Chenango

4 wage determinations 116 trade rates

Popular Trades In Chenango

Track Chenango County updates

Get an email when wage determinations covering Chenango County, New York are modified.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Trade Rates

Click a row to save its rate for later, then export your selections from the Saved panel.

Same trade names can appear multiple times when classification codes or coverage language differ. Compare the code badge, any italic scope text, and WD reference to identify the right line.
Save Trade & Classification Rate Fringe Total
ASBESTOS WORKER/HEAT & FROST INSULATOR Building
ASBE0030-006 (MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION))
$43.25 $27.29 $70.54
BOILERMAKER BROOME Building
BOIL0197-004 (BUILDING, HEAVY, AND HIGHWAY) AND CHENANGO (HEAVY AND HIGHWAY)
$43.34 $27.66 $71.00
BRICKLAYER Building
BRNY0001-004 Scope differs by code/WD
$62.54 $29.40 $91.94
BRICKLAYER Building
BRNY0001-004 Scope differs by code/WD
$62.54 $29.40 $91.94
CABLE SPLICER Building
ELEC0325-002 (BROOME (BUILDING, HEAVY, AND HIGHWAY) AND CHENANGO (ENTIRE COUNTY, EXCEPT COLUMBUS, NEW BERLIN AND SHERBURNE TOWNSHIPS) HEAVY AND HIGHWAY)
$50.43 $33.29 $83.72
CARPENTER Residential
SUNY2013-005
$21.16 0.00 $21.16
CARPENTER Building
CARP0277-035 (EXCLUDES DRYWALL HANGING, FORM WORK AND METAL STUD INSTALLATION)
$33.24 $24.60 $57.84
CARPENTER (DRYWALL HANGING ONLY) Building
CARP0279-003
$43.50 $30.22 $73.72
CARPENTER (FORM WORK ONLY) Building
CARP0279-003
$43.50 $30.22 $73.72
CARPENTER, BUILDING CONSTRUCTION: CARPENTERS, CARPET LAYER, DRYWALL APPLICATOR, FLOOR COVERER, LATHER Building
CARP0277-010 (BROOME COUNTY). FOOTNOTES: A. PAID HOLIDAYS: INDEPENDENCE DAY AND LABOR DAY, PROVIDED THE EMPLOYEE WORKS HIS SCHEDULED DAY BEFORE AND HIS SCHEDULED DAY AFTER THE HOLIDAY AND IS ON THE PAYROLL IN THE PAYROLL WEEK IN WHICH THE HOLIDAY FALLS
$31.69 $21.92 $53.61
CEMENT MASON/CONCRETE FINISHER Residential
SUNY2013-005
$22.83 $11.15 $33.98
CEMENT MASON/CONCRETE FINISHER Building
BRNY0001-004 Scope differs by code/WD
$53.54 $31.52 $85.06
CEMENT MASON/CONCRETE FINISHER Building
BRNY0001-004 Scope differs by code/WD
$53.54 $31.52 $85.06
DREDGING: CLASS A1: DECK CAPTAIN; MECHANICAL DREDGE OPERATOR, LEVERMAN, LICENSED TUG OPERATOR OVER 1000 HP. INCENTIVE PAY: Heavy
ENGI0025-001 (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 FOOTNOTES APPLICABLE TO ABOVE CRAFTS: A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
$48.48 $15.34 $63.82
DREDGING: CLASS A2: CRANE OPERATOR Heavy
ENGI0025-001 (360 SWING) INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 FOOTNOTES APPLICABLE TO ABOVE CRAFTS: A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
$43.20 $14.99 $58.19
DREDGING: CLASS B1: DERRICK OPERATOR Heavy
ENGI0025-001 (180 SWING), SPIDER/SPILL BARGE OPERATOR, ENGINEER, ELECTRICIAN, CHIEF WELDER, CHIEF MATE, FILL PLACER, OPERATOR II, MAINTENANCE ENGINEER, LICENSED BOAT OPERATOR, LICENSED CREW BOAT OPERATOR. INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
$41.93 $14.90 $56.83
DREDGING: CLASS B2: CERTIFIED WELDER. INCENTIVE PAY: Heavy
ENGI0025-001 (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
$39.46 $14.73 $54.19
DREDGING: CLASS C1: MATE, DRAG BARGE OPERATOR, ASSISTANT FILL PLACER, WELDER, STEWARD. INCENTIVE PAY: Heavy
ENGI0025-001 (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 FOOTNOTES APPLICABLE TO ABOVE CRAFTS: A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
$38.38 $14.66 $53.04
DREDGING: CLASS C2: BOAT OPERATOR. INCENTIVE PAY: Heavy
ENGI0025-001 (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
$37.15 $14.57 $51.72
DREDGING: CLASS D: OILER, DECKHAND, SHOREMAN, RODMAN, SCOWMAN, COOK, MESSMAN, PORTER/JANITOR. INCENTIVE PAY: Heavy
ENGI0025-001 (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 FOOTNOTES APPLICABLE TO ABOVE CRAFTS: A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
$30.86 $14.15 $45.01
ELECTRICIAN Building
ELEC0325-002 (BROOME (BUILDING, HEAVY, AND HIGHWAY) AND CHENANGO (ENTIRE COUNTY, EXCEPT COLUMBUS, NEW BERLIN AND SHERBURNE TOWNSHIPS) HEAVY AND HIGHWAY)
$42.68 $33.06 $75.74
ELECTRICIAN Building
ELEC1249-010 (LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS): MECHANIC (BROOME (BUILDING, HEAVY, AND HIGHWAY) AND CHENANGO (HEAVY AND HIGHWAY)) INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY
$42.29 $30.66 $72.95
ELECTRICIAN Building
ELEC1249-010 (LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS): LINEMAN & TECHNICIAN (BROOME (BUILDING, HEAVY, AND HIGHWAY) AND CHENANGO (HEAVY AND HIGHWAY)) FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY
$52.86 $35.60 $88.46
ELECTRICIAN Building
ELEC1249-010 (LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS): GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (BROOME (BUILDING, HEAVY, AND HIGHWAY) AND CHENANGO (HEAVY AND HIGHWAY)) FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY
$44.93 $30.85 $75.78
ELECTRICIAN Building
ELEC1249-010 (LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS): GROUNDMAN (TRUCK DRIVER) (BROOME (BUILDING, HEAVY, AND HIGHWAY) AND CHENANGO (HEAVY AND HIGHWAY)) FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY
$42.29 $30.66 $72.95
ELECTRICIAN Building
ELEC1249-010 (LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS): FLAGMAN (BROOME (BUILDING, HEAVY, AND HIGHWAY) AND CHENANGO (HEAVY AND HIGHWAY)) INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY
$31.72 $29.87 $61.59
ELECTRICIAN Residential
ELEC0910-007
$43.50 $28.38 $71.88
ELECTRICIAN CHENANGO Building
ELEC0043-003 (TWPS OF COLUMBUS, NEW BERLIN & SHERBURNE): HEAVY AND HIGHWAY
$50.50 $35.03 $85.53
ELECTRICIAN LINE CONSTRUCTION Building
ELEC1249-011 (SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES), PIPETYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE INSTALLATION): GROUNDMAN TRUCK DRIVER (TRACTOR-TRAILER UNIT) BROOME (BUILDING, HEAVY, AND HIGHWAY) AND CHENANGO (HEAVY AND HIGHWAY) PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY
$52.33 $31.36 $83.69
ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND MAN TRUCK DRIVER BROOME Building
ELEC1249-011 (BUILDING, HEAVY, AND HIGHWAY) AND CHENANGO (HEAVY AND HIGHWAY) PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY
$49.25 $31.15 $80.40
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER BROOME Building
ELEC1249-012 (BUILDING, HEAVY, AND HIGHWAY) AND CHENANGO (HEAVY AND HIGHWAY) A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY
$40.81 $6.99 $47.80
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN BROOME Building
ELEC1249-012 (BUILDING, HEAVY, AND HIGHWAY) AND CHENANGO (HEAVY AND HIGHWAY) A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY
$20.53 $6.39 $26.92
ELECTRICIAN, INCLUDES LOW VOLTAGE WIRING Building
SUNY2017-005
$35.95 $24.71 $60.66
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER Building
ELEC1249-011 (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation)
$64.59 $42.92 $107.51
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER Building
ELEC1249-011 (Substation:)
$63.14 $42.82 $105.96
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN Building
ELEC1249-011 (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation)
$35.34 $30.12 $65.46
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN Building
ELEC1249-011 (Substation:)
$35.34 $30.12 $65.46
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN Building
ELEC1249-011 (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)
$35.34 $30.12 $65.46
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR Building
ELEC1249-011 (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cab
$55.40 $31.78 $87.18
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR Building
ELEC1249-011 (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)
$55.40 $31.78 $87.18
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Substation:) Building
ELEC1249-011
$55.40 $31.78 $87.18
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER Building
ELEC1249-011 (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)
$49.25 $31.15 $80.40
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER Building
ELEC1249-011 (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installat
$49.25 $31.15 $80.40
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER Building
ELEC1249-011 (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)
$49.25 $31.15 $80.40
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Substation:) Building
ELEC1249-011
$49.25 $31.15 $80.40
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN Building
ELEC1249-011 (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable ins
$61.56 $36.21 $97.77
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:) Building
ELEC1249-011
$61.56 $36.21 $97.77
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC Building
ELEC1249-011 (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation)
$49.25 $31.15 $80.40
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC Building
ELEC1249-011 (Substation:)
$49.25 $31.15 $80.40
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC Building
ELEC1249-011 (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)
$49.25 $31.15 $80.40
ELEVATOR MECHANIC Building
ELEV0035-004
$57.73 $38.44 $96.17
ELEVATOR MECHANIC BROOME Building
ELEV0062-003 (BUILDING, HEAVY, AND HIGHWAY) AND CHENANGO (HEAVY AND HIGHWAY) REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY
$58.44 $38.44 $96.88
GLAZIER Building
PAIN0677-003 Scope differs by code/WD
$30.00 $31.95 $61.95
GLAZIER Building
PAIN0677-006 Scope differs by code/WD
$27.90 $27.50 $55.40
INSTALLER - METAL STUD Building
CARP0279-012
$44.72 $31.23 $75.95
IRONWORKER, REINFORCING Building
IRON0417-002
$42.63 $53.70 $96.33
IRONWORKER, STRUCTURAL Building
IRON0417-002
$42.63 $53.70 $96.33
IRONWORKER: ORNAMENTAL Building
IRON0006-007
$35.49 $32.30 $67.79
IRONWORKER: STRUCTURAL, ORNAMENTAL, RODMEN, REINFORCEMENT, RIGGER, MACHINERY MOVER, FENCE ERECTOR, STONE DERRICKMAN Building
IRON0440-003 (CHENANGO (TWPS. OF COLUMBUS, NEW BERLIN, NORTH NORWICH, PLYMOUTH, SHERBURNE AND SMYRNA):)
$35.50 $31.39 $66.89
LABORER LABORER HEAVY AND HIGHWAY: GROUP 1 LABORERS, FLAGGERS, OUTBOARD AND HAND BOATS Building
LABO0785-012 (BROOME; CHENANGO (REMAINDER OF COUNTIES))
$35.56 $25.60 $61.16
LABORER LABORER HEAVY AND HIGHWAY: GROUP 3 ALL ROCK OR DRILLING MACHINE OPERATORS Building
LABO0785-012 (EXCEPT QUARRY MASTER AND SIMILAR TYPE), ACETYLENE TORCH OPERATORS AND ASPHALT PAVER, POWDERMAN (BROOME; CHENANGO (REMAINDER OF COUNTIES))
$35.96 $25.60 $61.56
LABORER LABORER HEAVY AND HIGHWAY: GROUP 4 BLASTERS, FORM SETTERS, STONE OR GRANITE CURB SETTERS (BROOME; CHENANGO (REMAINDER OF COUNTIES)) Building
LABO0785-012
$36.16 $25.60 $61.76
LABORER LABORER HEAVY AND HIGHWAY: GROUP 5 ASBESTOS AND HAZARDOUS WASTE REMOVAL Building
LABO0785-012 (BROOME; CHENANGO (REMAINDER OF COUNTIES))
$38.76 $25.60 $64.36
LABORER LABORERS BUILDING: GROUP 1 COMMON LABORERS BROOME (REMAINDER OF COUNTY) Building
LABO0785-013
$26.50 $22.46 $48.96
LABORER LABORERS BUILDING: GROUP 2 MASONRY FORKLIFTS, BOB CATS, ROCK DRILLING EQUIPMENT AND BLASTERS BROOME (REMAINDER OF COUNTY) Building
LABO0785-013
$28.50 $22.46 $50.96
LABORER LABORERS BUILDING: GROUP 3 ASBESTOS AND HAZARDOUS WASTE REMOVAL BROOME Building
LABO0785-013 (REMAINDER OF COUNTY)
$28.50 $22.46 $50.96
LABORER: COMMON OR GENERAL Residential
SUNY2013-005
$15.54 0.00 $15.54
LABORER: COMMON OR GENERAL Building
SUNY2017-005
$28.07 $21.08 $49.15
LABORER: MASON TENDER - CEMENT/CONCRETE Residential
SUNY2013-005
$16.00 $10.45 $26.45
LABORER: MASON TENDER - CEMENT/CONCRETE Building
LABO0633-010
$28.27 $22.20 $50.47
MARBLE MASONS, TILE LAYERS, AND TERRAZZO WORKERS: BRICKLAYERS, CEMENT MASONS, STONE MASONS, POINTERS, CAULKERS AND CLEANERS: BUILDING CONSTRUCTION, BROOME COUNTY (BINGHAMTON CHAPTER) Building
BRNY0003-002
$34.34 $28.46 $62.80
MARBLE MASONS, TILE LAYERS, AND TERRAZZO WORKERS: CEMENT MASONS: HEAVY AND HIGHWAY CONSTRUCTION, BROOME & CHENANGO COUNTIES (BINGHAMTON CHAPTER) Building
BRNY0003-002
$38.63 $25.05 $63.68
MARBLE, TILE AND TERRAZZO FINISHERS: BUILDING CONSTRUCTION, BROOME COUNTY (BINGHAMTON CHAPTER) Building
BRNY0003-002
$34.34 $28.46 $62.80
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE Residential
SUNY2013-005
$27.59 0.00 $27.59
OPERATOR: BOBCAT/SKID STEER/SKID LOADER Residential
SUNY2013-005
$27.74 0.00 $27.74
OPERATOR: BOBCAT/SKID STEER/SKID LOADER Building
SUNY2017-005
$41.10 $19.26 $60.36
OPERATOR: BULLDOZER Residential
SUNY2013-005
$21.72 0.00 $21.72
PAINTER (BRUSH AND ROLLER) Residential
SUNY2013-005
$18.47 0.00 $18.47
PAINTER (BRUSH AND ROLLER) Building
SUNY2017-005
$25.37 $19.91 $45.28
PAINTER (SPRAY) Building
PAIN0038-004
$28.35 $25.21 $53.56
PAINTERS: Building
PAIN0004-056 (SWING SCAFFOLD, BOATSWAIN CHAIR, SPRAY, SANDBLASTING, STEAM CLEANING, ACID AND HIGH PRESSURE WATER, PAPERHANGERS, VINYL HANGERS, POWER GRINDERS W/RESPIRATOR)
$28.10 $23.83 $51.93
PAINTERS: (EPOXY-BRUSH & ROLLER) Building
PAIN0004-056
$28.60 $23.83 $52.43
PAINTERS: (PAINTERS AND TAPERS) Building
PAIN0004-056
$28.88 $23.83 $52.71
PAINTERS: (SPRAY EPOXY) Building
PAIN0004-056
$29.00 $23.83 $52.83
PAINTERS: (SPRAY WORK/STEEPLE JACK (OVER 100 FT)) Building
PAIN0004-056
$28.50 $23.83 $52.33
PAINTERS: (STRUCTURAL STEEL (BUILDINGS) SPRAY WORK) Building
PAIN0004-056
$28.10 $23.83 $51.93
PIPEFITTER Building
PLUM0022-017
$37.47 $27.40 $64.87
PLUMBER Residential
SUNY2013-005
$24.01 $9.83 $33.84
PLUMBER/PIPEFITTER: SOUTHERN ZONE Building
PLUM0112-010 (BROOME COUNTY (BUILDING, HEAVY, AND HIGHWAY) TOWNSHIPS OF LISLE, TRIANGLE, BARKER, NANTICOKE, NEWARK VALLEY, OWEGO, MAINE, UNION, VESTAL, KIRKWOOD, CONKLIN, CHENANGO, FENTON, COLESVILLE, WINDSOR AND STANFORD CHENANGO COUNTY (HEAVY AND HIGHWAY) TOWNSHIPS OF LINKLAEN, OTSELIC, SMYRNA, SHERBURNE, COLUMBUS, PITCHER, PHARSALIA, PLYMOUTH, NORTH NORWICH, NEW BERLIN, GERMAN, MCDONOUGH, PRESTON, NORWICH, SMITHVILLE, OXFORD, GUILFORD)
$44.91 $33.31 $78.22
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE Building
ENGI0825-001
$60.13 $37.50 $97.63
POWER EQUIPMENT OPERATOR: CRANE Building
ENGI0825-001
$61.72 $37.50 $99.22
POWER EQUIPMENT OPERATORS Building
ENGI0158-019 (HEAVY & HIGHWAY): GROUP 7 MASTER MECHANIC FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY
$58.61 $33.55 $92.16
POWER EQUIPMENT OPERATORS Building
ENGI0158-019 (HEAVY & HIGHWAY): GROUP 6 CRANES 49 TONS AND BELOW FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY
$60.30 $33.55 $93.85
POWER EQUIPMENT OPERATORS Building
ENGI0158-019 (HEAVY & HIGHWAY): GROUP 5 CRANES 50 TONS AND OVER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY
$61.80 $33.55 $95.35
POWER EQUIPMENT OPERATORS Building
ENGI0158-019 (HEAVY & HIGHWAY): GROUP 4 TOWER CRANES FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY
$63.30 $33.55 $96.85
POWER EQUIPMENT OPERATORS Building
ENGI0158-019 (HEAVY & HIGHWAY): GROUP 2 ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PLANT (NONAUTOMATED), BLAST OR ROTARY DRILL (TRUCK OR TRACTOR MOUNTED), BORING MACHINE, CAGE HOIST, CENTRAL MIX PLANT (NONAUTOMATED) AND ALL CONCRETE BATCHING PLANTS, CHERRY PICKER (5 TONS CAPACITY AND UNDER), CONCRETE PAVER (OVER 16S), CRAWLER DRILL, SELF-CONTAINED, CRUSHER, DIESEL POWER UNIT, DRILL RIGS, TRACTOR MOUNTED, FRONT END LOADER (UNDER 4 CU. YD.), GREASEMAN/LUBRICATION ENGINEER, HIPRESSURE BOILER (15 LBS. AND OVER), HOIST (ONE DRUM), HYDRO-AXE, KOLMAN PLANT LOADER AND SIMILAR TYPE LOADERS, L.C.M. WORK BOAT OPERATOR, LOCOMOTIVE MIXER (FOR STABILIZED BASE SELFPROPELLED), MONORAIL MACHINE, PLANT ENGINEER, PROFILER (105 H.P. AND UNDER), GRINDER, POST HOLE DIGGER AND POST DRIVER, POWER BROOM (TOWED), POWER HEATERMAN, POWER SWEEPER, REVINIUS WIDENER, ROLLER (GRADE AND FILL), SCARIFIER, RIDE-ON, SHELL WINDER, SKID STEER LOADER (BOBCAT OR SIMILAR), SPAN-SAW, RIDE-ON, STEAM CLEANER, PUG MILL, PUMP CRETE READY MIX CONCRETE PLANT REFRIGERATION EQUIPMENT (FOR SOIL STABILIZATION)ROAD WIDENER, ROLLER (ALL ABOVE SUBGRADE), SEA MULE, SELF-CONTAINED RIDE-ON ROCK DRILL, EXCLUDING AIR-TRACK TYPE DRILL, SKIDDER, TRACTOR WITH DOZER AND/OR PUSHER, TRENCHER. TUGGER HOIST, VERMEER SAW (RIDE ON, ANY SIZE OR TYPE), WINCH, WINCH CAT FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY
$56.39 $33.55 $89.94
POWER EQUIPMENT OPERATORS Building
ENGI0158-019 (HEAVY & HIGHWAY): GROUP 1 ASPHALT CURB MACHINE, SELF PROPELLED, SLIPFORM, AUTOMATED CONCRETE SPREADER (CMI TYPE), AUTOMATIC FINE GRADER, BACKHOE (EXCEPT TRACTOR MOUNTED, RUBBER TIRED), BACKHOE EXCAVATOR FULL SWING (CAT 212 OR SIMILAR TYPE), BACK FILLING MACHINE, BELT PLACER (CMI TYPE), BLACKTOP PLANT (AUTOMATED), BOOM TRUCK , CABLEWAY, CAISSON AUGER, CENTRAL MIX CONCRETE PLANT (AUTOMATED), CONCRETE CURB MACHINE, SELF PROPELLED, SLIPFORM, CONCRETE PUMP, CRANE, CHERRY PICKER, DERRICKS (STEEL ERECTION), DRAGLINE, OVERHEAD CRANE (GANTRY OR STRADDLE TYPE), PILE DRIVER, TRUCK CRANE, DIRECTIONAL DRILLING MACHINE, DREDGE, DUAL DRUM PAVER, EXCAVATOR (ALL PURPOSE HYDRAULICALLY OPERATED) (GRADALL OR SIMILAR), FRONT END LOADER ( 4 CU. YD. AND OVER), HEAD TOWER (SAUERMAN OR EQUAL), HOIST (TWO OR THREE DRUM), HOLLAND LOADER, MAINTENANCE ENGINEER, MINE HOIST, MUCKING MACHINE OR MOLE PAVEMENT BREAKER(SP) WERTGEN; PB-4 AND SIMILAR TYPE, POWER GRADER, PROFILER (OVER 105 H.P.) QUAD 9, QUARRY MASTER (OR EQUIVALENT), SCRAPER, FIREMAN, FORM TAMPER, GROUT PUMP, GUNITE MACHINE, HAMMERS (HYDRAULIC SELF-PROPELLED), HYDRA-SPIKER, RIDE-ON, HYDRAULIC PUMP (JACKING SYSTEM), HYDRO-BLASTER (WATER), MULCHING MACHINE, OILER, PARAPET CONCRETE OR PAVEMENT, SHOVEL, SIDE BOOM, SLIP FORM PAVER, TRACTOR DRAWN, BELTTYPE LOADER, TRUCK OR TRAILER MOUNTED LOG , CHIPPER (SELF FEEDER), TUG OPERATOR (MANNED RENTED EQUIPMENT EXCLUDED), TUNNEL SHOVEL MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY
$57.30 $33.55 $90.85
POWER EQUIPMENT OPERATORS: GROUP 3 Building
ENGI0158-019
$53.82 $33.55 $87.37
POWER EQUIPMENT OPERATORS: GROUP A Building
ENGI0158-005 (1) CRANE, HYDRAULIC CRANES, TOWER CRANE, LOCOMOTIVE CRANE, PILEDRIVER, CABLEWAY, DERRICKS, WHIRLIES, DRAGLINE, BOOM TRUCKS OVER 5 TONS BROOME COUNTY (BUILDING) HAZARDOUS WORK- ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $3.00 PER HOUR OVER REGULAR RATE. FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY
$51.71 $32.80 $84.51
POWER EQUIPMENT OPERATORS:, BUILDING: GROUP A SHOVEL, ALL EXCAVATORS Building
ENGI0158-005 (INCLUDING RUBBER TIRE, FULL SWING), GRADALLS, POWER ROAD GRADER ALL CMI EQUIPMENT, FRONT-END RUBBER TIRE LOADER, TRACTOR-MOUNTED DRILL (QUARRY MASTER), MUCKING MACHINE, CONCRETE CENTRAL MIX PLANT, CONCRETE PUMP, BELCRETE SYSTEM, AUTOMATED ASPHALT CONCRETE PLANT, TRACTOR ROAD PAVER, BOOM TRUCKS 5 TONS AND UNDER, MAINTENANCE ENGINEER, SELF CONTAINED CRAWLER DRILL-HYDRAULIC ROCK DRILL. (BROOME COUNTY) HAZARDOUS WORK- ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $3.00 PER HOUR OVER REGULAR RATE. FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY
$49.31 $32.80 $82.11
POWER EQUIPMENT OPERATORS:, BUILDING: GROUP B BACKHOES Building
ENGI0158-005 (RUBBER TIRED BACKHOE/LOADER COMBINATION), BULLDOZER, PUSHCAT, TRACTOR, TRAXCAVATOR, SCRAPER, LETOURNEAU GRADER, FORM FINE GRADER, ROAD ROLLER, BLACKTOP ROLLER, BLACKTOP SPREADER, POWER BROOMS, SWEEPERS, TRENCHING MACHINE, BARBER GREEN LOADER, SIDE BOOMS, HYDRO HAMMER, CONCRETE SPREADER, CONCRETE FINISHING MACHINE, ONE DRUM HOIST, POWER HOISTING (SINGLE DRUM), HOIST TWO DRUM OR MORE, THREE DRUM ENGINE, POWER HOISTING (TWO DRUM AND OVER), TWO DRUM AND SWINGING ENGINE, THREE DRUM SWINGING ENGINE, HOD HOIST, A-L FRAME WINCHES, CORE AND WELL DRILLERS (ONE DRUM), POST HOLE DIGGER, MODEL CHB VIBROTAMP OR SIMILAR MACHINE, BATCH BIN AND PLANT OPERATOR, DINKEY LOCOMOTIVE, SKID STEER LOADER, TRACK EXCAVATOR 5/8 CU. YD. OR SMALLER. (BROOME COUNTY) HAZARDOUS WORK- ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $3.00 PER HOUR OVER REGULAR RATE. FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY
$48.85 $32.80 $81.65
RECEIVERS; GREASERS; TRUCK TIREMEN FOOTNOTES: TRUCK DRIVERS: GROUP 1 Building
TEAM0317-009 (HEAVY & HIGHWAY) PICKUPS; PANEL TRUCKS; FLATBOY MATERIAL TRUCKS (STRAIGHT JOBS); SINGLE-AXLE DUMP TRUCKS; DUMPSTERS; A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAYS
$37.27 $29.29 $66.56
ROOFER Building
ROOF0203-004 ( BROOME (BUILDING, HEAVY, AND HIGHWAY) AND CHENANGO (HEAVY AND HIGHWAY)
$30.50 $19.84 $50.34
ROOFER Residential
SUNY2013-005
$16.61 0.00 $16.61
ROOFER Building
ROOF0008-006 Scope differs by code/WD
$50.25 $39.62 $89.87
SHEET METAL WORKER (BROOME COUNTY) Building
SHEE0112-003
$35.94 $20.89 $56.83
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) Residential
SUNY2013-005
$17.41 $2.46 $19.87
SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION: PROJECTS OVER $10 MILLION Building
SHEE0058-002 (CHENANGO COUNTY (HEAVY AND HIGHWAY):)
$46.29 $23.31 $69.60
SHEETMETAL WORKER Building
SHEE0058-002 (HVAC DUCT INSTALLATION ONLY): PROJECTS WITH SHEETMETAL WORK CONTRACTS TOTALLING HIGHWAY):)
$36.29 $23.31 $59.60
SOFT FLOOR LAYER (HARDWOOD FLOORS) Building
CARP0277-031
$28.90 $21.63 $50.53
SPRINKLER FITTER BROOME Building
SFNY0669-005 (BUILDING, HEAVY, AND HIGHWAY) AND CHENANGO (HEAVY AND HIGHWAY)
$45.06 $30.71 $75.77
TILE SETTER Building
BRNY0003-020
$30.69 $20.91 $51.60
TRUCK DRIVERS: GROUP 4 Building
TEAM0317-009 (HEAVY & HIGHWAY) SPECIALIZED EARTH MOVING EQUIPMENT - EUCLID TYPE OR SIMILAR OFF-HIGHWAY EQUIPMENT, WHERE NOT SELF LOADED; STRADDLE (ROSS) CARRIER; SELF CONTAINED CONCRETE UNIT FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAYS
$37.47 $29.29 $66.76
TRUCK DRIVERS: GROUP 5 Building
TEAM0317-009 (HEAVY & HIGHWAY) OFF-HIGHWAY TANDEM BACK-DUMP; TWIN ENGINE EQUIPMENT AND DOUBLE HITCHED EQUIPMENT WHERE NOT SELF LOADED MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAYS
$37.47 $29.29 $66.76
VEHICLES; TRUCK MECHANIC; FUEL TRUCK FOOTNOTES: TRUCK DRIVERS: GROUP 2 Building
TEAM0317-009 (HEAVY & HIGHWAY) TANDEMS; BATCH TRUCKS MECHANICS FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAYS
$37.27 $29.29 $66.56
VEHICLES; TRUCK MECHANIC; FUEL TRUCK FOOTNOTES: TRUCK DRIVERS: GROUP 3 Building
TEAM0317-009 (HEAVY & HIGHWAY) SEMI-TRAILERS; LOW-BOY TRUCKS; ASPHALT DISTRIBUTORS TRUCKS; AGITATOR; MIXER TRUCKS AND DUMPCRETE TYPE A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAYS
$37.27 $29.29 $66.56

Wage Determinations

Heavy

7 trades

Applies to

Albany, Allegany, Bronx, Broome, Cattaraugus, Cayuga, Chautauqua, Chemung, Chenango, Clinton +52 more

Building, Heavy, Highway

71 trades

Applies to

Broome, Chenango

Residential

12 trades

Applies to

Cayuga, Chenango, Cortland, Delaware, Otsego, Sullivan