NY20260001
rev 2Heavy
7 trades
Applies to
Albany, Allegany, Bronx, Broome, Cattaraugus, Cayuga, Chautauqua, Chemung, Chenango, Clinton +52 more
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Get an email when wage determinations covering Onondaga County, New York are modified.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Click a row to save its rate for later, then export your selections from the Saved panel.
| Save | Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR Building ASBE0030-003 (DUCT, PIPE, & MECHANICAL SYSTEM INSULATION) | $43.25 | $27.29 | $70.54 | |
| BRICKLAYER Building BRNY0002-021 (INCLUDES POINTING, CAULKING, AND CLEANING) | $33.16 | $19.77 | $52.93 | |
| BRICKLAYER Residential BRNY0003-001 | $25.38 | $12.02 | $37.40 | |
| BRICKLAYER, CEMENT MASONS Heavy BRNY0002-016 (SYRACUSE CHAPTER) 4TH, LABOR DAY, THANKGIVING DAY (PROVIDED THE EMPLOYEE IS EMPLOYED (1) DAY BEFORE AND (1) DAY AFTER THE HOLIDAY | $38.63 | $25.05 | $63.68 | |
| CARPENTER Heavy CARP0277-004 | $39.52 | $27.16 | $66.68 | |
| CARPENTER Building CARP0277-024 (INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION) | $32.99 | $21.92 | $54.91 | |
| CARPENTER, INCLUDES BATT INSULATION Residential SUNY2013-014 | $20.00 | $2.72 | $22.72 | |
| CEMENT MASON/CONCRETE FINISHER Building SUNY2016-003 | $34.53 | $15.59 | $50.12 | |
| CEMENT MASON/CONCRETE FINISHER Residential SUNY2013-014 | $21.73 | $14.28 | $36.01 | |
| DREDGING: CLASS A1: DECK CAPTAIN; MECHANICAL DREDGE OPERATOR, LEVERMAN, LICENSED TUG OPERATOR OVER 1000 HP. INCENTIVE PAY: Heavy ENGI0025-001 (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 FOOTNOTES APPLICABLE TO ABOVE CRAFTS: A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED | $48.48 | $15.34 | $63.82 | |
| DREDGING: CLASS A2: CRANE OPERATOR Heavy ENGI0025-001 (360 SWING) INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 FOOTNOTES APPLICABLE TO ABOVE CRAFTS: A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED | $43.20 | $14.99 | $58.19 | |
| DREDGING: CLASS B1: DERRICK OPERATOR Heavy ENGI0025-001 (180 SWING), SPIDER/SPILL BARGE OPERATOR, ENGINEER, ELECTRICIAN, CHIEF WELDER, CHIEF MATE, FILL PLACER, OPERATOR II, MAINTENANCE ENGINEER, LICENSED BOAT OPERATOR, LICENSED CREW BOAT OPERATOR. INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED | $41.93 | $14.90 | $56.83 | |
| DREDGING: CLASS B2: CERTIFIED WELDER. INCENTIVE PAY: Heavy ENGI0025-001 (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED | $39.46 | $14.73 | $54.19 | |
| DREDGING: CLASS C1: MATE, DRAG BARGE OPERATOR, ASSISTANT FILL PLACER, WELDER, STEWARD. INCENTIVE PAY: Heavy ENGI0025-001 (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 FOOTNOTES APPLICABLE TO ABOVE CRAFTS: A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED | $38.38 | $14.66 | $53.04 | |
| DREDGING: CLASS C2: BOAT OPERATOR. INCENTIVE PAY: Heavy ENGI0025-001 (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED | $37.15 | $14.57 | $51.72 | |
| DREDGING: CLASS D: OILER, DECKHAND, SHOREMAN, RODMAN, SCOWMAN, COOK, MESSMAN, PORTER/JANITOR. INCENTIVE PAY: Heavy ENGI0025-001 (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 FOOTNOTES APPLICABLE TO ABOVE CRAFTS: A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED | $30.86 | $14.15 | $45.01 | |
| DRYWALL FINISHER/TAPER Building PAIN0031-003 | $23.25 | $21.21 | $44.46 | |
| ELECTRICIAN Heavy ELEC0043-007 (ALL OF ONONDAGA COUNTY EXCEPT ELBRIDGE AND SKANEATELES) | $50.50 | $35.03 | $85.53 | |
| ELECTRICIAN Heavy ELEC0840-004 (REMAINDER OF ONONDAGA COUNTY (ELBRIDGE AND SKANCATELES)) | $45.00 | $31.12 | $76.12 | |
| ELECTRICIAN Building ELEC0043-012 (INCLUDES LOW VOLTAGE WIRING AND INSTALLATION OF ALARMS, HVAC/TEMPERATURE CONTROLS AND SOUND AND COMMUNICATION SYSTEMS) | $50.50 | $35.03 | $85.53 | |
| ELECTRICIAN Residential ELEC0910-008 | $28.28 | $18.26 | $46.54 | |
| ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER Heavy ELEC1249-004 (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) | $64.59 | $42.92 | $107.51 | |
| ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER Heavy ELEC1249-004 (Substation:) | $63.14 | $33.82 | $96.96 | |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN Heavy ELEC1249-004 (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) | $35.34 | $30.12 | $65.46 | |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN Heavy ELEC1249-004 (Substation:) | $35.34 | $30.12 | $65.46 | |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN Heavy ELEC1249-004 (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | $35.34 | $30.12 | $65.46 | |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR Heavy ELEC1249-004 (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cab | $55.40 | $31.78 | $87.18 | |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR Heavy ELEC1249-004 (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | $55.40 | $31.78 | $87.18 | |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Substation:) Heavy ELEC1249-004 | $55.40 | $31.78 | $87.18 | |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER Heavy ELEC1249-004 (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | $49.25 | $31.15 | $80.40 | |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER Heavy ELEC1249-004 (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installat | $49.25 | $31.15 | $80.40 | |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER Heavy ELEC1249-004 (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | $49.25 | $31.15 | $80.40 | |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Substation:) Heavy ELEC1249-004 | $49.25 | $31.15 | $80.40 | |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN Heavy ELEC1249-004 (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable ins | $61.56 | $36.21 | $97.77 | |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:) Heavy ELEC1249-004 | $61.56 | $36.21 | $97.77 | |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC Heavy ELEC1249-004 (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) | $49.25 | $31.15 | $80.40 | |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC Heavy ELEC1249-004 (Substation:) | $49.25 | $31.15 | $80.40 | |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC Heavy ELEC1249-004 (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | $49.25 | $31.15 | $80.40 | |
| GLAZIER Heavy SUNY1996-001 | $12.01 | $0.52 | $12.53 | |
| GLAZIER Building PAIN0677-005 | $30.00 | $27.59 | $57.59 | |
| IRONWORKER, ORNAMENTAL A) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING Residential IRON0417-004 (UNPAID), CHRISTMAS DAY | $42.63 | $53.70 | $96.33 | |
| IRONWORKER, ORNAMENTAL, REINFORCING AND STRUCTURAL Building IRON0060-014 | $37.16 | $30.68 | $67.84 | |
| IRONWORKER, REINFORCING Residential SUNY2013-014 | $27.06 | $23.02 | $50.08 | |
| IRONWORKER, STRUCTURAL Residential IRON0033-019 | $35.75 | $30.80 | $66.55 | |
| LABORER GROUP 3 ALL ROCK OR DRILL MACHINE OPERATORS Heavy LABO0633-004 (EXCEPT QUARRY MASTER AND SIMILAR TYPE), ACETYLENE TORCH OPERATORS, ASPHALT RAKER, POWDERMAN. INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $36.71 | $25.70 | $62.41 | |
| LABORER: ASBESTOS ABATEMENT Building SUNY2016-003 (REMOVAL FROM FLOORS, WALLS, & CEILINGS) | $29.18 | $17.72 | $46.90 | |
| LABORER: ASBESTOS ABATEMENT Residential SUNY2013-014 (REMOVAL FROM FLOORS, WALLS, & CEILINGS) | $16.83 | 0.00 | $16.83 | |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR Building SUNY2016-003 | $20.89 | $10.46 | $31.35 | |
| LABORER: COMMON OR GENERAL Building LABO0633-008 | $29.88 | $22.90 | $52.78 | |
| LABORER: COMMON OR GENERAL Residential SUNY2013-014 | $13.24 | $0.62 | $13.86 | |
| LABORER: MASON TENDER - BRICK Residential SUNY2013-014 | $18.03 | 0.00 | $18.03 | |
| LABORER: MASON TENDER - CEMENT/CONCRETE Residential SUNY2013-014 | $19.69 | 0.00 | $19.69 | |
| LABORER: PIPELAYER Building SUNY2016-003 | $20.47 | 0.00 | $20.47 | |
| MILLWRIGHT Building CARP1163-003 | $30.20 | $23.83 | $54.03 | |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE Residential SUNY2013-014 | $23.35 | 0.00 | $23.35 | |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER Building SUNY2016-003 | $36.17 | $17.76 | $53.93 | |
| OPERATOR: BULLDOZER Building SUNY2016-003 | $31.03 | $20.05 | $51.08 | |
| OPERATOR: BULLDOZER Residential SUNY2013-014 | $20.80 | 0.00 | $20.80 | |
| OPERATOR: FORKLIFT Building SUNY2016-003 | $33.14 | $21.04 | $54.18 | |
| OPERATOR: LOADER Residential SUNY2013-014 | $27.88 | $21.40 | $49.28 | |
| OPERATOR: PAVER Building SUNY2016-003 (ASPHALT, AGGREGATE, AND CONCRETE) | $30.19 | $17.42 | $47.61 | |
| OPERATOR: ROLLER Building SUNY2016-003 | $28.51 | $12.31 | $40.82 | |
| PAINTER Residential PAIN0031-001 ((BRUSH AND ROLLER), EXCLUDES DRYWALL FINISHING/TAPING) | $23.25 | $21.21 | $44.46 | |
| PAINTER (DRYWALL FINISHING/TAPING ONLY) Residential SUNY2013-014 | $19.91 | 0.00 | $19.91 | |
| PAINTER: BRUSH AND ROLLER Building PAIN0031-003 | $23.25 | $21.21 | $44.46 | |
| PAINTERS: (BRIDGES) Heavy PAIN0004-020 | $42.06 | $30.59 | $72.65 | |
| PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION) Building PLUM0267-014 | $35.51 | $24.57 | $60.08 | |
| PLUMBER Building PLUM0267-014 | $35.51 | $24.57 | $60.08 | |
| PLUMBER, INCLUDES HVAC UNIT INSTALLATION Residential SUNY2013-014 | $19.84 | $5.70 | $25.54 | |
| PLUMBER, PIPEFITTER, STEAMFITTER Heavy PLUM0267-002 (INCLUDING HVAC WORK) | $35.51 | $24.57 | $60.08 | |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE Building ENGI0158-002 | $48.11 | $31.85 | $79.96 | |
| POWER EQUIPMENT OPERATOR: CRANE Building ENGI0158-002 | $49.61 | $31.85 | $81.46 | |
| POWER EQUIPMENT OPERATORS: GROUP 1 Heavy ENGI0158-021 (TUNNEL AND SHAFT) AUTOMATED CONCRETE SPREADER (CMI OR EQUIVALENT), AUTOMATED FINE GRADE MACHINE (CMI), BACKHOE, BELT PLACER (CMI OR SIMILAR), BLACKTOP SPREADER (AUTOMATED), CABLEWAY, CAISSON AUGER, CENTRAL MIX PLANT (AUTOMATED), CHERRY PICKER (5 TONS), CONCRETE CURB MACHINE (SELF PROPELLED SLIPFORM), CONCRETE PUMP, CRANE; CRANE, SHAFT; CRANE, UNDERGROUND; CRANES AND DERRICKS (STEEL ERECTION), DRAGLINE, DREDGE, DUAL DRUM PAVER, EXCAVATOR (ALL PURPOSE-HYDRAULICLLY OPERATED GRADALL OR SIMILAR), FORK LIFT (FACTOR RATED 15"" AND OVER), FRONT END LOADER (4 CU. YD. AND OVER), HEAD TOWER (SAUERMAN OR EQUAL); HOIST, SHAFT; HOIST (TWO OR THREE DRUM), HOLLAND LOADER, MAINTENANCE ENGINEER (SHAFT AND TUNNEL), MINE HOIST, MINING MACHINE (MOLE AND SIMILAR TYPES), MUCKING MACHINE OR MOSE OVERHEAD CRANE (GANTRY OR STRADDLE TYPE), PILE DRIVER, POWER GRADER, QUAD 9, QUARRY MASTER (OR EQUIVALENT), SCRAPER, SHOVEL, SIDE BOOM, SLIP FORM PAVER, TRIPPER/MAINTENANCE ENGINEER (SHAFT AND TUNNEL), TRACTOR DRAWN BELT-TYPE LOADER, TRUCK CRANE, TRUCK ENGINEER (SHAFT AND TUNNEL), TRACTOR DRAWN BELT-TYPE LOADER, TRUCK CRANE, TRUCK OR TRAILER MOUNTED LOG CHIPPER (SELF FEEDER), TUG OPERATOR (MANNED RENTED EQUIPMENT EXCLUDED), TUNNEL SHOVEL NOTE: HAZMAT PREMIUM 5.00 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED THE WORKING DAY BEFORE THE HOLIDAY AND THE WORKING DAY AFTER THE HOLIDAY | $44.74 | $27.65 | $72.39 | |
| POWER EQUIPMENT OPERATORS: GROUP 1 ASPHALT CURB MACHINE, SELF PROPELLED, SLIPFORM, AUTOMATED CONCRETE SPREADER Heavy ENGI0158-020 (CMI TYPE), AUTOMATIC FINE GRADER, BACKHOE (EXCEPT TRACTOR MOUNTED, RUBBER TIRED), BACKHOE EXCAVATOR FULL SWING (CAT 212 OR SIMILAR TYPE), BACK FILLING MACHINE, BELT PLACER (CMI TYPE), BLACKTOP PLANT (AUTOMATED), BOOM TRUCK , CABLEWAY, CAISSON AUGER, CENTRAL MIX CONCRETE PLANT (AUTOMATED), CONCRETE CURB MACHINE, SELF PROPELLED, SLIPFORM, CONCRETE PUMP, CRANE, CHERRY PICKER, DERRICKS (STEEL ERECTION), DRAGLINE, OVERHEAD CRANE (GANTRY OR STRADDLE TYPE), PILE DRIVER, TRUCK CRANE, DIRECTIONAL DRILLING MACHINE, DREDGE, DUAL DRUM PAVER, EXCAVATOR (ALL PURPOSE HYDRAULICALLY OPERATED) (GRADALL OR SIMILAR), FRONT END LOADER ( 4 CU. YD. AND OVER), HEAD TOWER (SAUERMAN OR EQUAL), HOIST (TWO OR THREE DRUM), HOLLAND LOADER, MAINTENANCE ENGINEER, MINE HOIST, MUCKING MACHINE OR MOLE PAVEMENT BREAKER(SP) WERTGEN; PB-4 AND SIMILAR TYPE, POWER GRADER, PROFILER (OVER 105 H.P.) QUAD 9, QUARRY MASTER (OR EQUIVALENT), SCRAPER, FIREMAN, FORK LIFT, FORM TAMPER, GROUT PUMP, GUNITE MACHINE, HAMMERS (HYDRAULIC SELF-PROPELLED), HYDRA-SPIKER, RIDE-ON, HYDRAULIC PUMP (JACKING SYSTEM), HYDRO-BLASTER (WATER), MULCHING MACHINE, OILER, PARAPET CONCRETE OR PAVEMENT, SHOVEL, SIDE BOOM, SLIP FORM PAVER, TRACTOR DRAWN, BELTTYPE LOADER, TRUCK OR TRAILER MOUNTED LOG , CHIPPER (SELF FEEDER), TUG OPERATOR (MANNED RENTED EQUIPMENT EXCLUDED), TUNNEL SHOVEL INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE EMPLOYEE HAS WORKED THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $55.85 | $33.40 | $89.25 | |
| POWER EQUIPMENT OPERATORS: GROUP 2 Heavy ENGI0158-021 (TUNNEL AND SHAFT) AUTOMATED CENTRAL MIX CONCRETE PLANT, BACKHOE (TOP SIDE), BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITIMINOUS SPREADER AND MIXER, BLACKTOP PLANT (NONAUTOMATED), BLAST OR ROTARY DRILL (TRUCK OR TRACTOR MOUNTED), BORING MACHINE, CAGE HOIST, CENTRAL MIX PLANT (NON AUTOMATED) AND ALL CONCRETE BATCHING PLANTS, CHERRY PICKER (5 TONS CAPACITY AND UNDER), COMPRESSORS (4 OR LESS EXCEEDING 2000 C.F.M. COMBINED CAPACITY, CONCRETE PAVER (OVER 16S), CONCRETE PUMP, CRANE (TOPSIDE), CRUSHER, DIESEL POWER UNIT, DRILL RIGS, TRACTOR MOUNTED, FRONT END LOADER (UNDER 4 CU. YDS), GRAYCO EPOXY MACHINE, HI-PRESSURE BOILER (15 LBS AND OVER), HOIST (ONE DRUM) HOIST (ONE DRUM) HOIST, TWO OR HTREE DRUM (TOPSIDE), KOLMAN PLANT LOADER AND SIMILAR TYPE LOADERS, L.C.M. WORK BOAT OPERATOR, LOCOMOTIVE, MAINTENANCE ENGINEER (TOPSIDE) MAINTNENACE GREASEMAN, MIXER (FOR STABILIZED BASE SELF-PROPELLED), MONORAIL MACHINE,PLANT ENGINEER, PERSONNEL HOIST, PUMP CRETE, READY MIX CONCRETE PLANT, REFRIGERATION EQUIPMENT (FOR SOIL STABILIZATION), ROAD WIDENER, ROLLER (ALL ABOVE SUB-GRADE),SEA MULE, SHOTCRETE MACHINE, SHOVEL (TOPSIDE), TRACTOR WITH DOZER AND OR PUSHER, TRENCHER, TUGGER HOIST, TUNNEL LOCOMOTIVE, WELDER, WINCH, WINCH CAT NOTE: HAZMAT PREMIUM 5.00 MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED THE WORKING DAY BEFORE THE HOLIDAY AND THE WORKING DAY AFTER THE HOLIDAY | $43.52 | $27.65 | $71.17 | |
| POWER EQUIPMENT OPERATORS: GROUP 2 ASPHALT PAVER, BACKHOE Heavy ENGI0158-020 (TRACTOR MOUNTED, RUBBER TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PLANT (NONAUTOMATED), BLAST OR ROTARY DRILL (TRUCK OR TRACTOR MOUNTED), BORING MACHINE, CAGE HOIST, CENTRAL MIX PLANT (NONAUTOMATED) AND ALL CONCRETE BATCHING PLANTS, CHERRY PICKER (5 TONS CAPACITY AND UNDER), CONCRETE PAVER (OVER 16S), CRAWLER DRILL, SELF-CONTAINED, CRUSHER, DIESEL POWER UNIT, DRILL RIGS, TRACTOR MOUNTED, FRONT END LOADER (UNDER 4 CU. YD.), GREASEMAN/LUBRICATION ENGINEER, HIPRESSURE BOILER (15 LBS. AND OVER), HOIST (ONE DRUM), HYDRO-AXE, KOLMAN PLANT LOADER AND SIMILAR TYPE LOADERS, L.C.M. WORK BOAT OPERATOR, LOCOMOTIVE MIXER (FOR STABILIZED BASE SELFPROPELLED), MONORAIL MACHINE, PLANT ENGINEER, PROFILER (105 H.P. AND UNDER), GRINDER, POST HOLE DIGGER AND POST DRIVER, POWER BROOM (TOWED), POWER HEATERMAN, POWER SWEEPER, REVINIUS WIDENER, ROLLER (GRADE AND FILL), SCARIFIER, RIDE-ON, SHELL WINDER, SKID STEER LOADER (BOBCAT OR SIMILAR), SPAN-SAW, RIDE-ON, STEAM CLEANER, PUG MILL, PUMP CRETE READY MIX CONCRETE PLANT REFRIGERATION EQUIPMENT (FOR SOIL STABILIZATION)ROAD WIDENER, ROLLER (ALL ABOVE SUBGRADE), SEA MULE, SELF-CONTAINED RIDE-ON ROCK DRILL, EXCLUDING AIR-TRACK TYPE DRILL, SKIDDER, TRACTOR WITH DOZER AND/OR PUSHER, TRENCHER. TUGGER HOIST, VERMEER SAW (RIDE ON, ANY SIZE OR TYPE), WINCH, WINCH CAT FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE EMPLOYEE HAS WORKED THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $54.97 | $33.40 | $88.37 | |
| POWER EQUIPMENT OPERATORS: GROUP 3 Heavy ENGI0158-020 Scope differs by code/WD | $51.69 | $33.40 | $85.09 | |
| POWER EQUIPMENT OPERATORS: GROUP 3 Heavy ENGI0158-021 (TUNNEL AND SHAFT) A-FRAME TRUCK, BALLAST REGULATOR (RIDE ON), COMPRESSORS (4 NOT TO EXCEED 2000 C.F.M. COMBINED CAPACITY; OR 3 OR LESS WITH MORE THAN 1200 C.F.M. BUT NOT TO EXCEED 2000 C.F.M.); COMPRESSORS (ANY SIZE BUT SUBJECT TO OTHER PROVISIONS FOR COMPRESSORS, DUST COLLECTORS, GENERATORS, PUMPS, WELDING MACHIENS, LIGHT PLANTS (4 OF ANY TYPE OF COMBINATION); CONCRETE PAVEMENT SPREADERS AND FINISHERS, CONVEYOR, DRILL (CORE), DRILL (WELL), ELECTRIC PUMP USED IN CONJUNCTION WITH WELL POINT SYSTEM, FARM TRACTOR WITH ACCESSORIES, FINE GRADE MACHINE, FORK LIFT (UNDER 15 FT), GROUT PUMP OVER 5 CU. FT. (MANUFACTURERS RATING), GUNITE MACHINE, HAMMERS (HYDRAULIC SELF PROPELLED), HYDRA-SPIKER (RIDE ON), HYDRA BLASTER (WATER), HYDRO BLASTER, MOTORIZED FORM CARRIER, POST HOLE DIGGER AND POST DRIVER, POWER SWEEPER, ROLLER (GRADE AND FILL), SCARIFER (RIDE ON), SPAN SAW (RIDE ON), SUBMERSIBLE ELECTRIC PUMP (WHEN USED IN LIEU OF WELL POINTS), TAMPER (RIDE ON), TIE EXTRACTOR (RIDE ON), TIE HANDLER (RIDE ON), TIE INSERTER (RIDE ON), TIE SPACER (RIDE ON), TRACK LINER (RIDE ON), TRACTOR WITH TOWED ACCESSORIES, VIBRATORY COMPACTOR, VIBRO TAMP, WELL POINT NOTE: HAZMAT PREMIUM 5.00 MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED THE WORKING DAY BEFORE THE HOLIDAY AND THE WORKING DAY AFTER THE HOLIDAY | $40.73 | $27.65 | $68.38 | |
| POWER EQUIPMENT OPERATORS: GROUP 4 Heavy ENGI0158-021 (TUNNEL AND SHAFT) AGGREGATE PLANT, BOILER (USED IN CONJUNCTION WITH PRODUCTION), CEMENT AND BIN OPERATOR, COMPRESSORS (3 OR LESS NOT TO EXCEED 1200 C.F.M. COMBINED CAPACITY); COMPRESSORS (ANY SIZE, BUT SUBJECT TO OTHER PROVISIONS FOR COMPRESSORS), DUST COLELCTORS, GENERATORS, PUMPS, WELDING MACHINES, LIGHT PLANTS (3 OR LESS OF ANY TYPE OR COMBINATION); CONCRETE PAVER OR MIXER (16S AND UNDER), CONCRETE SAW (SELF PROPELLED), FIREMAN, FORM TAMPER, GREASEMAN, HYDRAULIC PUMP (JACKING SYSTEM), JUNIOR ENGINEER, LIGHT PLANTS, MULCHING MACHINE, OILDER, PARAPET CONCRETE OR PAVEMENT GRINDER, POWER BROOM (TOWED), POWER HEATERMAN (WHEN USED FOR PRODUCTION), REVINIUS WIDENER, SHELL WINDER, STEAM CLEANER, TRACTOR NOTE: HAZMAT PREMIUM 5.00 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED THE WORKING DAY BEFORE THE HOLIDAY AND THE WORKING DAY AFTER THE HOLIDAY | $37.72 | $27.65 | $65.37 | |
| POWER EQUIPMENT OPERATORS: GROUP 5 Heavy ENGI0158-021 (TUNNEL AND SHAFT) MASTER MECHANIC AND CHIEF TUNNEL ENGINEER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED THE WORKING DAY BEFORE THE HOLIDAY AND THE WORKING DAY AFTER THE HOLIDAY | $47.15 | $27.65 | $74.80 | |
| ROOFER Heavy ROOF0195-001 | $35.80 | $25.99 | $61.79 | |
| ROOFER Building ROOF0195-004 | $35.80 | $25.99 | $61.79 | |
| ROOFER Residential SUNY2013-014 | $15.15 | 0.00 | $15.15 | |
| SHEET METAL WORKER Building SHEE0058-009 (INCLUDING INSTALLATION OF HVAC DUCT, METAL FLASHING, AND SIDING (ALUMINUM, METAL, VINYL)) | $36.29 | $23.31 | $59.60 | |
| SHEET METAL WORKER (PROJECTS 10 MILLION OR LESS) Heavy SHEE0058-001 | $36.29 | $23.31 | $59.60 | |
| SHEET METAL WORKER (PROJECTS OVER $10 MILLION) Heavy SHEE0058-001 | $46.29 | $23.31 | $69.60 | |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION Residential SUNY2013-014 | $17.11 | $2.75 | $19.86 | |
| SPRINKLER FITTER (FIRE SPRINKLERS) Building SFNY0669-003 | $45.06 | $30.71 | $75.77 | |
| SPRINKLER FITTER (FIRE SPRINKLERS) Residential SUNY2013-014 | $18.05 | $1.44 | $19.49 | |
| TILE SETTER Building BRNY0002-020 | $31.81 | $17.50 | $49.31 |
No trade rates match your search and filter selection.
Heavy
Applies to
Albany, Allegany, Bronx, Broome, Cattaraugus, Cayuga, Chautauqua, Chemung, Chenango, Clinton +52 more
Heavy, Highway
Building
Residential