Maryland

66 wage determinations · 24 counties · 3,329 trade rates

Track Maryland wage updates

Get an email when wage determinations covering Maryland are modified.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Popular Trades In Maryland

Counties

Wage Determinations

MD20260001 rev 1

Dorchester · Residential

Trade Rate Fringe Total
SHEET METAL WORKER 21.16 9.99 31.15
PAINTER: BRUSH AND ROLLER 11.31 0.00 11.31
OPERATOR: BACKHOE 19.67 0.00 19.67
LABORER: COMMON OR GENERAL 10.12 0.00 10.12
CEMENT MASON/CONCRETE FINISHER 17.00 0.00 17.00
CARPENTER 15.79 1.20 16.99

MD20260002 rev 1

Garrett · Residential

Trade Rate Fringe Total
SHEET METAL WORKER 21.16 9.99 31.15
PAINTER: BRUSH AND ROLLER 11.31 0.00 11.31
OPERATOR: BACKHOE 19.67 0.00 19.67
LABORER: COMMON OR GENERAL 10.00 0.00 10.00
CEMENT MASON/CONCRETE FINISHER 17.00 0.00 17.00
CARPENTER 15.91 0.00 15.91

MD20260003 rev 1

Caroline, Kent, Talbot · Residential

Trade Rate Fringe Total
SHEET METAL WORKER 21.16 9.99 31.15
PAINTER: BRUSH AND ROLLER 11.31 0.00 11.31
OPERATOR: BACKHOE 19.67 0.00 19.67
LABORER: COMMON OR GENERAL 11.00 0.00 11.00
CEMENT MASON/CONCRETE FINISHER 17.00 0.00 17.00
CARPENTER 16.90 2.29 19.19

MD20260005 rev 2

Allegany, Anne Arundel, Baltimore, Baltimore City, Calvert, Caroline, Carroll, Cecil, Charles, Dorchester, Frederick, Garrett, Harford, Howard, Kent, Montgomery, Prince George's, Queen Anne's, Somerset, St Mary's, Talbot, Washington, Wicomico, Worcester · Heavy

Trade Rate Fringe Total
DREDGING: CLASS D: OILER, DECKHAND, SHOREMAN, RODM… 30.86 14.15 45.01
DREDGING: CLASS C2: BOAT OPERATOR. INCENTIVE PAY: 37.15 14.57 51.72
DREDGING: CLASS C1: MATE, DRAG BARGE OPERATOR, ASS… 38.38 14.66 53.04
DREDGING: CLASS B2: CERTIFIED WELDER. INCENTIVE PA… 39.46 14.73 54.19
DREDGING: CLASS B1: DERRICK OPERATOR 41.93 14.90 56.83
DREDGING: CLASS A2: CRANE OPERATOR 43.20 14.99 58.19
DREDGING: CLASS A1: DECK CAPTAIN; MECHANICAL DREDG… 48.48 15.34 63.82

MD20260008 rev 2

Allegany · Heavy, Highway

Trade Rate Fringe Total
CARPENTER 30.71 22.54 53.25
CARPENTER - SHORING SCAFFOLD BUILDER 30.25 22.00 52.25
CEMENT MASON 30.12 21.35 51.47
ELECTRICIAN 40.00 20.20 60.20
INSULATION WORKER 40.02 19.92 59.94
IRONWORKER - FENCE ERECTOR 31.00 24.40 55.40
IRONWORKER - ORNAMENTAL 31.00 24.40 55.40
IRONWORKER - REINFORCING 31.00 24.40 55.40
IRONWORKER - STRUCTURAL 31.65 24.75 56.40
LABORER - AIR TOOL OPERATOR 24.51 23.00 47.51
LABORER - ASPHALT PAVER 24.51 23.00 47.51
LABORER - ASPHALT RAKER 24.29 23.00 47.29
LABORER - BLASTER - DYNAMITE 24.51 23.00 47.51
LABORER - BURNER 24.51 23.00 47.51
LABORER - COMMON 24.29 23.00 47.29

MD20260029 rev 2

Anne Arundel · Heavy, Highway

Trade Rate Fringe Total
BRICKLAYER 38.80 15.57 54.37
CARPENTER 35.89 14.60 50.49
CARPENTER - SHORING SCAFFOLD BUILDER 35.89 14.60 50.49
CEMENT MASON 24.00 0.00 24.00
ELECTRICIAN 36.84 19.62 56.46
IRONWORKER - STRUCTURAL 38.00 23.96 61.96
MILLWRIGHT 39.50 17.52 57.02
PAINTER - BRIDGE 45.00 17.01 62.01
PILEDRIVER 37.74 14.73 52.47
POWER EQUIPMENT OPERATOR - BACKHOE 34.00 14.05 48.05
POWER EQUIPMENT OPERATOR - BROOM / SWEEPER 31.04 14.05 45.09
POWER EQUIPMENT OPERATOR - BULLDOZER 34.00 14.05 48.05
POWER EQUIPMENT OPERATOR - CONCRETE PUMP 34.00 14.05 48.05
POWER EQUIPMENT OPERATOR - CRANE 42.00 19.10 61.10
POWER EQUIPMENT OPERATOR - DRILL - RIG 34.00 14.05 48.05

MD20260030 rev 2

Baltimore City · Heavy, Highway

Trade Rate Fringe Total
BRICKLAYER 38.80 15.57 54.37
CARPENTER 35.89 14.60 50.49
CARPENTER - SHORING SCAFFOLD BUILDER 35.89 14.60 50.49
CEMENT MASON 24.00 0.00 24.00
ELECTRICIAN 36.84 19.62 56.46
IRONWORKER - STRUCTURAL 38.00 23.96 61.96
MILLWRIGHT 39.50 17.52 57.02
PAINTER - BRIDGE 45.00 17.01 62.01
PILEDRIVER 37.74 14.73 52.47
POWER EQUIPMENT OPERATOR - BACKHOE 34.00 14.05 48.05
POWER EQUIPMENT OPERATOR - BROOM / SWEEPER 31.04 14.05 45.09
POWER EQUIPMENT OPERATOR - BULLDOZER 34.00 14.05 48.05
POWER EQUIPMENT OPERATOR - CONCRETE PUMP 34.00 14.05 48.05
POWER EQUIPMENT OPERATOR - CRANE 42.00 19.10 61.10
POWER EQUIPMENT OPERATOR - DRILL - RIG 34.00 14.05 48.05

MD20260031 rev 2

Baltimore · Heavy, Highway

Trade Rate Fringe Total
BRICKLAYER 24.00 0.00 24.00
CARPENTER 35.89 14.60 50.49
CARPENTER - SHORING SCAFFOLD BUILDER 35.89 14.60 50.49
CEMENT MASON 24.00 0.00 24.00
ELECTRICIAN 36.84 19.62 56.46
IRONWORKER - STRUCTURAL 37.60 27.13 64.73
MILLWRIGHT 39.50 17.52 57.02
PAINTER - BRIDGE 45.00 17.01 62.01
PILEDRIVER 37.74 14.73 52.47
POWER EQUIPMENT OPERATOR - BACKHOE 34.00 14.05 48.05
POWER EQUIPMENT OPERATOR - BROOM / SWEEPER 31.04 14.05 45.09
POWER EQUIPMENT OPERATOR - BULLDOZER 34.00 14.05 48.05
POWER EQUIPMENT OPERATOR - CONCRETE PUMP 34.00 14.05 48.05
POWER EQUIPMENT OPERATOR - CRANE 42.00 19.10 61.10
POWER EQUIPMENT OPERATOR - DRILL - RIG 34.00 14.05 48.05

MD20260032 rev 2

Calvert · Heavy, Highway

Trade Rate Fringe Total
LABORER - ASPHALT RAKER 16.12 0.34 16.46
LABORER - COMMON 16.12 0.34 16.46
LABORER - CONCRETE PUDDLER 16.12 0.34 16.46
LABORER - CONCRETE TENDER 16.12 0.34 16.46
LABORER - CONCRETE VIBRATOR 16.12 0.34 16.46
LABORER - DENSITY GAUGE 16.12 0.34 16.46
LABORER - FIREPROOFER - MIXER 16.12 0.34 16.46
LABORER - FLAGGER 16.12 0.34 16.46
LABORER - GRADE CHECKER 16.12 0.34 16.46
LABORER - HAND ROLLER 16.12 0.34 16.46
LABORER - JACKHAMMER 16.12 0.34 16.46
LABORER - LANDSCAPING 16.12 0.34 16.46
LABORER - LAYOUT 16.12 0.34 16.46
LABORER - LUTEMAN 16.12 0.34 16.46
LABORER - MORTAR MIXER 16.12 0.34 16.46

MD20260033 rev 2

Caroline · Heavy, Highway

Trade Rate Fringe Total
LABORER - AIR TOOL OPERATOR 24.00 2.33 26.33
LABORER - ASPHALT PAVER 24.00 2.33 26.33
LABORER - ASPHALT RAKER 23.14 3.25 26.39
LABORER - BLASTER - DYNAMITE 24.00 2.33 26.33
LABORER - BURNER 24.00 2.33 26.33
LABORER - COMMON 23.14 3.25 26.39
LABORER - CONCRETE PUDDLER 23.14 3.25 26.39
LABORER - CONCRETE SURFACER 24.00 2.33 26.33
LABORER - CONCRETE TENDER 23.14 3.25 26.39
LABORER - CONCRETE VIBRATOR 23.14 3.25 26.39
LABORER - DENSITY GAUGE 23.14 3.25 26.39
LABORER - FIREPROOFER - MIXER 23.14 3.25 26.39
LABORER - FLAGGER 23.14 3.25 26.39
LABORER - GRADE CHECKER 23.14 3.25 26.39
LABORER - HAND ROLLER 23.14 3.25 26.39

MD20260034 rev 2

Carroll · Heavy, Highway

Trade Rate Fringe Total
BRICKLAYER 38.80 15.57 54.37
CARPENTER 35.89 14.60 50.49
CARPENTER - SHORING SCAFFOLD BUILDER 35.89 14.60 50.49
CEMENT MASON 24.00 0.00 24.00
ELECTRICIAN 36.84 19.62 56.46
IRONWORKER - STRUCTURAL 38.00 23.96 61.96
LABORER - TAMPER 19.24 2.00 21.24
MILLWRIGHT 39.50 17.52 57.02
PAINTER - BRIDGE 45.00 17.01 62.01
PILEDRIVER 37.74 14.73 52.47
POWER EQUIPMENT OPERATOR - BACKHOE 34.00 14.05 48.05
POWER EQUIPMENT OPERATOR - BROOM / SWEEPER 31.04 14.05 45.09
POWER EQUIPMENT OPERATOR - BULLDOZER 34.00 14.05 48.05
POWER EQUIPMENT OPERATOR - CONCRETE PUMP 34.00 14.05 48.05
POWER EQUIPMENT OPERATOR - CRANE 42.00 19.10 61.10

MD20260035 rev 2

Cecil · Heavy, Highway

Trade Rate Fringe Total
LABORER - AIR TOOL OPERATOR 27.32 7.21 34.53
LABORER - ASPHALT PAVER 27.32 7.21 34.53
LABORER - ASPHALT RAKER 24.83 9.02 33.85
LABORER - BLASTER - DYNAMITE 27.32 7.21 34.53
LABORER - BURNER 27.32 7.21 34.53
LABORER - COMMON 24.83 9.02 33.85
LABORER - CONCRETE PUDDLER 24.83 9.02 33.85
LABORER - CONCRETE SURFACER 27.32 7.21 34.53
LABORER - CONCRETE TENDER 24.83 9.02 33.85
LABORER - CONCRETE VIBRATOR 24.83 9.02 33.85
LABORER - DENSITY GAUGE 24.83 9.02 33.85
LABORER - FIREPROOFER - MIXER 24.83 9.02 33.85
LABORER - FLAGGER 24.83 9.02 33.85
LABORER - GRADE CHECKER 24.83 9.02 33.85
LABORER - HAND ROLLER 24.83 9.02 33.85

MD20260036 rev 2

Charles · Heavy, Highway

Trade Rate Fringe Total
LABORER - ASPHALT RAKER 23.85 3.63 27.48
LABORER - COMMON 23.85 3.63 27.48
LABORER - CONCRETE PUDDLER 23.85 3.63 27.48
LABORER - CONCRETE TENDER 23.85 3.63 27.48
LABORER - CONCRETE VIBRATOR 23.85 3.63 27.48
LABORER - DENSITY GAUGE 23.85 3.63 27.48
LABORER - FIREPROOFER - MIXER 23.85 3.63 27.48
LABORER - FLAGGER 23.85 3.63 27.48
LABORER - GRADE CHECKER 23.85 3.63 27.48
LABORER - HAND ROLLER 23.85 3.63 27.48
LABORER - JACKHAMMER 23.85 3.63 27.48
LABORER - LANDSCAPING 23.85 3.63 27.48
LABORER - LAYOUT 23.85 3.63 27.48
LABORER - LUTEMAN 23.85 3.63 27.48
LABORER - MORTAR MIXER 23.85 3.63 27.48

MD20260037 rev 2

Dorchester · Heavy, Highway

Trade Rate Fringe Total
LABORER - AIR TOOL OPERATOR 31.57 8.81 40.38
LABORER - ASPHALT PAVER 31.57 8.81 40.38
LABORER - ASPHALT RAKER 22.69 3.04 25.73
LABORER - BLASTER - DYNAMITE 31.57 8.81 40.38
LABORER - BURNER 31.57 8.81 40.38
LABORER - COMMON 22.69 3.04 25.73
LABORER - CONCRETE PUDDLER 22.69 3.04 25.73
LABORER - CONCRETE SURFACER 31.57 8.81 40.38
LABORER - CONCRETE TENDER 22.69 3.04 25.73
LABORER - CONCRETE VIBRATOR 22.69 3.04 25.73
LABORER - DENSITY GAUGE 22.69 3.04 25.73
LABORER - FIREPROOFER - MIXER 22.69 3.04 25.73
LABORER - FLAGGER 22.69 3.04 25.73
LABORER - GRADE CHECKER 22.69 3.04 25.73
LABORER - HAND ROLLER 22.69 3.04 25.73

MD20260038 rev 2

Frederick · Heavy, Highway

Trade Rate Fringe Total
BRICKLAYER 24.00 0.00 24.00
CARPENTER 35.89 14.60 50.49
CARPENTER - SHORING SCAFFOLD BUILDER 35.89 14.60 50.49
CARPET LAYER 35.10 15.33 50.43
CEMENT MASON 24.00 0.00 24.00
ELECTRICIAN 59.50 23.06 82.56
IRONWORKER - STRUCTURAL 39.30 27.14 66.44
LABORER - AIR TOOL OPERATOR 24.51 23.00 47.51
LABORER - ASPHALT PAVER 24.51 23.00 47.51
LABORER - ASPHALT RAKER 22.86 23.00 45.86
LABORER - BLASTER - DYNAMITE 24.51 23.00 47.51
LABORER - BURNER 24.51 23.00 47.51
LABORER - COMMON 22.86 23.00 45.86
LABORER - CONCRETE PUDDLER 22.86 23.00 45.86
LABORER - CONCRETE SURFACER 24.51 23.00 47.51

MD20260039 rev 2

Garrett · Heavy, Highway

Trade Rate Fringe Total
CARPENTER 30.71 22.54 53.25
CARPENTER - SHORING SCAFFOLD BUILDER 30.71 22.54 53.25
CEMENT MASON 32.12 22.65 54.77
ELECTRICIAN 40.00 20.20 60.20
INSULATION WORKER 40.02 19.92 59.94
IRONWORKER - FENCE ERECTOR 31.65 24.75 56.40
IRONWORKER - ORNAMENTAL 31.65 24.75 56.40
IRONWORKER - REINFORCING 31.65 24.75 56.40
IRONWORKER - STRUCTURAL 31.65 24.75 56.40
LABORER - AIR TOOL OPERATOR 24.51 23.00 47.51
LABORER - ASPHALT PAVER 24.51 23.00 47.51
LABORER - ASPHALT RAKER 24.51 23.00 47.51
LABORER - BLASTER - DYNAMITE 24.51 23.00 47.51
LABORER - BURNER 24.51 23.00 47.51
LABORER - COMMON 24.51 23.00 47.51

MD20260040 rev 2

Harford · Heavy, Highway

Trade Rate Fringe Total
BRICKLAYER 24.00 0.00 24.00
CARPENTER 35.89 14.60 50.49
CARPENTER - SHORING SCAFFOLD BUILDER 35.89 14.60 50.49
CEMENT MASON 24.00 0.00 24.00
ELECTRICIAN 36.84 19.62 56.46
IRONWORKER - STRUCTURAL 37.60 27.13 64.73
LABORER - AIR TOOL OPERATOR 27.32 7.21 34.53
LABORER - ASPHALT PAVER 27.32 7.21 34.53
LABORER - ASPHALT RAKER 16.00 0.33 16.33
LABORER - BLASTER - DYNAMITE 27.32 7.21 34.53
LABORER - BURNER 27.32 7.21 34.53
LABORER - COMMON 16.00 0.33 16.33
LABORER - CONCRETE PUDDLER 16.00 0.33 16.33
LABORER - CONCRETE SURFACER 27.32 7.21 34.53
LABORER - CONCRETE TENDER 16.00 0.33 16.33

MD20260041 rev 2

Howard · Heavy, Highway

Trade Rate Fringe Total
BRICKLAYER 38.80 15.57 54.37
CARPENTER 35.89 14.60 50.49
CARPENTER - SHORING SCAFFOLD BUILDER 35.89 14.60 50.49
CEMENT MASON 24.00 0.00 24.00
ELECTRICIAN 36.84 19.62 56.46
IRONWORKER - STRUCTURAL 38.00 23.96 61.96
MILLWRIGHT 39.50 17.52 57.02
PAINTER - BRIDGE 45.00 17.01 62.01
PILEDRIVER 37.74 14.73 52.47
POWER EQUIPMENT OPERATOR - BACKHOE 34.00 14.05 48.05
POWER EQUIPMENT OPERATOR - BROOM / SWEEPER 31.04 14.05 45.09
POWER EQUIPMENT OPERATOR - BULLDOZER 34.00 14.05 48.05
POWER EQUIPMENT OPERATOR - CONCRETE PUMP 34.00 14.05 48.05
POWER EQUIPMENT OPERATOR - CRANE 42.00 19.10 61.10
POWER EQUIPMENT OPERATOR - DRILL - RIG 34.00 14.05 48.05

MD20260042 rev 2

Kent · Heavy, Highway

Trade Rate Fringe Total
LABORER - AIR TOOL OPERATOR 24.00 2.33 26.33
LABORER - ASPHALT PAVER 24.00 2.33 26.33
LABORER - ASPHALT RAKER 23.09 3.14 26.23
LABORER - BLASTER - DYNAMITE 24.00 2.33 26.33
LABORER - BURNER 24.00 2.33 26.33
LABORER - COMMON 23.09 3.14 26.23
LABORER - CONCRETE PUDDLER 23.09 3.14 26.23
LABORER - CONCRETE SURFACER 24.00 2.33 26.33
LABORER - CONCRETE TENDER 23.09 3.14 26.23
LABORER - CONCRETE VIBRATOR 23.09 3.14 26.23
LABORER - DENSITY GAUGE 23.09 3.14 26.23
LABORER - FIREPROOFER - MIXER 23.09 3.14 26.23
LABORER - FLAGGER 23.09 3.14 26.23
LABORER - GRADE CHECKER 23.09 3.14 26.23
LABORER - HAND ROLLER 23.09 3.14 26.23

MD20260043 rev 2

Montgomery · Heavy, Highway

Trade Rate Fringe Total
BRICKLAYER 25.50 0.00 25.50
CARPENTER 32.28 0.00 32.28
CARPENTER - SHORING SCAFFOLD BUILDER 35.89 14.60 50.49
CARPET LAYER 35.10 15.33 50.43
CEMENT MASON 24.00 0.00 24.00
ELECTRICIAN 59.50 23.06 82.56
IRONWORKER - STRUCTURAL 39.30 27.14 66.44
LABORER - AIR TOOL OPERATOR 33.88 9.20 43.08
LABORER - ASPHALT PAVER 33.88 9.20 43.08
LABORER - ASPHALT RAKER 29.58 9.20 38.78
LABORER - BLASTER - DYNAMITE 33.88 9.20 43.08
LABORER - BURNER 33.88 9.20 43.08
LABORER - COMMON 29.58 9.20 38.78
LABORER - CONCRETE PUDDLER 29.58 9.20 38.78
LABORER - CONCRETE SURFACER 33.88 9.20 43.08

MD20260044 rev 2

Prince George's · Heavy, Highway

Trade Rate Fringe Total
BRICKLAYER 24.00 0.00 24.00
CARPENTER 35.89 14.60 50.49
CARPENTER - SHORING SCAFFOLD BUILDER 35.89 14.60 50.49
CARPET LAYER 35.10 15.33 50.43
CEMENT MASON 24.00 0.00 24.00
ELECTRICIAN 59.50 23.06 82.56
IRONWORKER - STRUCTURAL 39.30 27.14 66.44
LABORER - AIR TOOL OPERATOR 31.26 9.20 40.46
LABORER - ASPHALT PAVER 31.26 9.20 40.46
LABORER - BLASTER - DYNAMITE 31.26 9.20 40.46
LABORER - BURNER 31.26 9.20 40.46
LABORER - CONCRETE SURFACER 31.26 9.20 40.46
LABORER - HAZARDOUS MATERIAL HANDLER 31.26 9.20 40.46
LABORER - MASON TENDER 31.26 9.20 40.46
LABORER - PIPELAYER 31.26 9.20 40.46

MD20260059 rev 1

Allegany · Residential

Trade Rate Fringe Total
ELECTRICIAN 44.00 20.69 64.69
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) 19.89 1.20 21.09
ROOFER 22.69 0.00 22.69
PLUMBER 20.89 3.22 24.11
PAINTER (BRUSH AND ROLLER) 16.36 1.45 17.81
OPERATOR: LOADER 20.25 2.06 22.31
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE 16.92 5.43 22.35
LABORER: PIPELAYER 16.19 2.15 18.34
LABORER: COMMON OR GENERAL, INCLUDING BRICK MASON … 14.15 1.14 15.29
IRONWORKER, ORNAMENTAL 17.31 0.00 17.31
CEMENT MASON/CONCRETE FINISHER 17.54 0.00 17.54
CARPENTER 21.60 7.17 28.77
BRICKLAYER 26.20 7.43 33.63

MD20260060 rev 1

Anne Arundel · Residential

Trade Rate Fringe Total
SOFT FLOOR LAYER (CARPET) 34.12 14.54 48.66
SPRINKLER FITTER (FIRE SPRINKLERS) 26.06 6.52 32.58
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) 17.83 1.20 19.03
ROOFER 26.80 0.00 26.80
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION 22.63 0.60 23.23
PLUMBER (HVAC PIPE INSTALLATION ONLY) 17.60 0.00 17.60
PAINTER 15.12 0.88 16.00
OPERATOR: LOADER 20.25 2.06 22.31
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE 18.40 4.42 22.82
LABORER: PIPELAYER 16.19 2.15 18.34
LABORER: MASON TENDER - CEMENT/CONCRETE 14.71 0.00 14.71
LABORER: MASON TENDER - BRICK 12.26 0.00 12.26
LABORER: COMMON OR GENERAL 11.95 0.00 11.95
IRONWORKER, ORNAMENTAL 17.31 0.00 17.31
ELECTRICIAN 23.49 0.81 24.30

MD20260061 rev 1

Baltimore City · Residential

Trade Rate Fringe Total
FLOOR LAYER: CARPET 34.12 14.64 48.76
SPRINKLER FITTER (FIRE SPRINKLERS) 26.06 6.52 32.58
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) 18.82 1.20 20.02
ROOFER 26.80 0.00 26.80
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION 20.48 0.00 20.48
PLUMBER (HVAC PIPE INSTALLATION ONLY) 17.60 0.00 17.60
PAINTER 15.23 0.70 15.93
OPERATOR: LOADER 20.25 2.06 22.31
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE 18.40 4.42 22.82
LABORER: PIPELAYER 16.19 2.15 18.34
LABORER: COMMON OR GENERAL, INCLUDING BRICK MASON … 13.81 0.00 13.81
IRONWORKER, ORNAMENTAL 17.31 0.00 17.31
ELECTRICIAN 22.59 0.81 23.40
DRYWALL HANGER AND METAL STUD INSTALLER 16.36 0.62 16.98
CEMENT MASON/CONCRETE FINISHER 18.92 0.00 18.92

MD20260062 rev 1

Frederick · Residential

Trade Rate Fringe Total
TILE SETTER 14.50 0.00 14.50
SPRINKLER FITTER (FIRE SPRINKLERS) 20.75 2.85 23.60
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) 19.89 1.20 21.09
ROOFER 19.40 4.28 23.68
PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION 26.00 6.67 32.67
PLUMBER (HVAC PIPE AND UNIT INSTALLATION ONLY) 18.80 6.63 25.43
PAINTER (BRUSH AND ROLLER) 18.61 1.38 19.99
OPERATOR: LOADER 20.25 2.06 22.31
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE 21.46 2.81 24.27
LABORER: PIPELAYER 16.19 2.15 18.34
LABORER: COMMON OR GENERAL, INCLUDING BRICK MASON … 13.55 2.18 15.73
IRONWORKER, ORNAMENTAL 17.31 0.00 17.31
ELECTRICIAN 27.01 8.16 35.17
DRYWALL HANGER AND METAL STUD INSTALLER 19.28 0.00 19.28
CEMENT MASON/CONCRETE FINISHER 16.40 2.00 18.40

MD20260063 rev 1

Harford · Residential

Trade Rate Fringe Total
FLOOR LAYER: CARPET 34.12 14.64 48.76
SPRINKLER FITTER (FIRE SPRINKLERS) 26.06 6.52 32.58
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) 18.82 1.20 20.02
ROOFER 26.80 0.00 26.80
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION 20.48 0.00 20.48
PLUMBER (HVAC PIPE INSTALLATION ONLY) 17.60 0.00 17.60
PAINTER 15.12 0.88 16.00
OPERATOR: LOADER 20.25 2.06 22.31
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE 18.40 4.42 22.82
LABORER: PIPELAYER 16.19 2.15 18.34
LABORER: COMMON OR GENERAL, INCLUDING BRICK MASON … 13.50 1.50 15.00
IRONWORKER, ORNAMENTAL 17.31 0.00 17.31
ELECTRICIAN 23.49 0.81 24.30
DRYWALL HANGER AND METAL STUD INSTALLER 17.27 0.62 17.89
DRYWALL FINISHER/TAPER 19.09 5.00 24.09

MD20260064 rev 1

Howard · Residential

Trade Rate Fringe Total
FLOOR LAYER: CARPET 34.12 14.64 48.76
SPRINKLER FITTER (FIRE SPRINKLERS) 26.06 6.52 32.58
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) 20.09 1.96 22.05
ROOFER 26.80 0.00 26.80
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION 20.48 0.00 20.48
PLUMBER (HVAC PIPE INSTALLATION ONLY) 17.60 0.00 17.60
PAINTER 15.12 0.88 16.00
OPERATOR: LOADER 20.25 2.06 22.31
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE 18.40 4.42 22.82
LABORER: PIPELAYER 16.19 2.15 18.34
LABORER: COMMON OR GENERAL, INCLUDING BRICK MASON … 14.02 0.00 14.02
IRONWORKER, ORNAMENTAL 17.31 0.00 17.31
ELECTRICIAN 23.49 0.81 24.30
DRYWALL HANGER AND METAL STUD INSTALLER 17.27 0.62 17.89
DRYWALL FINISHER/TAPER 19.09 5.00 24.09

MD20260065 rev 1

Montgomery · Residential

Trade Rate Fringe Total
TILE SETTER 14.50 0.00 14.50
SPRINKLER FITTER (FIRE SPRINKLERS) 20.75 2.85 23.60
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) 19.89 1.20 21.09
ROOFER 19.40 4.28 23.68
PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION 26.00 6.67 32.67
PLUMBER (HVAC PIPE AND UNIT INSTALLATION ONLY) 18.80 6.63 25.43
PAINTER (BRUSH AND ROLLER) 16.00 0.00 16.00
OPERATOR: LOADER 20.25 2.06 22.31
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE 20.00 2.06 22.06
LABORER: PIPELAYER 16.19 2.15 18.34
LABORER: COMMON OR GENERAL, INCLUDING BRICK MASON … 12.62 1.77 14.39
IRONWORKER, ORNAMENTAL 17.31 0.00 17.31
ELECTRICIAN 26.50 7.80 34.30
DRYWALL HANGER AND METAL STUD INSTALLER 19.28 0.00 19.28
CEMENT MASON/CONCRETE FINISHER 18.50 2.00 20.50

MD20260066 rev 1

Prince George's · Residential

Trade Rate Fringe Total
TILE SETTER 14.50 0.00 14.50
SPRINKLER FITTER (FIRE SPRINKLERS) 20.75 2.85 23.60
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) 19.89 1.20 21.09
ROOFER 19.40 4.28 23.68
PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION 26.00 6.67 32.67
PLUMBER (HVAC PIPE AND UNIT INSTALLATION ONLY) 18.80 6.63 25.43
PAINTER (BRUSH AND ROLLER) 17.36 1.38 18.74
OPERATOR: LOADER 20.25 2.06 22.31
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE 21.46 2.81 24.27
LABORER: PIPELAYER 16.19 2.15 18.34
LABORER: COMMON OR GENERAL, INCLUDING BRICK MASON … 12.85 2.53 15.38
IRONWORKER, ORNAMENTAL 17.31 0.00 17.31
ELECTRICIAN 27.01 8.16 35.17
DRYWALL HANGER AND METAL STUD INSTALLER 19.28 0.00 19.28
CEMENT MASON/CONCRETE FINISHER 16.40 2.00 18.40

MD20260067 rev 1

Queen Anne's · Residential

Trade Rate Fringe Total
SOFT FLOOR LAYER (CARPET) 34.12 14.64 48.76
SPRINKLER FITTER (FIRE SPRINKLERS) 26.06 6.52 32.58
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) 18.82 1.20 20.02
ROOFER 26.80 0.00 26.80
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION 20.48 0.00 20.48
PLUMBER (HVAC PIPE INSTALLATION ONLY) 17.60 0.00 17.60
PAINTER 15.12 0.88 16.00
OPERATOR: LOADER 20.25 2.06 22.31
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE 18.40 4.42 22.82
LABORER: PIPELAYER 16.19 2.15 18.34
LABORER: COMMON OR GENERAL, INCLUDING BRICK MASON … 11.00 1.86 12.86
IRONWORKER, ORNAMENTAL 17.31 0.00 17.31
ELECTRICIAN 23.49 0.81 24.30
DRYWALL HANGER AND METAL STUD INSTALLER 17.27 0.62 17.89
DRYWALL FINISHER/TAPER 19.09 5.00 24.09

MD20260068 rev 1

St Mary's · Residential

Trade Rate Fringe Total
TILE SETTER 14.50 0.00 14.50
SPRINKLER FITTER (FIRE SPRINKLERS) 20.75 2.85 23.60
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) 19.89 1.20 21.09
ROOFER 19.40 4.28 23.68
PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION 26.00 6.67 32.67
PLUMBER (HVAC PIPE AND UNIT INSTALLATION ONLY) 18.80 6.63 25.43
PAINTER (BRUSH AND ROLLER) 16.71 0.00 16.71
OPERATOR: LOADER 20.25 2.06 22.31
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE 21.46 2.81 24.27
LABORER: PIPELAYER 16.19 2.15 18.34
LABORER: COMMON OR GENERAL, INCLUDING BRICK MASON … 12.25 2.75 15.00
IRONWORKER, ORNAMENTAL 17.31 0.00 17.31
ELECTRICIAN 27.01 8.16 35.17
DRYWALL HANGER AND METAL STUD INSTALLER 19.28 0.00 19.28
CEMENT MASON/CONCRETE FINISHER 16.40 2.00 18.40

MD20260069 rev 1

Washington · Residential

Trade Rate Fringe Total
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) 19.89 1.20 21.09
ROOFER 22.69 0.00 22.69
PLUMBER 20.89 3.22 24.11
PAINTER (BRUSH AND ROLLER) 16.36 1.45 17.81
OPERATOR: LOADER 20.25 2.06 22.31
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE 16.92 5.43 22.35
LABORER: PIPELAYER 16.19 2.15 18.34
LABORER: COMMON OR GENERAL, INCLUDING BRICK MASON … 13.00 0.00 13.00
IRONWORKER, ORNAMENTAL 17.31 0.00 17.31
ELECTRICIAN 18.00 0.00 18.00
CEMENT MASON/CONCRETE FINISHER 17.54 0.00 17.54
CARPENTER 15.85 0.88 16.73
BRICKLAYER 26.20 7.43 33.63

MD20260070 rev 1

Baltimore, Carroll, Cecil · Residential

Trade Rate Fringe Total
FLOOR LAYER: CARPET 34.12 14.64 48.76
SPRINKLER FITTER (FIRE SPRINKLERS) 26.06 6.52 32.58
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) 18.82 1.20 20.02
ROOFER 26.80 0.00 26.80
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION 20.48 0.00 20.48
PLUMBER (HVAC PIPE INSTALLATION ONLY) 17.60 0.00 17.60
PAINTER 15.12 0.88 16.00
OPERATOR: LOADER 20.25 2.06 22.31
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE 18.40 4.42 22.82
LABORER: PIPELAYER 16.19 2.15 18.34
LABORER: COMMON OR GENERAL, INCLUDING BRICK MASON … 13.50 1.50 15.00
IRONWORKER, ORNAMENTAL 17.31 0.00 17.31
ELECTRICIAN 23.49 0.81 24.30
DRYWALL HANGER AND METAL STUD INSTALLER 17.27 0.62 17.89
DRYWALL FINISHER/TAPER 19.09 5.00 24.09

MD20260071 rev 1

Calvert, Charles · Residential

Trade Rate Fringe Total
TILE SETTER 14.50 0.00 14.50
SPRINKLER FITTER (FIRE SPRINKLERS) 20.75 2.85 23.60
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) 19.89 1.20 21.09
ROOFER 19.40 4.28 23.68
PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION 26.00 6.67 32.67
PLUMBER (HVAC PIPE AND UNIT INSTALLATION ONLY) 18.80 6.63 25.43
PAINTER (BRUSH AND ROLLER) 16.71 0.00 16.71
OPERATOR: LOADER 20.25 2.06 22.31
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE 21.46 2.81 24.27
LABORER: PIPELAYER 16.19 2.15 18.34
LABORER: COMMON OR GENERAL, INCLUDING BRICK MASON … 13.75 0.43 14.18
IRONWORKER, ORNAMENTAL 17.31 0.00 17.31
ELECTRICIAN 27.01 8.16 35.17
DRYWALL HANGER AND METAL STUD INSTALLER 19.28 0.00 19.28
CEMENT MASON/CONCRETE FINISHER 16.40 2.00 18.40

MD20260072 rev 1

Somerset, Wicomico, Worcester · Residential

Trade Rate Fringe Total
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) 19.89 1.20 21.09
ROOFER 22.69 0.00 22.69
PLUMBER 20.89 3.22 24.11
PAINTER (BRUSH AND ROLLER) 16.36 1.45 17.81
OPERATOR: LOADER 20.25 2.06 22.31
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE 23.33 6.62 29.95
LABORER: PIPELAYER 16.19 2.15 18.34
LABORER: COMMON OR GENERAL, INCLUDING BRICK MASON … 13.60 1.45 15.05
IRONWORKER, ORNAMENTAL 17.31 0.00 17.31
ELECTRICIAN 25.56 6.75 32.31
CEMENT MASON/CONCRETE FINISHER 17.54 0.00 17.54
CARPENTER 19.38 3.97 23.35
BRICKLAYER 26.20 7.43 33.63

MD20260074 rev 2

Queen Anne's · Heavy, Highway

Trade Rate Fringe Total
LABORER - AIR TOOL OPERATOR 24.00 2.33 26.33
LABORER - ASPHALT PAVER 24.00 2.33 26.33
LABORER - ASPHALT RAKER 21.59 2.64 24.23
LABORER - BLASTER - DYNAMITE 24.00 2.33 26.33
LABORER - BURNER 24.00 2.33 26.33
LABORER - COMMON 21.59 2.64 24.23
LABORER - CONCRETE PUDDLER 21.59 2.64 24.23
LABORER - CONCRETE SURFACER 24.00 2.33 26.33
LABORER - CONCRETE TENDER 21.59 2.64 24.23
LABORER - CONCRETE VIBRATOR 21.59 2.64 24.23
LABORER - DENSITY GAUGE 21.59 2.64 24.23
LABORER - FIREPROOFER - MIXER 21.59 2.64 24.23
LABORER - FLAGGER 21.59 2.64 24.23
LABORER - GRADE CHECKER 21.59 2.64 24.23
LABORER - HAND ROLLER 21.59 2.64 24.23

MD20260075 rev 2

Somerset · Heavy, Highway

Trade Rate Fringe Total
LABORER - AIR TOOL OPERATOR 31.57 8.81 40.38
LABORER - ASPHALT PAVER 31.57 8.81 40.38
LABORER - ASPHALT RAKER 22.69 3.04 25.73
LABORER - BLASTER - DYNAMITE 31.57 8.81 40.38
LABORER - BURNER 31.57 8.81 40.38
LABORER - COMMON 22.69 3.04 25.73
LABORER - CONCRETE PUDDLER 22.69 3.04 25.73
LABORER - CONCRETE SURFACER 31.57 8.81 40.38
LABORER - CONCRETE TENDER 22.69 3.04 25.73
LABORER - CONCRETE VIBRATOR 22.69 3.04 25.73
LABORER - DENSITY GAUGE 22.69 3.04 25.73
LABORER - FIREPROOFER - MIXER 22.69 3.04 25.73
LABORER - FLAGGER 22.69 3.04 25.73
LABORER - GRADE CHECKER 22.69 3.04 25.73
LABORER - HAND ROLLER 22.69 3.04 25.73

MD20260076 rev 2

St Mary's · Heavy, Highway

Trade Rate Fringe Total
LABORER - ASPHALT RAKER 23.85 3.63 27.48
LABORER - COMMON 23.85 3.63 27.48
LABORER - CONCRETE PUDDLER 23.85 3.63 27.48
LABORER - CONCRETE TENDER 23.85 3.63 27.48
LABORER - CONCRETE VIBRATOR 23.85 3.63 27.48
LABORER - DENSITY GAUGE 23.85 3.63 27.48
LABORER - FIREPROOFER - MIXER 23.85 3.63 27.48
LABORER - FLAGGER 23.85 3.63 27.48
LABORER - GRADE CHECKER 23.85 3.63 27.48
LABORER - HAND ROLLER 23.85 3.63 27.48
LABORER - JACKHAMMER 23.85 3.63 27.48
LABORER - LANDSCAPING 23.85 3.63 27.48
LABORER - LAYOUT 23.85 3.63 27.48
LABORER - LUTEMAN 23.85 3.63 27.48
LABORER - MORTAR MIXER 23.85 3.63 27.48

MD20260077 rev 2

Talbot · Heavy, Highway

Trade Rate Fringe Total
LABORER - AIR TOOL OPERATOR 24.00 2.33 26.33
LABORER - ASPHALT PAVER 24.00 2.33 26.33
LABORER - ASPHALT RAKER 22.66 2.75 25.41
LABORER - BLASTER - DYNAMITE 24.00 2.33 26.33
LABORER - BURNER 24.00 2.33 26.33
LABORER - COMMON 22.66 2.75 25.41
LABORER - CONCRETE PUDDLER 22.66 2.75 25.41
LABORER - CONCRETE SURFACER 24.00 2.33 26.33
LABORER - CONCRETE TENDER 22.66 2.75 25.41
LABORER - CONCRETE VIBRATOR 22.66 2.75 25.41
LABORER - DENSITY GAUGE 22.66 2.75 25.41
LABORER - FIREPROOFER - MIXER 22.66 2.75 25.41
LABORER - FLAGGER 22.66 2.75 25.41
LABORER - GRADE CHECKER 22.66 2.75 25.41
LABORER - HAND ROLLER 22.66 2.75 25.41

MD20260078 rev 2

Washington · Heavy, Highway

Trade Rate Fringe Total
CARPENTER 30.71 22.54 53.25
CARPENTER - SHORING SCAFFOLD BUILDER 30.71 22.54 53.25
CEMENT MASON 32.12 22.65 54.77
ELECTRICIAN 40.00 20.20 60.20
INSULATION WORKER 40.02 19.92 59.94
IRONWORKER - FENCE ERECTOR 31.65 24.75 56.40
IRONWORKER - ORNAMENTAL 31.65 24.75 56.40
IRONWORKER - REINFORCING 31.65 24.75 56.40
IRONWORKER - STRUCTURAL 31.65 24.75 56.40
LABORER - AIR TOOL OPERATOR 24.51 23.00 47.51
LABORER - ASPHALT PAVER 24.51 23.00 47.51
LABORER - ASPHALT RAKER 24.51 23.00 47.51
LABORER - BLASTER - DYNAMITE 24.51 23.00 47.51
LABORER - BURNER 24.51 23.00 47.51
LABORER - COMMON 24.51 23.00 47.51

MD20260079 rev 2

Wicomico · Heavy, Highway

Trade Rate Fringe Total
LABORER - AIR TOOL OPERATOR 31.57 8.81 40.38
LABORER - ASPHALT PAVER 31.57 8.81 40.38
LABORER - ASPHALT RAKER 21.88 3.03 24.91
LABORER - BLASTER - DYNAMITE 31.57 8.81 40.38
LABORER - BURNER 31.57 8.81 40.38
LABORER - COMMON 21.88 3.03 24.91
LABORER - CONCRETE PUDDLER 21.88 3.03 24.91
LABORER - CONCRETE SURFACER 31.57 8.81 40.38
LABORER - CONCRETE TENDER 21.88 3.03 24.91
LABORER - CONCRETE VIBRATOR 21.88 3.03 24.91
LABORER - DENSITY GAUGE 21.88 3.03 24.91
LABORER - FIREPROOFER - MIXER 21.88 3.03 24.91
LABORER - FLAGGER 21.88 3.03 24.91
LABORER - GRADE CHECKER 21.88 3.03 24.91
LABORER - HAND ROLLER 21.88 3.03 24.91

MD20260080 rev 2

Worcester · Heavy, Highway

Trade Rate Fringe Total
LABORER - AIR TOOL OPERATOR 31.57 8.81 40.38
LABORER - ASPHALT PAVER 31.57 8.81 40.38
LABORER - ASPHALT RAKER 24.58 4.73 29.31
LABORER - BLASTER - DYNAMITE 31.57 8.81 40.38
LABORER - BURNER 31.57 8.81 40.38
LABORER - COMMON 24.58 4.73 29.31
LABORER - CONCRETE PUDDLER 24.58 4.73 29.31
LABORER - CONCRETE SURFACER 31.57 8.81 40.38
LABORER - CONCRETE TENDER 24.58 4.73 29.31
LABORER - CONCRETE VIBRATOR 24.58 4.73 29.31
LABORER - DENSITY GAUGE 24.58 4.73 29.31
LABORER - FIREPROOFER - MIXER 24.58 4.73 29.31
LABORER - FLAGGER 24.58 4.73 29.31
LABORER - GRADE CHECKER 24.58 4.73 29.31
LABORER - HAND ROLLER 24.58 4.73 29.31

MD20260081 rev 2

Allegany · Building

Trade Rate Fringe Total
BALANCING TECHNICIAN 50.92 24.61 75.53
BRICKLAYER 35.50 14.62 50.12
CARPENTER 30.71 22.54 53.25
CARPET LAYER 35.10 15.33 50.43
COMMUNICATION INSTALLER TECHNICIAN 36.83 17.55 54.38
ELECTRICIAN 41.58 20.98 62.56
ELEVATOR MECHANIC 58.81 46.61 105.42
FIREPROOFER - BY HAND 25.18 20.35 45.53
FIREPROOFER - SPRAYER 25.25 20.35 45.60
INSULATION WORKER 40.77 20.42 61.19
IRONWORKER - ORNAMENTAL 30.31 24.40 54.71
IRONWORKER - REINFORCING 31.65 24.75 56.40
IRONWORKER - STRUCTURAL 31.65 24.75 56.40
LABORER - AIR TOOL OPERATOR 24.69 23.00 47.69
LABORER - ASPHALT PAVER 24.69 23.00 47.69

MD20260082 rev 2

Anne Arundel · Building

Trade Rate Fringe Total
BALANCING TECHNICIAN 50.92 24.61 75.53
BRICKLAYER 38.80 15.57 54.37
CARPENTER 35.89 14.60 50.49
CARPENTER - SHORING SCAFFOLD BUILDER 35.89 14.60 50.49
CARPET LAYER 35.10 15.33 50.43
COMMUNICATION INSTALLER TECHNICIAN 32.40 17.34 49.74
DRYWALL - SPACKLING, TAPING, & FINISHING 35.89 14.60 50.49
ELECTRICIAN 49.50 21.14 70.64
ELEVATOR MECHANIC 48.99 18.89 67.88
FIREPROOFER - BY HAND 17.00 2.24 19.24
FIREPROOFER - SPRAYER 27.00 5.22 32.22
FIRESTOPPER 30.21 10.68 40.89
GLAZIER 36.65 14.61 51.26
INSULATION WORKER 40.77 20.42 61.19
IRONWORKER - FENCE ERECTOR 48.25 21.11 69.36

MD20260107 rev 2

Baltimore City · Building

Trade Rate Fringe Total
BALANCING TECHNICIAN 25.95 7.07 33.02
BRICKLAYER 38.80 15.57 54.37
CARPENTER 35.89 14.60 50.49
CARPENTER - SHORING SCAFFOLD BUILDER 35.89 14.60 50.49
CARPET LAYER 35.10 15.33 50.43
COMMUNICATION INSTALLER TECHNICIAN 32.83 16.79 49.62
DRYWALL - SPACKLING, TAPING, & FINISHING 35.89 14.60 50.49
ELECTRICIAN 48.95 20.56 69.51
ELEVATOR MECHANIC 58.81 46.61 105.42
FIREPROOFER - BY HAND 17.00 2.24 19.24
FIREPROOFER - SPRAYER 27.00 5.22 32.22
FIRESTOPPER 30.21 10.68 40.89
GLAZIER 36.65 14.61 51.26
INSULATION WORKER 40.77 20.42 61.19
IRONWORKER - FENCE ERECTOR 48.25 21.11 69.36

MD20260108 rev 2

Baltimore · Building

Trade Rate Fringe Total
BALANCING TECHNICIAN 50.92 24.61 75.53
BRICKLAYER 37.39 15.25 52.64
CARPENTER 35.89 14.60 50.49
CARPENTER - SHORING SCAFFOLD BUILDER 35.89 14.60 50.49
CARPET LAYER 35.89 14.60 50.49
COMMUNICATION INSTALLER TECHNICIAN 34.10 17.42 51.52
DRYWALL - SPACKLING, TAPING, & FINISHING 35.89 14.60 50.49
ELECTRICIAN 48.25 21.14 69.39
ELEVATOR MECHANIC 58.81 46.61 105.42
FIREPROOFER - BY HAND 17.00 2.24 19.24
FIREPROOFER - SPRAYER 29.70 7.48 37.18
FIRESTOPPER 30.21 10.68 40.89
GLAZIER 36.65 14.61 51.26
INSULATION WORKER 40.77 20.42 61.19
IRONWORKER - FENCE ERECTOR 48.25 21.11 69.36

MD20260109 rev 2

Calvert · Building

Trade Rate Fringe Total
BALANCING TECHNICIAN 50.92 24.61 75.53
BOILERMAKER 47.37 25.94 73.31
BRICKLAYER 38.80 15.57 54.37
CARPENTER 35.89 14.60 50.49
CARPENTER - SHORING SCAFFOLD BUILDER 35.89 14.60 50.49
CARPET LAYER 35.10 15.33 50.43
COMMUNICATION INSTALLER TECHNICIAN 30.62 11.64 42.26
DRYWALL - SPACKLING, TAPING, & FINISHING 29.16 12.01 41.17
ELECTRICIAN 57.00 22.15 79.15
ELEVATOR MECHANIC 57.16 44.61 101.77
FIREPROOFER - BY HAND 29.04 6.69 35.73
FIREPROOFER - SPRAYER 29.41 7.77 37.18
FIRESTOPPER 30.21 10.68 40.89
GLAZIER 36.40 6.35 42.75
INSULATION WORKER 40.77 20.42 61.19

MD20260110 rev 2

Caroline · Building

Trade Rate Fringe Total
BALANCING TECHNICIAN 36.00 7.82 43.82
BRICKLAYER 38.80 15.57 54.37
CARPENTER 32.87 19.43 52.30
CARPET LAYER 35.10 15.33 50.43
CEMENT MASON 30.00 3.03 33.03
COMMUNICATION INSTALLER TECHNICIAN 39.71 12.29 52.00
DRYWALL - SPACKLING, TAPING, & FINISHING 29.16 12.01 41.17
ELECTRICIAN 36.75 26.41 63.16
ELEVATOR MECHANIC 58.81 46.61 105.42
FIREPROOFER - BY HAND 23.96 4.85 28.81
FIREPROOFER - SPRAYER 27.68 11.63 39.31
INSULATION WORKER 40.77 20.42 61.19
IRONWORKER - REINFORCING 33.12 25.63 58.75
IRONWORKER - STRUCTURAL 24.56 1.96 26.52
LABORER - AIR TOOL OPERATOR 24.23 5.66 29.89

MD20260111 rev 2

Carroll · Building

Trade Rate Fringe Total
BALANCING TECHNICIAN 32.17 11.69 43.86
BRICKLAYER 38.80 15.57 54.37
CARPENTER 35.89 14.60 50.49
CARPENTER - SHORING SCAFFOLD BUILDER 35.89 14.60 50.49
CARPET LAYER 35.10 15.33 50.43
COMMUNICATION INSTALLER TECHNICIAN 36.83 17.55 54.38
DRYWALL - SPACKLING, TAPING, & FINISHING 35.89 14.60 50.49
ELECTRICIAN 49.50 20.80 70.30
ELEVATOR MECHANIC 88.34 7.56 95.90
FIREPROOFER - BY HAND 17.00 2.24 19.24
FIREPROOFER - SPRAYER 27.00 5.22 32.22
FIRESTOPPER 30.21 10.68 40.89
GLAZIER 36.65 14.61 51.26
INSULATION WORKER 40.77 20.42 61.19
IRONWORKER - FENCE ERECTOR 48.25 21.11 69.36

MD20260112 rev 2

Cecil · Building

Trade Rate Fringe Total
BALANCING TECHNICIAN 31.63 8.82 40.45
BRICKLAYER 38.80 15.57 54.37
CARPENTER 37.08 25.48 62.56
CARPET LAYER 35.10 15.33 50.43
CEMENT MASON 30.00 3.03 33.03
COMMUNICATION INSTALLER TECHNICIAN 39.71 12.29 52.00
DRYWALL - SPACKLING, TAPING, & FINISHING 29.16 12.01 41.17
ELECTRICIAN 36.75 26.41 63.16
ELEVATOR MECHANIC 50.00 12.84 62.84
FIREPROOFER - BY HAND 23.96 4.85 28.81
FIREPROOFER - SPRAYER 27.68 11.63 39.31
INSULATION WORKER 40.77 20.42 61.19
IRONWORKER - REINFORCING 33.12 25.63 58.75
IRONWORKER - STRUCTURAL 24.56 1.96 26.52
LABORER - AIR TOOL OPERATOR 24.23 5.66 29.89

MD20260113 rev 2

Charles · Building

Trade Rate Fringe Total
BALANCING TECHNICIAN 50.92 24.61 75.53
BOILERMAKER 47.37 25.94 73.31
BRICKLAYER 38.80 15.57 54.37
CARPENTER 35.89 14.60 50.49
CARPENTER - SHORING SCAFFOLD BUILDER 35.89 14.60 50.49
CARPET LAYER 35.10 15.33 50.43
COMMUNICATION INSTALLER TECHNICIAN 30.62 11.64 42.26
DRYWALL - SPACKLING, TAPING, & FINISHING 29.16 12.01 41.17
ELECTRICIAN 57.00 22.15 79.15
ELEVATOR MECHANIC 57.16 44.61 101.77
FIREPROOFER - BY HAND 29.04 6.69 35.73
FIREPROOFER - SPRAYER 29.41 7.77 37.18
FIRESTOPPER 30.21 10.68 40.89
GLAZIER 57.04 3.98 61.02
INSULATION WORKER 40.77 20.42 61.19

MD20260114 rev 2

Dorchester · Building

Trade Rate Fringe Total
BALANCING TECHNICIAN 33.00 9.16 42.16
BRICKLAYER 38.80 15.57 54.37
CARPENTER 32.87 19.43 52.30
CARPET LAYER 35.10 15.33 50.43
CEMENT MASON 24.83 2.64 27.47
COMMUNICATION INSTALLER TECHNICIAN 33.99 13.85 47.84
DRYWALL - SPACKLING, TAPING, & FINISHING 29.16 12.01 41.17
ELECTRICIAN 47.50 36.42 83.92
ELEVATOR MECHANIC 52.00 11.26 63.26
FIREPROOFER - BY HAND 22.18 4.25 26.43
FIREPROOFER - SPRAYER 22.51 5.03 27.54
IRONWORKER - REINFORCING 25.44 9.20 34.64
LABORER - AIR TOOL OPERATOR 25.10 4.96 30.06
LABORER - ASPHALT PAVER 25.10 4.96 30.06
LABORER - ASPHALT RAKER 21.00 0.73 21.73

MD20260115 rev 2

Frederick · Building

Trade Rate Fringe Total
BALANCING TECHNICIAN 50.92 24.61 75.53
BOILERMAKER 47.37 25.94 73.31
BRICKLAYER 38.80 15.57 54.37
CARPENTER 35.89 14.60 50.49
CARPENTER - SHORING SCAFFOLD BUILDER 35.89 14.60 50.49
CARPET LAYER 35.10 15.33 50.43
CEMENT MASON 29.65 11.88 41.53
COMMUNICATION INSTALLER TECHNICIAN 34.60 12.98 47.58
DRYWALL - SPACKLING, TAPING, & FINISHING 35.89 14.60 50.49
ELECTRICIAN 49.50 20.79 70.29
ELEVATOR MECHANIC 58.81 46.61 105.42
FIREPROOFER - BY HAND 28.44 8.11 36.55
FIREPROOFER - SPRAYER 27.61 8.34 35.95
FIRESTOPPER 30.21 10.68 40.89
GLAZIER 33.65 0.00 33.65

MD20260116 rev 2

Garrett · Building

Trade Rate Fringe Total
BALANCING TECHNICIAN 50.92 24.61 75.53
BRICKLAYER 38.80 15.57 54.37
CARPENTER 30.71 22.54 53.25
CARPET LAYER 35.10 15.33 50.43
COMMUNICATION INSTALLER TECHNICIAN 36.83 17.55 54.38
ELECTRICIAN 40.00 20.20 60.20
ELEVATOR MECHANIC 58.81 46.61 105.42
FIREPROOFER - BY HAND 25.18 20.35 45.53
FIREPROOFER - SPRAYER 25.25 20.35 45.60
INSULATION WORKER 40.77 20.42 61.19
IRONWORKER - ORNAMENTAL 30.31 24.40 54.71
IRONWORKER - REINFORCING 31.65 24.75 56.40
IRONWORKER - STRUCTURAL 31.65 24.75 56.40
LABORER - AIR TOOL OPERATOR 24.69 23.00 47.69
LABORER - ASPHALT PAVER 24.69 23.00 47.69

MD20260117 rev 2

Harford · Building

Trade Rate Fringe Total
BALANCING TECHNICIAN 32.17 11.69 43.86
BRICKLAYER 38.80 15.57 54.37
CARPENTER 35.89 14.60 50.49
CARPENTER - SHORING SCAFFOLD BUILDER 35.89 14.60 50.49
CARPET LAYER 35.10 15.33 50.43
COMMUNICATION INSTALLER TECHNICIAN 33.35 17.63 50.98
DRYWALL - SPACKLING, TAPING, & FINISHING 35.89 14.60 50.49
ELECTRICIAN 49.50 20.95 70.45
ELEVATOR MECHANIC 88.34 7.56 95.90
FIREPROOFER - BY HAND 17.00 2.24 19.24
FIREPROOFER - SPRAYER 29.70 7.48 37.18
FIRESTOPPER 30.21 10.68 40.89
GLAZIER 36.65 14.61 51.26
INSULATION WORKER 40.77 20.42 61.19
IRONWORKER - FENCE ERECTOR 48.25 21.11 69.36

MD20260118 rev 2

Howard · Building

Trade Rate Fringe Total
BALANCING TECHNICIAN 50.92 24.61 75.53
BRICKLAYER 38.80 15.57 54.37
CARPENTER 35.89 14.60 50.49
CARPENTER - SHORING SCAFFOLD BUILDER 35.89 14.60 50.49
CARPET LAYER 35.10 15.33 50.43
COMMUNICATION INSTALLER TECHNICIAN 32.60 16.85 49.45
DRYWALL - SPACKLING, TAPING, & FINISHING 35.89 14.60 50.49
ELECTRICIAN 49.50 20.80 70.30
ELEVATOR MECHANIC 58.81 46.61 105.42
FIREPROOFER - BY HAND 17.00 2.24 19.24
FIREPROOFER - SPRAYER 27.00 5.22 32.22
FIRESTOPPER 30.21 10.68 40.89
GLAZIER 36.65 14.61 51.26
INSULATION WORKER 40.77 20.42 61.19
IRONWORKER - FENCE ERECTOR 48.25 21.11 69.36

MD20260119 rev 2

Kent · Building

Trade Rate Fringe Total
BALANCING TECHNICIAN 26.50 8.49 34.99
BRICKLAYER 38.80 15.57 54.37
CARPENTER 32.87 19.43 52.30
CARPET LAYER 35.10 15.33 50.43
CEMENT MASON 30.00 3.03 33.03
COMMUNICATION INSTALLER TECHNICIAN 39.71 12.29 52.00
DRYWALL - SPACKLING, TAPING, & FINISHING 29.16 12.01 41.17
ELECTRICIAN 36.75 26.41 63.16
ELEVATOR MECHANIC 58.81 46.61 105.42
FIREPROOFER - BY HAND 23.96 4.85 28.81
FIREPROOFER - SPRAYER 27.68 11.63 39.31
INSULATION WORKER 40.77 20.42 61.19
IRONWORKER - REINFORCING 33.12 25.63 58.75
IRONWORKER - STRUCTURAL 35.58 26.21 61.79
LABORER - AIR TOOL OPERATOR 27.00 7.88 34.88

MD20260120 rev 2

Montgomery · Building

Trade Rate Fringe Total
BALANCING TECHNICIAN 50.92 24.61 75.53
BOILERMAKER 47.37 25.94 73.31
BRICKLAYER 38.80 15.57 54.37
CARPENTER 35.89 14.60 50.49
CARPENTER - SHORING SCAFFOLD BUILDER 35.89 14.60 50.49
CARPET LAYER 35.10 15.33 50.43
CEMENT MASON 29.65 11.88 41.53
COMMUNICATION INSTALLER TECHNICIAN 34.60 12.98 47.58
DRYWALL - SPACKLING, TAPING, & FINISHING 29.16 12.01 41.17
ELECTRICIAN 59.50 23.06 82.56
ELEVATOR MECHANIC 57.16 44.61 101.77
FIREPROOFER - BY HAND 28.44 8.11 36.55
FIREPROOFER - SPRAYER 27.61 8.34 35.95
FIRESTOPPER 30.21 10.68 40.89
GLAZIER 36.65 14.61 51.26

MD20260121 rev 2

Prince George's · Building

Trade Rate Fringe Total
BALANCING TECHNICIAN 50.92 24.61 75.53
BOILERMAKER 47.37 25.94 73.31
BRICKLAYER 38.80 15.57 54.37
CARPENTER 35.89 14.60 50.49
CARPENTER - SHORING SCAFFOLD BUILDER 35.89 14.60 50.49
CARPET LAYER 35.10 15.33 50.43
CEMENT MASON 29.65 11.88 41.53
COMMUNICATION INSTALLER TECHNICIAN 34.60 12.98 47.58
DRYWALL - SPACKLING, TAPING, & FINISHING 29.16 12.01 41.17
ELECTRICIAN 57.00 22.15 79.15
ELEVATOR MECHANIC 57.16 44.61 101.77
FIREPROOFER - BY HAND 28.44 8.11 36.55
FIREPROOFER - SPRAYER 27.61 8.34 35.95
FIRESTOPPER 30.21 10.68 40.89
GLAZIER 36.65 14.61 51.26

MD20260122 rev 2

Queen Anne's · Building

Trade Rate Fringe Total
BALANCING TECHNICIAN 31.63 8.82 40.45
BRICKLAYER 38.80 15.57 54.37
CARPENTER 37.08 25.48 62.56
CARPET LAYER 35.10 15.33 50.43
CEMENT MASON 30.00 3.03 33.03
COMMUNICATION INSTALLER TECHNICIAN 39.71 12.29 52.00
DRYWALL - SPACKLING, TAPING, & FINISHING 29.16 12.01 41.17
ELECTRICIAN 36.75 26.41 63.16
ELEVATOR MECHANIC 58.81 46.61 105.42
FIREPROOFER - BY HAND 23.96 4.85 28.81
FIREPROOFER - SPRAYER 27.68 11.63 39.31
INSULATION WORKER 40.77 20.42 61.19
IRONWORKER - REINFORCING 33.12 25.63 58.75
IRONWORKER - STRUCTURAL 24.56 1.96 26.52
LABORER - AIR TOOL OPERATOR 24.23 5.66 29.89

MD20260123 rev 2

Somerset · Building

Trade Rate Fringe Total
BALANCING TECHNICIAN 33.00 9.16 42.16
BRICKLAYER 38.80 15.57 54.37
CARPENTER 32.87 19.43 52.30
CARPET LAYER 35.10 15.33 50.43
CEMENT MASON 24.83 2.64 27.47
COMMUNICATION INSTALLER TECHNICIAN 33.99 13.85 47.84
DRYWALL - SPACKLING, TAPING, & FINISHING 29.16 12.01 41.17
ELECTRICIAN 32.55 16.58 49.13
ELEVATOR MECHANIC 52.00 11.26 63.26
FIREPROOFER - BY HAND 22.18 4.25 26.43
FIREPROOFER - SPRAYER 22.51 5.03 27.54
IRONWORKER - REINFORCING 25.44 9.20 34.64
LABORER - AIR TOOL OPERATOR 25.10 4.96 30.06
LABORER - ASPHALT PAVER 25.10 4.96 30.06
LABORER - ASPHALT RAKER 21.00 0.73 21.73

MD20260124 rev 2

St Mary's · Building

Trade Rate Fringe Total
BALANCING TECHNICIAN 50.92 24.61 75.53
BOILERMAKER 47.37 25.94 73.31
BRICKLAYER 38.80 15.57 54.37
CARPENTER 35.89 14.60 50.49
CARPENTER - SHORING SCAFFOLD BUILDER 35.89 14.60 50.49
CARPET LAYER 35.10 15.33 50.43
COMMUNICATION INSTALLER TECHNICIAN 30.62 11.64 42.26
DRYWALL - SPACKLING, TAPING, & FINISHING 29.16 12.01 41.17
ELECTRICIAN 57.00 22.15 79.15
ELEVATOR MECHANIC 75.58 11.69 87.27
FIREPROOFER - BY HAND 29.04 6.69 35.73
FIREPROOFER - SPRAYER 29.41 7.77 37.18
FIRESTOPPER 30.21 10.68 40.89
GLAZIER 36.40 6.35 42.75
INSULATION WORKER 40.77 20.42 61.19

MD20260125 rev 2

Talbot · Building

Trade Rate Fringe Total
BALANCING TECHNICIAN 36.00 7.82 43.82
BRICKLAYER 38.80 15.57 54.37
CARPENTER 32.87 19.43 52.30
CARPET LAYER 35.10 15.33 50.43
CEMENT MASON 30.00 3.03 33.03
COMMUNICATION INSTALLER TECHNICIAN 39.71 12.29 52.00
DRYWALL - SPACKLING, TAPING, & FINISHING 29.16 12.01 41.17
ELECTRICIAN 36.75 26.41 63.16
ELEVATOR MECHANIC 58.81 46.61 105.42
FIREPROOFER - BY HAND 23.96 4.85 28.81
FIREPROOFER - SPRAYER 27.68 11.63 39.31
INSULATION WORKER 40.77 20.42 61.19
IRONWORKER - REINFORCING 33.12 25.63 58.75
IRONWORKER - STRUCTURAL 24.56 1.96 26.52
LABORER - AIR TOOL OPERATOR 24.23 5.66 29.89

MD20260126 rev 2

Washington · Building

Trade Rate Fringe Total
BALANCING TECHNICIAN 50.92 24.61 75.53
BRICKLAYER 35.50 14.62 50.12
CARPENTER 30.71 22.54 53.25
CARPET LAYER 35.10 15.33 50.43
COMMUNICATION INSTALLER TECHNICIAN 36.83 17.55 54.38
ELECTRICIAN 42.20 20.91 63.11
ELEVATOR MECHANIC 58.81 46.61 105.42
FIREPROOFER - BY HAND 25.18 20.35 45.53
FIREPROOFER - SPRAYER 25.25 20.35 45.60
INSULATION WORKER 40.77 20.42 61.19
IRONWORKER - ORNAMENTAL 30.31 24.40 54.71
IRONWORKER - REINFORCING 31.65 24.75 56.40
IRONWORKER - STRUCTURAL 31.65 24.75 56.40
LABORER - AIR TOOL OPERATOR 25.10 6.72 31.82
LABORER - ASPHALT PAVER 25.10 6.72 31.82

MD20260127 rev 2

Wicomico · Building

Trade Rate Fringe Total
BALANCING TECHNICIAN 33.00 9.16 42.16
BRICKLAYER 38.80 15.57 54.37
CARPENTER 31.68 19.12 50.80
CARPET LAYER 35.10 15.33 50.43
CEMENT MASON 24.83 2.64 27.47
COMMUNICATION INSTALLER TECHNICIAN 33.99 13.85 47.84
DRYWALL - SPACKLING, TAPING, & FINISHING 29.16 12.01 41.17
ELECTRICIAN 32.55 16.58 49.13
ELEVATOR MECHANIC 58.81 46.61 105.42
FIREPROOFER - BY HAND 22.18 4.25 26.43
FIREPROOFER - SPRAYER 22.51 5.03 27.54
IRONWORKER - REINFORCING 25.44 9.20 34.64
LABORER - AIR TOOL OPERATOR 25.10 4.96 30.06
LABORER - ASPHALT PAVER 25.10 4.96 30.06
LABORER - ASPHALT RAKER 18.00 1.56 19.56

MD20260128 rev 2

Worcester · Building

Trade Rate Fringe Total
BALANCING TECHNICIAN 33.00 9.16 42.16
BRICKLAYER 38.80 15.57 54.37
CARPENTER 32.87 19.43 52.30
CARPET LAYER 35.10 15.33 50.43
CEMENT MASON 24.83 2.64 27.47
COMMUNICATION INSTALLER TECHNICIAN 33.99 13.85 47.84
DRYWALL - SPACKLING, TAPING, & FINISHING 29.16 12.01 41.17
ELECTRICIAN 32.55 16.58 49.13
ELEVATOR MECHANIC 52.00 11.26 63.26
FIREPROOFER - BY HAND 22.18 4.25 26.43
FIREPROOFER - SPRAYER 22.51 5.03 27.54
IRONWORKER - REINFORCING 25.44 9.20 34.64
LABORER - AIR TOOL OPERATOR 25.10 4.96 30.06
LABORER - ASPHALT PAVER 25.10 4.96 30.06
LABORER - ASPHALT RAKER 21.03 3.47 24.50