND WOODFORD (NORTHEAST CORNER - NORTH OF ROUTE 116 AND EAST OF ROUTE 117) COUNTIES)
$40.50 $33.54 $74.04
CEMENT MASON/CONCRETE FINISHER Building
PLAS0011-004 (CARROLL, JO DAVIESS, LEE, OGLE, STEPHENSON, AND WHITESIDE (EXCEPT ERIE AND AREA SOUTHWEST THEREOF) COUNTIES)
$38.48 $38.77 $77.25
CEMENT MASON/CONCRETE FINISHER Building
PLAS0018-002 (ADAMS, BROWN, CASS, FULTON (EXCEPT NORTHEWS PORTION), HANCOCK, MCDONOUGH, MENARD, PIKE, AND SCHUYLER COUNTIES)
$31.80 $26.89 $58.69
CEMENT MASON/CONCRETE FINISHER Building
PLAS0018-016 (FULTON (EXCEPT NORTHWESTERN PORTION), MARSHALL (WESTERN PART EXCEPT TOLUCA), MASON, AND WOODFORD (NORTHWESTERN PART - NORTH OF ROUTE 116 AND WEST OF ROUTE 117) COUNTIES)
$30.52 $25.22 $55.74
CEMENT MASON/CONCRETE FINISHER Building
PLAS0018-019 (LIVINGSTON (SOUTHERN HALF), MCLEAN, AND WOODFORD (SOUTH OF ROUTE 116) COUNTIES)
$32.12 $22.29 $54.41
CEMENT MASON/CONCRETE FINISHER Building
PLAS0018-026 (HENRY, LIVINGSTON (NORTHERN PART INCLUDING PONTIAC), AND STARK COUNTIES)
$36.70 $22.08 $58.78
CEMENT MASON/CONCRETE FINISHER Building
PLAS0018-029 (FULTON (NORTHWESTERN PART), KNOX, MERCER (SOUTHEASTERN CORNER), AND WARREN COUNTIES)
$29.14 $20.42 $49.56
CEMENT MASON/CONCRETE FINISHER Building
PLAS0018-035 (HENDERSON (NORTHERN HALF), MERCER (EXCEPT SOUTHEASTERN PART), ROCK ISLAND, AND WHITESIDE (ERIE & AREA SOUTHWEST THEREOF) COUNTIES)
$28.16 $23.48 $51.64
CEMENT MASON/CONCRETE FINISHER Heavy
PLAS0011-003 (LASALLE & PUTNAM COUNTIES)
$40.50 $33.54 $74.04
CEMENT MASON/CONCRETE FINISHER Heavy
PLAS0011-011 (IROQUOIS AND KANKAKEE COUNTIES)
$46.00 $37.04 $83.04
CEMENT MASON/CONCRETE FINISHER Heavy
PLAS0018-010 (MARSHALL AND WOODFORD (NORTH AND WEST OF ROUTES 116 AND 117) COUNTIES)
$32.11 $25.52 $57.63
CEMENT MASON/CONCRETE FINISHER Heavy
PLAS0018-018 (LIVINGSTON (SOUTHERN PART), MCLEAN, AND WOODFORD (SOUTH OF ROUTE 116) COUNTIES)
$33.46 $22.22 $55.68
CEMENT MASON/CONCRETE FINISHER Heavy
PLAS0018-024 (LIVINGSTON (NORTHERN PART) COUNTY)
$32.11 $25.52 $57.63
CEMENT MASON/CONCRETE FINISHER Residential
SUIL1998-001
$10.90 0.00 $10.90
CEMENT MASON/CONCRETE FINISHER (BOONE COUNTY) Building
PLAS0011-015
$41.03 $36.39 $77.42
CEMENT MASON/CONCRETE FINISHER (DE KALB COUNTY) Building
PLAS0011-009
$50.70 $40.60 $91.30
CEMENT MASON/CONCRETE FINISHER (FORD COUNTY) Heavy
PLAS0143-006
$31.51 $17.50 $49.01
CEMENT MASON/CONCRETE FINISHER (WINNEBAGO COUNTY) Building
PLAS0011-019
$41.03 $36.39 $77.42
CEMENT MASON/PLASTERER (MORGAN AND SCOTT COUNTIES) Building
BRIL0008-009
$31.91 $21.93 $53.84
CEMENT MASONS & PLASTERERS Building
PLAS0143-016 (RANDOLPH AND WASHINGTON COUNTIES)
$30.83 $18.06 $48.89
DREDGING: Heavy
SUIL2003-001 (FIREMAN, OILER, DECKHAND, & SCOWMAN (WITH DIPPER, HYDRAULIC OR OTHER FLOATING EQUIPMENT ENGAGED IN HYDRAULIC AND DIPPER DREDGING OPERATIONS) PIPELINE MEN (BOTH AFLOAT & ASHORE INCLUDING LOADING, UNLOADING, MAINTAINING, AND HANDLING PIPELINES FOR HYDRAULIC DREDGES AND SANDBOATS RANGEMAN, TANKERMAN, SWEEPMAN AND SERVICE TRUCK DRIVER)
$22.51 $7.61 $30.12
DREDGING: Heavy
SUIL2003-001 (LEAD DECKHAND) PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: a. $30.10 per day per employee for medical b. Eight paid holidays: A thru H
$29.68 $7.61 $37.29
DREDGING: ENGINEER AND MECHANIC Heavy
SUIL2003-002 (AREA IV: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE ST. PAUL, ROCK ISLAND AND CHICAGO DISTRICTS, CORPS OF ENGINEERS)
$44.78 $34.21 $78.99
DREDGING: ENGINEER AND MECHANIC Heavy
SUIL2003-002 (AREA III: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE HUNTINGTON DISTRICT, CORPS OF ENGINEERS)
$47.70 $31.75 $79.45
DREDGING: ENGINEER AND MECHANIC Heavy
SUIL2003-002 (AREA II: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE LOUISVILLE DISTRICT, CORPS OF ENGINEERS)
$47.70 $31.75 $79.45
DREDGING: ENGINEER AND MECHANIC Heavy
SUIL2003-002 (AREA I: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE ST. LOUIS DISTRICT, CORPS OF ENGINEERS)
$47.83 $31.75 $79.58
DREDGING: LEVERMEN AND BOATMAN Heavy
SUIL2003-002 (AREA 4: LEVERMAN. OPERATORS ON BACKHOES OVER 130,000 LBS., OPERATORS ON CRANES OVER 165 TONS, AND OPERATORS THAT ARE REQUIRED TO HAVE A LICENSE OR CERTIFICATION TO DO THE WORK ASSIGNED THEM SHALL RECEIVE 5% MORE THAN THE HIGHEST RATE OF PAY PER HOUR LISTED ON THIS AGREEMENT.)
$47.02 $34.21 $81.23
DREDGING: LEVERMEN AND BOATMAN Heavy
SUIL2003-002 (AREA 4: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE ST. PAUL, ROCK ISLAND AND CHICAGO DISTRICTS, CORPS OF ENGINEERS:)
$44.78 $34.21 $78.99
DREDGING: LEVERMEN AND BOATMAN Heavy
SUIL2003-002 (AREA 3: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE HUNTINGTON DISTRICT, CORPS OF ENGINEERS:)
$55.54 $31.75 $87.29
DREDGING: LEVERMEN AND BOATMAN Heavy
SUIL2003-002 (AREA 2: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE LOUISVILLE DISTRICT, CORPS OF ENGINEERS)
$55.54 $31.75 $87.29
DREDGING: LEVERMEN AND BOATMAN Heavy
SUIL2003-002 (AREA 1: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE ST. LOUIS DISTRICT, CORPS OF ENGINEERS)
$55.69 $31.75 $87.44
ELECTRICAL LOW VOLTAGE WIRING INSTALLER, BUILDING Building
ELEC0601-010 (CHAMPAIGN, DEWITT (NORTHEAST SIDE), DOUGLAS (NORTHEAST SIDE), FORD (SOUTHSIDE), IROQUIOS (SOUTHWEST SIDE), LASALLE (SOUTHSIDE), LIVINGSTON, MARSHALL (EASTSIDE), PIATT (NORTHEAST SIDE), PUTNAM (SOUTHEAST SIDE), AND WOODFORD (NORTHEAST SIDE) COUNTIES)Installation, service and maintenance of low-voltage systems which utilizes the transmission and/or transference of voice, sound, vision, or digital for commercial, education, security and entertainment purposes for the following: TV monitoring and surveillance, background/foreground music, intercom and telephone interconnect, field programming, inventory control systems, microwave transmission, multi-media, multiplex, radio page, school, intercom and sound burglar alarms and low voltage master clock systems
$36.25 $21.65 $57.90
ELECTRICAL LOW VOLTAGE WIRING INSTALLER, BUILDING Building
ELEC0702-016 (ALEXANDER, BOND (EASTSIDE), CLAY, CLINTON (EASTSIDE), EDWARDS, EFFINGHAM (SOUTHWESTERN SIDE), FAYETTE (SOUTHSIDE), FRANKLIN, GALLATIN, HAMILTON, HARDIN, JACKSON, JEFFERSON, JOHNSON, MARION, MASSAC, PULASKI, PERRY, POPE, RANDOLPH (SOUTHEASTERN SIDE), SALINE, UNION, WASHINGTON (SOUTHEASTERN SIDE), WAYNE, WHITE, AND WILLIAMSON COUNTIES) Installation, service and maintenance of low-voltage systems which utilizes the transmission and/or transference of voice, sound, vision, or digital for commercial, education, security and entertainment purposes for the following: TV monitoring and surveillance, background/foreground music, intercom and telephone interconnect, field programming, inventory control systems, microwave transmission, multi-media, multiplex, radio page, school, intercom and sound burglar alarms and low voltage master clock systems
$38.44 $19.37 $57.81
ELECTRICIAN Building
ELEC0034-001 (PEORIA DIVISION - MARSHALL (AREA WEST OF BELL PLAIN & ROBERTS TWPS) AND WOODFORD (AREA WEST OF KANSAS, LINN, PALESTINE & ROANOKE TWPS) COUNTIES)
$45.65 $26.77 $72.42
ELECTRICIAN Building
ELEC0034-002 (GALESBURG DIVISION - FULTON (CASS, DEERFIELD, ELLISVILLE, HARRIS, LEE, UNION, YOUNG, & HICKORY TWPS), HENDERSON, KNOX, MCDONOUGH (BLANDINSVILLE, PRAIRIE CITY, EMMET, TENNESSEE, SCOTLAND, SCIOTA, BUSHNELL, CHALMERS TWPS), MERCER (OHIO GROVE, NORTH HENDERSON, AND SUEZ TWPS), AND WARREN COUNTIES)
$45.65 $26.77 $72.42
ELECTRICIAN Building
ELEC0034-003 (QUINCY DIVISION - ADAMS, BROWN, HANCOCK, MCDONOUGH (LAMOINE, BETHEL, INDUSTRY & ELDORADO), PIKE, AND SCHUYLER COUNTIES)
$35.00 $20.67 $55.67
ELECTRICIAN Building
ELEC0034-005 (PEORIA DIVISION - FULTON (EXCEPT CASS, DEERFIELD, ELLISVILLE, HARRIS, LEE, UNION, YOUNG, & HICKORY TWPS); MASON (EXCEPT BATH, CRANE, CREEK, KILBOURNE, LYNCHBURG, MASON CITY, AND SALT CREEK TWPS); AND STARK (ESSEX, VALLEY & WEST JERSEY TWPS) COUNTIES)
$39.50 $24.24 $63.74
ELECTRICIAN Building
ELEC0145-002 (CARROLL (CHADWICK, MT. CARROLL, SAVANNA AND THOMPSON TWPS), HENRY (EXCEPT ANNAWAN, BURNS, CAMBRIDGE, GALVA, KEWANEE, WELLER, AND WESTERFIELD TWPS), JO DAVIESS (SAVANNA ORDANANCE DEPOT), MERCER (EXCEPT OHIO GROVE, NORTH HENDERSON, & SUEZ), WHITESIDE (REMAINDER), AND ROCK ISLAND COUNTIES)
$46.00 $28.56 $74.56
ELECTRICIAN Building
ELEC0176-002 (BUREAU, HENRY (ANAWAN, BURNS, CAMBRIDGE, GALVA, KEWANEE, WELLER, AND WESTERFIELD TWPS), LA SALLE (DEER PARK, EDEN, LA SALLE, PERU, UTICA, OTTAWA, SENECA & VERMILION TWPS), PUTNAM (GRANVILLE, HENNEPIN & SENACHWINE TWPS) AND STARK (ELMIRA, GOSHEN, OSEOLA, PENN, AND TOULON TWPS) COUNTIES)
$50.45 $44.96 $95.41
ELECTRICIAN Building
ELEC0193-001 (CASS, LOGAN, MACOUPIN (ATHENVILLE, SCOTTVILLE, GIRARD & AREA NORTH THEREOF), MASON (LYNCHBURG, BATH, KILBOURNE, CRANE CREEK, SALT CREEK & MASON TWPS), MENARD, MONTGOMERY (BOIS D ARC, PITMAN, & HARVEL TWPS), MORGAN, AND SCOTT COUNTIES)
$39.80 $23.08 $62.88
ELECTRICIAN Building
ELEC0197-001 (MC LEAN (EXCEPT ANCHOR, BELLEFLOWER, CROPSEY, CHENEY GROVE TWPS) AND WOODFORD (PALESTINE, EL PASO & KANSAS TWPS) COUNTIES)
$43.86 $23.72 $67.58
ELECTRICIAN Building
ELEC0309-001 (BOND (WESTERN HALF), CLINTON (EXCEPT HUEY, HOFFMAN, AND VICINITY), MACOUPIN (EXCEPT BRIGHTON TWP, ATHENVILLE, SCOTTVILLE, GIRARD, AND AREA NORTH THEREOF), MONROE, MONTGOMERY (WEST OF BUTLER GROVE, ISHAM, & RAYMOND TWPS), RANDOLPH (RED BUD TWP), AND WASHINGTON (VENEDY TWP) COUNTIES)
$52.41 $30.27 $82.68
ELECTRICIAN Building
ELEC0364-001 (BOONE, CARROLL (CHERRY GROVE, SHANNON, ROCK CREEK, LINA, WYSOX & ELKHORN GROVE TWPS), DEKALB (FRANKLIN, KINGSTON, GENOA, SOUTH GROVE, MANSFIELD, DEKALB, CORLAND, MILAN, ALTON PIERCE, SHABBONA MAYFIELD, SYCAMORE, MALTA, PAW PAW, SQUAW GROVE, VICTOR, & SOMONAUK TWPS), JO DAVIESS (WARREN & RUSH), LEE, OGLE, STEPHENSON, WHITESIDE (GENESEE, JORDAN, HOPKINS, STERLING, HUME, MONTGOMERY, TAMPICO, & HAHNAMAN TWPS), AND WINNEBAGO COUNTIES)
$62.61 $43.96 $106.57
ELECTRICIAN Building
ELEC0601-003 (LA SALLE (REMAINDER), LIVINGSTON, MCLEAN (CROPSEY, ANCHOR, CHENEY GROVE, & BELLEFLOWER TWPS), MARSHALL (ROBERTS, EVANS, BELL, PLAINE, & BENNINGTON), PUTNAM (MAGNOLIA TWP), AND WOODFORD (LINN, CLAYTON, MINONK, ROANOKE, GREEN, & PANOLA TWPS) COUNTIES)
$49.63 $22.51 $72.14
ELECTRICIAN Building
ELEC0649-001 (CALHOUN, GREEN, JERSEY, AND MACOUPIN (BRIGHTON TWP) COUNTIES)
$54.53 $29.46 $83.99
ELECTRICIAN Building
ELEC0702-007 (BOND (EASTERN HALF), CLINTON (HUEY, HOFFMAN, & VICINITY), RANDOLPH (EXCEPT RED BUD TWP), AND WASHINGTON (EXCEPT VENEDY TWP) COUNTIES)
$52.14 $29.14 $81.28
ELECTRICIAN Building
ELEC0704-002 (JO DAVIESS COUNTY (EXCEPT SAVANNA ORDNANCE DEPOT & AREA EAST OF APPLE RIVER, THOMPSON & WOODBINE TWPS))
$42.45 $20.55 $63.00
ELECTRICIAN Heavy
ELEC0034-001 (PEORIA DIVISION - MARSHALL (AREA WEST OF BELL PLAIN & ROBERTS TWPS) AND WOODFORD (AREA WEST OF KANSAS, LINN, PALESTINE & ROANOKE TWPS) COUNTIES)
$45.65 $26.77 $72.42
ELECTRICIAN Heavy
ELEC0176-004 (KANKAKEE AND LASALLE COUNTIES (LA SALLE (Deer Park, Eden, La Salle, Peru, Utica, & Vermilion))
$51.60 $45.00 $96.60
ELECTRICIAN Heavy
ELEC0176-004 (FORD, IROQUOIS, AND PUTNAM COUNTIES (FORD (REMAINDER), IROQUOIS (EXCLUDING ARTESIA, PEGEON GROVE, LODA, FOUNTAIN CREEK, LOVEJOY & PRAIRIE GREEN TWPS), LA SALLE (DEER PARK, EDEN, LA SALLE, PERU, UTICA, & VERMILION) KANKAKEE, & PUTNAM (GRANVILLE, HENNIPIN & SENACHWINE TWPS) COUNTIES)
$50.45 $44.96 $95.41
ELECTRICIAN Heavy
ELEC0197-002 (MCLEAN (REMAINDER) AND WOODFORD (PALESTINE, EL PASO, & KANSAS TWPS) COUNTIES)
$43.86 $23.72 $67.58
ELECTRICIAN Heavy
ELEC0538-001 (IROQUOIS COUNTY (FOUNTAIN CREEK, LOVEJOY, AND PRAIRIE GREEN TWPS))
$41.00 $27.36 $68.36
ELECTRICIAN Heavy
ELEC0601-002 (FORD (SOUTH OF BENTON TWP), IROQUOIS (ARTESIA, PEGEON GROVE, & LODA TWPS), LA SALLE (SOUTHEASTERN PART), LIVINGSTON, MCLEAN (CROPSEY, ANCHOR, CHENEY GROVE, & BELLEFLOWER TWPS), MARSHALL (ROBERTS, EVANS, BELL, PLAIN, & BENNINGTON TWPS), PUTNAM (MAGNOLIA TWP), AND WOODFORD (LINN, CLAYTON, MINONK, ROANOKE, GREEN, & PANOLA TWPS) COUNTIES)
$49.63 $22.51 $72.14
ELECTRICIAN Residential
ELEC0034-013 (PEORIA DIVISION - WOODFORD COUNTY (AREA WEST OF KANSAS, LINN, PALESTINE & ROANOKE TWPS))
$26.58 $18.50 $45.08
ELECTRICIAN Residential
ELEC0197-005 (WOODFORD COUNTY (PALESTINE, EL PASO & KANSAS TWPS))
$30.56 $16.37 $46.93
ELECTRICIAN Residential
ELEC0601-007 (WOODFORD COUNTY (LINN, CLAYTON, MINONK, ROANOKE, GREEN, AND PANOLA TWPS))
$25.02 $15.23 $40.25
ELECTRICIAN (DE KALB COUNTY (SANDWICH TWP)) Building
ELEC0461-001
$60.17 $43.50 $103.67
ELECTRICIAN (GRUNDY COUNTY) Heavy
ELEC0176-001
$52.00 $45.01 $97.01
ELECTRICIAN (LASALLE COUNTY) Heavy
ELEC0176-001
$51.60 $45.00 $96.60
ELECTRICIAN (PUTNAM COUNTY) Heavy
ELEC0176-001
$50.45 $44.96 $95.41
ELECTRICIAN, ELECTRICAL TECHNICIAN Building
ELEC0461-004 (DE KALB COUNTY (SANDWICH TWP)) Work includes the installation, maintenance and removal of telecommunication facilities (voice, sound, data and video), telephone, security, fire alarm systems that are a component of a multiplex system and share a common cable, and data inside wire, interconnect, terminal equipment, central office, PABX and equipment, micro waves, V-SAT, bypass, CATV, WAN, (wide area networks), LAN (Local area networks), and ISDN (integrated system digital network).The work shall cover the pulling of wire in raceways, but not the installation of raceways
$49.70 $38.45 $88.15
ELEVATOR MECHANIC Building
ELEV0003-005 (BOND, CALHOUN, CLINTON, GREENE, JERSEY, MACOUPIN, MONROE, MONTGOMERY, RANDOLPH AND WASHINGTON COUNTIES) FOOTNOTES: A) EMPLOYER CONTRIBUTES 8% OF REGULAR BASIC HOURLY RATE AS AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR LESS THAN 5 YEARS OF SERVICE B) EIGHT PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY FRIDAY AFTER THANKSGIVING DAY, VETERANS' DAY AND CHRISTMAS DAY
$62.73 $38.44 $101.17
ELEVATOR MECHANIC Building
ELEV0033-003 (BUREAU, HENRY, MERCER, ROCK ISLAND AND WHITESIDE COUNTIES) FOOTNOTES: A. EMPLOYER CONTRIBUTES 8% OF REGULAR BASIC HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR EMPLOYEES WITH LESS THAN 5 YEARS OF SERVICE. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY; DAY AFTER THANKSGIVING; & CHRISTMAS DAY
$56.30 $38.44 $94.74
ELEVATOR MECHANIC Building
ELEV0055-003 (ADAMS, BROWN, CASS, FULTON, HANCOCK, HENDERSON, KNOX, LA SALLE, LIVINGSTON, LOGAN, MARSHALL. MASON, MCDONOUGH, MCLEAN, MENARD, MERCER, MORGAN, PIKE, PUTNAM, SCHUYLER, SCOTT, STARK, WARREN AND WOODFORD COUNTIES) FOOTNOTES: A. EMPLOYER CONTRIBUTES 8% OF REGULAR BASIC HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR UNDER 5 YEARS OF SERVICE. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; DAY AFTER THANKSGIVING; VETERANS' DAY & CHRISTMAS DAY
$57.99 $38.44 $96.43
ELEVATOR MECHANIC Building
ELEV0132-002 (BOONE, CARROLL, DE KALB, JO DAVIESS, LEE, OGLE, STEPHENSON AND WINNEBAGO COUNTIES) FOOTNOTES: A. EMPLOYER CONTRIBUTES 8% OF REGULAR BASIC HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR UNDER 5 YEARS OF SERVICE. B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING DAY, VETERANS' DAY AND CHRISTMAS DAY
$65.17 $38.44 $103.61
FIRE STOP TECHNICIAN Building
ASBE0017-003 (BUREAU, DE KALB, LA SALLE, LEE, LIVINGSTON AND PUTNAM COUNTIES)
$44.02 $32.76 $76.78
FIRE STOP TECHNICIAN Building
ASBE0017-007 (MARSHALL, MCLEAN, STARK, AND WOODFORD COUNTIES)
$36.73 $31.21 $67.94
GLAZIER Building
PAIN0157-008 (BUREAU, FULTON, HANCOCK, LEE, LASALLE, LIVINGSTON, MCDONOUGH, MARSHALL, PUTNAM, STARK, AND WOODARD COUNTIES)
$39.74 $27.78 $67.52
GLAZIER Building
PAIN0513-003 (BOND, CALHOUN, CLINTON, GREENE, JACKSON, JERSEY, MACOUPIN (SOUTHSIDE), MADISON, MARION, MONROE, PERRY, RANDOLPH, ST. CLAIR, AND WASHINGTON COUNTIES)
$43.32 $25.43 $68.75
GLAZIER Building
PAIN0581-001 (SECTOR TWO: CARROLL, HENDERSON, JO DAVIESS, WARREN, AND WHITESIDE COUNTIES)
$33.37 $21.80 $55.17
GLAZIER Building
PAIN0581-001 (SECTOR ONE: HENRY, KNOX, MERCER, AND ROCK ISLAND COUNTIES)
$35.37 $21.80 $57.17
GLAZIER Building
PAIN0607-001 (BOONE, DE KALB, OGLE, STEPHENSON, AND WINNEBAGO COUNTIES)
$48.28 $28.50 $76.78
GLAZIER Building
PAIN1168-001 (ADAMS, BROWN, CASS, LOGAN, MACOUPIN (NORTHERN PART), MASON, MENARD, MONTGOMERY, MORGAN, PIKE, SCHUYLER, AND SCOTT COUNTIES)
$39.77 $22.73 $62.50
HYDRAULIC DREDGING: LAUNCH OPERATOR - VESSEL 800 HORSE- POWER OR LESS PAID HOLIDAYS Heavy
SUIL2003-001 (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: a. $30.10 per day per employee for medical b. Eight paid holidays: A thru H
$25.15 $7.61 $32.76
HYDRAULIC DREDGING: TUG ENGINEER PAID HOLIDAYS Heavy
SUIL2003-001 (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: a. paid holidays: A thru H
$26.49 $7.61 $34.10
HYDRAULIC DREDGING: TUG OPERATOR - VESSEL OVER 800 HORSE-POWER PAID HOLIDAYS Heavy
SUIL2003-001 (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: a. $30.10 per day per employee for medical b. Eight paid holidays: A thru H
$26.49 $7.61 $34.10
HYDRAULIC DREDGING:TUG WORKERS: FIREMAN, LINEMAN, OILER, DECKHAND, TANKERMAN. SCOWMAN Heavy
SUIL2003-001 (ON/OR WITH TUGBOATS, LAUNCHES, OR OTHER SELF-PROPELLED BOATS) PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: a. $30.10 per day per employee for medical b. Eight paid holidays: A thru H
$22.51 $7.61 $30.12
IRONWORKER Building
IRON0046-004 (ADAMS (SOUTHEASTERN CORNER), BROWN, CASS, FULTON (SOUTHERN TIP INCLUDING MARBLETOWN, ASTORIA & SUMMUN TWPS), GREENE (NORTHERN HALF), LOGAN, MACOUPIN (NORTHERN PART), MASON (EAST OF RT. 136), MENARD, MONTGOMERY (EXCEPT LITCHFIELD, HILLSBORO & SOUTH THEREOF) MORGAN, PIKE, SCHUYLER (EASTERN HALF), AND SCOTT COUNTIES)
$36.20 $31.35 $67.55
IRONWORKER Building
IRON0111-003 (CARROLL (THOMPSON, SAVANNA & VICINITY), HENRY, JO DAVIESS (EAST DUBUQUE, GALENA, HANOVER, & VICINITY), KNOX (GALESBURG AND AREA NORTH OF THE CITY), MERCER (EXCEPT SOUTHWEST PART), ROCK ISLAND, WARREN (INCLUDES NORTHWEST PART), AND WHITESIDE (WESTERN HALF) COUNTIES)
$38.25 $32.28 $70.53
IRONWORKER Building
IRON0112-001 (FULTON (EXCEPT MARBLETOWN, ASTORIA & SUMMUN TWPS), KNOX (AREA SOUTHEAST OF GALENSBURG), LIVINGSTON, MCLEAN (WESTERN HALF), MARSHALL (SOUTHWESTERN CORNER), MASON (WEST OF RT. 136), STARK, AND WOODFORD COUNTIES)
$39.24 $33.88 $73.12
IRONWORKER Building
IRON0392-001 (BOND, CALHOUN, CLINTON, GREENE (SOUTHERN HALF), JERSEY, MACOUPIN (SOUTHERN PART), MONROE, MONTGOMERY (LITCHFIELD, HILLSBORO & SOUTH THEREOF), RANDOLPH, AND WASHINGTON COUNTIES)
$41.65 $31.18 $72.83
IRONWORKER Building
IRON0393-001 (DEKALB COUNTY (SOUTHEASTERN 2/3 INCLUDING SYCAMORE AND DEKALB))
$48.83 $39.84 $88.67
IRONWORKER Building
IRON0444-003 (LA SALLE, MARSHALL (EXCEPT THE SOUTHWESTERN PART), AND PUTNMAN COUNTIES)
$45.50 $38.90 $84.40
IRONWORKER Building
IRON0498-001 (BOONE, CARROLL (EXCEPT THOMPSON, SAVANNA & VICINITY.), DEKALB (EXCEPT SOUTHEASTERN 2/3), JO DAVIESS (EXCEPT EAST DUBUQUE, GALENA, HANOVER & VICINITY), LEE, OGLE, STEPHENSON, WHITESIDE (CITIES OF ROCK FALLS, STERLING, WEST STERLING), AND WINNEBAGO COUNTIES)
$41.37 $44.41 $85.78
IRONWORKER Building
IRON0577-007 (ADAMS, HANCOCK, HENDERSON, KNOX (WEST OF HWY #41), MC DONOUGH, MERCER (SOUTHWEST PART), SCHUYLER (WESTERN HALF), AND WARREN (EXCEPT NORTHWEST PART) COUNTIES)
$36.30 $25.80 $62.10
IRONWORKER Heavy
IRON0112-002 (LIVINGSTON, MARSHALL (SOUTHWESTERN CORNER), MCLEAN (WESTERN HALF), AND WOODFORD COUNTIES)
$45.48 $34.13 $79.61
IRONWORKER Heavy
IRON0380-005 (FORD AND MCLEAN (EASTERN HALF) COUNTIES)
$40.40 $29.65 $70.05
IRONWORKER Heavy
IRON0444-003 (LA SALLE, MARSHALL (EXCEPT THE SOUTHWESTERN PART), AND PUTNMAN COUNTIES)
$45.50 $38.90 $84.40
IRONWORKER (GRUNDY COUNTY) Heavy
IRON0444-001
$47.80 $42.50 $90.30
IRONWORKER (KANKABEE COUNTY) Heavy
IRON0444-005
$46.00 $39.30 $85.30
IRONWORKER (MCLEAN COUNTY (EASTERN HALF)) Building
IRON0380-002
$37.71 $29.65 $67.36
LABORER Building
LABO0231-010 (BUILDING) (BROWN, MASON, PIKE, AND SCHUYLER COUNTIES)
$31.70 $27.28 $58.98
LABORER (ADAMS COUNTY) Building
LABO0231-007
$31.13 $25.06 $56.19
LABORER (FULTON COUNTY) Building
LABO0231-012
$34.00 $30.04 $64.04
LABORER (HANCOCK AND MCDONOUGH COUNTIES) Building
LABO0231-004
$33.00 $28.34 $61.34
LABORER GROUP 1 ALL CLASSIFICATIONS NOT LISTED BELOW (LIVINGSTON, MARSHALL, AND WOODFORD COUNTIES) Heavy
LABO0996-001
$39.17 $28.01 $67.18
LABORER GROUP 1 ALL CLASSIFICATIONS NOT LISTED BELOW (MCLEAN COUNTY) Heavy
LABO0362-001
$37.12 $30.06 $67.18
LABORER GROUP 1 COMMON LABORER, BOBCAT, FORKLIFT Building
LABO0149-003 (BOONE COUNTY)
$51.40 $36.94 $88.34
LABORER GROUP 1 GENERAL LABORER Building
LABO0100-004 (CLINTON COUNTY (NORTHWEST))
$35.38 $29.35 $64.73
LABORER GROUP 1 GENERAL LABORER Building
LABO0218-003 (CALHOUN, GREENE, AND JERSEY COUNTIES)
$32.84 $27.89 $60.73
LABORER GROUP 1 GENERAL LABORER (MACOUPIN COUNTY) Building
LABO0338-003
$34.14 $30.59 $64.73
LABORER GROUP 1 MORTAR MIXERS; SCAFFOLDS; SEWER AND TRENCH WORK Heavy
LABO0075-003 (GROUND LEVEL DOWN TO 8 FEET); CATCH BASIN AND MANHOLE DIGGERS, MESH HANDLING ON ROAD TO WORK, CEMENT AND MINERAL FILLER HANDLER, CONCRETE PUDDLERS, BATCH DUMPERS (CEMT & ASPHALT); VIBRATOR OPERATOR; SAND AND STONE WHEELERS TO MIXER (HANDLER); CONCRETE WHEELERS; AIRTAMPING HAMMERMEN; CONCRETE & PAVING BREAKERS; ROCK DRILLERS/ JACKHAMMERMEN; CHIPPING HAMMERMEN; ASPHALT; LABORER; CHAIN AND POWER SAWS; PIT MEN; FENCING LABORERS; MASON TENDER (MORTAR AND BRICK WHEELER); KETTLEMEN & TARMEN, TANK CLEANERS; SCAFFOLD, STAGING LABORERS; POT FIREMEN (TARMEN); HEATERS TENDER FOR ANY PURPOSE; WATER PUMPS (PORTABLE WATER PUMPS SHALL BE TENDED BY LABORERS IF THE EMPLOYER DETERMINES TENDING IS REQUIRED); RIP RAP; HANDLING OF SLAB STEEL ROAD FORMS IN ANY MANNER (EXCEPT ROAD FORM SETTING); SETTING CENTER STRIPS, CONTRACTION AND EXPANSION JOINTS (ROAD WORK); UNLOADING AND HANDLING OF LUMBER, BRICK, TRANSITE MATERIALS, CAST IRON WATER PIPE, REINFORCED CONCRETE RODS, SEWER AND DRAIN TILE RAILROAD TILES AND ALL OTHER CREOSOTED MATERIALS, PAVING BLOCKS AND CONCRETE FORMS; HANDLING OF INSULATION OF ANY TYPE, ALL WORK INVOLVING THE UNLOADING OF MATERIALS, FIXTURES, OR FURNISHING, WHETHER CRATED OR UNCRATED; ALL MORTAR AND COMPOSITION MIXERS OF SEWER WORK; TRACK LABORERS; CHIMNEY AND SILO LABORERS WORKING AT A HEIGHT OF 1 TO 48 FEET; ALL LABORERS WORKING ON SWING, SUSPENDED, OR ANY TYPE OR MAKE OF SCAFFOLDING 1 TO 48 FEET; ALL LABORERS WORKING INSIDE A SPHERE OR ANY TYPE OR MAKE OF TANK; WORKING INSIDE A SPHERE OR ANY TYPE OR MAKE OF TANK FROM BOTTOM TO A HEIGHT OF 48 FEET; FORM STRIPPERS (ANY TYPE); MECHANICAL OR MOTORIZED BUGGIES, FOR CONCRETE OR MASONSL USE OF SKID STEER LOADS OR ANY OTHER MACHINERY WHICH REPLACES THE WHEELBARROW OR BUGGY; HANDLING MULTIPLE CONCRETE DUCT OR ANY OTHER TYPE OF PIPE USED IN PUBLIC UTILITY WORK UNLESS OTHERWISE SPECIFIED HEREIN; SNAPPING OF WALL TIES AND REMOVAL OF RODS, DRILLING OF ANCHOR BOLT HOLES; CONCRETE OR ASPAHLT CLIPPER TYPE SAWS AND SELF- PROPELLED SAWS; SHOULDER AND GRADE LABORERS; ALL HYDRAULIC ELECTRIC AND AIR OR ANY OTHER TYPE OF TOOLS; GROUTING AND CAULKING; CLEANING LUMBER, NAIL PULLING, DECK HAND; DREDGEHAND; SHORE LABORER; BANKMEN ON FLOATING PLANT; TOOL AND MATERIAL CHECKERS; SIGNALMEN AND FLAGMEN ON ALL CONSTRUCTION WORK DEFINED HEREIN; CLEANING OF DEBRIS; REMOVAL OF TREES; CONCRETE CURING, TEMPORARY CONCRETE PROTECTION REGARDLESS OF MANNER OR MATERIALS USED; LABORERS ON APSCO; JANITORIAL; WRECKING AND DEMOLITION LABORERS (GRUNDY COUNTY)
$51.40 $36.94 $88.34
LABORER GROUP 1 UNSKILLED - ALL CLASSIFICATIONS NOT LISTED BELOW Building
LABO0393-001 (BUREAU, LA SALLE, AND PUTNAM COUNTIES)
$40.54 $32.42 $72.96
LABORER GROUP 1 UNSKILLED - ALL CLASSIFICATIONS NOT LISTED BELOW Heavy
LABO0393-001 (BUREAU, LA SALLE, AND PUTNAM COUNTIES)
$40.54 $32.42 $72.96
LABORER GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER Building
LABO0100-004 (CLINTON COUNTY (NORTHWEST))
$35.88 $29.35 $65.23
LABORER GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER Building
LABO0218-003 (CALHOUN, GREENE, AND JERSEY COUNTIES)
$33.34 $27.89 $61.23
LABORER GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER Building
LABO0338-003 (MACOUPIN COUNTY)
$34.64 $30.59 $65.23
LABORER GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER; DYNAMITE MAN (MCLEAN COUNTY) Heavy
LABO0362-001
$38.12 $30.06 $68.18
LABORER GROUP 2 DYNAMITE MAN; ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER Heavy
LABO0751-002 (FORD, IROQUOIS, AND KANKAKEE COUNTIES)
$46.08 $34.34 $80.42
LABORER GROUP 2 DYNAMITE MAN; ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; AND LEAD BASE PAINT WORKER Heavy
LABO0996-001 (LIVINGSTON, MARSHALL, AND WOODFORD COUNTIES)
$40.17 $28.01 $68.18
LABORER GROUP 2 DYNAMITE MEN; ASBESTOS ABATEMENT LABORER; HAZARDOUS WASTE WORKER Building
LABO0996-002 (LIVINGSTON, MARSHALL, STARK (EASTERN HALF), AND WOODFORD COUNTIES)
$38.59 $27.04 $65.63
LABORER GROUP 2 POWER VIRBRATOR (BOONE COUNTY) Building
LABO0149-003
$51.75 $36.94 $88.69
LABORER GROUP 2 SEWER AND DRAIN PIPELAYERS AND MULTIPLE CONCRETE DUCT OR ANY OTHER TYPE OF PIPE USED ON PUBLIC UTILITY WORK Heavy
LABO0075-003 (GROUND LEVEL TO 8 FEET); PUMPCRETE PIPEHANDLERS; (GRUNDY COUNTY)
$51.75 $36.94 $88.69
LABORER GROUP 3 DYNAMITE MAN Building
LABO0100-004 (CLINTON COUNTY (NORTHWEST))
$36.88 $29.35 $66.23
LABORER GROUP 3 DYNAMITE MAN AND POWDER MAN Building
LABO0218-003 (CALHOUN, GREENE, AND JERSEY COUNTIES)
$34.34 $27.89 $62.23
LABORER GROUP 3 DYNAMITE MAN AND POWDER MAN Building
LABO0338-003 (MACOUPIN COUNTY)
$35.64 $30.59 $66.23
LABORER GROUP 3 TORCHMAN Building
LABO0149-003 (DEMOLITION), MORTARMAN (BOONE COUNTY)
$51.40 $36.94 $88.34
LABORER GROUP 4 DYNAMITE MAN Building
LABO0393-001 (BUREAU, LA SALLE, AND PUTNAM COUNTIES)
$41.54 $32.42 $73.96
LABORER GROUP 4 DYNAMITE MAN Heavy
LABO0393-001 (BUREAU, LA SALLE, AND PUTNAM COUNTIES)
$41.54 $32.42 $73.96
LABORER GROUP 4 POWER TAMPER (BOONE COUNTY) Building
LABO0149-003
$51.75 $36.94 $88.69
LABORER GROUP 4 TUNNEL MINERS, AND ALL LABORERS INSIDE TUNNEL; AIR BLOWN PIPEMEN, TORCHMEN Heavy
LABO0075-003 (BURNERS); MORTARING MEN ON SEWER AND DRAIN PIPE (THE APPLYING OF MORTAR AND COMPOSITION MIXES), ALL BOTTOM MEN ON SEWER WORK-ALL SEWER AND DRAIN PIPELAYERS-MULTIPLE CONCRETE DUCT OR ANY OTHER TYPE OF PIPE USED ON PUBLIC UTILITY WORK-8 FEET OR MORE BELOW GROUND LEVEL, AND ALL OTHER SEWER AND TRENCH LABORERS 8 FEET OR MORE BELOW GROUND LEVEL REGARDLESS OF EXCAVATION AREA; ALL LABOR WORK INSIDE COFFERDAM; USE OF A 10 FOOT OR MORE DRILL STEEL FOR HAND HELD DRILLS; CAISSON LABORERS GROUND LEVEL DWON 15 FEET; ALL AIR TOOLS 8 FEET OR MORE BELOW GROUND LEVEL; ALL LABORERS WORKING ON SWINING-SUSPENDED ON ANY TYPE OR MAKE OF SCAFFOLD, 48 FEET TO 100 FEET; ALL CHIMNEY AND SILO LABORERS WORKING AT A HEIGHT OF 48 TO 100 FEET; ALL TAMPING HAMMERS OVER 150 LBS.; ALL LABORERS WORKING INSIDE OF A SPHERE OR ANY TYPE OR MAKE OF TANK AT A HEIGHT OF 48 FEET TO 100 FEET; ALL HYDRAULIC, ELECTRIC AND AIR TOOLS OR ANY OTHER TYPE 8 FEET OR MORE BELOW GROUND LEVEL; VIBRATORS-ANY TYPE-8 FEET OR MORE BELOW GROUND LEVEL (GRUNDY COUNTY)
$51.63 $36.94 $88.57
LABORER GROUP 6 ALL UNDERGROUND CAVERN LABORERS; CAISSON LABORERS 50 FEET OR MORE BELOW GROUND LEVEL; LABORERS WORKING UNDER RADIO ACTIVE CONDITIONS Heavy
LABO0075-003 (SUITING UP); BLASTING MEN (POWDERMEN) (GRUNDY COUNTY)
$51.75 $36.94 $88.69
LABORER GROUP 6 TILE LAYERS, BOTTOM MEN Building
LABO0149-003 (BOONE COUNTY)
$52.10 $36.94 $89.04
LABORER GROUP 7 CAISSON LABORERS, DYNAMITERS Building
LABO0149-003 (BOONE COUNTY)
$52.10 $36.94 $89.04
LABORER GROUP 7 DOSIMETER Heavy
LABO0075-003 (ANY DEVICE) USED FOR MONITORING NUCLEAR EXPOSURE; ASBESTOS ABATEMENT WORKER; TOXIC AND HAZARDOUS WASTE REMOVAL LABORER (GRUNDY COUNTY)
$51.60 $36.94 $88.54
LABORER GROUP 8 ASBESTOS ABATEMENT LABORERS, TOXIC AND HAZARDOUS WASTE REMOVAL LABORERS, DOSIMETER Building
LABO0149-003 (ANY DEVICE) MONITORING NUCLEAR EXPOSURE (BOONE COUNTY)
$51.80 $36.94 $88.74
LABORER GROUP ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER5 Building
LABO0393-001 (BUREAU, LA SALLE, AND PUTNAM COUNTIES)
$42.54 $32.42 $74.96
LABORER GROUP ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER5 Heavy
LABO0393-001 (BUREAU, LA SALLE, AND PUTNAM COUNTIES)
$42.54 $32.42 $74.96
LABORER, UNSKILLED Residential
SUIL1998-001
$8.41 0.00 $8.41
LABORER: ASBESTOS ABATEMENT WORKER Building
LABO0477-007 (CASS, MORGAN, AND SCOTT COUNTIES)
$33.49 $29.26 $62.75
LABORER: ASBESTOS ABATEMENT WORKER (LOGAN COUNTY) Building
LABO0477-006
$35.92 $29.26 $65.18
LABORER: ASBESTOS ABATEMENT WORKER (MCLEAN COUNTY) Building
LABO0362-002
$37.14 $28.49 $65.63
LABORER: DYNAMITE MEN; ASBESTOS ABATEMENT LABORER; AND HAZARDOUS WASTE WORKER Building
LABO0538-002 (HENDERSON, HENRY, KNOX, WARREN, AND STARK (WEST) COUNTIES)
$37.66 $27.80 $65.46
LABORER: GENERAL LABORER Building
LABO0477-007 (CASS, MORGAN, AND SCOTT COUNTIES)
$30.49 $29.26 $59.75
LABORER: GENERAL LABORER Building
LABO0538-002 (HENDERSON, HENRY, KNOX, WARREN, AND STARK (WEST) COUNTIES)
$35.66 $27.80 $63.46
LABORER: GENERAL LABORER (LOGAN COUNTY) Building
LABO0477-006
$32.92 $29.26 $62.18
LABORER: GENERAL LABORER (MCLEAN COUNTY) Building
LABO0362-002
$35.14 $28.49 $63.63
LABORER: LANDSCAPE DRIVER Building
SUIL1993-003 (KANKAKEE COUNTY) HIGHWAY CONSTRUCTION (LANDSCAPE WORK)
$8.75 $0.17 $8.92
LABORER: LANDSCAPE DRIVER 2 & 3 AXLES Building
SUIL1993-001 (GRUNDY, LAKE & WILL COUNTIES) BUILDING CONSTRUCTION (LANDSCAPE WORK)
$11.86 $2.81 $14.67
LABORER: LANDSCAPE DRIVER, 2 & 3 AXLES Building
SUIL1993-002 (DU PAGE COUNTY) HEAVY CONSTRUCTION (LANDSCAPE WORK)
$8.32 $1.02 $9.34
LABORER: LANDSCAPE DRIVER, 2 & 3 AXLES Building
SUIL1993-002 (COOK COUNTY) HEAVY CONSTRUCTION (LANDSCAPE WORK)
$9.93 $1.89 $11.82
LABORER: LANDSCAPE DRIVER, 2 & 3 AXLES Building
SUIL1993-002 (BOONE, GRUNDY, KANE, KENDALL, LAKE, MCHENRY & WILL COUNTIES) (HEAVY CONSTRUCTION (LANDSCAPE WORK)
$11.94 $2.42 $14.36
LABORER: LANDSCAPE LABORERS Building
SUIL1993-001 (DU PAGE COUNTY) HEAVY CONSTRUCTION (LANDSCAPE WORK)
$7.25 0.00 $7.25
LABORER: LANDSCAPE LABORERS Building
SUIL1993-001 (DE KALB COUNTY) HEAVY CONSTRUCTION (LANDSCAPE WORK)
$7.25 0.00 $7.25
LABORER: LANDSCAPE LABORERS Building
SUIL1993-001 (COOK COUNTY) BUILDING CONSTRUCTION (LANDSCAPE WORK)
$7.25 0.00 $7.25
LABORER: LANDSCAPE LABORERS Building
SUIL1993-001 (BOONE, GRUNDY, KANE, KENDALL, LAKE, MCHENRY & WILL COUNTIES) HEAVY CONSTRUCTION (LANDSCAPE WORK)
$7.25 0.00 $7.25
LABORER: LANDSCAPE LABORERS Building
SUIL1993-002 (DU PAGE COUNTY) HEAVY CONSTRUCTION (LANDSCAPE WORK)
$7.25 0.00 $7.25
LABORER: LANDSCAPE LABORERS Building
SUIL1993-002 (DE KALB COUNTY) HEAVY CONSTRUCTION (LANDSCAPE WORK)
$7.25 0.00 $7.25
LABORER: LANDSCAPE LABORERS Building
SUIL1993-002 (COOK COUNTY) BUILDING CONSTRUCTION (LANDSCAPE WORK)
$7.25 0.00 $7.25
LABORER: LANDSCAPE LABORERS Building
SUIL1993-002 (BOONE, GRUNDY, KANE, KENDALL, LAKE, MCHENRY & WILL COUNTIES) HEAVY CONSTRUCTION (LANDSCAPE WORK)
$7.25 0.00 $7.25
LABORER: LANDSCAPE LABORERS Building
SUIL1993-003 (DE KALB COUNTY) HEAVY CONSTRUCTION (LANDSCAPE WORK)
$7.25 0.00 $7.25
LABORER: LANDSCAPE OPERATOR Building
SUIL1993-003 (KANKAKEE COUNTY) HIGHWAY CONSTRUCTION (LANDSCAPE WORK)
$16.57 $3.56 $20.13
LABORER: LANDSCAPE OPERATORS Building
SUIL1993-001 (DE KALB COUNTY) HEAVY CONSTRUCTION (LANDSCAPE WORK)
$7.25 0.00 $7.25
LABORER: LANDSCAPE OPERATORS Building
SUIL1993-002 (DU PAGE COUNTY) HEAVY CONSTRUCTION (LANDSCAPE WORK)
$10.75 0.00 $10.75
LABORER: LANDSCAPE OPERATORS Building
SUIL1993-002 (DE KALB COUNTY) HEAVY CONSTRUCTION (LANDSCAPE WORK)
$7.25 0.00 $7.25
LABORER: LANDSCAPE OPERATORS Building
SUIL1993-002 (COOK COUNTY) HEAVY CONSTRUCTION (LANDSCAPE WORK)
$10.98 $2.12 $13.10
LABORER: LANDSCAPE OPERATORS Building
SUIL1993-002 (BOONE, GRUNDY, KANE, KENDALL, LAKE, MCHENRY & WILL COUNTIES) HEAVY CONSTRUCTION (LANDSCAPE WORK)
$13.11 $3.01 $16.12
LABORER: LANDSCAPE OPERATORS Building
SUIL1993-003 (DE KALB COUNTY) HEAVY CONSTRUCTION (LANDSCAPE WORK)
$7.25 0.00 $7.25
LABORER: LANDSCAPE PLANTSMAN Building
SUIL1993-001 (GRUNDY, LAKE & WILL COUNTIES) BUILDING CONSTRUCTION (LANDSCAPE WORK)
$12.00 $3.32 $15.32
LABORER: LANDSCAPE PLANTSMAN Building
SUIL1993-001 (DU PAGE COUNTY) BUILDING CONSTRUCTION (LANDSCAPE WORK)
$9.04 $1.16 $10.20
LABORER: LANDSCAPE PLANTSMAN Building
SUIL1993-001 (DE KALB COUNTY) HEAVY CONSTRUCTION (LANDSCAPE WORK)
$9.66 $0.26 $9.92
LABORER: LANDSCAPE PLANTSMAN Building
SUIL1993-001 (COOK COUNTY) BUILDING CONSTRUCTION (LANDSCAPE WORK)
$9.80 $1.82 $11.62
LABORER: LANDSCAPE PLANTSMAN Building
SUIL1993-002 (DU PAGE COUNTY) BUILDING CONSTRUCTION (LANDSCAPE WORK)
$10.65 0.00 $10.65
LABORER: LANDSCAPE PLANTSMAN Building
SUIL1993-002 (DE KALB COUNTY) HEAVY CONSTRUCTION (LANDSCAPE WORK)
$9.66 $0.26 $9.92
LABORER: LANDSCAPE PLANTSMAN Building
SUIL1993-002 (COOK COUNTY) BUILDING CONSTRUCTION (LANDSCAPE WORK)
$10.08 $2.06 $12.14
LABORER: LANDSCAPE PLANTSMAN Building
SUIL1993-002 (BOONE, GRUNDY, KANE, KENDALL, LAKE, MCHENRY & WILL COUNTIES) HEAVY CONSTRUCTION (LANDSCAPE WORK)
$9.73 $2.05 $11.78
LABORER: LANDSCAPE PLANTSMAN Building
SUIL1993-003 (DE KALB COUNTY) HEAVY CONSTRUCTION (LANDSCAPE WORK)
$9.66 $0.26 $9.92
LABORER: TRUCK DRIVERS 2 & 3 AXLES Building
SUIL1993-003 (PEORIA, TAZEWELL, & WOODFORD COUNTIES) HIGHWAY CONSTRUCTION (LANDSCAPE WORK)
$17.58 $5.88 $23.46
LABORERS, GROUP 1 GENERAL LABORER Building
LABO0459-003 (RANDOLPH AND WASHINGTON COUNTIES)
$34.14 $30.59 $64.73
LABORERS, GROUP 1 GENERAL LABORER Building
LABO0581-001 (CLINTON COUNTY (NORTHEAST))
$31.00 $33.73 $64.73
LABORERS, GROUP 1 GENERAL LABORER Building
LABO0622-001 (BOND COUNTY (NORTHSIDE))
$29.65 $35.08 $64.73
LABORERS, GROUP 1 GENERAL LABORER Building
LABO0622-003 (BOND COUNTY (EXCEPT THE NORTHSIDE))
$29.65 $35.08 $64.73
LABORERS, GROUP 1 GENERAL LABORER Building
LABO0742-002 (CLINTON COUNTY (SOUTHWEST))
$29.26 $31.47 $60.73
LABORERS, GROUP 1 GENERAL LABORER Building
LABO1084-001 (BOND (SORENTO) AND MONTGOMERY COUNTIES)
$32.41 $32.32 $64.73
LABORERS, GROUP 1 GENERAL LABORER (MONROE COUNTY) Building
LABO0196-001
$32.81 $31.92 $64.73
LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER Building
LABO0196-001 (MONROE COUNTY)
$33.31 $31.92 $65.23
LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER Building
LABO0459-003 (RANDOLPH AND WASHINGTON COUNTIES)
$34.64 $30.59 $65.23
LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER Building
LABO0622-001 (BOND COUNTY (NORTHSIDE))
$30.15 $35.08 $65.23
LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER Building
LABO0622-003 (BOND COUNTY (EXCEPT THE NORTHSIDE))
$30.15 $35.08 $65.23
LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER Building
LABO0742-002 (CLINTON COUNTY (SOUTHWEST))
$29.76 $31.47 $61.23
LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER Building
LABO1084-001 (BOND (SORENTO) AND MONTGOMERY COUNTIES)
$32.91 $32.32 $65.23
LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER; Building
LABO0581-001 (CLINTON COUNTY (NORTHEAST))
$31.50 $33.73 $65.23
LABORERS, GROUP 2 DYNAMITE MAN, ASBESTOS ABATEMENT WORKER, HAZARDOUS WASTE ABATEMENT WORK, LEAD BASE PAINT ABATEMENT WORKER, AND UNLOADING EXPLOSIVES Building
LABO0309-002 (MERCER AND ROCK ISLAND COUNTIES)
$30.06 $24.10 $54.16
LABORERS, GROUP 3 CONCRETE SPECIALIST Building
LABO0309-002 (MERCER AND ROCK ISLAND COUNTIES)
$30.71 $24.10 $54.81
LABORERS, GROUP 3 DYNAMITE MAN Building
LABO0459-003 (RANDOLPH AND WASHINGTON COUNTIES)
$35.64 $30.59 $66.23
LABORERS, GROUP 3 DYNAMITE MAN Building
LABO0622-001 (BOND COUNTY (NORTHSIDE))
$31.15 $35.08 $66.23
LABORERS, GROUP 3 DYNAMITE MAN Building
LABO0622-003 (BOND COUNTY (EXCEPT THE NORTHSIDE))
$31.15 $35.08 $66.23
LABORERS, GROUP 3 DYNAMITE MAN Building
LABO1084-001 (BOND (SORENTO) AND MONTGOMERY COUNTIES)
$33.91 $32.32 $66.23
LABORERS, GROUP 3 DYNAMITE MAN AND POWDER MAN Building
LABO0196-001 (MONROE COUNTY)
$34.31 $31.92 $66.23
LABORERS, GROUP 3 DYNAMITE MAN AND POWDER MAN Building
LABO0581-001 (CLINTON COUNTY (NORTHEAST))
$32.50 $33.73 $66.23
LABORERS, GROUP 3DYNAMITE MAN Building
LABO0742-002 (CLINTON COUNTY (SOUTHWEST))
$30.76 $31.47 $62.23
LABORERS: ASBESTOS ABATEMENT WORKER (MENARD COUNTY) Building
LABO0477-001
$35.90 $29.26 $65.16
LABORERS: GENERAL LABORER (MENARD COUNTY) Building
LABO0477-001
$32.90 $29.26 $62.16
LANDSCAPE LABORER Building
LABO0032-004 (WINNEBAGO COUNTY) HIGHWAY CONSTRUCTION
$47.04 $36.31 $83.35
LANDSCAPE LABORER Building
LABO0309-006 (ROCK ISLAND COUNTY) HIGHWAY CONSTRUCTION
$33.77 $23.60 $57.37
LANDSCAPE LABORER Building
LABO0362-003 (MCLEAN COUNTY) HIGHWAY CONSTRUCTION
$31.08 $24.43 $55.51
LANDSCAPE LABORER Building
LABO0538-011 (HENRY COUNTY) HIGHWAY CONSTRUCTION
$35.23 $28.10 $63.33
LANDSCAPE LABORER Building
LABO0751-004 (KANKAKEE COUNTY) HIGHWAY CONSTRUCTION
$39.44 $32.54 $71.98
LANDSCAPE LABORER Building
LABO0996-004 (PEORIA, TAZEWELL, AND WOODFORD COUNTIES) HIGHWAY CONSTRUCTION
$32.73 $23.74 $56.47
LINE CONSTRUCTION: GROUNDMAN Heavy
ELEC0009-001 (GRUNDY AND KANKAKEE COUNTIES)
$48.44 $29.09 $77.53
LINE CONSTRUCTION: GROUNDMAN/EQUIPMENT OPERATOR Heavy
ELEC0051-001 (ALL CRAWLER TYPE EQUIPMENT LARGER THAN D-4, 15 TON CRANE OR LARGER) (FORD, IROQUOIS, LASALLE, LIVINGSTON, MCLEAN, MARSHALL, PUTNAM, AND WOODFORD COUNTIES)
$55.13 $25.17 $80.30
LINE CONSTRUCTION: GROUNDMAN/TRUCK DRIVER Heavy
ELEC0051-001 (FORD, IROQUOIS, LASALLE, LIVINGSTON, MCLEAN, MARSHALL, PUTNAM, AND WOODFORD COUNTIES)
$41.82 $20.84 $62.66
LINE CONSTRUCTION: LINEMAN AND EQUIPMENT OPERATOR Heavy
ELEC0009-001 (GRUNDY AND KANKAKEE COUNTIES)
$62.10 $37.29 $99.39
LINE CONSTRUCTION: LINEMAN AND SUBSTATION TECHNICIAN Heavy
ELEC0051-001 (FORD, IROQUOIS, LASALLE, LIVINGSTON, MCLEAN, MARSHALL, PUTNAM, AND WOODFORD COUNTIES)
$61.36 $27.19 $88.55
MARBLE & TILE SETTER AND TERRAZZO WORKER Building
BRIL0006-009 (FULTON, HENDERSON, KNOX, MARSHALL, MCLEAN, WARREN, AND WOODFORD COUNTIES)
$32.87 $21.09 $53.96
MARBLE & TILE SETTER AND TERRAZZO WORKER Building
BRIL0006-023 (BOONE, CARROLL, JO DAVIESS, LEE, OGLE, STEPHENSON, WHITESIDE & WINNEBAGO COUNTIES)
$38.52 $21.86 $60.38
MARBLE & TILE SETTER AND TERRAZZO WORKER Building
BRIL0006-026 (MERCER & ROCK ISLAND COUNTIES)
$25.78 $19.40 $45.18
MARBLE & TILE SETTER AND TERRAZZO WORKER Building
BRIL0008-027 (ADAMS, BROWN, CASS, GREENE, HANCOCK, MACOUPIN, MORGAN, MCDONOUGH, PIKE, SCHUYLER, AND SCOTT COUNTIES)
$32.20 $18.51 $50.71
MARBLE FINISHER, TERRAZZO FINISHER AND TILE FINISHER (RANDOLPH COUNTY) Building
BRIL0008-029
$29.75 $20.23 $49.98
MARBLE SETTER, TERRAZZO WORKER & TILE SETTER Building
BRIL0008-028 (LOGAN, MASON, AND MENARD COUNTIES)
$31.74 $17.87 $49.61
MARBLE, TERRAZZO AND TILE FINISHER Building
BRIL0008-027 (ADAMS, BROWN, CASS, GREENE, HANCOCK, MACOUPIN, MORGAN, MCDONOUGH, PIKE, SCHUYLER, AND SCOTT COUNTIES)
$30.70 $18.51 $49.21
MARBLE, TERRAZZO AND TILE FINISHER Building
BRIL0008-028 (LOGAN, MASON, AND MENARD COUNTIES)
$30.24 $17.87 $48.11
MARBLE, TILE & TERRAZZO FINISHER Building
BRIL0006-023 (BOONE, CARROLL, JO DAVIESS, LEE, OGLE, STEPHENSON, WHITESIDE & WINNEBAGO COUNTIES)
$35.69 $19.65 $55.34
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: NEW YORK:(ALBANY, HERKIMER, MONTGOMERY, SARATOGA AND SCHENECTADY COUNTIES))
$67.40 $33.55 $100.95
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: NEW YORK:(CATTARAUGUS, CHAUTAUGA, ERIE, NIAGARA AND ORLEANS COUNTIES))
$56.00 $36.81 $92.81
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: NEW YORK:(CAYUGA, JEFFERSON, MADISON, ONEIDA, OSWEGO AND ST. LAWRENCE COUNTIES))
$65.75 $33.40 $99.15
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: NEW YORK:(MONROE, ONTARIO AND WAYNE COUNTIES AND THE CITY OF ROCHESTER))
$65.20 $35.75 $100.95
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: OHIO:(ASHTABULA, CUYAHOGA, ERIE,LAKE, AND LORAIN COUNTIES))
$55.95 $16.81 $72.76
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: OHIO:(LUCAS, HENRY, OTTAWA, WOOD AND SANDUSKY COUNTIES))
$54.25 $16.81 $71.06
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: PENNSYLVANIA:(ERIE COUNTY):)
$53.00 $24.21 $77.21
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: WISCONSIN:INCLUDES ALL MARINE/FLOATING TYPE WORK ON PROJECTS IN THE SUPERIOR/DULUTH HARBOR, LAKE SUPERIOR.)
$57.15 $30.38 $87.53
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: ILLINOIS) Class I - Master Mechanic - assist and direct PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency
$73.95 $51.10 $125.05
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: INDIANA) Class I - Master Mechanic - assist and direct PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency
$57.90 $43.80 $101.70
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: MICHIGAN) Class I - Master Mechanic - assist and direct PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency
$53.00 $33.02 $86.02
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: MINNESOTA) Class I - Master Mechanic - assist and direct PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency
$57.80 $29.50 $87.30
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: NEW YORK:(ALBANY, HERKIMER, MONTGOMERY, SARATOGA AND SCHENECTADY COUNTIES))
$65.90 $33.55 $99.45
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: NEW YORK:(CATTARAUGUS, CHAUTAUGA, ERIE, NIAGARA AND ORLEANS COUNTIES))
$54.50 $36.81 $91.31
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: NEW YORK:(CAYUGA, JEFFERSON, MADISON, ONEIDA, OSWEGO AND ST. LAWRENCE COUNTIES))
$64.25 $33.40 $97.65
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: NEW YORK:(MONROE, ONTARIO AND WAYNE COUNTIES AND THE CITY OF ROCHESTER))
$63.70 $35.75 $99.45
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: OHIO:(ASHTABULA, CUYAHOGA, ERIE,LAKE, AND LORAIN COUNTIES))
$54.45 $16.81 $71.26
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: OHIO:(LUCAS, HENRY, OTTAWA, WOOD AND SANDUSKY COUNTIES))
$52.75 $16.81 $69.56
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: PENNSYLVANIA:(ERIE COUNTY):)
$51.50 $24.21 $75.71
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: WISCONSIN:INCLUDES ALL MARINE/FLOATING TYPE WORK ON PROJECTS IN THE SUPERIOR/DULUTH HARBOR, LAKE SUPERIOR.)
$55.65 $30.38 $86.03
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: ILLINOIS) Class II-A Crane/Backhoe Operator, 70 Ton or over Tug Operator, Mechanic/Welder, assistant engineer(hydraulic dredge), leverman (hydraulic dredge), diver tender PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency
$72.45 $51.10 $123.55
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: INDIANA) Class II-A Crane/Backhoe Operator, 70 Ton or over Tug Operator, Mechanic/Welder, assistant engineer(hydraulic dredge), leverman (hydraulic dredge), diver tender PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency
$56.40 $43.80 $100.20
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: MICHIGAN) Class II-A Crane/Backhoe Operator, 70 Ton or over Tug Operator, Mechanic/Welder, assistant engineer(hydraulic dredge), leverman (hydraulic dredge), diver tender PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency
$51.50 $33.02 $84.52
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: MINNESOTA) Class II-A Crane/Backhoe Operator, 70 Ton or over Tug Operator, Mechanic/Welder, assistant engineer(hydraulic dredge), leverman (hydraulic dredge), diver tender PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency
$56.30 $29.50 $85.80
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: NEW YORK:(ALBANY, HERKIMER, MONTGOMERY, SARATOGA AND SCHENECTADY COUNTIES))
$68.90 $33.55 $102.45
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: NEW YORK:(CATTARAUGUS, CHAUTAUGA, ERIE, NIAGARA AND ORLEANS COUNTIES))
$57.50 $36.81 $94.31
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: NEW YORK:(CAYUGA, JEFFERSON, MADISON, ONEIDA, OSWEGO AND ST. LAWRENCE COUNTIES))
$67.25 $33.40 $100.65
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: NEW YORK:(MONROE, ONTARIO AND WAYNE COUNTIES AND THE CITY OF ROCHESTER))
$66.70 $35.75 $102.45
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: OHIO:(ASHTABULA, CUYAHOGA, ERIE,LAKE, AND LORAIN COUNTIES))
$57.45 $16.81 $74.26
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: OHIO:(LUCAS, HENRY, OTTAWA, WOOD AND SANDUSKY COUNTIES))
$55.75 $16.81 $72.56
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: PENNSYLVANIA:(ERIE COUNTY):)
$54.50 $24.21 $78.71
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: WISCONSIN:INCLUDES ALL MARINE/FLOATING TYPE WORK ON PROJECTS IN THE SUPERIOR/DULUTH HARBOR, LAKE SUPERIOR.)
$58.65 $30.38 $89.03
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: ILLINOIS) Class II-B Friction, Lattice Boom, or any Crane Certifications PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency
$75.45 $51.10 $126.55
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: INDIANA) Class II-B Friction, Lattice Boom, or any Crane Certifications PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency
$59.40 $43.80 $103.20
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: MICHIGAN) Class II-B Friction, Lattice Boom, or any Crane Certifications PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency
$54.50 $33.02 $87.52
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: MINNESOTA) Class II-B Friction, Lattice Boom, or any Crane Certifications PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency
$59.30 $29.50 $88.80
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: NEW YORK:(ALBANY, HERKIMER, MONTGOMERY, SARATOGA AND SCHENECTADY COUNTIES))
$61.40 $33.55 $94.95
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: NEW YORK:(CATTARAUGUS, CHAUTAUGA, ERIE, NIAGARA AND ORLEANS COUNTIES))
$50.00 $36.81 $86.81
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: NEW YORK:(CAYUGA, JEFFERSON, MADISON, ONEIDA, OSWEGO AND ST. LAWRENCE COUNTIES))
$59.75 $33.40 $93.15
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: NEW YORK:(MONROE, ONTARIO AND WAYNE COUNTIES AND THE CITY OF ROCHESTER))
$59.20 $35.75 $94.95
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: OHIO:(ASHTABULA, CUYAHOGA, ERIE,LAKE, AND LORAIN COUNTIES))
$49.95 $16.81 $66.76
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: OHIO:(LUCAS, HENRY, OTTAWA, WOOD AND SANDUSKY COUNTIES))
$48.25 $16.81 $65.06
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: PENNSYLVANIA:(ERIE COUNTY):)
$47.00 $24.21 $71.21
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: WISCONSIN:INCLUDES ALL MARINE/FLOATING TYPE WORK ON PROJECTS IN THE SUPERIOR/DULUTH HARBOR, LAKE SUPERIOR.)
$51.15 $30.38 $81.53
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: ILLINOIS) Class III - Deck Equipment Operator (Machineryman) Maintenance of Crane (over 50 ton capacity) or Backhoe (115,000 pounds or more), Tug/launch operator, Loader/dozer and like equipment on Barge, breakwater wall, slip/dock, Scow, Deck Machinery, etc. PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency
$67.95 $51.10 $119.05
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: INDIANA) Class III - Deck Equipment Operator (Machineryman) Maintenance of Crane (over 50 ton capacity) or Backhoe (115,000 pounds or more), Tug/launch operator, Loader/dozer and like equipment on Barge, breakwater wall, slip/dock, Scow, Deck Machinery, etc. PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency
$51.90 $43.80 $95.70
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: MICHIGAN) Class III - Deck Equipment Operator (Machineryman) Maintenance of Crane (over 50 ton capacity) or Backhoe (115,000 pounds or more), Tug/launch operator, Loader/dozer and like equipment on Barge, breakwater wall, slip/dock, Scow, Deck Machinery, etc. PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency
$47.00 $33.02 $80.02
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: MINNESOTA) Class III - Deck Equipment Operator (Machineryman) Maintenance of Crane (over 50 ton capacity) or Backhoe (115,000 pounds or more), Tug/launch operator, Loader/dozer and like equipment on Barge, breakwater wall, slip/dock, Scow, Deck Machinery, etc. PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency
$51.80 $29.50 $81.30
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: NEW YORK:(ALBANY, HERKIMER, MONTGOMERY, SARATOGA AND SCHENECTADY COUNTIES))
$56.90 $33.55 $90.45
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: NEW YORK:(CATTARAUGUS, CHAUTAUGA, ERIE, NIAGARA AND ORLEANS COUNTIES))
$45.50 $36.81 $82.31
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: NEW YORK:(CAYUGA, JEFFERSON, MADISON, ONEIDA, OSWEGO AND ST. LAWRENCE COUNTIES))
$55.25 $33.40 $88.65
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: NEW YORK:(MONROE, ONTARIO AND WAYNE COUNTIES AND THE CITY OF ROCHESTER))
$54.70 $35.75 $90.45
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: OHIO:(ASHTABULA, CUYAHOGA, ERIE,LAKE, AND LORAIN COUNTIES))
$45.45 $16.81 $62.26
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: OHIO:(LUCAS, HENRY, OTTAWA, WOOD AND SANDUSKY COUNTIES))
$43.75 $16.81 $60.56
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: PENNSYLVANIA:(ERIE COUNTY):)
$42.50 $24.21 $66.71
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: WISCONSIN:INCLUDES ALL MARINE/FLOATING TYPE WORK ON PROJECTS IN THE SUPERIOR/DULUTH HARBOR, LAKE SUPERIOR.)
$46.65 $30.38 $77.03
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: ILLINOIS) Class IV - Deck Equipment Operator(Machineryman/Fireman) (Four equipment units or more) Off Road Trucks, Deck Hand, Tug Engineer and Crane Maintenance 50 ton capacity and under or Backhoe weighing 115,000 pounds or less, assistant tug operator. PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency
$63.45 $51.10 $114.55
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: INDIANA) Class IV - Deck Equipment Operator(Machineryman/Fireman) (Four equipment units or more) Off Road Trucks, Deck Hand, Tug Engineer and Crane Maintenance 50 ton capacity and under or Backhoe weighing 115,000 pounds or less, assistant tug operator. PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency
$47.40 $43.80 $91.20
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: MICHIGAN) Class IV - Deck Equipment Operator(Machineryman/Fireman) (Four equipment units or more) Off Road Trucks, Deck Hand, Tug Engineer and Crane Maintenance 50 ton capacity and under or Backhoe weighing 115,000 pounds or less, assistant tug operator. PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency
$42.50 $33.02 $75.52
MECHANIC Heavy
SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: MINNESOTA) Class IV - Deck Equipment Operator(Machineryman/Fireman) (Four equipment units or more) Off Road Trucks, Deck Hand, Tug Engineer and Crane Maintenance 50 ton capacity and under or Backhoe weighing 115,000 pounds or less, assistant tug operator. PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency
$47.30 $29.50 $76.80
MILLWRIGHT Building
CARP1051-001 (FULTON, HANCOCK, KNOX, LOGAN, MASON, MCDONOUGH, WARREN, AND WOODFORD COUNTIES)
$33.06 $29.97 $63.03
MILLWRIGHT Building
CARP1051-003 (ADAMS, BROWN, CASS, GREENE, MACOUPIN, MENARD, MONTGOMERY, MORGAN, PIKE, SCHUYLER, AND SCOTT COUNTIES)
$33.06 $29.36 $62.42
MILLWRIGHT (LIVINGSTON AND MCLEAN COUNTIES) Building
CARP1051-007
$33.06 $30.04 $63.10
MILLWRIGHT: ZONE 1: CARROLL, HENDERSON, HENRY, MERCER, AND ROCK ISLAND (EAST) COUNTIES Building
CARP2158-001
$39.31 $29.84 $69.15
MILLWRIGHT: ZONE 3: BOONE, JO DAVIESS, OGLE, STEPHENSON, AND WINNEBAGO COUNTIES Building
CARP2158-001
$51.81 $32.69 $84.50
MILLWRIGHT: ZONE 5: BUREAU, DEKALB, LA SALLE, LEE, MARSHALL, PUTNAM, ROCK ISLAND Building
CARP2158-001 (WEST), STARK, AND WHITESIDE COUNTIES
$51.09 $33.61 $84.70
OPERATOR: POWER EQUIPMENT, GROUP 1 CRANE Building
ENGI0150-019 (FRICTION OR HYDRAULIC, REGARDLESS OF SIZE OR ATTACHMENTS); TOW OR PUSH BOAT (HENRY (WESTERN HALF), MERCER, ROCK ISLAND, AND WHITESIDE (WESTERN PART FROM THE 5TH SECTIONAL LINE EAST OF MORRISON RUNNING DIRECTLY NORTH AND SOUTH) COUNTIES)
$43.50 $41.25 $84.75
OPERATOR: POWER EQUIPMENT, GROUP 1 MECHANIC; ASPHALT PLANT*; ASPHALT SPREADER; AUTOGRADE*; BACKHOES WITH CAISSON ATTACHMENT*; BATCH PLANT*; BENOTO Building
ENGI0150-005 (REQUIRES TWO ENGINEERS); BOILER AND THROTTLE VALVE; CAISSON RIGS*; CENTRAL REDI-MIX PLANT*; COMBINATION BACKHOE FRONTEND LOADER; COMPRESSOR AND THROTTLE VALVE; CONCRETE BREAKER (TRUCK MOUNTED)*; CONCRETE CONVEYOR; CONCRETE PAVER OVER 27E CU FT*; CONCRETE PAVER 27E CU FT AND UNDER; CONCRETE PLACER*; CONCRETE PUMP TRUCK MOUNTED; CONCRETE TOWER; CRANES; CRANES, HAMMERHEAD*; CRETER CRANE; CRUSHER, STONE, ETC; DERRICKS; DERRICKS, TRAVELING; FORMLESS CURB AND GUTTER MACHINE*; GRADER, ELEVATING; GROUTING MACHINES; HIGHLIFT SHOVELS OR FRONTEND LOADER 2 1/4 YD AND OVER; HOISTS, ELEVATORS, OUTSIDE TYPE RACK AND PINION AND SIMILAR; HOISTS, ONE, TWO, AND THREE DRUMS; HOISTS, TWO TUGGER ONE FLOOR; HYDRAULIC BACKHOES; HYDRAULIC BOOM TRUCKS; HYDRO VAC (AND SIMILAR EQUIPMENT); LOCOMOTIVE; MOTOR PATROL; PILE DRIVERS AND SKID RIG; POST HOLE DIGGER; PRESTRESS MACHINE; PUMP CRETE DUAL RAM (REQUIRING FREQUENT LUBRICATION AND WATER)*; PUMP CRETES; SQUEEZE CRETES SCREW TYPE PUMPS GYPSUM BULKER AND PUMP; ROTO MILL GRINDER 36"" AND OVER*; ROTO MILL GRINDER LESS THAN 36""; SCOOPS-TRACTOR DRAWN; SLIP-FORM PAVER*; STRADDLE BUGGIES; TOURNAPULL; TRACTOR WITH BOOM AND SIDE BOOM; TRENCHING MACHINES *REQUIRES AN OILER (BUREAU (EAST AND NORTH OF RT. 26), LA SALLE, LIVINGSTON, AND PUTNAM (EAST & SOUTH OF THE ILLINOIS RIVER) COUNTIES)
$63.00 $51.00 $114.00
OPERATOR: POWER EQUIPMENT, GROUP 1 MECHANIC; ASPHALT PLANT*; ASPHALT SPREADER; AUTOGRADE*; BACKHOES WITH CAISSON ATTACHMENT*: BATCH PLANT*; BENOTO Building
ENGI0150-003 (REQUIRES TWO ENGINEERS); BOILER AND THROTTLE VALVE; CAISSON RIGS*; CENTRAL REDI-MIX PLANT*; COMBINATION BACKHOE FRONT ENDLOADER MACHINE; COMPRESSOR AND THROTTLE VALVE; CONCRETE BREAKER (TRUCK MOUNTED)*; CONCRETE CONVEYOR; CONCRETE CONVEYOR, TRUCK MOUNTED; CONCRETE PAVER OVER 27E CU. FT.*; CONCRETE PAVER 27E CU FT AND UNDER*; CONCRETE PLACER*; CONCRETE PLACING BOOM; CONCRETE PUMP (TRUCK MOUNTED); CONCRETE TOWER; CRANES*; CRANES, HAMMERHEAD*; CRANES, (GCI AND SIMILAR TYPE REQUIRES TWO OPERATORS ONLY); CRETER CRANE; CRUSHER, STONE, ETC; DERRICKS; DERRICKS, TRAVELING*; FORMLESS CURB AND GUTTER MACHINE*; GRADER, ELEVATING; GROUTING MACHINES; HIGHLIFT SHOVELS OR FRONT ENDLOADER 2 1/4 YD. AND OVER; HOISTS, ELEVATORS, OUTSIDE TYPE RACK AND PINION AND SIMILAR MACHINES; HOISTS, ONE, TWO, AND THREE DRUM; HOISTS, TWO TUGGER ONE FLOOR; HYDRAULIC BACKHOES*; HYDRAULIC BOOM TRUCKS; HYDRAULIC VAC (AND SIMILAR EQUIPMENT);LOCOMOTIVES; MOTOR PATROL*; PILE DRIVERS AMD SKID RIG*; POST HOLE DIGGER; PRE- STRESS MACHINE; PUMP CRETES DUAL RAM(REQUIRING FREQUENT LUBRICATION AND WATER); PUMP CRETES; SQUEEZE CRETES-SCREW TYPE PUMPS GYPSUM BULKER AND PUMP; RAISED AND BLIND HOLE DRILL*; ROTO MILL GRINDER (36"" AND OVER)*; ROTO MILL GRINDER (LESS THAN 36"")*; SCOOPS-TRACTOR DRAWN; SLIP-FORM PAVER*; STRADDLE BUGGIES; TOURNAPULL; TRACTOR WITH BOOM, AND SIDE BOOM; AND TRENCHING MACHINES*. *-REQUIRES OILER (BOONE, CARROLL, DE KALB, JO DAVIESS, LEE, OGLE, STEPHENSON, WHITESIDE, AND WINNEBAGO COUNTIES) PREMIUM PAY: LONG BOOM: CRANES & DERRICKS 90' TO 150' INCLUDING JIB RECEIVE AN EXTRA INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR PLUS AN ADDITIONAL $.10 FOR EACH ADDITIONAL 10' OF BOOM OR JIB. CAPACITY PAY: CRANES & DERRICKS WITH MAXIMUM CAPACITY EXCEEDING 50 TON WITH LESS THAN 90' OF BOOM OR JIB SHALL BE COMPENSATED $.01 PER HOUR FOR EACH TON OF THE RATED CAPACITY IN EXCESS OF 50 TON. LONG BOOM PAY AND CAPACITY PAY CANNOT BE COMBINED. CRANE MOUNTED EARTH AUGER, RAISED AND BLIND HOLE DRILLS, AND TRUCK MOUNTED DRILL RIGS RECEIVE AN EXTRA $.50 PER HOUR. CRETER CRANES: WHEN THE CRETER CRANE IS EQUIPPED WITH A CONVEYOR SYSTEM CAPABLE OF EXTENDING 70' OR MORE, THE ENGINEER SHALL RECEIVE AN EXTRA $.50 PER HOUR. TRUCK MOUNTED CONCRETE PUMPS: WHEN THE TRUCK MOUNTED CONCRETE PUMP IS EQUIPPED WITH A BOOM, WHICH IS CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER SHALL RECEIVE $.50 PER HOUR EXTRA. TRUCK MOUNTED CONCRETE CONVEYOR: TRUCK MOUNTED CONCRETE CONVEYORS EQUIPPED WITH CONVEYORS THAT ARE CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER SHALL RECEIVE AN EXTRA $.50 PER HOUR. UNDERGROUND WORK: EMPLOYEES WORKING IN TUNNELS, SHAFTS, ETC. SHALL BE PAID AN ADDITIONAL $.40 PER HOUR. EMPLOYEES WORKING UNDER AIR PRESSURE 1/2 POUND TO 7 POUNDS SHALL RECEIVE AN ADDITIONAL $.50 PER HOUR. EMPLOYEES WORKING UNDER AIR PRESSURE OF 7 POUNDS OR OVER SHALL RECEIVE $.65 PER HOUR MORE. MINING MACHINES-BORING MACHINES: THE CREW OPERATING AND MAINTAINING THE MINING MACHINES SHALL BE COMPENSATED AN ADDITIONAL $.50 PER HOUR
$56.75 $51.05 $107.80
OPERATOR: POWER EQUIPMENT, GROUP 1 OVERHEAD CRANES; GRADALL; ALL ROUGH TERRAIN HYDRAULIC CRANES Building
ENGI0649-001 (CHERRY PICKERS) 91,000 LBS GROSS VEHICLE WEIGHT AND OVER REQUIRE AN OILER; MECHANICS; CENTRAL CONCRETE MIXING PLANT OPERATOR; ROAD PAVERS (SINGLE DRUM, DUAL DRUM, TRI-BATCHERS); BLACKTOP PLANT OPERATORS AND PLANT ENGINEERS; 3-DRUM HOIST; DERRICKS; HYDRO CRANES (NON-LATTICE BOOM TRUCK CRANES HAVING THREE (3) AXLES OR LESS SHALL NOT REQUIRE AN OILER, A DOLLY SHALL COUNT AS AN AXLE); SHOVELS; SKIMMER SCOOPS; KOEHRING SCOOPER; DRAGLINES; BACKHOE; DERRICK BOATS; 360"" SWING EXCAVATORS; LOCOMOTIVE CRANES; DREDGE (ALL TYPES); GUARD RAIL MACHINES ( MACHINES THAT CANNOT BE MOVED FORWARD FROM THE POST POUNDER SEAT REQUIRES AN OILER); MOTOR PATROL; POWER BLADES-DUMORE-ELEVATING AND SIMILAR TYPES; TOWER CRANES (CRAWLER-MOBILE) AND STATIONARY; CRANE-TYPE BACK-FILLER; DROTT YUMBO AND SIMILAR TYPES CONSIDERED AS CRANES; CAISSON RIGS; DOZER; TOURNADOZER; WORK BOATS; ROSS CARRIER; TUNNEL BORING MACHINE (SHALL REQUIRE AN OILER); CARTS/HAUL UNITS FOR A BORING MACHINE; HELICOPTER; TOURNAPULLS - ALL AND SIMILAR TYPES; SCOOPS (ALL SIZES); PUSHCATS; ENDLOADERS (ALL TYPES); ASPHALT SURFACING MACHINE; SLIP FORM PAVER; ROCK CRUSHER; HEAVY EQUIPMENT GREASER; CMI, CMI BELT PLACER, AUTO GRADE & 3 TRACK AND SIMILAR TYPES; SIDE BOOMS; MULTIPLE UNIT EARTH MOVERS: .75 CENTS PER HR., FOR EACH SCOOP OVER ONE (1); CRETER CRANE; TRENCH MACHINE; PUMPCRETE-BELT CRETE- SQUEEZE CRETES-SCREW-TYPE PUMPS AND GYPSUM, BULKER & PUMP- OPERATOR WILL CLEAN; FORMLESS FINISHING MACHINE; FLAHERTY SPREADER OR SIMILAR TYPES; SCREEE MAN ON LAYDOWN MACHINE; WHEEL TRACTORS (INDUSTRIAL OR FARM-TYPE W/DOZER-HOE-ENDLOADER OR OTHER ATTACHMENTS); FWD & SIMILAR TYPES; VERMEER CONCRETE SAW; SELF PROPELLED CONCRETE SAW; MATERIAL CRUSHER; SCREENING PLANTS; LASER SCREED; SPAN SAW; LULL & SIMILAR TYPES; OFF ROAD TRUCKS, ARTICULATING END DUMP VEHICLES & SIMILAR TYPES; CONCRETE & ALL RECYCLING MACHINES (BUREAU (WEST OF RT. 26), FULTON, HANCOCK, HENDERSON, HENRY (EASTERN HALF), KNOX, MARSHALL, MASON, MCDONOUGH, MCLEAN, PUTNAM (WEST OF ILLINOIS RIVER), STARK, WARREN, AND WOODFORD COUNTIES)
$47.79 $43.42 $91.21
OPERATOR: POWER EQUIPMENT, GROUP 2 BOBCAT Building
ENGI0150-003 (OVER 3/4 CU YD); BOILERS; BRICK FORKLIFT; BROOM, POWER PROPELLED; BULLDOZERS; CONCRETE MIXER (TWO BAG AND OVER); CONVEYOR, PORTABLE; FORKLIFT TRUCKS; GREASER ENGINEER; HIGHLIFT SHOVELS OR FRONT END LOADERS UNDER 2 1/4 CU YD; AOTOMATIC HOISTS, HOISTS, INSIDE ELEVATORS; HOISTS, SEWER DRAGGING MACHINE; HOISTS, TUGGER SINGLE DRUM; LASER SCREED; ROCK DRILL (SELF-PROPELLED); ROCK DRILL (TRUCK MOUNTED)*; ROLLERS; STEAM GENERATORS; TRACTORS; TRACTOR DRAWN VIBRATORY ROLLER (RECEIVES AN ADDITIONAL $.50 PER HOUR); WINCH TRUCKS WITH ""A"" FRAME. *-REQUIRES OILER (BOONE, CARROLL, DE KALB, JO DAVIESS, LEE, OGLE, STEPHENSON, WHITESIDE, AND WINNEBAGO COUNTIES) PREMIUM PAY: LONG BOOM: CRANES & DERRICKS 90' TO 150' INCLUDING JIB RECEIVE AN EXTRA INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR PLUS AN ADDITIONAL $.10 FOR EACH ADDITIONAL 10' OF BOOM OR JIB. CAPACITY PAY: CRANES & DERRICKS WITH MAXIMUM CAPACITY EXCEEDING 50 TON WITH LESS THAN 90' OF BOOM OR JIB SHALL BE COMPENSATED $.01 PER HOUR FOR EACH TON OF THE RATED CAPACITY IN EXCESS OF 50 TON. LONG BOOM PAY AND CAPACITY PAY CANNOT BE COMBINED. CRANE MOUNTED EARTH AUGER, RAISED AND BLIND HOLE DRILLS, AND TRUCK MOUNTED DRILL RIGS RECEIVE AN EXTRA $.50 PER HOUR. CRETER CRANES: WHEN THE CRETER CRANE IS EQUIPPED WITH A CONVEYOR SYSTEM CAPABLE OF EXTENDING 70' OR MORE, THE ENGINEER SHALL RECEIVE AN EXTRA $.50 PER HOUR. TRUCK MOUNTED CONCRETE PUMPS: WHEN THE TRUCK MOUNTED CONCRETE PUMP IS EQUIPPED WITH A BOOM, WHICH IS CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER SHALL RECEIVE $.50 PER HOUR EXTRA. TRUCK MOUNTED CONCRETE CONVEYOR: TRUCK MOUNTED CONCRETE CONVEYORS EQUIPPED WITH CONVEYORS THAT ARE CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER SHALL RECEIVE AN EXTRA $.50 PER HOUR. UNDERGROUND WORK: EMPLOYEES WORKING IN TUNNELS, SHAFTS, ETC. SHALL BE PAID AN ADDITIONAL $.40 PER HOUR. EMPLOYEES WORKING UNDER AIR PRESSURE 1/2 POUND TO 7 POUNDS SHALL RECEIVE AN ADDITIONAL $.50 PER HOUR. EMPLOYEES WORKING UNDER AIR PRESSURE OF 7 POUNDS OR OVER SHALL RECEIVE $.65 PER HOUR MORE. MINING MACHINES-BORING MACHINES: THE CREW OPERATING AND MAINTAINING THE MINING MACHINES SHALL BE COMPENSATED AN ADDITIONAL $.50 PER HOUR
$56.05 $51.05 $107.10
OPERATOR: POWER EQUIPMENT, GROUP 2 DINKEYS; POWER LAUNCHES; PH ONE-PASS SOIL-CEMENT MACHINE Building
ENGI0649-001 (AND SIMILAR TYPES); PUGMILL WITH PUMP; BACKFILLERS; EUCLID LOADER; FORKLIFTS; JEEPS W/DITCHING MACHINE OR OTHER ATTACHMENTS; TUNELUGER; AUTOMATIC CEMENT AND GRAVEL BATCHING PLANTS; MOBILE DRILLS (SOIL TESTING) AND SIMILAR TYPES; GURRIES AND SIMILAR TYPES; 1 AND 2 DRUM HOISTS (BUCK HOISTS AND SIMILAR TYPES); CHICAGO BOOM; HORIZONTAL BORING MACHINE & PIPE JACKING MACHINE; HYDRO BOOM; DEWATERING SYSTEM; STRAW BLOWER; HYDRO SEEDER; ASSISTANT HEAVY EQUIPMENT GREASER ON SPREAD; TRACTORS (TRACK- TYPE) WITHOUT POWER UNIT PULLING ROLLERS; ROLLERS ON ASPHALT - BRICK OR MACADAM; CONCRETE BREAKERS; CONCRETE SPREADERS; MULE PULLING ROLLERS; CEMENT STRIPPER; CEMENT FINISHING MACHINES & CMI TEXTURE & REEL CURING MACHINES; CEMENT FINISHING MACHINE; BARBER GREEN OR SIMILAR LOADERS; VIBRO TAMPER (ALL SIMILAR TYPES) SELF- PROPELLED; WINCH OR BOOM TRUCK; MECHANICAL BULL FLOATS; MIXERS OVER 3 BAGS; TRACTOR PULLING POWER BLADE OR ELEVATING GRADER; PORTER REX RAIL; CLARY SCREED; TRUCK-TYPE OILERS WITH CDL; FIREMAN; SPRAY MACHINE ON PAVING; CURB MACHINES; TRUCK CRANE OILERS WITH CDL; OIL DISTRIBUTOR; TRUCK-MOUNTED SAWS; ALL ELEVATOR, PERMANENTLY INSTALLED USED FOR HOISTING OR LOWERING BUILDING MATERIAL; CONSTRUCTION ELEVATOR TEMPORARILY INSTALLED (BUREAU (WEST OF RT. 26), FULTON, HANCOCK, HENDERSON, HENRY (EASTERN HALF), KNOX, MARSHALL, MASON, MCDONOUGH, MCLEAN, PUTNAM (WEST OF ILLINOIS RIVER), STARK, WARREN, AND WOODFORD COUNTIES)
$44.09 $43.42 $87.51
OPERATOR: POWER EQUIPMENT, GROUP 3 AIR COMPRESSOR-SMALL 185 AND UNDER Building
ENGI0150-003 (1 TO 5 NOT TO EXCEED A TOTAL OF 300 FT); AIR COMPRESSOR-LARGE OVER 185; COMBINATION-SMALL EQUIPMENT OPERATOR; GENERATOR- SMALL 50 KW AND UNDER; GENERATOR-LARGE OVER 50 KW; HEATERS, MECHANICAL; HOISTS, INSIDE ELEVATORS (REMODELING OR RENOVATIN WORK); HYDRUALIC POWER UNITS (PILE DRIVING, EXTRACTING, AND DRILLING); LOW BOYS; PUMPS OVER 3"" (1 TO 3 NOT TO EXCEED A TOTAL OF 300 FT); PUMPS, WELL POINTS; WELDING MACHINES (2 THROUGH 5); WINCHES, 4 SMALL ELECTRIC DRILL WINCHES; BOBCAT (UP TO AND INCLUDING 3/4 CU YD) (BOONE, CARROLL, DE KALB, JO DAVIESS, LEE, OGLE, STEPHENSON, WHITESIDE, AND WINNEBAGO COUNTIES) PREMIUM PAY: LONG BOOM: CRANES & DERRICKS 90' TO 150' INCLUDING JIB RECEIVE AN EXTRA INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR PLUS AN ADDITIONAL $.10 FOR EACH ADDITIONAL 10' OF BOOM OR JIB. CAPACITY PAY: CRANES & DERRICKS WITH MAXIMUM CAPACITY EXCEEDING 50 TON WITH LESS THAN 90' OF BOOM OR JIB SHALL BE COMPENSATED $.01 PER HOUR FOR EACH TON OF THE RATED CAPACITY IN EXCESS OF 50 TON. LONG BOOM PAY AND CAPACITY PAY CANNOT BE COMBINED. CRANE MOUNTED EARTH AUGER, RAISED AND BLIND HOLE DRILLS, AND TRUCK MOUNTED DRILL RIGS RECEIVE AN EXTRA $.50 PER HOUR. CRETER CRANES: WHEN THE CRETER CRANE IS EQUIPPED WITH A CONVEYOR SYSTEM CAPABLE OF EXTENDING 70' OR MORE, THE ENGINEER SHALL RECEIVE AN EXTRA $.50 PER HOUR. TRUCK MOUNTED CONCRETE PUMPS: WHEN THE TRUCK MOUNTED CONCRETE PUMP IS EQUIPPED WITH A BOOM, WHICH IS CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER SHALL RECEIVE $.50 PER HOUR EXTRA. TRUCK MOUNTED CONCRETE CONVEYOR: TRUCK MOUNTED CONCRETE CONVEYORS EQUIPPED WITH CONVEYORS THAT ARE CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER SHALL RECEIVE AN EXTRA $.50 PER HOUR. UNDERGROUND WORK: EMPLOYEES WORKING IN TUNNELS, SHAFTS, ETC. SHALL BE PAID AN ADDITIONAL $.40 PER HOUR. EMPLOYEES WORKING UNDER AIR PRESSURE 1/2 POUND TO 7 POUNDS SHALL RECEIVE AN ADDITIONAL $.50 PER HOUR. EMPLOYEES WORKING UNDER AIR PRESSURE OF 7 POUNDS OR OVER SHALL RECEIVE $.65 PER HOUR MORE. MINING MACHINES-BORING MACHINES: THE CREW OPERATING AND MAINTAINING THE MINING MACHINES SHALL BE COMPENSATED AN ADDITIONAL $.50 PER HOUR
$53.60 $51.05 $104.65
OPERATOR: POWER EQUIPMENT, GROUP 3 AIR COMPRESSOR, SMALL 250 AND UNDER Building
ENGI0150-005 (1 TO 5 NOT TO EXCEED A TOTAL OF 300 FT; AIR COMPRESSOR, LARGE OVER 250; COMBINATION SMALL EQUIPMENT OPERATOR; GENERATOR, SMALL 50 KW AND UNDER; GENERATOR, LARGE OVER 50 KW; HEATERS, MECHANICAL; HOISTS, INSIDE ELEVATORS (RHEOSTAT MANUAL CONTROLLED); HYDRAULIC POWER UNITS, (PILE DRIVING AND EXTRACTING); LOWBOYS; PUMPS OVER 3"" (1 TO 3 NOT TO EXCEED A TOTAL OF 300 FT); PUMPS, WELL POINTS; WELDING MACHINES (2 THROUGH 5); WINCHES, 4 SMALL ELECTRIC DRILL WINCHES (BUREAU (EAST AND NORTH OF RT. 26), LA SALLE, LIVINGSTON, AND PUTNAM (EAST & SOUTH OF THE ILLINOIS RIVER) COUNTIES)
$59.15 $51.00 $110.15
OPERATOR: POWER EQUIPMENT, GROUP 3 AIR COMPRESSOR; HERMAN NELSON HEATER, DRAVO, WARNER, SILENT GLO, AND SIMILAR TYPES; WATER PUMP Building
ENGI0649-001 (S); LIGHT PLANTS; GENERATORS; WELDING MACHINES; POWER SUBGRADER; STRAIGHT TRACTOR; TRAC AIR WITHOUT ATTAHMENTS; ROLLER: FIVE (5) TON AND UNDER ON EARTH OR GRAVEL; FORM GRADER; CRAWLER CRANE, SKID RIG OILERS & OILERS WITH CDL; CONVEYOR (1) OR (2); MIXER (3) BAG AND UNDER(STANDARD CAPACITY WITH SKIP); BULK CEMENT PLANT; OILER ON CENTRAL CONCRETE MIXING PLANT; STUD WELDER (BUREAU (WEST OF RT. 26), FULTON, HANCOCK, HENDERSON, HENRY (EASTERN HALF), KNOX, MARSHALL, MASON, MCDONOUGH, MCLEAN, PUTNAM (WEST OF ILLINOIS RIVER), STARK, WARREN, AND WOODFORD COUNTIES)
$38.03 $43.42 $81.45
OPERATOR: POWER EQUIPMENT, GROUP 3 ARTICULATED OFF-ROAD HAUL UNIT; ASPHALT BOOSTER; BOILER Building
ENGI0150-019 (ENGINEER OR FIREMAN); CONVEYOR OVER 20 H.P.; DISTRIBUTOR; DRIVER ON TRUCK CRANE OR SIMILAR MACHINES; ELEVATOR; FARM-TYPE TRACTOR (WITHOUT POWER ATTACHMENT); FIREMAN & PUMP OPERATOR AT ASPHALT PLANT; FORKLIFT (LESS THAN 6000 LB. CAPACITY); GROUT PUMP; LIGHT PLANT; MECHANICAL BROOM; MUD JACK; SELF-PROPELLED ROLLER (OTHER THAN LISTED IN GROUP 2); STRADDLE CARRIER; TRENCH MACHINE (UNDER 40 H.P.). (HENRY (WESTERN HALF), MERCER, ROCK ISLAND, AND WHITESIDE (WESTERN PART FROM THE 5TH SECTIONAL LINE EAST OF MORRISON RUNNING DIRECTLY NORTH AND SOUTH) COUNTIES)
$38.85 $41.25 $80.10
OPERATOR: POWER EQUIPMENT, GROUP 3 BOILERS; BROOMS, ALL POWER PROPELLED; CEMENT SUPPLY TENDER; COMPRESSOR, COMMON RECEIVER Heavy
ENGI0150-007 (2); CONCRETE MIXER, TWO BAG AND OVER; CONVEYOR, PORTABLE; FARM TYPE TRACTORS USED FOR MOWING, SEEDING, ETC; FIREMAN ON BOILERS; FORKLIFT TRUCKS; GROUTING MACHINES; HOISTS, AUTOMATIC; HOISTS, ALL ELEVATORS; HOISTS, TUGGER SINGLE DRUM; JEEP DIGGERS; LOW BOYS; PIPE JACKING MACHINES; POST-HOLE DIGGER; POWER SAW, CONCRETE, POWER DRIVEN; PUG MILLS; ROLLERS, OTHER THAN ASPHALT; SEED AND STRAW BLOWER; STEAM GENERATORS; STUMP MACHINE; WINCH TRUCKS WITH A-FRAME; WORK BOATS;TAMPER-FORM MOTOR DRIVEN (GRUNDY, KANKAKEE, LA SALLE, LIVINGSTON, AND PUTNAM (EAST AND SOUTH OF THE ILLINOIS RIVER) COUNTIES)
$60.40 $51.00 $111.40
OPERATOR: POWER EQUIPMENT, GROUP 3 STRAIGHT FRAMED TRUCK AND TRUCK MOUNTED VAC UNIT, STARTING ENGINEER Heavy
ENGI0649-004 (3 TO 5 PIECES); TRAC AIR MACHINE W/O ATTACHMENTS; ROLLERS, 5 TONS & UNDER ON EARTH & GRAVEL; FORM GRADER; BULK CEMENT PLANT; OILERS. (MCLEAN, MARSHALL, PUTNAM (WEST OF THE ILLINOIS RIVER), AND WOODFORD COUNTIES) - ESCALATED RATE ON CRANE, DERRICK BOOMS, AND TOWER CRANES: ADDITIONAL $1.00 PER HOUR OVER SCALE WHEN CRANE OR DERRICK IS POSITIONED 50 FT. OR MORE ABOVE ADJACENT GROUND LEVEL OR WATER LEVEL. $.05 PER HOUR, PER FOOT, OVER 90 FEET INCLUDING JIB. $0.02 PER HOUR, PER TON - OVER 50-TON CAPACITY. - OPERATING ENGINEERS WHO OPERATE LATTICE BOOM CRAWLER CRANES, LATTICE BOOM TRUCK CRANES, TELESCOPIC BOOM CRANES LESS THAN 17.5 TONS, TOWER CRANES, OVERHEAD CRANES AND HAVE BEEN CERTIFIED BY HTE NATIONAL COMMISSION FOR THE CERTIFICATION OF CRANE OPERATORS ON THE EQUIPMENT THEY OPERATE SHALL RECEIVE $1.60 PER HOUR OVER SCALE. A. ON DESIGNATED HAZARDOUS WASTE JOBS, OPERATORS SHALL RECEIVE: LEVEL A ADD $4.00 TO THE APPROPRIATE GROUP RATE; LEVELS B AND C ADD $3.00 TO THE APPROPRIATE GROUP RATE; AND LEVEL D ADD $2.00 TO THE APPROPRIATE GROUP RATE
$38.03 $43.42 $81.45
OPERATOR: POWER EQUIPMENT, GROUP 4 AIR COMPRESSOR Building
ENGI0150-019 (400 C.F.M. OR OVER); COMPACT LOADER (RUBBER TIRE, TRACK & UTILITY); ENGINE DRIVEN WELDING MACHINE; MECHANICAL HEATER (OTHER THAN STEAM BOILER); SMALL OUTBOARD MOTOR BOAT (SAFETY BOAT & LIFE BOAT); WATER PUMP (MORE THAN ONE WELL POINT PUMP). (HENRY (WESTERN HALF), MERCER, ROCK ISLAND, AND WHITESIDE (WESTERN PART FROM THE 5TH SECTIONAL LINE EAST OF MORRISON RUNNING DIRECTLY NORTH AND SOUTH) COUNTIES)
$37.80 $41.25 $79.05
OPERATOR: POWER EQUIPMENT, GROUP 4 AIR COMPRESSOR - SMALL 250 AND UNDER Heavy
ENGI0150-007 (1 TO 5 NOT TO EXCEED A TOTAL OF 300 FT); AIR COMPRESSOR - LARGE OVER 250; COMBINATION - SMALL EQUIPMENT OPERATOR; GENERATORS - SMALL 50 KW AND UNDER; GENERATORS - LARGE, OVER 50 KW; HEATERS, MECHANICAL; HYDRAULIC POWER UNIT (PILE DRIVING, EXTRACTING OR DRILLING); HYDRO-BLASTER REQUIRES TWO OPERATORS (ONE GROUP 2); LIGHT PLANTS ALL (1 TO 5); PUMPS, OVER 3"" (1 TO 3, NOT TO EXCEED A TOTAL OF 300 FT); TRACTAIRE; WELDING MACHINES (2 THROUGH 5); WINCHES, 4 SMALL ELECTRIC DRILL WINCHES (GRUNDY, KANKAKEE, LA SALLE, LIVINGSTON, AND PUTNAM (EAST AND SOUTH OF THE ILLINOIS RIVER) COUNTIES)
$59.00 $51.00 $110.00
OPERATOR: POWER EQUIPMENT, GROUP 4 BOBCAT/SKID STEER LOADER; BOOM TRUCKS Building
ENGI0150-005 (RESIDENTIAL); BRICK FORKLIFT; HOISTS, INSIDE ELEVATORS PUSH BUTTON WITH AUTOMATIC DOORS; OILERS (BUREAU (EAST AND NORTH OF RT. 26), LA SALLE, LIVINGSTON, AND PUTNAM (EAST & SOUTH OF THE ILLINOIS RIVER) COUNTIES)
$57.40 $51.00 $108.40
OPERATOR: POWER EQUIPMENT, GROUP 4 OILERS; HOISTS; INSIDE ELEVATORS; PUSH BUTTON AUTOMATIC DOORS Building
ENGI0150-003 (BOONE, CARROLL, DE KALB, JO DAVIESS, LEE, OGLE, STEPHENSON, WHITESIDE, AND WINNEBAGO COUNTIES) PREMIUM PAY: LONG BOOM: CRANES & DERRICKS 90' TO 150' INCLUDING JIB RECEIVE AN EXTRA INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR PLUS AN ADDITIONAL $.10 FOR EACH ADDITIONAL 10' OF BOOM OR JIB. CAPACITY PAY: CRANES & DERRICKS WITH MAXIMUM CAPACITY EXCEEDING 50 TON WITH LESS THAN 90' OF BOOM OR JIB SHALL BE COMPENSATED $.01 PER HOUR FOR EACH TON OF THE RATED CAPACITY IN EXCESS OF 50 TON. LONG BOOM PAY AND CAPACITY PAY CANNOT BE COMBINED. CRANE MOUNTED EARTH AUGER, RAISED AND BLIND HOLE DRILLS, AND TRUCK MOUNTED DRILL RIGS RECEIVE AN EXTRA $.50 PER HOUR. CRETER CRANES: WHEN THE CRETER CRANE IS EQUIPPED WITH A CONVEYOR SYSTEM CAPABLE OF EXTENDING 70' OR MORE, THE ENGINEER SHALL RECEIVE AN EXTRA $.50 PER HOUR. TRUCK MOUNTED CONCRETE PUMPS: WHEN THE TRUCK MOUNTED CONCRETE PUMP IS EQUIPPED WITH A BOOM, WHICH IS CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER SHALL RECEIVE $.50 PER HOUR EXTRA. TRUCK MOUNTED CONCRETE CONVEYOR: TRUCK MOUNTED CONCRETE CONVEYORS EQUIPPED WITH CONVEYORS THAT ARE CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER SHALL RECEIVE AN EXTRA $.50 PER HOUR. UNDERGROUND WORK: EMPLOYEES WORKING IN TUNNELS, SHAFTS, ETC. SHALL BE PAID AN ADDITIONAL $.40 PER HOUR. EMPLOYEES WORKING UNDER AIR PRESSURE 1/2 POUND TO 7 POUNDS SHALL RECEIVE AN ADDITIONAL $.50 PER HOUR. EMPLOYEES WORKING UNDER AIR PRESSURE OF 7 POUNDS OR OVER SHALL RECEIVE $.65 PER HOUR MORE. MINING MACHINES-BORING MACHINES: THE CREW OPERATING AND MAINTAINING THE MINING MACHINES SHALL BE COMPENSATED AN ADDITIONAL $.50 PER HOUR
$51.60 $51.05 $102.65
OPERATOR: POWER EQUIPMENT, GROUP 5 BOBCATS Heavy
ENGI0150-007 (ALL); BRICK FORKLIFTS; DIRECTIONAL BORING MACHINE LOCATOR; OILERS (GRUNDY, KANKAKEE, LA SALLE, LIVINGSTON, AND PUTNAM (EAST AND SOUTH OF THE ILLINOIS RIVER) COUNTIES)
$57.80 $51.00 $108.80
OPERATOR: POWER EQUIPMENT: GROUP 1 OVERHEAD CRANES; GRADALL; ALL ROUGH TERRAIN HYDRAULIC CRANES Residential
ENGI0649-008 (CHERRY PICKERS) 91,000 LBS GROSS VEHICLE WEIGHT AND OVER REQUIRE AN OILER; MECHANICS; CENTRAL CONCRETE MIXING PLANT OPERATOR; ROAD PAVERS (SINGLE DRUM, DUAL DRUM, TRI-BATCHERS); BLACKTOP PLANT OPERATORS AND PLANT ENGINEERS; 3-DRUM HOIST; DERRICKS; HYDRO CRANES (NON-LATTICE BOOM TRUCK CRANES HAVING THREE (3) AXLES OR LESS SHALL NOT REQUIRE AN OILER, A DOLLY SHALL COUNT AS AN AXLE); SHOVELS; SKIMMER SCOOPS; KOEHRING SCOOPER; DRAGLINES; BACKHOE; DERRICK BOATS; 360"" SWING EXCAVATORS; LOCOMOTIVE CRANES; DREDGE (ALL TYPES); GUARD RAIL MACHINES ( MACHINES THAT CANNOT BE MOVED FORWARD FROM THE POST POUNDER SEAT REQUIRES AN OILER); MOTOR PATROL; POWER BLADES-DUMORE-ELEVATING AND SIMILAR TYPES; TOWER CRANES (CRAWLER-MOBILE) AND STATIONARY; CRANE-TYPE BACK-FILLER; DROTT YUMBO AND SIMILAR TYPES CONSIDERED AS CRANES; CAISSON RIGS; DOZER; TOURNADOZER; WORK BOATS; ROSS CARRIER; TUNNEL BORING MACHINE (SHALL REQUIRE AN OILER); CARTS/HAUL UNITS FOR A BORING MACHINE; HELICOPTER; TOURNAPULLS - ALL AND SIMILAR TYPES; SCOOPS (ALL SIZES); PUSHCATS; ENDLOADERS (ALL TYPES); ASPHALT SURFACING MACHINE; SLIP FORM PAVER; ROCK CRUSHER; HEAVY EQUIPMENT GREASER; CMI, CMI BELT PLACER, AUTO GRADE & 3 TRACK AND SIMILAR TYPES; SIDE BOOMS; MULTIPLE UNIT EARTH MOVERS: .75 CENTS PER HR., FOR EACH SCOOP OVER ONE (1); CRETER CRANE; TRENCH MACHINE; PUMPCRETE-BELT CRETE- SQUEEZE CRETES-SCREW-TYPE PUMPS AND GYPSUM, BULKER & PUMP- OPERATOR WILL CLEAN; FORMLESS FINISHING MACHINE; FLAHERTY SPREADER OR SIMILAR TYPES; SCREEE MAN ON LAYDOWN MACHINE; WHEEL TRACTORS (INDUSTRIAL OR FARM-TYPE W/DOZER-HOE-ENDLOADER OR OTHER ATTACHMENTS); FWD & SIMILAR TYPES; VERMEER CONCRETE SAW; SELF PROPELLED CONCRETE SAW; MATERIAL CRUSHER; SCREENING PLANTS; LASER SCREED; SPAN SAW; LULL & SIMILAR TYPES; OFF ROAD TRUCKS, ARTICULATING END DUMP VEHICLES & SIMILAR TYPES; CONCRETE & ALL RECYCLING MACHINES
$47.79 $43.42 $91.21
OPERATOR: POWER EQUIPMENT: GROUP 2 DINKEYS; POWER LAUNCHES; PH ONE-PASS SOIL-CEMENT MACHINE Residential
ENGI0649-008 (AND SIMILAR TYPES); PUGMILL WITH PUMP; BACKFILLERS; EUCLID LOADER; FORKLIFTS; JEEPS W/DITCHING MACHINE OR OTHER ATTACHMENTS; TUNELUGER; AUTOMATIC CEMENT AND GRAVEL BATCHING PLANTS; MOBILE DRILLS (SOIL TESTING) AND SIMILAR TYPES; GURRIES AND SIMILAR TYPES; 1 AND 2 DRUM HOISTS (BUCK HOISTS AND SIMILAR TYPES); CHICAGO BOOM; HORIZONTAL BORING MACHINE & PIPE JACKING MACHINE; HYDRO BOOM; DEWATERING SYSTEM; STRAW BLOWER; HYDRO SEEDER; ASSISTANT HEAVY EQUIPMENT GREASER ON SPREAD; TRACTORS (TRACK- TYPE) WITHOUT POWER UNIT PULLING ROLLERS; ROLLERS ON ASPHALT - BRICK OR MACADAM; CONCRETE BREAKERS; CONCRETE SPREADERS; MULE PULLING ROLLERS; CEMENT STRIPPER; CEMENT FINISHING MACHINES & CMI TEXTURE & REEL CURING MACHINES; CEMENT FINISHING MACHINE; BARBER GREEN OR SIMILAR LOADERS; VIBRO TAMPER (ALL SIMILAR TYPES) SELF- PROPELLED; WINCH OR BOOM TRUCK; MECHANICAL BULL FLOATS; MIXERS OVER 3 BAGS; TRACTOR PULLING POWER BLADE OR ELEVATING GRADER; PORTER REX RAIL; CLARY SCREED; TRUCK-TYPE OILERS WITH CDL; FIREMAN; SPRAY MACHINE ON PAVING; CURB MACHINES; TRUCK CRANE OILERS WITH CDL; OIL DISTRIBUTOR; TRUCK-MOUNTED SAWS; ALL ELEVATOR, PERMANENTLY INSTALLED USED FOR HOISTING OR LOWERING BUILDING MATERIAL; CONSTRUCTION ELEVATOR TEMPORARILY INSTALLED
$44.09 $43.42 $87.51
OPERATOR: POWER EQUIPMENT: GROUP 3 AIR COMPRESSOR; HERMAN NELSON HEATER, DRAVO, WARNER, SILENT GLO, AND SIMILAR TYPES; WATER PUMP Residential
ENGI0649-008 (S); LIGHT PLANTS; GENERATORS; WELDING MACHINES; POWER SUBGRADER; STRAIGHT TRACTOR; TRAC AIR WITHOUT ATTAHMENTS; ROLLER: FIVE (5) TON AND UNDER ON EARTH OR GRAVEL; FORM GRADER; CRAWLER CRANE, SKID RIG OILERS & OILERS WITH CDL; CONVEYOR (1) OR (2); MIXER (3) BAG AND UNDER(STANDARD CAPACITY WITH SKIP); BULK CEMENT PLANT; OILER ON CENTRAL CONCRETE MIXING PLANT; STUD WELDER
$38.03 $43.42 $81.45
OPERATORS Building
ENGI0150-013 (BOONE, COOK, DUPAGE, GRUNDY, KANE, KENDALL, LAKE, MCHENRY, AND WILL COUNTIES) INCLUDES ANGLE DOZER, SMALL; BOBCAT AND OTHER SIMILAR TYPE MACHINES, 1 CU YD OR LESS; CHIPPING MACHINE; COMBINATION BACKHOE AND FRONT END LOADER 1 CU YD OR LESS; FORK LIFT TRUCK; HI-REACH AND HIGH-RANGER;HYDRAULIC BOOM WITH CLAM;LOG SKIDDER; STTRAW BLOWER AND SEEDER; STUMP MACHINE;TRACTORS, CRAWLERS, RUBBER TIRE TRACTORS, HIGHLIFT SHOVELS OR FRONT END LOADERS 1 CU YD OR LESS; TREE SPADES, ALL; UTILITY TRACTOR AND ATTACHMENTS, AND RUBBER TIRE FRONT END LOADER OR SIMILAR MACHINE OF 1 TO 1.5 CU YD SOLELY USED FOR PLACEMENT OF LARGE DECORATIVE BOULDERS, TREES WITH BALLED SOIL, AND OTHER DECORATIVE LANDSCAPE MATERIAL TOO LARGE TO BE ACCOMMODATED IN A 1 CU YD BUCKET. ALL OTHER EQUIPMENT UTILIZED FOR PERFORMING LANDSCAPE WORK, TREE TRIMMING OR REMOVAL OF STEES, AND TO INSTALL PLANTS; TRANSPORT TREES; EXCAVATE PLANT PITS; PLACE SOIL AND OTHER LANDSCAPE MATERIALS; AND APPLY FINISH LANDSCAPE MATERIAL ON SUBGRADE PREPARED BY OTHERS BUILDING AND HIGHWAY CONSTRUCTION (LANDSCAPE WORK): THE LANDSCAPE WORK FOR THE LANDSCAPE EQUIPMENT OPERATOR EXCLUDES THE PREPARATION OF SUB-GRADE PRIOR TO APPLICATION OF FINISH LANDSCAPE MATERIALS AND THE UTILIZATION OF ANY EQUIPMENT OVER ONE CUBIC YARD. FOOTNOTE: A. HEALTH AND WELFARE CONTRIBUTION IS YEAR'S DAY; MEMORIAL DAY; FOURTH OF JULY; LABOR DAY; THANKSGIVING DAY; AND CHRISTMAS DAY PROVIDED THAT ALL SUCH EMPLOYEES SHALL HAVE IN FACT WORKED THEIR REGULARLY SCHEDULED WORK DAY IMMEDIATELY PRECEDING AND THE REGULARLY SCHEDULED WORK DAY IMMEDIATELY SUCCEEDING THE OCCURRENCE OF SUCH HOLIDAY
$37.55 $9.50 $47.05
OPERATORS Building
ENGI0150-023 (HENRY, MCLEAN, OGLE, PEORIA, ROCK ISLAND, TAZEWELL, WINNEBAGO, AND WOODFORD COUNTIES) INCLUDES THE FOLLOWING: ANGLE DOZER, SMALL; BOBCAT AND OTHER SIMILAR TYPE MACHINES, 1 CU YD OR LESS; CHIPPING MACHINE; COMBINATION BACKHOE AND FRONT END LOADER 1 CU YD OR LESS; FORK LIFT TRUCK; HI-REACH AND HIGH-RANGER;HYDRAULIC BOOM WITH CLAM;LOG SKIDDER; STTRAW BLOWER AND SEEDER; STUMP MACHINE;TRACTORS, CRAWLERS, RUBBER TIRE TRACTORS, HIGHLIFT SHOVELS OR FRONT END LOADERS 1 CU YD OR LESS; TREE SPADES, ALL; UTILITY TRACTOR AND ATTACHMENTS, AND RUBBER TIRE FRONT END LOADER OR SIMILAR MACHINE OF 1 TO 1.5 CU YD SOLELY USED FOR PLACEMENT OF LARGE DECORATIVE BOULDERS, TREES WITH BALLED SOIL, AND OTHER DECORATIVE LANDSCAPE MATERIAL TOO LARGE TO BE ACCOMMODATED IN A 1 CU YD BUCKET. ALL OTHER EQUIPMENT UTILIZED FOR PERFORMING LANDSCAPE WORK, TREE TRIMMING OR REMOVAL OF STEES, AND TO INSTALL PLANTS; TRANSPORT TREES; EXCAVATE PLANT PITS; PLACE SOIL AND OTHER LANDSCAPE MATERIALS; AND APPLY FINISH LANDSCAPE MATERIAL ON SUBGRADE PREPARED BY OTHERS HIGHWAY CONSTRUCTION (LANDSCAPE WORK): THE LANDSCAPE WORK FOR THE LANDSCAPE EQUIPMENT OPERATOR EXCLUDES THE PREPARATION OF SUB-GRADE PRIOR TO APPLICATION OF FINISH LANDSCAPE MATERIALS AND THE UTILIZATION OF ANY EQUIPMENT OVER ONE CUBIC YARD. FOOTNOTE: A. HEALTH AND WELFARE CONTRIBUTION IS YEAR'S DAY; MEMORIAL DAY; FOURTH OF JULY; LABOR DAY; THANKSGIVING DAY; AND CHRISTMAS DAY PROVIDED THAT ALL SUCH EMPLOYEES SHALL HAVE IN FACT WORKED THEIR REGULARLY SCHEDULED WORK DAY IMMEDIATELY PRECEDING AND THE REGULARLY SCHEDULED WORK DAY IMMEDIATELY SUCCEEDING THE OCCURRENCE OF SUCH HOLIDAY
$37.55 $9.50 $47.05
PAINTER Building
PAIN0032-005 (RANDOLPH COUNTY) EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM
$31.21 $18.78 $49.99
PAINTER Building
PAIN0058-001 (BOND, CALHOUN, CLINTON, GREENE, JERSEY, MACOUPIN, MONROE, MONTGOMERY, PIKE, AND WASHINGTON COUNTIES)
$31.25 $17.12 $48.37
PAINTER Building
PAIN0090-002 (ADAMS, BROWN, CASS, LOGAN, MENARD, MORGAN, AND SCOTT COUNTIES) EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM ALL WORK OVER 40 FT. ABOVE FLOOR OR GROUND LEVEL - $1.00 PREMIUM
$32.23 $20.58 $52.81
PAINTER (GRUNDY COUNTY) Heavy
PAIN0014-005
$53.05 $33.91 $86.96
PAINTER: BRUSH AND ROLLER Building
PAIN1178-002 (CARROLL, HENDERSON, HENRY, KNOX, MERCER, ROCK ISLAND, WARREN, AND WHITESIDE COUNTIES)
$30.00 $17.37 $47.37
PAINTER: BRUSH ONLY: EXCLUDING DRYWALL FINISHING Residential
PAIN0157-005 (MARSHALL, STARK, AND WOODFORD COUNTIES)
$40.00 $26.90 $66.90
PAINTER: BRUSH, DRYWALL TAPER/FINISHER, SANDBLASTER, AND SPRAY Building
PAIN0030-001 (DE KALB, DU PAGE, KANE, KENDALL AND MCHENRY COUNTIES)
$53.05 $27.63 $80.68
PAINTER: BRUSH, ROLLER, PRESSURE ROLLER, SPRAY, AIRLESS SPRAY, SANDBLASTING, TAPER, DRYWALL TAPER/FINISHER, STRUCTURAL STEEL, AND BRIDGES Building
PAIN0030-010 (BUREAU, FORD, HANCOCK, LA SALLE, LIVINGSTON, MCDONOUGH, MCLEAN, PUTNAM AND STARK COUNTIES)
$40.00 $26.90 $66.90
PAINTER: BRUSH, ROLLER, PRESSURE ROLLER, SPRAY, AIRLESS SPRAY, SANDBLASTING, TAPER, DRYWALL TAPER/FINISHER, STRUCTURAL STEEL, AND BRIDGES Heavy
PAIN0030-010 (BUREAU, FORD, HANCOCK, LA SALLE, LIVINGSTON, MCDONOUGH, MCLEAN, PUTNAM AND STARK COUNTIES)
$40.00 $26.90 $66.90
PAINTER: BRUSH, ROLLER, SPRAY, SANDBLASTING, PAPERHANGER, DRYWALL FINISHING, TAPER, AND SPRAY STRUCTURAL STEEL Building
PAIN0030-004 (BOONE, JO DAVIESS, LEE, OGLE, STEPHENSON AND WINNEBAGO COUNTIES)
$45.15 $29.41 $74.56
PAINTER: BRUSH, SPRAY, PRESSURE ROLLER, SANDBLASTING, BRIDGES, & NEW STRUCTURAL STEEL WORK Building
PAIN0157-001 (FULTON, MARSHALL, MASON, PEORIA, SCHUYLER, TAZEWELL AND WOODFORD COUNTIES)
$40.00 $26.90 $66.90
PAINTER: BRUSH, SPRAY, PRESSURE ROLLER, SANDBLASTING, BRIDGES, & NEW STRUCTURAL STEEL WORK Heavy
PAIN0157-001 (FULTON, MARSHALL, MASON, PEORIA, SCHUYLER, TAZEWELL AND WOODFORD COUNTIES)
$40.00 $26.90 $66.90
PAINTER: SPRAY, STRUCTURAL STEEL, & SANDBLASTING Building
PAIN1178-002 (CARROLL, HENDERSON, HENRY, KNOX, MERCER, ROCK ISLAND, WARREN, AND WHITESIDE COUNTIES)
$30.50 $17.37 $47.87
PILEDRIVER Building
CARP0237-020 Scope differs by code/WD
$34.57 $29.10 $63.67
PILEDRIVER Building
CARP0270-009 (HANCOCK, MCDONOUGH, AND WARREN COUNTIES)
$35.14 $28.60 $63.74
PILEDRIVER Building
CARP0270-022 (BROWN, CASS, GREENE, MORGAN, PIKE, SCHUYLER, AND SCOTT COUNTIES)
$34.36 $28.60 $62.96
PILEDRIVER (ADAMS COUNTY) Building
CARP0270-006
$32.39 $25.99 $58.38
PILEDRIVER (KNOX COUNTY) Building
CARP0237-009
$35.30 $29.94 $65.24
PILEDRIVER (LOGAN COUNTY) Building
CARP0270-020
$35.10 $28.60 $63.70
PILEDRIVER (MACOUPIN AND MONTGOMERY COUNTIES) Building
CARP0270-013
$34.36 $28.60 $62.96
PILEDRIVER (MENARD COUNTY) Building
CARP0270-001
$33.83 $27.45 $61.28
PILEDRIVER (WOODFORD COUNTY) Building
CARP0237-015
$34.58 $29.10 $63.68
PILEDRIVERMAN Heavy
CARP0237-016 (LIVINGSTON, MCLEAN, AND FORD COUNTIES)
$37.06 $31.16 $68.22
PILEDRIVERMAN (WOODFORD COUNTY) Heavy
CARP0237-010
$37.06 $31.16 $68.22
PIPEFITTER Building
PLUM0353-002 (FULTON, HANCOCK (EASTERN HALF), MCDONOUGH (EXCEPT PRAIRIE), MARSHALL (SOUTH OF RT 17), MASON (NORTH OF RT 136), SCHUYLER (BROWNING, FREDERICK & HICKORY TWPS), STARK, AND WOODFORD (NORTH OF RT 116 TO RT 116A, AND AREA WEST OF RT 116A TO, BUT EXCLUDING GOODFIELD) COUNTIES)
$41.10 $27.59 $68.69
PIPEFITTER Building
PLUM0597-007 (BUREAU, LA SALLE, LIVINGSTON (NORTH OF RT. 116 EXCLUDING THE CITY OF PONTIAC), MARSHALL (NORTH OF RT 17 AND EAST OF RT. 116A), AND PUTNAM COUNTIES)
$55.00 $38.62 $93.62
PIPEFITTER: INCLUDING HVAC Residential
PLUM0353-003 (WOODFORD COUNTY (NORTH OF RT 116 TO RT 116A, AND AREA WEST OF RT 116A TO, BUT EXCLUDING GOODFIELD))
$41.10 $27.59 $68.69
PLASTERER Building
PLAS0011-004 (CARROLL, JO DAVIESS, LEE, OGLE, STEPHENSON, AND WHITESIDE (EXCEPT ERIE AND AREA SOUTHWEST THEREOF) COUNTIES)
$38.98 $36.58 $75.56
PLASTERER Building
PLAS0018-002 (ADAMS, BROWN, CASS, FULTON (EXCEPT NORTHEWS PORTION), HANCOCK, MCDONOUGH, MENARD, PIKE, AND SCHUYLER COUNTIES)
$35.41 $27.31 $62.72
PLASTERER Building
PLAS0018-005 (HENDERSON (NORTHERN HALF), MERCER (EXCEPT SOUTHEASTERN PART), AND ROCK ISLAND COUNTIES)
$34.00 $21.76 $55.76
PLASTERER Building
PLAS0018-016 (FULTON (EXCEPT NORTHWESTERN PORTION), MARSHALL (WESTERN PART EXCEPT TOLUCA), MASON, AND WOODFORD (NORTHWESTERN PART - NORTH OF ROUTE 116 AND WEST OF ROUTE 117) COUNTIES)
$29.41 $26.01 $55.42
PLASTERER Building
PLAS0018-019 (LIVINGSTON (SOUTHERN HALF), MCLEAN, AND WOODFORD (SOUTH OF ROUTE 116) COUNTIES)
$30.00 $27.01 $57.01
PLASTERER Building
PLAS0018-026 (HENRY, LIVINGSTON (NORTHERN PART INCLUDING PONTIAC), AND STARK COUNTIES)
$36.70 $22.08 $58.78
PLASTERER Building
PLAS0018-030 (FULTON (NORTHWESTERN PART) AND MERCER (SOUTHEASTERN CORNER) COUNTIES)
$29.14 $20.42 $49.56
PLASTERER Building
PLAS0090-002 (BOND, CALHOUN, CLINTON, GREENE, JERSEY, MACOUPIN, MONROE, AND MONTGOMERY (EXCLUDING THE TOWNS OF COALTON, COFFEN, FILLMORE, NOKOMIS, OHLMAN, WENOAH, WITT) COUNTIES)
$37.30 $24.75 $62.05
PLASTERER (BOONE COUNTY) Building
PLAS0011-015
$37.90 $37.66 $75.56
PLASTERER (HENDERSON COUNTY (SOUTHERN HALF)) Building
PLAS0018-008
$28.51 $21.93 $50.44
PLASTERER (WINNEBAGO COUNTY) Building
PLAS0011-019
$37.90 $37.66 $75.56
PLUMBER Building
PLUM0063-002 (FULTON, HANCOCK (EASTERN HALF), MCDONOUGH (EXCEPT PRAIRIE), MARSHALL (SOUTH OF RT 17), MASON (NORTH OF RT 136), SCHUYLER (BROWNING, FREDERICK & HICKORY TWPS), STARK, AND WOODFORD (NORTH OF RT 116 TO RT 116A, AND AREA WEST OF RT 116A TO, BUT EXCLUDING GOODFIELD) COUNTIES)
$42.70 $30.98 $73.68
PLUMBER Building
PLUM0130-005 (BUREAU, LA SALLE, LIVINGSTON (NORTH OF RT. 116 EXCLUDING THE CITY OF PONTIAC), MARSHALL (NORTH OF RT 17 AND EAST OF RT. 116A), AND PUTNAM COUNTIES)
$60.50 $39.02 $99.52
PLUMBER Building
PLUM0360-001 (CLINTON (NORTHWESTERN PART INCLUDING ST ROSE, FROGTOWN, JAMESTOWN & KEYPORT), RANDOLPH (WESTERN 1/4 INCLUDING KELLOG, MODOC, PRAIRIE, DUROCKER, AND ROOTS), AND MONROE (EXCEPT HECKER) COUNTIES)
$43.75 $21.25 $65.00
PLUMBER AND STEAMFITTER Building
PLUM0137-003 (CASS, LOGAN, MACOUPIN (NORTH OF STATE ROUTE 108 INCLUDING THE TOWN OF CARLINVILLE), MASON (SOUTH OF STATE ROUTE 136 INCLUDING THE TOWN OF HAVANA), MENARD, MONTGOMERY (NORTH AND EAST OF STATE ROUTE 127 INCLUDING THE TOWNS OF HILLSBORO AND SCHRAM CITY), MORGAN, PIKE, & SCOTT)
$43.89 $25.71 $69.60
PLUMBER AND STEAMFITTER Building
PLUM0653-002 (CLINTON (EASTERN 1/3) AND WASHINGTON (EASTERN 1/2) COUNTIES)
$45.00 $21.54 $66.54
PLUMBER, PIPEFITTER, STEAMFITTER Building
PLUM0099-001 (LIVINGSTON (PONTIAC AND SOUTH OF RT 116 EXTENDING EAST TO FORD COUNTY), MCLEAN, AND WOODFORD (SOUTH OF RT 16 TO RT 116A AREA EAST OF RT 116A TO AND INCLUDING GOODFIELD) COUNTIES)
$50.85 $27.75 $78.60
PLUMBER, PIPEFITTER, STEAMFITTER: INCLUDING HVAC Residential
PLUM0099-002 (WOODFORD COUNTY (SOUTH OF RT 116 TO RT 116A AREA EAST OF RT 116A TO AND INCLUDING GOODFIELD))
$50.85 $27.75 $78.60
PLUMBER: INCLUDING HVAC Residential
PLUM0063-003 (WOODFORD COUNTY (NORTH OF RT 116 TO RT 116A, AND AREA WEST OF RT 116A TO, BUT EXCLUDING GOODFIELD))
$42.70 $30.98 $73.68
PLUMBER/PIPEFITTER Building
PLUM0023-001 (BOONE, CARROLL (EAST OF RT 78 INCLUDING MT CARROLL), JO DAVIESS, OGLE, STEPHENSON, AND WINNEBAGO COUNTIES)
$55.54 $31.43 $86.97
PLUMBER/PIPEFITTER Building
PLUM0025-001 (ADAMS, BROWN, HANCOCK (WESTERN HALF), CARROLL (WEST OF RT 78 EXCLUDING MT CARROLL), HENDERSON, HENRY, KNOX, LEE, MERCER, ROCK ISLAND, SCHUYLER (EXCEPT BROWNING, FREDERICK, AND HICKORY TWPS), WARREN, AND WHITESIDE COUNTIES)
$46.50 $27.80 $74.30
PLUMBER/PIPEFITTER Building
PLUM0101-001 (CLINTON (WESTERN 2/3 INCLUDING ALBERS, AVISTON, BARTELS, BECKEMEYER, BREESE, CARLYLE, GERMANTOWN, NEW BADEN, NEW MEMPHIS, POSEY & TRENTON), MCDONOUGH (PRAIRIE), MONROE (HECKER), RANDOLPH (BALDWIN, RED BUD, RUMA, TILDEN), AND WASHINGTON (ADDIEVILLE, COVINGTON, CARDES, CASPARS, DAMIANSVILLE, DARMSTRAT, ELKHORN, JOHANNISBURG, LIVELY GROVE, NASHVILLE, NEW MENDEN, OAKDALE, OKAWVILLE, PLUM, RENTCHER, STONE CHURCH HILL & VENEDY) COUNTIES)
$47.75 $23.42 $71.17
PLUMBER/PIPEFITTER Building
PLUM0160-002 (RANDOLPH COUNTY (SOUTHEASTERN SIDE))
$52.80 $23.95 $76.75
PLUMBER/PIPEFITTER Building
PLUM0553-001 (BOND, CALHOUN, GREENE, JERSEY, MACOUPIN (SOUTH OF RT 108), AND MONTGOMERY (SOUTHWEST OF RT 127) COUNTIES) FOOTNOTE: A. 4 HOURS PAID HOLIDAY FOR CHRISTMAS EVE IF HOLIDAY FALLS ON MONDAY THROUGH FRIDAY
$51.61 $21.45 $73.06
PLUMBER/PIPEFITTER (DE KALB) Building
PLUM0501-002
$45.76 $26.92 $72.68
POWER EQUIPMENT OPERATOR GROUP 11 MASTER MECHANIC Building
ENGI0520-001 (BOND, CALHOUN, CLINTON, GREENE, JERSEY, MACOUPIN, MONROE, MONTGOMERY, RANDOLPH, AND WASHINGTON COUNTIES)
$50.70 $39.10 $89.80
POWER EQUIPMENT OPERATOR GROUP 12 LICENSED BOAT PILOT Building
ENGI0520-001 (BOND, CALHOUN, CLINTON, GREENE, JERSEY, MACOUPIN, MONROE, MONTGOMERY, RANDOLPH, AND WASHINGTON COUNTIES)
$51.70 $39.10 $90.80
POWER EQUIPMENT OPERATOR GROUP 3 AIR COMPRESSOR, TRACK OR SELF-PROPELLED; BULK CEMENT BATCHING- PLANTS; CONVEYORS; CONCRETE MIXERS Building
ENGI0965-001 (EXCEPT PLANT, PAVER, TOWER) FIREMENT, GENERATORS; GREASERS; LIGHT PLANTS; MECHANICAL THEATER; OILERS; POWER FROM GRADERS; POWER SUB-GRADER; PUG MILL, WHEN USED OTHER THAN ASPHALT OPERATION; ROOLERS (EXCEPT BITUMINOUS); TRACTORS W/O POWER ATTACHMENTS REGARDLESS OF SIZE OR TYPE; TRUCK CRANE OILER; & DRIVER (ONE MAN); VIBRATORY HAMMER; WATER PUMP; WELDING MACHINE (ONE 300 AMP OR OVER) COMBINATIONS OF FIVE OF ANY AIR COMPRESSORS; CONVEYORS, WELDING MACHINES, WATER PUMPS; LIGHT PLANTS OR GENERATORS SHALL BE IN BATTERIES OR WITH IN 300 FT. (ADAMS, BROWN, CASS, LOGAN, MENARD, MORGAN, PIKE, SCHUYLER, AND SCOTT COUNTIES) PREMIUM PAY - CRANES WITH BOOMS 120-200 FT. 1.00 PER HOUR; .02 PER FOOT FOR EACH FOOT ABOVE 200 MULTIPLE UNIT MACHINE - 1.00 PER HOUR; UNDERGROUND WORK - 1.00 PER HOUR; UNDER AIR PRESSURE - 1.00 PER HOUR; HAZARDOUS WASTE OR ASBESTOS REMOVAL PROJECTS - 1.00 PER HOUR FOR LEVEL C WORK; 1.50 PER HOUR FOR LEVEL B WORK; 2.00 PER HOUR FOR LEVEL A WORK; LONG BOOM ON A STATIONARY CRANE 1.00 PER HOUR ABOVE LONG BOOM SCALE LEVEL A: (HIGHEST LEVEL OF REPIRATORY, SKIN, AND EYE PROTECTION) LEVEL B: (SAME AS LEVEL A, BUT A LOWER LEVEL OF SKIN PROTECTION) LEVEL C: (SAME AS LEVEL B, BUT A LOWER LEVEL OF RESPIRATORY PROTECTION)
$34.30 $28.75 $63.05
POWER EQUIPMENT OPERATOR GROUP 4 LATTICE BOOM CRAWLER CRANE, LATTICE BOOM TRUCK CRANE, TELESCOPIC TRUCK MOUNTED CRANE, TOWER CRANE Building
ENGI0965-001 (ADAMS, BROWN, CASS, LOGAN, MENARD, MORGAN, PIKE, SCHUYLER, AND SCOTT COUNTIES) PREMIUM PAY - CRANES WITH BOOMS 120-200 FT. 1.00 PER HOUR; .02 PER FOOT FOR EACH FOOT ABOVE 200 MULTIPLE UNIT MACHINE - 1.00 PER HOUR; UNDERGROUND WORK - 1.00 PER HOUR; UNDER AIR PRESSURE - 1.00 PER HOUR; HAZARDOUS WASTE OR ASBESTOS REMOVAL PROJECTS - 1.00 PER HOUR FOR LEVEL C WORK; 1.50 PER HOUR FOR LEVEL B WORK; 2.00 PER HOUR FOR LEVEL A WORK; LONG BOOM ON A STATIONARY CRANE 1.00 PER HOUR ABOVE LONG BOOM SCALE LEVEL A: (HIGHEST LEVEL OF REPIRATORY, SKIN, AND EYE PROTECTION) LEVEL B: (SAME AS LEVEL A, BUT A LOWER LEVEL OF SKIN PROTECTION) LEVEL C: (SAME AS LEVEL B, BUT A LOWER LEVEL OF RESPIRATORY PROTECTION)
$42.32 $28.75 $71.07
POWER EQUIPMENT OPERATOR: GROUP 02 ASSISTANT OPERATORS Building
ENGI0520-001 (BOND, CALHOUN, CLINTON, GREENE, JERSEY, MACOUPIN, MONROE, MONTGOMERY, RANDOLPH, AND WASHINGTON COUNTIES)
$47.57 $39.10 $86.67
POWER EQUIPMENT OPERATOR: GROUP 05 OILERS Building
ENGI0520-001 (BOND, CALHOUN, CLINTON, GREENE, JERSEY, MACOUPIN, MONROE, MONTGOMERY, RANDOLPH, AND WASHINGTON COUNTIES)
$43.15 $39.10 $82.25
POWER EQUIPMENT OPERATOR: GROUP 06 OPERATORS ON EQUIPMENT WITH BOOMS, INCLUDING JIBS, 100 FT AND OVER, BUT LESS THAN 150 FT Building
ENGI0520-001 (BOND, CALHOUN, CLINTON, GREENE, JERSEY, MACOUPIN, MONROE, MONTGOMERY, RANDOLPH, AND WASHINGTON COUNTIES)
$51.45 $39.10 $90.55
POWER EQUIPMENT OPERATOR: GROUP 07 Operators on equipment with Booms, including Jibs, 150 ft and over, but less than 200 ft Building
ENGI0520-001 (BOND, CALHOUN, CLINTON, GREENE, JERSEY, MACOUPIN, MONROE, MONTGOMERY, RANDOLPH, AND WASHINGTON COUNTIES)
$49.50 $36.90 $86.40
POWER EQUIPMENT OPERATOR: GROUP 08 Operators on equipment with Boomns, including Jibs, 200 ft and over; Tower Cranes, and Whirley Cranes Building
ENGI0520-001 (BOND, CALHOUN, CLINTON, GREENE, JERSEY, MACOUPIN, MONROE, MONTGOMERY, RANDOLPH, AND WASHINGTON COUNTIES)
$49.80 $36.90 $86.70
POWER EQUIPMENT OPERATOR: GROUP 09 OPERATORS ON EQUIPMENT WITH BOOMS, INCLUDING JIBS, 150 FT AND OVER, BUT LESS THAN 200 FT Building
ENGI0520-001 (BOND, CALHOUN, CLINTON, GREENE, JERSEY, MACOUPIN, MONROE, MONTGOMERY, RANDOLPH, AND WASHINGTON COUNTIES)
$49.70 $39.10 $88.80
POWER EQUIPMENT OPERATOR: GROUP 10 Certified crane Operators 17.5 tons and above, when requested by the Contractor or required by the Owner Building
ENGI0520-001 (BOND, CALHOUN, CLINTON, GREENE, JERSEY, MACOUPIN, MONROE, MONTGOMERY, RANDOLPH, AND WASHINGTON COUNTIES)
$45.25 $34.95 $80.20
ROOFER Building
ROOF0002-005 (BOND, CALHOUN, CLINTON, GREENE, JERSEY, MACOUPIN (SOUTHERN HALF), MONROE, PIKE (REMAINDER), RANDOLPH, AND WASHINGTON COUNTIES)
$40.00 $22.05 $62.05
ROOFER Building
ROOF0011-005 (CARROLL, JO DAVIESS, LEE, LIVINGSTON (EAST OF ROUTE 47), OGLE, STEPHENSON, WHITESIDE (STERLING AND ROCK FALLS), AND WINNEBAGO COUNTIES)
$50.25 $30.43 $80.68
ROOFER Building
ROOF0011-008 (BUREAU, LA SALLE, MARSHALL, AND PUTNAM COUNTIES)
$38.50 $27.23 $65.73
ROOFER Building
ROOF0032-002 (HENDERSON, HENRY, KNOX, MCDONOUGH (WESTERN HALF INCLUDING MACOMB), MERCER, ROCK ISLAND, WARREN, AND WHITESIDE COUNTIES)
$38.23 $23.88 $62.11
ROOFER Building
ROOF0069-002 (FULTON, LIVINGSTON (ALL TOWNS TO RT. 47), MARSHALL (CAMP GROVE, HALLOCK HELD, HENRY LACON, LAROSE, LAPRAIRIE, PATTONSBURG, SPARLAND, TOLUCA, WASHBURN AND WILBURN), MCDONOUGH (ADAIR, BUSHNELL, INDUSTRY, PRAIRIE CITY, BARDOLPH, GOOD HOPE, NEW PHILADELPHIA AND WALNUT GROVE), MCLEAN, STARK, AND WOODFORD COUNTIES)
$38.05 $24.60 $62.65
ROOFER Building
ROOF0112-001 (ADAMS, BROWN, CASS, HANCOCK, LOGAN, MACOUPIN (NORTHERN HALF), MASON, MENARD, MONTGOMERY, MORGAN, PIKE (NORTHERN HALF), SCHUYLER AND SCOTT COUNTIES)
$36.00 $26.36 $62.36
SHEET METAL WORKER Building
SHEE0001-001 (BUREAU, LA SALLE, MARSHALL, PUTNAM, AND STARK COUNTIES)
$50.36 $26.88 $77.24
SHEET METAL WORKER Building
SHEE0001-003 (FULTON, MCLEAN, PEORIA, TAZWELL, AND WOODFORD COUNTIES)
$39.50 $33.06 $72.56
SHEET METAL WORKER Building
SHEE0091-002 (ZONE C: WEST OF ILLINOIS ROUTE 78 & NORTH OF U.S. ROUTE 30 IN JO DAVIESS, CARROLL AND WHITESIDE COUNTIES)
$40.26 $24.51 $64.77
SHEET METAL WORKER Building
SHEE0091-002 (ZONE A: HENRY, KNOX, MCDONOUGH, MERCER, ROCK ISLAND, WARREN & WHITESIDE (WEST OF ILLINOIS ROUTE 78 & SOUTH OF U.S. ROUTE 30) COUNTIES)
$44.70 $26.18 $70.88
SHEET METAL WORKER Building
SHEE0091-003 (ADAMS, CALHOUN, HANCOCK, HENDERSON, AND PIKE COUNTIES)
$38.82 $24.70 $63.52
SHEET METAL WORKER Building
SHEE0218-001 (BROWN, CASS, LOGAN, MASON, MENARD, MORGAN, SCHUYLER, AND SCOTT COUNTIES)
$38.54 $30.37 $68.91
SHEET METAL WORKER Building
SHEE0219-001 (BOONE, CARROLL (EASTERN HALF), DEKALB, JO DAVIESS (EAST OF HWY 78) LEE, OGLE, STEPHENSON, WHITESIDE, AND WINNEBAGO COUNTIES)
$52.14 $37.43 $89.57
SHEET METAL WORKER Building
SHEE0268-001 (BOND, CLINTON, GREENE, JERSEY, MACOUPIN, MONROE, MONTGOMERY, RANDOLPH, AND WASHINGTON COUNTIES)
$46.57 $24.48 $71.05
SHEET METAL WORKER Residential
SHEE0001-005 (INCLUDING HVAC DUCT WORK) (WOODFORD COUNTY)
$28.18 $33.06 $61.24
SHEET METAL WORKER (LIVINGSTON COUNTY) Building
SHEE0265-005
$56.35 $38.65 $95.00
STEAMFITTER Building
PLUM0439-002 (CLINTON (NORTHWESTERN PART INCLUDING ST. ROSE, FROGTOWN, JAMESTOWN AND KEY PORT), RANDOLPH (WESTERN 1/4 INCLUDING KELLOG, MODOC, PRAIRIE, DUROCKER, AND ROOTS) AND MONROE (EXCEPT HECKER) COUNTIES)
$49.00 $24.42 $73.42
TILE FINISHER Building
BRIL0006-002 (BUREAU, HENRY, LA SALLE, LIVINGSTON, PUTNAM, AND STARK COUNTIES)
$35.25 $18.00 $53.25
TILE LAYER Building
BRIL0006-002 (BUREAU, HENRY, LA SALLE, LIVINGSTON, PUTNAM, AND STARK COUNTIES)
$38.07 $20.21 $58.28
TRUCK DRIVER GROUP 5: DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK Building
TEAM0050-001 (BOND, CLINTON, MONROE, RANDOLPH, WASHINGTON COUNTIES)
$47.71 $25.72 $73.43
TRUCK DRIVER, 2 OR 3 AXLE TRUCKS Heavy
TEAM0179-006 (FORD (NORTH SECTION THE OF THE COUNTY NORTH OF A LINE FROM THE SOUTHEASTERN CORNER OF LIVINGSTON COUNTY STRAIGHT EAST TO THE FORD-IRQUOIS COUNTY LINE), GRUNDY, LIVINGSTON (AVOCA, BELLE PRAIRIE, BROUGHTON, CHARLOTTE, CHATSWORTH, DWIGHT, EPPARDS POINT, ESMEN, FAYETTE, FORREST, GERMANVILLE, INDIAN GROVE, NEBRASKA, ODELL, OWEGA, PIKE, PLEASANT RIDGE, PONTIAC, ROOKS CREEK, ROUND GROVE, SAUNEMIN, SULLIVAN, UNION, & WALDO), MCLEAN (NORTH OF A STRAIGHT LINE STARTIN
$44.82 $0.25 $45.07
TRUCK DRIVER, 4 AXLE TRUCKS Heavy
TEAM0179-006 (FORD (NORTH SECTION THE OF THE COUNTY NORTH OF A LINE FROM THE SOUTHEASTERN CORNER OF LIVINGSTON COUNTY STRAIGHT EAST TO THE FORD-IRQUOIS COUNTY LINE), GRUNDY, LIVINGSTON (AVOCA, BELLE PRAIRIE, BROUGHTON, CHARLOTTE, CHATSWORTH, DWIGHT, EPPARDS POINT, ESMEN, FAYETTE, FORREST, GERMANVILLE, INDIAN GROVE, NEBRASKA, ODELL, OWEGA, PIKE, PLEASANT RIDGE, PONTIAC, ROOKS CREEK, ROUND GROVE, SAUNEMIN, SULLIVAN, UNION, & WALDO), MCLEAN (NORTH OF A STRAIGHT LINE STARTING AT
$44.97 $0.25 $45.22
TRUCK DRIVER, 5 AXLE TRUCKS Heavy
TEAM0179-006 (FORD (NORTH SECTION THE OF THE COUNTY NORTH OF A LINE FROM THE SOUTHEASTERN CORNER OF LIVINGSTON COUNTY STRAIGHT EAST TO THE FORD-IRQUOIS COUNTY LINE), GRUNDY, LIVINGSTON (AVOCA, BELLE PRAIRIE, BROUGHTON, CHARLOTTE, CHATSWORTH, DWIGHT, EPPARDS POINT, ESMEN, FAYETTE, FORREST, GERMANVILLE, INDIAN GROVE, NEBRASKA, ODELL, OWEGA, PIKE, PLEASANT RIDGE, PONTIAC, ROOKS CREEK, ROUND GROVE, SAUNEMIN, SULLIVAN, UNION, & WALDO), MCLEAN (NORTH OF A STRAIGHT LINE STARTING AT
$45.17 $0.25 $45.42
TRUCK DRIVER, 6 AXLE TRUCKS Heavy
TEAM0179-006 (FORD (NORTH SECTION THE OF THE COUNTY NORTH OF A LINE FROM THE SOUTHEASTERN CORNER OF LIVINGSTON COUNTY STRAIGHT EAST TO THE FORD-IRQUOIS COUNTY LINE), GRUNDY, LIVINGSTON (AVOCA, BELLE PRAIRIE, BROUGHTON, CHARLOTTE, CHATSWORTH, DWIGHT, EPPARDS POINT, ESMEN, FAYETTE, FORREST, GERMANVILLE, INDIAN GROVE, NEBRASKA, ODELL, OWEGA, PIKE, PLEASANT RIDGE, PONTIAC, ROOKS CREEK, ROUND GROVE, SAUNEMIN, SULLIVAN, UNION, & WALDO), MCLEAN (NORTH OF A STRAIGHT LINE STARTING AT
$45.37 $0.25 $45.62
TRUCK DRIVER, GROUP 2 Heavy
TEAM0026-003 (FORD ( ELLIOT, GIBSON CITY, HARPSTER, MELVIN, PAXTON, ROBERTS & SIBLEY), IROQUOIS (FOUNTAIN CREEK, LOVEJOY, MILFORD, PIGEON GROVE, PRAIRIE GREEN & STOCKLAND),MCLEAN (SOUTH OF A STRAIGHT LINE FROM WHERE ROUTE 24 INTERSECTS THE WOODFORD COUNTY LINE IN A SOUTHEAST DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY) COUNTIES)
$45.88 $25.42 $71.30
TRUCK DRIVER, GROUP 2 Heavy
TEAM0050-005 (MARSHALL AND WOODFORD COUNTIES)
$45.93 $25.72 $71.65
TRUCK DRIVER, GROUP 2 Heavy
TEAM0722-004 (LASALLE, LIVINGSTON (ALL OF THE LIVINGSTON EXCEPT AMITY, AVOCA, BELLE PRAIRIE, BROUGHTON, CHARLOTTE, CHATSWORTH, DWIGHT, EPPARDS POINT, ESMEN, FAYETTE, FLANAGAN, FORREST, GERMANSVILLE, INDIAN GROVE, NEBRASKA TOWNSHIP, NEVADA, NEWTON, ODELL, OSWEGO, PIKE, PLEASANT RIDGE, PONTIAC, ROOKS CREEK, ROUND GROVE, SAUNEMIN, SULLIVAN, SUNBURY, UNION & WALDO), PUTNAM COUNTIES)
$45.88 $25.42 $71.30
TRUCK DRIVER, GROUP 2 Building
TEAM0026-005 (MCLEAN (SOUTH OF A STRAIGHT LINE FROM WHERE ROUTE 24 INTERSECTS THE WOODFORD COUNTY LINE IN A SOUTHEAST DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY) COUNTY)
$45.88 $25.42 $71.30
TRUCK DRIVER, GROUP 2 Building
TEAM0371-004 (HENRY AND ROCK ISLAND COUNTIES)
$45.93 $25.72 $71.65
TRUCK DRIVER, GROUP 2 Building
TEAM0627-004 (PEORIA, TAZEWELL, AND WOODFORD COUNTIES)
$43.83 $24.27 $68.10
TRUCK DRIVER, GROUP 2 Building
TEAM0722-005 (OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251) COUNTY)
$45.88 $25.42 $71.30
TRUCK DRIVER, GROUP 3 Heavy
TEAM0026-003 (FORD ( ELLIOT, GIBSON CITY, HARPSTER, MELVIN, PAXTON, ROBERTS & SIBLEY), IROQUOIS (FOUNTAIN CREEK, LOVEJOY, MILFORD, PIGEON GROVE, PRAIRIE GREEN & STOCKLAND),MCLEAN (SOUTH OF A STRAIGHT LINE FROM WHERE ROUTE 24 INTERSECTS THE WOODFORD COUNTY LINE IN A SOUTHEAST DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY) COUNTIES)
$46.15 $25.42 $71.57
TRUCK DRIVER, GROUP 3 Heavy
TEAM0050-005 (MARSHALL AND WOODFORD COUNTIES)
$46.25 $25.72 $71.97
TRUCK DRIVER, GROUP 3 Heavy
TEAM0722-004 (LASALLE, LIVINGSTON (ALL OF THE LIVINGSTON EXCEPT AMITY, AVOCA, BELLE PRAIRIE, BROUGHTON, CHARLOTTE, CHATSWORTH, DWIGHT, EPPARDS POINT, ESMEN, FAYETTE, FLANAGAN, FORREST, GERMANSVILLE, INDIAN GROVE, NEBRASKA TOWNSHIP, NEVADA, NEWTON, ODELL, OSWEGO, PIKE, PLEASANT RIDGE, PONTIAC, ROOKS CREEK, ROUND GROVE, SAUNEMIN, SULLIVAN, SUNBURY, UNION & WALDO), PUTNAM COUNTIES)
$46.15 $25.42 $71.57
TRUCK DRIVER, GROUP 3 Building
TEAM0026-005 (MCLEAN (SOUTH OF A STRAIGHT LINE FROM WHERE ROUTE 24 INTERSECTS THE WOODFORD COUNTY LINE IN A SOUTHEAST DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY) COUNTY)
$46.15 $25.42 $71.57
TRUCK DRIVER, GROUP 3 Building
TEAM0371-004 (HENRY AND ROCK ISLAND COUNTIES)
$46.25 $25.72 $71.97
TRUCK DRIVER, GROUP 3 Building
TEAM0627-004 (PEORIA, TAZEWELL, AND WOODFORD COUNTIES)
$44.10 $24.27 $68.37
TRUCK DRIVER, GROUP 3 Building
TEAM0722-005 (OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251) COUNTY)
$46.15 $25.42 $71.57
TRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS Heavy
TEAM0050-005 (MARSHALL AND WOODFORD COUNTIES)
$46.60 $25.72 $72.32
TRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS Building
TEAM0371-004 (HENRY AND ROCK ISLAND COUNTIES)
$46.60 $25.72 $72.32
TRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS Building
TEAM0627-004 (PEORIA, TAZEWELL, AND WOODFORD COUNTIES)
$44.49 $24.27 $68.76
TRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS Building
TEAM0722-005 (OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251) COUNTY)
$46.54 $25.42 $71.96
TRUCK DRIVER, GROUP 4- LOW BOY AND OIL DISTRIBUTORS Heavy
TEAM0026-003 (FORD ( ELLIOT, GIBSON CITY, HARPSTER, MELVIN, PAXTON, ROBERTS & SIBLEY), IROQUOIS (FOUNTAIN CREEK, LOVEJOY, MILFORD, PIGEON GROVE, PRAIRIE GREEN & STOCKLAND),MCLEAN (SOUTH OF A STRAIGHT LINE FROM WHERE ROUTE 24 INTERSECTS THE WOODFORD COUNTY LINE IN A SOUTHEAST DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY) COUNTIES)
$46.54 $25.42 $71.96
TRUCK DRIVER, GROUP 4- LOW BOY AND OIL DISTRIBUTORS Heavy
TEAM0722-004 (LASALLE, LIVINGSTON (ALL OF THE LIVINGSTON EXCEPT AMITY, AVOCA, BELLE PRAIRIE, BROUGHTON, CHARLOTTE, CHATSWORTH, DWIGHT, EPPARDS POINT, ESMEN, FAYETTE, FLANAGAN, FORREST, GERMANSVILLE, INDIAN GROVE, NEBRASKA TOWNSHIP, NEVADA, NEWTON, ODELL, OSWEGO, PIKE, PLEASANT RIDGE, PONTIAC, ROOKS CREEK, ROUND GROVE, SAUNEMIN, SULLIVAN, SUNBURY, UNION & WALDO), PUTNAM COUNTIES)
$46.54 $25.42 $71.96
TRUCK DRIVER, GROUP 4: LOW BOY AND OIL DISTRIBUTORS Building
TEAM0026-001 (MCLEAN (SOUTH OF A STRAIGHT LINE FROM WHERE ROUTE 24 INTERSECTS THE WOODFORD COUNTY LINE IN A SOUTHEAST DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY) COUNTY)
$46.54 $25.42 $71.96
TRUCK DRIVER, GROUP 4: LOW BOY AND OIL DISTRIBUTORS Building
TEAM0050-001 (BOND, CLINTON, MONROE, RANDOLPH, WASHINGTON COUNTIES)
$46.60 $25.72 $72.32
TRUCK DRIVER, GROUP 4: LOW BOY AND OIL DISTRIBUTORS Building
TEAM0371-002 (HENRY, MERCER, ROCK ISLAND COUNTIES)
$46.60 $25.72 $72.32
TRUCK DRIVER, GROUP 4: LOW BOY AND OIL DISTRIBUTORS Building
TEAM0525-001 (CALHOUN, GREENE (SOUTH OF A DIRECT LINE THAT EXTENDS EAST FROM PIKE COUNTY THROUGH HILLVIEW/WHITEHALL TO MACOUPIN COUNTY), JERSEY, MACOUPIN, MONTOGOMERY COUNTIES)
$46.60 $25.72 $72.32
TRUCK DRIVER, GROUP 4: LOW BOY AND OIL DISTRIBUTORS Building
TEAM0627-006 (FULTON, HANCOCK, HENDERSON, KNOWX, MARSHALL, MASON, MCDONOUGH, STARK, WARREN, AND WOODFORD (ALL EXCEPT NORTHEAST CORNER EAST OF ROUTE 51/251 AND SOUTH OF ROUTE 24) COUNTIES)
$44.49 $24.27 $68.76
TRUCK DRIVER, GROUP 4: LOW BOY AND OIL DISTRIBUTORS Building
TEAM0722-002 (BUREAU, CARROLL (WEST OF ROUTE78/SOUTH OF ROUTE 72), JO DAVIESS (WEST OF ROUTE 78), LASALLE, LEE (WEST OF ROUTE 251), LIVINGSTON (AMITY, LONG POINT, NEVADA, NEWTOWN READING, & SUNBURY), PUTNAM, WHITESIDE COUNTIES)
$46.54 $25.42 $71.96
TRUCK DRIVER, GROUP 4: LOW BOY AND OIL DISTRIBUTORS Building
TEAM0916-002 (ADAMS, BROWN, CASS, CLINTON, GREENE (NORTH OF A DIRECT LINE THAT EXTENDS EAST FROM PINKE COUNTY THROUGH HILLVIEW/WHITEHALL TO MACOUPIN COUNTY) LOGAN, MENARD, MORGAN, PIKE, SCHYLER, SCOTT COUNTIES
$46.60 $25.72 $72.32
TRUCK DRIVER, GROUP 4LOW BOY AND OIL DISTRIBUTORS Building
TEAM0026-005 (MCLEAN (SOUTH OF A STRAIGHT LINE FROM WHERE ROUTE 24 INTERSECTS THE WOODFORD COUNTY LINE IN A SOUTHEAST DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY) COUNTY)
$46.54 $25.42 $71.96
TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK Building
TEAM0026-005 (MCLEAN (SOUTH OF A STRAIGHT LINE FROM WHERE ROUTE 24 INTERSECTS THE WOODFORD COUNTY LINE IN A SOUTHEAST DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY) COUNTY)
$47.64 $25.42 $73.06
TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK Building
TEAM0627-004 (PEORIA, TAZEWELL, AND WOODFORD COUNTIES)
$45.59 $24.27 $69.86
TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK Building
TEAM0722-005 (OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251) COUNTY)
$47.64 $25.42 $73.06
TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. (HENRY AND ROCK ISLAND COUNTIES) Building
TEAM0371-004
$47.71 $25.72 $73.43
TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. (MARSHALL AND WOODFORD COUNTIES) Heavy
TEAM0050-005
$47.71 $25.72 $73.43
TRUCK DRIVER, GROUP 5- DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK Heavy
TEAM0026-003 (FORD ( ELLIOT, GIBSON CITY, HARPSTER, MELVIN, PAXTON, ROBERTS & SIBLEY), IROQUOIS (FOUNTAIN CREEK, LOVEJOY, MILFORD, PIGEON GROVE, PRAIRIE GREEN & STOCKLAND),MCLEAN (SOUTH OF A STRAIGHT LINE FROM WHERE ROUTE 24 INTERSECTS THE WOODFORD COUNTY LINE IN A SOUTHEAST DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY) COUNTIES)
$47.64 $25.42 $73.06
TRUCK DRIVER, GROUP 5- DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK Heavy
TEAM0722-004 (LASALLE, LIVINGSTON (ALL OF THE LIVINGSTON EXCEPT AMITY, AVOCA, BELLE PRAIRIE, BROUGHTON, CHARLOTTE, CHATSWORTH, DWIGHT, EPPARDS POINT, ESMEN, FAYETTE, FLANAGAN, FORREST, GERMANSVILLE, INDIAN GROVE, NEBRASKA TOWNSHIP, NEVADA, NEWTON, ODELL, OSWEGO, PIKE, PLEASANT RIDGE, PONTIAC, ROOKS CREEK, ROUND GROVE, SAUNEMIN, SULLIVAN, SUNBURY, UNION & WALDO), PUTNAM COUNTIES)
$47.64 $25.42 $73.06
TRUCK DRIVER, GROUP 5: DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK Building
TEAM0026-001 (MCLEAN (SOUTH OF A STRAIGHT LINE FROM WHERE ROUTE 24 INTERSECTS THE WOODFORD COUNTY LINE IN A SOUTHEAST DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY) COUNTY)
$47.64 $25.42 $73.06
TRUCK DRIVER, GROUP 5: DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK Building
TEAM0525-001 (CALHOUN, GREENE (SOUTH OF A DIRECT LINE THAT EXTENDS EAST FROM PIKE COUNTY THROUGH HILLVIEW/WHITEHALL TO MACOUPIN COUNTY), JERSEY, MACOUPIN, MONTOGOMERY COUNTIES)
$47.71 $25.72 $73.43
TRUCK DRIVER, GROUP 5: DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK Building
TEAM0627-006 (FULTON, HANCOCK, HENDERSON, KNOWX, MARSHALL, MASON, MCDONOUGH, STARK, WARREN, AND WOODFORD (ALL EXCEPT NORTHEAST CORNER EAST OF ROUTE 51/251 AND SOUTH OF ROUTE 24) COUNTIES)
$45.59 $24.27 $69.86
TRUCK DRIVER, GROUP 5: DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK Building
TEAM0722-002 (BUREAU, CARROLL (WEST OF ROUTE78/SOUTH OF ROUTE 72), JO DAVIESS (WEST OF ROUTE 78), LASALLE, LEE (WEST OF ROUTE 251), LIVINGSTON (AMITY, LONG POINT, NEVADA, NEWTOWN READING, & SUNBURY), PUTNAM, WHITESIDE COUNTIES)
$47.64 $25.42 $73.06
TRUCK DRIVER, GROUP 5: DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK Building
TEAM0916-002 (ADAMS, BROWN, CASS, CLINTON, GREENE (NORTH OF A DIRECT LINE THAT EXTENDS EAST FROM PINKE COUNTY THROUGH HILLVIEW/WHITEHALL TO MACOUPIN COUNTY) LOGAN, MENARD, MORGAN, PIKE, SCHYLER, SCOTT COUNTIES
$47.71 $25.72 $73.43
TRUCK DRIVER, GROUP 5: DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. (HENRY, MERCER, ROCK ISLAND COUNTIES) Building
TEAM0371-002
$47.71 $25.72 $73.43
TRUCK DRIVER: 2 - 3 AXLES Building
TEAM0325-004 (BOONE AND WINNEBAGO COUNTIES) FOOTNOTE: AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES
$48.47 $26.70 $75.17
TRUCK DRIVER: 2 & 3 AXLES Building
TEAM0786-001 (COOK COUNTY - BUILDING AND RESIDENTIAL) FOOTNOTES: A. AN ADDITIONAL MORE THAN SIX (6) AXLES. LOW-BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR. HEALTH AND WELFARE: $445.00 PER WEEK PENSION: $408 PER WEEK. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY
$53.95 $0.30 $54.25
TRUCK DRIVER: 2 OR 3 AXLE TRUCKS Building
TEAM0179-011 (LIVINGSTON (AVOCA, BELLE PRAIRIE, BROUGHTON, CHARLOTTE, CHATSWORTH, DWIGHT, EPPARDS POINT, ESMEN, FAYETTE, FORREST, GERMANVILLE, INDIAN GROVE, NEBRASKA, ODELL, OWEGA, PIKE, PLEASANT RIDGE, PONTIAC, ROOKS CREEK, ROUND GROVE, SAUNEMIN, SULLIVAN, UNION, & WALDO), MCLEAN (NORTH OF A STRAIGHT LINE STARTING AT THE INTERSECTION OF MCLEAN-WOODFORD COUNTIES LINE & ROUTE 24 IN A SOUTHEASTERN DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY), AND WOODF
$44.82 $0.25 $45.07
TRUCK DRIVER: 2 OR 3 AXLES Heavy
TEAM0179-007 (KANKAKEE AND IROQUOIS (ALL OF IROQUOIS EXCEPT THE TOWNSHIPS OF MILFORD, STOCKLAND, LODA, PIGEON GROVE, FOUNTAIN CREEK, LOVEJOY, AND PRAIRIE GREEN) COUNTIES) FOOTNOTES: A. $1055.60 PER WEEK. LOW BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER WEEK AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES
$44.82 $0.25 $45.07
TRUCK DRIVER: 2 OR 3 AXLES Building
TEAM0179-008 (KANKAKEE COUNTY) CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES
$44.82 $0.25 $45.07
TRUCK DRIVER: 2 OR 3 AXLES Building
TEAM0731-001 (COOK COUNTY - HEAVY AND HIGHWAY) FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. C. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR HEALTH AND WELFARE: $448.80 PER WEEK PENSION: $562.80 PER WEEK
$45.55 $30.27 $75.82
TRUCK DRIVER: 2-3 AXLES Building
TEAM0325-001 (BOONE, CARROLL (EAST OF ROUTE 78/NORTH OF ROUTE 72), JODAVIESS (EAST OF ROUTE 78), STEPHENSON, AND WINNEBAGO COUNTIES)
$48.47 $26.70 $75.17
TRUCK DRIVER: 2-3 AXLES Building
TEAM0330-001 (DEKALB, LEE (EAST OF ROUTE 251, COMPTON, LEE, PAW PAW, SCARBORO, & STEWARD), AND OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251, ADELINE, BYRON, CRESTON, DEMENT, FORRESTON NORTH OF ROUTE 72, LEAF RIVER NORTH OF ROUTE 72, LYNNVILLE, MONROE, ROCHELLE, & SCOTT) COUNTIES) PENSION $664.34 PER WEEK LOW BOY CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION
$44.83 $0.30 $45.13
TRUCK DRIVER: 2-3 AXLES Building
TEAM0179-004 (GRUNDY, KENDALL, MCLEAN (NORTH OF A STRAIGHT LINE STARTING AT THE INTERSECTION OF MCLEAN-WOODFORD COUNTIES LINE & ROUTE 24 IN A SOUTHEASTERN DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY), WILL, AND WOODFORD (NORTHEAST CORNER EAST OF ROUTE 51/251 & NORTH OF ROUTE 24) COUNTIES) FOOTNOTES: A.HEALTH AND WELFARE $448.80 PER WEEK; PENSION ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES
$46.12 $0.30 $46.42
TRUCK DRIVER: 2-3 AXLES Building
TEAM0301-001 (LAKE AND MCHENRY COUNTIES) LOWBOY IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION
$44.54 $13.40 $57.94
TRUCK DRIVER: 2-3 AXLES Building
TEAM0330-004 (DEKALB AND OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251, ADELINE, BYRON, CRESTON, DEMENT, FORRESTON NORTH OF ROUTE 72, LEAF RIVER NORTH OF ROUTE 72, LYNNVILLE, MONROE, ROCHELLE, & SCOTT) COUNTIES) FOOTNOTE: A. HEALTH AND WELFARE $468.00 PER WEEK; PENSION ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION
$44.83 $0.30 $45.13
TRUCK DRIVER: 2-3 AXLES Building
TEAM0673-003 (DU PAGE AND KANE COUNTIES) SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR HEALTH AND WELFARE: $453.20 PER WEEK PENSON: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION
$45.31 $0.30 $45.61
TRUCK DRIVER: 4 AXLE TRUCKS Building
TEAM0179-011 (LIVINGSTON (AVOCA, BELLE PRAIRIE, BROUGHTON, CHARLOTTE, CHATSWORTH, DWIGHT, EPPARDS POINT, ESMEN, FAYETTE, FORREST, GERMANVILLE, INDIAN GROVE, NEBRASKA, ODELL, OWEGA, PIKE, PLEASANT RIDGE, PONTIAC, ROOKS CREEK, ROUND GROVE, SAUNEMIN, SULLIVAN, UNION, & WALDO), MCLEAN (NORTH OF A STRAIGHT LINE STARTING AT THE INTERSECTION OF MCLEAN-WOODFORD COUNTIES LINE & ROUTE 24 IN A SOUTHEASTERN DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY), AND WOODFORD (
$44.97 $0.25 $45.22
TRUCK DRIVER: 4 AXLES Building
TEAM0325-001 (BOONE, CARROLL (EAST OF ROUTE 78/NORTH OF ROUTE 72), JODAVIESS (EAST OF ROUTE 78), STEPHENSON, AND WINNEBAGO COUNTIES) PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES
$48.62 $26.70 $75.32
TRUCK DRIVER: 4 AXLES Building
TEAM0330-001 (DEKALB, LEE (EAST OF ROUTE 251, COMPTON, LEE, PAW PAW, SCARBORO, & STEWARD), AND OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251, ADELINE, BYRON, CRESTON, DEMENT, FORRESTON NORTH OF ROUTE 72, LEAF RIVER NORTH OF ROUTE 72, LYNNVILLE, MONROE, ROCHELLE, & SCOTT) COUNTIES) FOOTNOTE: A. HEALTH AND WELFARE $488.00 PER WEEK; PENSION ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION
$44.98 $0.30 $45.28
TRUCK DRIVER: 4 AXLES Heavy
TEAM0179-007 (KANKAKEE AND IROQUOIS (ALL OF IROQUOIS EXCEPT THE TOWNSHIPS OF MILFORD, STOCKLAND, LODA, PIGEON GROVE, FOUNTAIN CREEK, LOVEJOY, AND PRAIRIE GREEN) COUNTIES) FOOTNOTES: A. $1055.60 PER WEEK. LOW BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER WEEK AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES
$44.97 $0.25 $45.22
TRUCK DRIVER: 4 AXLES Building
TEAM0179-004 (GRUNDY, KENDALL, MCLEAN (NORTH OF A STRAIGHT LINE STARTING AT THE INTERSECTION OF MCLEAN-WOODFORD COUNTIES LINE & ROUTE 24 IN A SOUTHEASTERN DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY), WILL, AND WOODFORD (NORTHEAST CORNER EAST OF ROUTE 51/251 & NORTH OF ROUTE 24) COUNTIES) FOOTNOTES: A.HEALTH AND WELFARE $448.80 PER WEEK; PENSION ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES
$46.27 $0.30 $46.57
TRUCK DRIVER: 4 AXLES Building
TEAM0179-008 (KANKAKEE COUNTY) CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES
$44.97 $0.25 $45.22
TRUCK DRIVER: 4 AXLES Building
TEAM0301-001 (LAKE AND MCHENRY COUNTIES) LOWBOY IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION
$44.69 $13.40 $58.09
TRUCK DRIVER: 4 AXLES Building
TEAM0325-004 (BOONE AND WINNEBAGO COUNTIES) FOOTNOTE: AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES
$48.62 $26.70 $75.32
TRUCK DRIVER: 4 AXLES Building
TEAM0330-004 (DEKALB AND OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251, ADELINE, BYRON, CRESTON, DEMENT, FORRESTON NORTH OF ROUTE 72, LEAF RIVER NORTH OF ROUTE 72, LYNNVILLE, MONROE, ROCHELLE, & SCOTT) COUNTIES) FOOTNOTE: A. HEALTH AND WELFARE $468.00 PER WEEK; PENSION ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION
$44.98 $0.30 $45.28
TRUCK DRIVER: 4 AXLES Building
TEAM0673-003 (DU PAGE AND KANE COUNTIES) BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR HEALTH AND WELFARE: $453.20 PER WEEK PENSON: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION
$45.46 $0.30 $45.76
TRUCK DRIVER: 4 AXLES Building
TEAM0731-001 (COOK COUNTY - HEAVY AND HIGHWAY) FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. C. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR HEALTH AND WELFARE: $448.80 PER WEEK PENSION: $562.80 PER WEEK
$45.80 $30.27 $76.07
TRUCK DRIVER: 4 AXLES Building
TEAM0786-001 (COOK COUNTY - BUILDING AND RESIDENTIAL) FOOTNOTES: A. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR. HEALTH AND WELFARE: $445.00 PER WEEK PENSION: $408 PER WEEK. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY
$54.21 $0.30 $54.51
TRUCK DRIVER: 5 AXLE TRUCKS Building
TEAM0179-011 (LIVINGSTON (AVOCA, BELLE PRAIRIE, BROUGHTON, CHARLOTTE, CHATSWORTH, DWIGHT, EPPARDS POINT, ESMEN, FAYETTE, FORREST, GERMANVILLE, INDIAN GROVE, NEBRASKA, ODELL, OWEGA, PIKE, PLEASANT RIDGE, PONTIAC, ROOKS CREEK, ROUND GROVE, SAUNEMIN, SULLIVAN, UNION, & WALDO), MCLEAN (NORTH OF A STRAIGHT LINE STARTING AT THE INTERSECTION OF MCLEAN-WOODFORD COUNTIES LINE & ROUTE 24 IN A SOUTHEASTERN DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY), AND WOODFORD (
$45.17 $0.25 $45.42
TRUCK DRIVER: 5 AXLES Building
TEAM0325-001 (BOONE, CARROLL (EAST OF ROUTE 78/NORTH OF ROUTE 72), JODAVIESS (EAST OF ROUTE 78), STEPHENSON, AND WINNEBAGO COUNTIES) PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES
$48.82 $26.70 $75.52
TRUCK DRIVER: 5 AXLES Building
TEAM0330-001 (DEKALB, LEE (EAST OF ROUTE 251, COMPTON, LEE, PAW PAW, SCARBORO, & STEWARD), AND OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251, ADELINE, BYRON, CRESTON, DEMENT, FORRESTON NORTH OF ROUTE 72, LEAF RIVER NORTH OF ROUTE 72, LYNNVILLE, MONROE, ROCHELLE, & SCOTT) COUNTIES) FOOTNOTE: A. HEALTH AND WELFARE $488.00 PER WEEK; PENSION ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION
$45.18 $0.30 $45.48
TRUCK DRIVER: 5 AXLES Heavy
TEAM0179-007 (KANKAKEE AND IROQUOIS (ALL OF IROQUOIS EXCEPT THE TOWNSHIPS OF MILFORD, STOCKLAND, LODA, PIGEON GROVE, FOUNTAIN CREEK, LOVEJOY, AND PRAIRIE GREEN) COUNTIES) FOOTNOTES: A. $1055.60 PER WEEK. LOW BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER WEEK AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES
$45.17 $0.25 $45.42
TRUCK DRIVER: 5 AXLES Building
TEAM0179-004 (GRUNDY, KENDALL, MCLEAN (NORTH OF A STRAIGHT LINE STARTING AT THE INTERSECTION OF MCLEAN-WOODFORD COUNTIES LINE & ROUTE 24 IN A SOUTHEASTERN DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY), WILL, AND WOODFORD (NORTHEAST CORNER EAST OF ROUTE 51/251 & NORTH OF ROUTE 24) COUNTIES) FOOTNOTES: A.HEALTH AND WELFARE $448.80 PER WEEK; PENSION ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES
$46.47 $0.30 $46.77
TRUCK DRIVER: 5 AXLES Building
TEAM0179-008 (KANKAKEE COUNTY) CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES
$45.17 $0.25 $45.42
TRUCK DRIVER: 5 AXLES Building
TEAM0301-001 (LAKE AND MCHENRY COUNTIES) LOWBOY IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION
$44.89 $13.40 $58.29
TRUCK DRIVER: 5 AXLES Building
TEAM0325-004 (BOONE AND WINNEBAGO COUNTIES) FOOTNOTE: AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES
$48.82 $26.70 $75.52
TRUCK DRIVER: 5 AXLES Building
TEAM0330-004 (DEKALB AND OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251, ADELINE, BYRON, CRESTON, DEMENT, FORRESTON NORTH OF ROUTE 72, LEAF RIVER NORTH OF ROUTE 72, LYNNVILLE, MONROE, ROCHELLE, & SCOTT) COUNTIES) FOOTNOTE: A. HEALTH AND WELFARE $468.00 PER WEEK; PENSION ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION
$45.18 $0.30 $45.48
TRUCK DRIVER: 5 AXLES Building
TEAM0673-003 (DU PAGE AND KANE COUNTIES) BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR HEALTH AND WELFARE: $453.20 PER WEEK PENSON: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION
$45.66 $0.30 $45.96
TRUCK DRIVER: 5 AXLES Building
TEAM0731-001 (COOK COUNTY - HEAVY AND HIGHWAY) FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. C. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR HEALTH AND WELFARE: $448.80 PER WEEK PENSION: $562.80 PER WEEK
$46.00 $30.27 $76.27
TRUCK DRIVER: 5 AXLES Building
TEAM0786-001 (COOK COUNTY - BUILDING AND RESIDENTIAL) FOOTNOTES: A. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR. HEALTH AND WELFARE: $445.00 PER WEEK PENSION: $408 PER WEEK. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY
$54.43 $0.30 $54.73
TRUCK DRIVER: 6 AXLE TRUCKS Building
TEAM0179-011 (LIVINGSTON (AVOCA, BELLE PRAIRIE, BROUGHTON, CHARLOTTE, CHATSWORTH, DWIGHT, EPPARDS POINT, ESMEN, FAYETTE, FORREST, GERMANVILLE, INDIAN GROVE, NEBRASKA, ODELL, OWEGA, PIKE, PLEASANT RIDGE, PONTIAC, ROOKS CREEK, ROUND GROVE, SAUNEMIN, SULLIVAN, UNION, & WALDO), MCLEAN (NORTH OF A STRAIGHT LINE STARTING AT THE INTERSECTION OF MCLEAN-WOODFORD COUNTIES LINE & ROUTE 24 IN A SOUTHEASTERN DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY), AND WOODFORD (
$45.37 $0.25 $45.62
TRUCK DRIVER: 6 AXLES Building
TEAM0325-001 (BOONE, CARROLL (EAST OF ROUTE 78/NORTH OF ROUTE 72), JODAVIESS (EAST OF ROUTE 78), STEPHENSON, AND WINNEBAGO COUNTIES) PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES
$48.93 $26.70 $75.63
TRUCK DRIVER: 6 AXLES Building
TEAM0330-001 (DEKALB, LEE (EAST OF ROUTE 251, COMPTON, LEE, PAW PAW, SCARBORO, & STEWARD), AND OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251, ADELINE, BYRON, CRESTON, DEMENT, FORRESTON NORTH OF ROUTE 72, LEAF RIVER NORTH OF ROUTE 72, LYNNVILLE, MONROE, ROCHELLE, & SCOTT) COUNTIES) FOOTNOTE: A. HEALTH AND WELFARE $488.00 PER WEEK; PENSION ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION
$45.38 $0.30 $45.68
TRUCK DRIVER: 6 AXLES Heavy
TEAM0179-007 (KANKAKEE AND IROQUOIS (ALL OF IROQUOIS EXCEPT THE TOWNSHIPS OF MILFORD, STOCKLAND, LODA, PIGEON GROVE, FOUNTAIN CREEK, LOVEJOY, AND PRAIRIE GREEN) COUNTIES) FOOTNOTES: A. $1055.60 PER WEEK. LOW BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER WEEK AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES
$45.37 $0.25 $45.62
TRUCK DRIVER: 6 AXLES Building
TEAM0179-004 (GRUNDY, KENDALL, MCLEAN (NORTH OF A STRAIGHT LINE STARTING AT THE INTERSECTION OF MCLEAN-WOODFORD COUNTIES LINE & ROUTE 24 IN A SOUTHEASTERN DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY), WILL, AND WOODFORD (NORTHEAST CORNER EAST OF ROUTE 51/251 & NORTH OF ROUTE 24) COUNTIES) FOOTNOTES: A.HEALTH AND WELFARE $448.80 PER WEEK; PENSION ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES
$46.67 $0.30 $46.97
TRUCK DRIVER: 6 AXLES Building
TEAM0179-008 (KANKAKEE COUNTY) CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES
$45.37 $0.25 $45.62
TRUCK DRIVER: 6 AXLES Building
TEAM0301-001 (LAKE AND MCHENRY COUNTIES) LOWBOY IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION
$45.09 $13.40 $58.49
TRUCK DRIVER: 6 AXLES Building
TEAM0325-004 (BOONE AND WINNEBAGO COUNTIES) FOOTNOTE: AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES
$48.93 $26.70 $75.63
TRUCK DRIVER: 6 AXLES Building
TEAM0330-004 (DEKALB AND OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251, ADELINE, BYRON, CRESTON, DEMENT, FORRESTON NORTH OF ROUTE 72, LEAF RIVER NORTH OF ROUTE 72, LYNNVILLE, MONROE, ROCHELLE, & SCOTT) COUNTIES) FOOTNOTE: A. HEALTH AND WELFARE $468.00 PER WEEK; PENSION ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION
$45.38 $0.30 $45.68
TRUCK DRIVER: 6 AXLES Building
TEAM0673-003 (DU PAGE AND KANE COUNTIES) BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR HEALTH AND WELFARE: $453.20 PER WEEK PENSON: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION
$45.86 $0.30 $46.16
TRUCK DRIVER: 6 AXLES Building
TEAM0731-001 (COOK COUNTY - HEAVY AND HIGHWAY) FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. C. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR HEALTH AND WELFARE: $448.80 PER WEEK PENSION: $562.80 PER WEEK
$46.20 $30.27 $76.47
TRUCK DRIVER: 6 AXLES Building
TEAM0786-001 (COOK COUNTY - BUILDING AND RESIDENTIAL) FOOTNOTES: A. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR. HEALTH AND WELFARE: $445.00 PER WEEK PENSION: $408 PER WEEK. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY
$54.64 $0.30 $54.94

Wage Determinations

Building

278 trades

Applies to

Adams, Bond, Boone, Brown, Bureau, Calhoun, Carroll, Cass, Clinton, De Kalb +36 more

Heavy, Highway

72 trades

Applies to

Ford, Grundy, Iroquois, Kankakee, La Salle, Livingston, Marshall, McLean, Putnam, Woodford

Heavy

66 trades

Applies to

Adams, Alexander, Bond, Boone, Brown, Bureau, Calhoun, Carroll, Cass, Champaign +92 more

Heavy

9 trades

Applies to

Adams, Alexander, Bond, Boone, Brown, Bureau, Calhoun, Carroll, Cass, Champaign +92 more

Building, Heavy, Highway, Residential

87 trades

Applies to

Boone, Cook, De Kalb, Du Page, Grundy, Henry, Kane, Kankakee, Kendall, Lake +9 more