Ontario

3 wage determinations 89 trade rates

Popular Trades In Ontario

Track Ontario County updates

Get an email when wage determinations covering Ontario County, New York are modified.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Trade Rates

Click a row to save its rate for later, then export your selections from the Saved panel.

Same trade names can appear multiple times when classification codes or coverage language differ. Compare the code badge, any italic scope text, and WD reference to identify the right line.
Save Trade & Classification Rate Fringe Total
BRICKLAYER Residential
BRNY0003-001
$25.38 $12.02 $37.40
CARPENTER Residential
CARP0276-020 (EXCLUDES FORM WORK, DRYWALL HANGING, AND METAL STUD INSTALLATION)
$33.24 $23.46 $56.70
CARPENTER Residential
SUNY2013-015 (DRYWALL HANGING AND METAL STUD INSTALLATION ONLY)
$16.99 $5.56 $22.55
CARPENTER (FORM WORK ONLY) Residential
CARP0276-020
$33.24 $23.46 $56.70
CARPENTERS Building
CARP0276-010 (BUILDING CONSTRUCTION ONTARIO COUNTY (TOWNS OF PHELPS, SENECA AND GENEVA))
$33.24 $23.46 $56.70
CARPENTERS, INCLUDING DRYWALL HANGING: BUILDING CONSTRUCTION ENTIRE COUNTY, EXCLUDING THE TOWNS OF PHELPS, SENECA AND GENEVA Building
CARP0276-007 Scope differs by code/WD
$30.05 $22.19 $52.24
CARPENTERS, INCLUDING DRYWALL HANGING: BUILDING CONSTRUCTION ENTIRE COUNTY, EXCLUDING THE TOWNS OF PHELPS, SENECA AND GENEVA Building
CARP0276-007 Scope differs by code/WD
$30.05 $22.19 $52.24
CEMENT MASON/CONCRETE FINISHER Building
SUNY1993-002
$15.75 $0.59 $16.34
CEMENT MASON/CONCRETE FINISHER Residential
SUNY2013-015
$24.58 $7.50 $32.08
DREDGING: CLASS A1: DECK CAPTAIN; MECHANICAL DREDGE OPERATOR, LEVERMAN, LICENSED TUG OPERATOR OVER 1000 HP. INCENTIVE PAY: Heavy
ENGI0025-001 (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 FOOTNOTES APPLICABLE TO ABOVE CRAFTS: A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
$48.48 $15.34 $63.82
DREDGING: CLASS A2: CRANE OPERATOR Heavy
ENGI0025-001 (360 SWING) INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 FOOTNOTES APPLICABLE TO ABOVE CRAFTS: A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
$43.20 $14.99 $58.19
DREDGING: CLASS B1: DERRICK OPERATOR Heavy
ENGI0025-001 (180 SWING), SPIDER/SPILL BARGE OPERATOR, ENGINEER, ELECTRICIAN, CHIEF WELDER, CHIEF MATE, FILL PLACER, OPERATOR II, MAINTENANCE ENGINEER, LICENSED BOAT OPERATOR, LICENSED CREW BOAT OPERATOR. INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
$41.93 $14.90 $56.83
DREDGING: CLASS B2: CERTIFIED WELDER. INCENTIVE PAY: Heavy
ENGI0025-001 (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
$39.46 $14.73 $54.19
DREDGING: CLASS C1: MATE, DRAG BARGE OPERATOR, ASSISTANT FILL PLACER, WELDER, STEWARD. INCENTIVE PAY: Heavy
ENGI0025-001 (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 FOOTNOTES APPLICABLE TO ABOVE CRAFTS: A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
$38.38 $14.66 $53.04
DREDGING: CLASS C2: BOAT OPERATOR. INCENTIVE PAY: Heavy
ENGI0025-001 (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
$37.15 $14.57 $51.72
DREDGING: CLASS D: OILER, DECKHAND, SHOREMAN, RODMAN, SCOWMAN, COOK, MESSMAN, PORTER/JANITOR. INCENTIVE PAY: Heavy
ENGI0025-001 (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 FOOTNOTES APPLICABLE TO ABOVE CRAFTS: A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
$30.86 $14.15 $45.01
ELECTRICIAN Building
ELEC0840-002 (TOWNSPHIP OF FARMINGTON, MANCHESTER, PHELPS, HOPEWELL, GENEVA, GORHAM, SENECA AND CANANDAIGUA)
$45.00 $31.12 $76.12
ELECTRICIAN Residential
SUNY2013-015
$20.73 $7.08 $27.81
ELECTRICIAN (REMAINDER OF COUNTY) Building
ELEC0086-005
$44.30 $30.20 $74.50
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER Building
ELEC1249-004 (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation)
$64.59 $42.92 $107.51
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER Building
ELEC1249-004 (Substation:)
$63.14 $33.82 $96.96
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN Building
ELEC1249-004 (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation)
$35.34 $30.12 $65.46
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN Building
ELEC1249-004 (Substation:)
$35.34 $30.12 $65.46
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN Building
ELEC1249-004 (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)
$35.34 $30.12 $65.46
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR Building
ELEC1249-004 (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cab
$55.40 $31.78 $87.18
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR Building
ELEC1249-004 (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)
$55.40 $31.78 $87.18
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Substation:) Building
ELEC1249-004
$55.40 $31.78 $87.18
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER Building
ELEC1249-004 (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)
$49.25 $31.15 $80.40
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER Building
ELEC1249-004 (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installat
$49.25 $31.15 $80.40
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER Building
ELEC1249-004 (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)
$49.25 $31.15 $80.40
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Substation:) Building
ELEC1249-004
$49.25 $31.15 $80.40
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN Building
ELEC1249-004 (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable ins
$61.56 $36.21 $97.77
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:) Building
ELEC1249-004
$61.56 $36.21 $97.77
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC Building
ELEC1249-004 (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation)
$49.25 $31.15 $80.40
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC Building
ELEC1249-004 (Substation:)
$49.25 $31.15 $80.40
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC Building
ELEC1249-004 (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)
$49.25 $31.15 $80.40
IRONWORKER, ORNAMENTAL A) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING Residential
IRON0417-004 (UNPAID), CHRISTMAS DAY
$42.63 $53.70 $96.33
IRONWORKER, REINFORCING Residential
SUNY2013-015
$27.06 $23.02 $50.08
IRONWORKER, STRUCTURAL Residential
IRON0033-019
$35.75 $30.80 $66.55
IRONWORKERS: Building
IRON0033-010 (STRUCTURAL, ORNAMENTAL, RODMAN MACHINERY MOVER RIGGER, FENCE ERECTOR, PRECAST CONCRETE ERECTOR, REINFORCING, STONE DERRICKMAN)
$35.75 $30.80 $66.55
IRONWORKERS: (SHEETER) Building
IRON0033-010
$36.00 $30.80 $66.80
LABORER: ASBESTOS ABATEMENT Residential
SUNY2013-015 (REMOVAL FROM FLOORS, WALLS, & CEILINGS)
$18.53 $10.88 $29.41
LABORER: COMMON OR GENERAL, INCLUDING BRICK MASON TENDERS Residential
SUNY2013-015
$13.66 $5.60 $19.26
LABORER: MASON TENDER - CEMENT/CONCRETE Residential
LABO0210-002
$26.38 $23.65 $50.03
LABORERS: GROUP 1 Building
LABO0435-006 (HEAVY AND HIGHWAY) FLAGGERS MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
$32.96 $25.30 $58.26
LABORERS: GROUP 2 Building
LABO0435-006 (HEAVY AND HIGHWAY) LABORERS MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
$33.66 $25.30 $58.96
LABORERS: GROUP 3 Building
LABO0435-006 (HEAVY AND HIGHWAY) RAKERS, DRILLERS, PIPELAYERS AND TORCH OPERATORS MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
$33.86 $25.30 $59.16
LABORERS: GROUP 4 Building
LABO0435-006 (HEAVY AND HIGHWAY) BLASTERS MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
$34.69 $25.30 $59.99
LABORERS: GROUP 5 Building
LABO0435-006 (HEAVY AND HIGHWAY) HAZARDOUS WASTE REMOVAL FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
$35.44 $25.30 $60.74
OPERATING ENGINEER: GROUP 1 Building
ENGI0158-024 (TUNNEL AND SHAFT) AUTOMATED CONCRETE SPREADER (CMI OR EQUIVALENT); AUTOMATED FINE GRADE MACHINE (CMI); BACKHOE; BELT PLACER (CMI OR SIMILAR); BLACKTOP SPREADER (AUTOMATED); CABLEWAY; CAISSON AUGER; CENTRAL MIX PLANT (AUTOMATED); CHERRY PICKER (5 TONS); CONCRETE CURB MACHINE (SELF-PROPELLED SLIPFORM); CONCRETE PUMP; CRANE; CRANE SHAFT; CRANE UNDERGROUND; CRANES AND DERRICKS (STEEL ERECTION); DRAGLINE; DREDGE; DUAL DRUM PAVER; EXCAVATOR (ALL PURPOSE-HYDRAULICLY OPERATED GRADALL OR SIMILAR); FORK LIFT (FACTORY RATED 15' AND OVER); FRONT END LOADER (4CU YD AND OVER); HEAD TOWER (SAUERMAN OR EQUAL); HOIST; SHAFT; HOIST (TWO OR THREE DRUM); HOLLAND LOADER; MAINTENANCE ENGINEER (SHAFT AND TUNNEL); MINE HOIST; MINING MACHINE (MOLE AND SIMILAR TYPES); MUCKING MACHINE OR MOSE; OVERHEAD CRANE (GANTRY OR STRADDLE TYPE); PILE DRIVER; POWER GRADER; QUAD 9, QUARRY MASTER (OR EQUIVALENT); SCRAPER; SHOVEL; SIDE BOOM; SLIP FORM PAVER; TRIPPER/MAINTENANCE ENGINEER (SHAFT AND TUNNEL); TRACTOR DRAWN BELT-TYPE LOADER; TRUCK CRANE; TRUCK OR TRAILER MOUNTED LOG CHIPPER (SELF FEEDER); TUG OPERATOR (MANNED RENTED EQUIPMENT EXCLUDED); TUNNEL SHOVEL MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, REGARDLESS OF THE DAY OF THE WEEK ON WHICH THE HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
$58.43 $35.00 $93.43
OPERATING ENGINEER: GROUP 1 Building
ENGI0158-024 (HEAVY AND HIGHWAY) AUTOMATED CONCRETE SPREADER (CMI OR EQUIVALENT); AUTOMATED FINE GRADE MACHINE (CMI); BACKHOE; BELT PLACER (CMI OR SIMILAR); BLACKTOP SPREADER (AUTOMATED); CABLEWAY; CAISSON AUGER; CENTRAL MIX PLANT (AUTOMATED); CHERRY PICKER (5 TONS); CONCRETE CURB MACHINE (SELF-PROPELLED SLIPFORM); CONCRETE PUMP; CRANE; CRANE SHAFT; CRANE UNDERGROUND; CRANES AND DERRICKS (STEEL ERECTION); DRAGLINE; DREDGE; DUAL DRUM PAVER; EXCAVATOR (ALL PURPOSE-HYDRAULICLY OPERATED GRADALL OR SIMILAR); FORK LIFT (FACTORY RATED 15' AND OVER); FRONT END LOADER (4CU YD AND OVER); HEAD TOWER (SAUERMAN OR EQUAL); HOIST; SHAFT; HOIST (TWO OR THREE DRUM); HOLLAND LOADER; MAINTENANCE ENGINEER (SHAFT AND TUNNEL); MINE HOIST; MINING MACHINE (MOLE AND SIMILAR TYPES); MUCKING MACHINE OR MOSE; OVERHEAD CRANE (GANTRY OR STRADDLE TYPE); PILE DRIVER; POWER GRADER; QUAD 9, QUARRY MASTER (OR EQUIVALENT); SCRAPER; SHOVEL; SIDE BOOM; SLIP FORM PAVER; TRIPPER/MAINTENANCE ENGINEER (SHAFT AND TUNNEL); TRACTOR DRAWN BELT-TYPE LOADER; TRUCK CRANE; TRUCK OR TRAILER MOUNTED LOG CHIPPER (SELF FEEDER); TUG OPERATOR (MANNED RENTED EQUIPMENT EXCLUDED); TUNNEL SHOVEL MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
$55.38 $35.75 $91.13
OPERATING ENGINEER: GROUP 1 Building
ENGI0158-024 (EXCAVATING AND PAVING) ASPHALT PAVER; AUTOMATIC FINE GRADER; BACKHOE (EXCEPT TRACTOR MOUNTED, RUBBER TIRED); BLACKTOP PLANT (AUTOMATED); CABLEWAY; CAISSON AUGER; CENTRAL MIX CONCRETE PLANT (AUTOMATED); CHERRY PICKER- OVER 5 TON CAPACITY; CRANE; CRANES AND DERRICKS (STEEL ERECTION); DRAGLINE; DUAL DRUM PAVER; FRONT END LOADER (4 CU. YD. AND OVER); HOIST,(TOW OR 3 DRUM); PILE DRIVER; POWER GRADER WITH ELEVATION LOADER ATTACHMENT; QUARRY MASTER (OR EQUIVALENT); SHOVEL; SLIP FORM PAVER; TRACTOR DRAWN BELT-TYPE LOADER; TRUCK CRANE TUNNEL SHOVEL; EXCAVATOR, ALL PURPOSE HYDRAULICALLY OPERATED FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY, REGARDLESS OF THE DAY OF THE WEEK ON WHICH THE HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE WORKS EITHER ON THE WORK DAY IMMEDIATELY PRECEDING THE HOLIDAY OR ON THE SCHEDULED WORK DAY IMMEDIATELY FOLLOWING THE HOLIDAY
$41.26 $34.85 $76.11
OPERATING ENGINEER: GROUP 2 Building
ENGI0158-024 (TUNNEL AND SHAFT): AUTOMATED CENTRAL MIX CONCRETE PLANT; BACKHOE (TOPSIDE); BACKHOE (TRACTOR MOUNTED,RUBBER TIRED); BITUMINOUS SPREADER AND MIXER; BLACKTOP PLANT (NON AUTOMATED); BLAST OR ROTARY DRILL (TRUCK OR TRACTOR MOUNTED); BORING MACHINE; CAGE HOIST; CENTRAL MIX PLANT (NON AUTOMATED) AND ALL CONCRETE BATCHING PLANTS; CHERRY PICKER (5 TONS CAPACITY AND UNDER); COMPRESSORS (4 OR LESS EXCEEDING 2000 CFM COMBINED CAPACITY); CONCRETE PAVER (OVER 16S); CONCRETE PUMP; CRANE (TOPSIDE); CRUSHER; DIESEL POWER UNIT; DRILL RIGS, TRACTOR MOUNTED; FRONT END LOADER (UNDER 4 CU. YDS); GRAYCO EPOXY MACHINE; HI-PRESSURE BOILER (15 LBS AND OVER); HOIST (ONE DRUM); HOIST (TWO OR THREE DRUM) (TOPSIDE); KOLMAN PLANT LOADER AND SIMILAR TYPE LOADERS; L.C.M. WORK BOAT OPERATOR; LOCOMOTIVE; MAINTENANCE ENGINEER (TOPSIDE); MAINTENANCE GREASEMAN; MIXER (FOR STABILIZED BASE SELF-PROPELLED); MONORIAL MACHINE; PLANT ENGINEER; PERSONNEL HOIST; PUMP CRETE; READY MIX CONCRETE PLANT; REFRIGERATION EQUIPMENT (FROM SOIL STABILIZATION); ROAD WIDENER; ROLLER (ALL ABOVE SUB-GRADE); SEA MULE; SHOTCRETE MACHINE; SHOVEL (TOPSIDE); TRACTOR WITH DOZER AND/OR PUSHER; TRENCHER; TUGGER HOIST; TUNNEL LOCOMOTIVE; WELDER; WINCH; WINCH CAT FOOTNOTE: B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, REGARDLESS OF THE DAY OF THE WEEK ON WHICH THE HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
$57.21 $35.00 $92.21
OPERATING ENGINEER: GROUP 2 Building
ENGI0158-024 (HEAVY AND HIGHWAY) ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PLANT (NONAUTOMATED), BLAST OR ROTARY DRILL (TRUCK OR TRACTOR MOUNTED), BORING MACHINE, CAGE HOIST, CENTRAL MIX PLANT (NONAUTOMATED) AND ALL CONCRETE BATCHING PLANTS, CHERRY PICKER (5 TONS CAPACITY AND UNDER), CONCRETE PAVER (OVER 16S), CRAWLER DRILL, SELF-CONTAINED, CRUSHER, DIESEL POWER UNIT, DRILL RIGS, TRACTOR MOUNTED, FRONT END LOADER (UNDER 4 CU. YD.), GREASEMAN/LUBRICATION ENGINEER, HIPRESSURE BOILER (15 LBS. AND OVER), HOIST (ONE DRUM), HYDRO-AXE, KOLMAN PLANT LOADER AND SIMILAR TYPE LOADERS, L.C.M. WORK BOAT OPERATOR, LOCOMOTIVE MIXER (FOR STABILIZED BASE SELFPROPELLED), MONORAIL MACHINE, PLANT ENGINEER, PROFILER (105 H.P. AND UNDER), GRINDER, POST HOLE DIGGER AND POST DRIVER, POWER BROOM (TOWED), POWER HEATERMAN, POWER SWEEPER, REVINIUS WIDENER, ROLLER (GRADE AND FILL), SCARIFIER, RIDE-ON, SHELL WINDER, SKID STEER LOADER (BOBCAT OR SIMILAR), SPAN-SAW, RIDE-ON, STEAM CLEANER, PUG MILL, PUMP CRETE READY MIX CONCRETE PLANT REFRIGERATION EQUIPMENT (FOR SOIL STABILIZATION)ROAD WIDENER, ROLLER (ALL ABOVE SUBGRADE), SEA MULE, SELF-CONTAINED RIDE-ON ROCK DRILL, EXCLUDING AIR-TRACK TYPE DRILL, SKIDDER, TRACTOR WITH DOZER AND/OR PUSHER, TRENCHER. TUGGER HOIST, VERMEER SAW (RIDE ON, ANY SIZE OR TYPE), WINCH, WINCH CAT FOOTNOTE: B. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
$54.68 $35.75 $90.43
OPERATING ENGINEER: GROUP 2 Building
ENGI0158-024 (EXCAVATING AND PAVING) BACKHOE (TRACTOR MOUNTED, RUBBER TIRED); BITUMINOUS SPREADER AND MIXER; BLACKTOP PLANT (NON AUTOMATED); BORING MACHINE; CAGE HOIST; CENTRAL MIX PLANT (NON AUTOMATED) AND ALL CONCRETE BATCHING PLANTS; CHERRY PICKER, 5 TONS AND UNDER; COMPRESSOR (4 OR LESS) EXCEEDING 2000 CFM COMBINED CAPACITY; CONCRETE PAVER OVER 16S; CONCRETE PUMP; CRUSHER; DRILL RIGS (TRACTOR MOUNTED); FRONT END LOADER (UNDER 4 CU. YDS); HI- PRESSURE BOILER (15 LBS AND OVER); HOIST (ONE DRUM); KOLMAN PLANT LOADER AND SIMILAR TYPE LOADERS; MAINTENANCE ENGINEER; MAINTENANCE GREASE MAN; MECHANICAL SLURRY MACHINE; MIXER FOR STABILIZED BASE SELF PROPELLED; MONORAIL MACHINE; PLANT ENGINEER; POWER BROOM; POWER GRADER; PUMP CRETE; READY MIX CONCRETE PLANT; ROAD WIDENER; ROLLER (ALL ABOVE SUB-GRADE); SIDE BOOM; TRACTOR SCRAPER; TRACTOR WITH DOZER AND OR PUSHER; TRENCHER; WINCH FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY, REGARDLESS OF THE DAY OF THE WEEK ON WHICH THE HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE WORKS EITHER ON THE WORK DAY IMMEDIATELY PRECEDING THE HOLIDAY OR ON THE SCHEDULED WORK DAY IMMEDIATELY FOLLOWING THE HOLIDAY
$40.79 $34.85 $75.64
OPERATING ENGINEER: GROUP 3 Building
ENGI0158-024 (TUNNEL AND SHAFT): ""A"" FRAME TRUCK; BALLAST REGULATOR (RIDE ON); COMPRESSORS (4 NOT TO EXCEED 2000 CFM COMBINED CAPACITY; OR 3 OR LESS WITH MORE THAN 1200 CFM BUT NOT TO EXCEED 2000 CFM); COMPRESSORS (ANY SIZE BUT SUBJECT TO OTHER PROVISIONS FOR COMPRESSORS; DUST COLLECTORS; GENERATORS; PUMPS; WELDING MACHINES; LIGHT PLANTS (4 OF ANY TYPE OR COMBINATION); CONCRETE PAVEMENT SPREADERS AND FINISHERS; CONVEYOR; DRILL (CORE); DRILL (WELL); ELECTRIC PUMP USED IN CONJUNCTION WITH WELL POINT SYSTEM; FARM TRACTOR WITH ACCESSORIES; FINE GRADE MACHINE; FORK LIFT (UNDER 15 FT); GROUND PUMP OVER 5 CU. FT (MANUFACTURERS RATING); GUNITE MACHINE; HAMMERS (HYDRAULIC SELF PROPELLED); HYDRA-SPIKER (RIDE ON); HYDRA BLASTER (WATER); HYDRA BLASTER; MOTORIZED FORM CARRIER; POST HOLE DIGGER AND POST DRIVER; POWER SWEEPER; ROLLER (GRADE AND FILL); SCARIFER (RIDE ON); SPAN SAW (RIDE ON); SUBMERSIBLE ELECTRIC PUMP (WHEN USED IN LIEU OF WELL POINTS); TAMPER (RIDE ON); TIE EXTRACTOR (RIDE ON); TIE HANDLER (RIDE ON); TIE INSERTER (RIDER ON); TIE SPACER (RIDE ON); TRACK LINER (RIDE ON); TRACTOR WITH TOWED ACCESSORIES; VIBRATORY COMPACTOR; VIBRO TAMP; WELL POINT AGGREGATE PLANT; BOILER (USED IN CONJUNCTION WITH PRODUCTION); CEMENT AND BIN OPERATOR; COMPRESSORS (3 OR LESS NOT TO EXCEED 1200 CFM COMBINED CAPACITY); COMPRESSORS (ANY SIZE; BUT SUBJECT TO OTHER PROVISIONS FOR COMPRESSORS); DUST COLLECTORS; GENERATORS; PUMPS; WELDING MACHINES; LIGHT PLANTS (3 OR LESS OF ANY TYPE OR COMBINATION); CONCRETE PAVER OR MIXER (16S AND UNDER); CONCRETE SAW (SELF PROPELLED); FIREMAN; FORM TAMPER; GREASEMAN; HYDRAULIC PUMP (JACKING SYSTEM); JUNIOR ENGINEER; LIGHT PLANTS; MULCHING MACHINE; OILER; PARAPET CONCRETE OR PAVEMENT GRINDER; POWER BROOM (TOWED); POWER HEATERMAN (WHEN USED FOR PRODUCTION); REVINIUS WIDENER; SHELL WINDER; STEAM CLEANER; TRACTOR FOOTNOTE: B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, REGARDLESS OF THE DAY OF THE WEEK ON WHICH THE HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
$54.42 $35.00 $89.42
OPERATING ENGINEER: GROUP 3 Building
ENGI0158-024 (HEAVY AND HIGHWAY): A FRAME WINCH HOIST ON TRUCK , ARTICULATED HEAVY HAULER, AGGREGATE PLANT, ASPHALT OR CONCRETE GROOVING, MACHINE (RIDE ON), BALLAST REGULATOR, RIDE-ON BOILER (USED IN CONJUNCTION WITH PRODUCTION), BITUMINOUS HEATER, SELF-PROPELLED, BOAT (POWERED), CEMENT AND BIN OPERATOR, COMPRESSORS, DUST COLLECTORS, GENERATORS, PUMPS, WELDING MACHINES, LIGHT PLANTS, HEATERS (HANDS-OFF EQUIPMENT), CONCRETE PAVEMENT SPREADER AND FINISHER, CONCRETE PAVER OR MIXER (16S AND UNDER), CONCRETE SAW (SELF-PROPELLED), CONVEYOR, DECK HAND, DIRECTIONAL DRILL MACHINE LOCATOR, DRILL, (CORE), DRILL, (WELL,) FARM TRACTOR WITH ACCESSORIES, FINE GRADE MACHINE, TAMPER, RIDE-ON, TIE EXTRACTOR, RIDE-ON, TIE HANDLER, RIDE-ON, TIE INSERTER, RIDE-ON, TIE SPACER, RIDE-ON, TIRE REPAIR, TRACK LINER, RIDE-ON, TRACTOR, TRACTOR (WITH TOWED ACCESSORIES), VIBRATORY COMPACTOR, VIBRO TAMP, WELL POINT FOOTNOTE: B. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
$51.80 $35.75 $87.55
OPERATING ENGINEER: GROUP 3 Building
ENGI0158-024 (EXCAVATING AND PAVING) COMPRESSORS (4 NOT TO EXCEED 2000 CFM COMBINED CAPACITY; OR 3 OR LESS WITH MORE THAN 1200 CFM BUT NOT TO EXCEED 2000 CFM); COMPRESSORS (ANY SIZE BUT SUBJECT TO OTHER PROVISIONS FOR COMPRESSORS); DUST COLLECTORS; GENERATORS; WELDING MACHINES (4 OF ANY TYPE OR COMBINATION); CONCRETE PAVEMENT SPREADERS AND FINISHERS; CONVEYOR; DRILL (CORE); DRILL (WELL); ELECTRIC PUMP USED IN CONJUNCTION WITH WELL POINT SYSTEMS; FARM TRACTOR WITH ACCESSORIES; FINE GRADE MACHINE; FORK LIFT; GUNITE MACHINE; HAMMERS-HYDRAULIC-SELF PROPELLED; LOCOMOTIVE; POST HOLE DIGGER AND POST DRIVER; PUMPS (REGARDLESS OF MOTIVE POWER, NOT MORE THAN 4 IN NUMBER NOT TO EXCEED 20"" IN TOTAL CAPACITY); SUBMERSIBLE ELECTRIC PUMPS WHEN USED IN LIEU OF WELL POINTS, TRACTOR WITH TOWED ACCESSORIES; VIBRATORY COMPACTOR; VIBRO TAMP; WELL POINT FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY, REGARDLESS OF THE DAY OF THE WEEK ON WHICH THE HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE WORKS EITHER ON THE WORK DAY IMMEDIATELY PRECEDING THE HOLIDAY OR ON THE SCHEDULED WORK DAY IMMEDIATELY FOLLOWING THE HOLIDAY
$40.10 $34.85 $74.95
OPERATING ENGINEER: GROUP 4 Building
ENGI0158-024 (TUNNEL AND SHAFT): CRANE, FRICTION OR LATTICE TYPE WITH BOOM LENGTH 200 FEET AND OVER FOOTNOTE: B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, REGARDLESS OF THE DAY OF THE WEEK ON WHICH THE HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
$51.41 $35.00 $86.41
OPERATING ENGINEER: GROUP 4 Building
ENGI0158-024 (HEAVY AND HIGHWAY)TOWER CRANES FOOTNOTE: B. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
$61.38 $35.75 $97.13
OPERATING ENGINEER: GROUP 4 Building
ENGI0158-024 (EXCAVATING AND PAVING) COMPRESSOR (ANY SIZE, BUT SUBJECT TO OTHER PROVISIONS FOR COMPRESSORS); DUST COLLECTORS; GENERATORS; WELDING MACHINES (3 OR LESS OF ANY TYPE OR COMBINATION); CONCRETE MIXER (16S AND UNDER), CONCRETE SAW-SELF PROPELLED; FIREMAN; FORM TAMPER; MULCHING MACHINE; POWER HEATERMAN; PUMPS REGARDLESS OF MOTIVE POWER NO MORE THAN 3 IN NUMBER NOT TO EXCEED 12"" IN TOTAL CAPACITY; REVINIUS WIDENER; STEAM CLEANER; TRACTOR FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY, REGARDLESS OF THE DAY OF THE WEEK ON WHICH THE HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE WORKS EITHER ON THE WORK DAY IMMEDIATELY PRECEDING THE HOLIDAY OR ON THE SCHEDULED WORK DAY IMMEDIATELY FOLLOWING THE HOLIDAY
$36.61 $34.85 $71.46
OPERATING ENGINEER: GROUP 5 Building
ENGI0158-024 (HEAVY AND HIGHWAY) GROUP 5: CRANES 50 TONS AND OVER FOOTNOTE: B. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
$59.88 $35.75 $95.63
OPERATING ENGINEER: GROUP 6 Building
ENGI0158-024 (HEAVY AND HIGHWAY) CRANES 49 TONS AND FOOTNOTE: B. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
$58.38 $35.75 $94.13
OPERATING ENGINEER: GROUP 7 Building
ENGI0158-024 (HEAVY AND HIGHWAY) MASTER MECHANIC FOOTNOTE: B. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
$56.81 $35.75 $92.56
OPERATING ENGINEER: MASTER MECHANIC Building
ENGI0158-024 (TUNNEL AND SHAFT). FOR EXCAVATION AND PAVING: FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY, REGARDLESS OF THE DAY OF THE WEEK ON WHICH THE HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE WORKS EITHER ON THE WORK DAY IMMEDIATELY PRECEDING THE HOLIDAY OR ON THE SCHEDULED WORK DAY IMMEDIATELY FOLLOWING THE HOLIDAY. EXCAVATION AND PAVING CLASSIFICATIONS
$60.84 $35.00 $95.84
OPERATING ENGINEER: MASTER MECHANIC Building
ENGI0158-024 (EXCAVATING AND PAVING). FOR EXCAVATION AND PAVING: FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY, REGARDLESS OF THE DAY OF THE WEEK ON WHICH THE HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE WORKS EITHER ON THE WORK DAY IMMEDIATELY PRECEDING THE HOLIDAY OR ON THE SCHEDULED WORK DAY IMMEDIATELY FOLLOWING THE HOLIDAY. EXCAVATION AND PAVING CLASSIFICATIONS
$43.26 $34.85 $78.11
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE Residential
SUNY2013-015
$27.88 $19.75 $47.63
OPERATOR: BULLDOZER Residential
SUNY2013-015
$21.20 0.00 $21.20
OPERATOR: LOADER Residential
SUNY2013-015
$27.88 $21.40 $49.28
PAINTER (BRUSH AND ROLLER) Residential
SUNY2013-015
$22.15 $15.62 $37.77
PAINTERS: BRUSH & ROLL (BUILDING CONSTRUCTION) Building
PAIN0004-028
$27.27 $26.23 $53.50
PAINTERS: DRYWALL TAPER (BUILDING CONSTRUCTION) Building
PAIN0004-028
$28.02 $26.23 $54.25
PAINTERS: SANDBLASTING (BUILDING CONSTRUCTION) Building
PAIN0004-028
$27.77 $26.23 $54.00
PAINTERS: SPRAY (BUILDING CONSTRUCTION) Building
PAIN0004-028
$27.77 $26.23 $54.00
PAINTERS: WALLCOVERING (BUILDING CONSTRUCTION) Building
PAIN0004-028
$28.02 $26.23 $54.25
PLUMBER Residential
SUNY2013-015
$20.38 $7.78 $28.16
PLUMBER AND STEAMFITTER (INCLUDING HVAC WORK) Building
PLUM0013-004
$42.68 $27.88 $70.56
POWER EQUIPMENT OPERATORS: GROUP 1 Building
ENGI0158-014 (BUILDING CONSTRUCTION) AIR TUGGER, ALL TERRAIN TELESCOPING MATERIAL HANDLER, CLAMSHELL, DRAGLINE, SHOVEL AND SIMILAR MACHINES OVER THREE EIGHTHS CU.YD. CAPACITY (FACT. RATING);CARRIER MOUNTED BACKHOES THAT SWING 360 DEGREES BIG GENERATOR PLANT HOIST (ON STEEL ERECTION) BRIDGE CRANE (ALL TYPES), CABLEWAY, CAISSON AUGER AND SIMILAR TYPE MACHINE, CRANE, DERRICK, DREDGE, EXCAVATOR ALL PURPOSE HYDRAULICALLY OPERATED, FORKLIFT (WITH FACTORY RATING OF FIFTEEN FT. OR MORE OF LIFT),HOIST (ON STEEL ERECTION), HYDRAULIC/KRUPP DRILL TYPE MUCKING MACHINES, REMOTE CONTROLLED EXCAVATOR WITH ATTACHMENTS (BROKK TYPE OR SIMILAR), ROSS CARRIER (AND SIMILAR TYPE), THREE-DRUM HOIST(WHEN ALL THREE DRUMS ARE IN USE) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ON THE WORK DAY IMMEDIATELY PRECEDING THE HOLIDAY OR ON THE SCHEDULED WORK DAY IMMEDIATELY FOLLOWING THE HOLIDAY
$43.14 $35.20 $78.34
POWER EQUIPMENT OPERATORS: GROUP 2 Building
ENGI0158-014 (BUILDING CONSTRUCTION) A-FRAME TRUCK, BACKFILLING MACHINE, BACKHOE -TRACTOR MOUNTED, BARBER GREEN AND SIMILAR TYPE MACHINES, BELT CRETE AND SIMILAR TYPE MACHINES, BITUMINOUS SPREADING MACHINE 3/8 YD. CAPACITY OR LESS(FACTORY RATING), BULLDOZER, CARRY-ALL TYPE SCRAPER, COMPRESSORS: FOUR (4) NOT TO EXCEED 2000 CFM COMBINED CAPACITY; OR THREE (3) OR LESS WITH MORE THAN1200 CFM BUT NOT TO EXCEED 2000 CFM, CONCRETE MIXER, CONCRETE PLACER, CONCRETE PUMP, DINKY LOCOMOTIVES (ALL TYPES), ELEVATING GRADER, ELEVATOR FINE GRADE AND FINISH, ROLLERS, FINE GRADE MACHINES(ALL KINDS), FORKLIFT WITH FACTORY RATING OF LESS THAN FIFTEEN(15) FEET OF LIFT, FRONT END LOADER, GUNITE PUMPING MACHINE, HIGH PRESSURE BOILER, HOIST (1 OR 2 DRUMS), MAINTENANCE ENGINEER (MECHANIC), MECHANICAL SLURRY MACHINE (ALL KINDS), MEGA MIXERS AND SIMILAR TYPE MACHINES, MOTOR GRADER, POST HOLE DIGGER, PUMPS (REGARDLESS OF MOTIVE POWER) NO MORE THAN FOUR (4) IN NUMBER NOT TO EXCEED TWENTY (20) INCHES IN TOTAL CAPACITY, SHOT CRETE PUMPING MACHINE, SIDE BOOM TRACTOR, SKID STEER LOADER WITH ATTACHMENTS, STONE CRUSHER TOURNADOZER AND SIMILAR TYPES TOURNAPULL AND SIMILAR TYPES, TRENCHING MACHINES, WELL DRILL, WELLPOINT SYSTEM EXCEPTION: SINGLE ELECTRIC PUMPS UP TO AND INCLUDING FOUR (4) INCHES NEED NOT BE MANNED. FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ON THE WORK DAY IMMEDIATELY PRECEDING THE HOLIDAY OR ON THE SCHEDULED WORK DAY IMMEDIATELY FOLLOWING THE HOLIDAY
$42.34 $35.20 $77.54
POWER EQUIPMENT OPERATORS: GROUP 3 Building
ENGI0158-014 (BUILDING CONSTRUCTION) ANY COMBINATION (NOT TO EXCEED THREE (3) PIECES OF EQUIPMENT) COMPRESSORS �THREE (3) OR LESS, OR NOT TO EXCEED 1200 CFM COMBINED CAPACITY, FIREMAN, LONGITUDINAL FLOAT, MECHANICAL HEATER PUMPS (REGARDLESS OF MOTIVE POWER) NO MORE THAN THREE (3) IN NUMBER, NOT TO EXCEED TWELVE (12) INCHES TOTAL CAPACITY, ROLLER (FILL AND GRADE)RUBBER TIRED TRACTOR WELDING MACHINE OR MECHANICAL CONVEYOR (OVER 12FT. IN LENGTH) EXCEPTION: SINGLE GASOLINE DRIVEN WELDING MACHINE UP TO 300AMPS NEED NOT BE MANNED. FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ON THE WORK DAY IMMEDIATELY PRECEDING THE HOLIDAY OR ON THE SCHEDULED WORK DAY IMMEDIATELY FOLLOWING THE HOLIDAY
$39.64 $35.20 $74.84
POWER EQUIPMENT OPERATORS: GROUP 4 Building
ENGI0158-014 (BUILDING CONSTRUCTION) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ON THE WORK DAY IMMEDIATELY PRECEDING THE HOLIDAY OR ON THE SCHEDULED WORK DAY IMMEDIATELY FOLLOWING THE HOLIDAY
$39.64 $35.20 $74.84
POWER EQUIPMENT OPERATORS: GROUP 5 Building
ENGI0158-014 (BUILDING CONSTRUCTION) CRANES UP TO AND INCLUDING 25 TONS MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ON THE WORK DAY IMMEDIATELY PRECEDING THE HOLIDAY OR ON THE SCHEDULED WORK DAY IMMEDIATELY FOLLOWING THE HOLIDAY
$47.64 $35.20 $82.84
POWER EQUIPMENT OPERATORS: GROUP 6 Building
ENGI0158-014 (BUILDING CONSTRUCTION) CRANES 25-250 TONS FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ON THE WORK DAY IMMEDIATELY PRECEDING THE HOLIDAY OR ON THE SCHEDULED WORK DAY IMMEDIATELY FOLLOWING THE HOLIDAY
$49.64 $35.20 $84.84
POWER EQUIPMENT OPERATORS: GROUP 7 Building
ENGI0158-014 (BUILDING CONSTRUCTION) CRANES 251 AND OVER TONS FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ON THE WORK DAY IMMEDIATELY PRECEDING THE HOLIDAY OR ON THE SCHEDULED WORK DAY IMMEDIATELY FOLLOWING THE HOLIDAY
$50.64 $35.20 $85.84
POWER EQUIPMENT OPERATORS: GROUP 8 Building
ENGI0158-014 (BUILDING CONSTRUCTION) TOWER CRANES FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ON THE WORK DAY IMMEDIATELY PRECEDING THE HOLIDAY OR ON THE SCHEDULED WORK DAY IMMEDIATELY FOLLOWING THE HOLIDAY
$50.14 $35.20 $85.34
ROOFER Building
ROOF0022-001
$34.10 $28.20 $62.30
ROOFER Residential
SUNY2013-015
$18.17 0.00 $18.17
SHEET METAL (INCLUDING HVAC WORK) Building
SHEE0046-003
$43.01 $28.66 $71.67
SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION Residential
SUNY2013-015
$18.75 $7.30 $26.05

Wage Determinations

Heavy

7 trades

Applies to

Albany, Allegany, Bronx, Broome, Cattaraugus, Cayuga, Chautauqua, Chemung, Chenango, Clinton +52 more