NY20260001
rev 2Heavy
Applies to
Albany, Allegany, Bronx, Broome, Cattaraugus, Cayuga, Chautauqua, Chemung, Chenango, Clinton +52 more
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Get an email when wage determinations covering Otsego County, New York are modified.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Click a row to save its rate for later, then export your selections from the Saved panel.
| Save | Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR Building ASBE0030-006 (MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION)) | $43.25 | $27.29 | $70.54 | |
| ASBESTOS/INSULATOR WORKER Heavy ASBE0030-001 (INCLUDES APPLICATION OF ALL MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS. ALSO THE APPLICATION OF FIRESTOPPING MATERIAL TO OPENINGS AND PENETRATIONS IN WALLS, FLOORS, CEILINGS, CURTAIN WALLS AND ALL LEAD ABATEMENT.) | $43.25 | $27.29 | $70.54 | |
| ASBESTOS/INSULATOR WORKER Heavy ASBE0030-001 (INCLUDES APPLICATION OF ALL MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS. ALSO THE APPLICATION OF FIRESTOPPING MATERIAL TO OPENINGS AND PENETRATIONS IN WALLS, FLOORS, CEILINGS, CURTAIN WALLS AND ALL LEAD ABATEMENT.) | $43.25 | $27.29 | $70.54 | |
| BOILERMAKER Heavy BOIL0197-001 | $43.34 | $27.66 | $71.00 | |
| BRICKLAYER Building BRNY0001-005 | $62.54 | $29.40 | $91.94 | |
| CABLE SPLICER Heavy ELEC0325-001 (BUTTERNUT, HARTWICK, LAURENS, MARYLAND, MILFORD, MORRIS, ONEONTA, OTEGO, UNADILLA AND WESTFORD TOWNSHIPS) | $50.43 | $33.29 | $83.72 | |
| CABLE SPLICER (REMAINDER OF COUNTY) Heavy ELEC0043-004 | $55.55 | $35.03 | $90.58 | |
| CARPENTER Residential SUNY2013-005 | $21.16 | 0.00 | $21.16 | |
| CARPENTER Building CARP0277-035 (EXCLUDES DRYWALL HANGING, FORM WORK AND METAL STUD INSTALLATION) | $33.24 | $24.60 | $57.84 | |
| CARPENTER (DRYWALL HANGING ONLY) Building CARP0279-003 | $43.50 | $30.22 | $73.72 | |
| CARPENTER (FORM WORK ONLY) Building CARP0279-003 | $43.50 | $30.22 | $73.72 | |
| CARPENTER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING AND CHRISTMAS Heavy CARP0277-020 | $44.52 | $27.16 | $71.68 | |
| CEMENT MASON (BINGHAMTON CHAPTER) Heavy BRNY0003-017 | $38.63 | $25.05 | $63.68 | |
| CEMENT MASON/CONCRETE FINISHER Residential SUNY2013-005 | $22.83 | $11.15 | $33.98 | |
| CEMENT MASON/CONCRETE FINISHER Building BRNY0002-031 | $34.32 | $20.52 | $54.84 | |
| DREDGING: CLASS A1: DECK CAPTAIN; MECHANICAL DREDGE OPERATOR, LEVERMAN, LICENSED TUG OPERATOR OVER 1000 HP. INCENTIVE PAY: Heavy ENGI0025-001 (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 FOOTNOTES APPLICABLE TO ABOVE CRAFTS: A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED | $48.48 | $15.34 | $63.82 | |
| DREDGING: CLASS A2: CRANE OPERATOR Heavy ENGI0025-001 (360 SWING) INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 FOOTNOTES APPLICABLE TO ABOVE CRAFTS: A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED | $43.20 | $14.99 | $58.19 | |
| DREDGING: CLASS B1: DERRICK OPERATOR Heavy ENGI0025-001 (180 SWING), SPIDER/SPILL BARGE OPERATOR, ENGINEER, ELECTRICIAN, CHIEF WELDER, CHIEF MATE, FILL PLACER, OPERATOR II, MAINTENANCE ENGINEER, LICENSED BOAT OPERATOR, LICENSED CREW BOAT OPERATOR. INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED | $41.93 | $14.90 | $56.83 | |
| DREDGING: CLASS B2: CERTIFIED WELDER. INCENTIVE PAY: Heavy ENGI0025-001 (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED | $39.46 | $14.73 | $54.19 | |
| DREDGING: CLASS C1: MATE, DRAG BARGE OPERATOR, ASSISTANT FILL PLACER, WELDER, STEWARD. INCENTIVE PAY: Heavy ENGI0025-001 (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 FOOTNOTES APPLICABLE TO ABOVE CRAFTS: A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED | $38.38 | $14.66 | $53.04 | |
| DREDGING: CLASS C2: BOAT OPERATOR. INCENTIVE PAY: Heavy ENGI0025-001 (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED | $37.15 | $14.57 | $51.72 | |
| DREDGING: CLASS D: OILER, DECKHAND, SHOREMAN, RODMAN, SCOWMAN, COOK, MESSMAN, PORTER/JANITOR. INCENTIVE PAY: Heavy ENGI0025-001 (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 FOOTNOTES APPLICABLE TO ABOVE CRAFTS: A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED | $30.86 | $14.15 | $45.01 | |
| ELECTRICIAN Heavy ELEC0325-001 (BUTTERNUT, HARTWICK, LAURENS, MARYLAND, MILFORD, MORRIS, ONEONTA, OTEGO, UNADILLA AND WESTFORD TOWNSHIPS) | $42.68 | $33.06 | $75.74 | |
| ELECTRICIAN Residential ELEC0910-007 | $43.50 | $28.38 | $71.88 | |
| ELECTRICIAN (INCLUDES LOW VOLTAGE WIRING) Building ELEC0325-005 | $42.68 | $33.06 | $75.74 | |
| ELECTRICIAN (REMAINDER OF COUNTY) Heavy ELEC0043-004 | $50.50 | $35.03 | $85.53 | |
| ELECTRICIAN (TOWNSHIPS OF DECATUR AND WORCESTER) Heavy ELEC0236-002 | $48.00 | $32.09 | $80.09 | |
| ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER Heavy ELEC1249-004 (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) | $64.59 | $42.92 | $107.51 | |
| ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER Heavy ELEC1249-004 (Substation:) | $63.14 | $33.82 | $96.96 | |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN Heavy ELEC1249-004 (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) | $35.34 | $30.12 | $65.46 | |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN Heavy ELEC1249-004 (Substation:) | $35.34 | $30.12 | $65.46 | |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN Heavy ELEC1249-004 (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | $35.34 | $30.12 | $65.46 | |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR Heavy ELEC1249-004 (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cab | $55.40 | $31.78 | $87.18 | |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR Heavy ELEC1249-004 (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | $55.40 | $31.78 | $87.18 | |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Substation:) Heavy ELEC1249-004 | $55.40 | $31.78 | $87.18 | |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER Heavy ELEC1249-004 (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | $49.25 | $31.15 | $80.40 | |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER Heavy ELEC1249-004 (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installat | $49.25 | $31.15 | $80.40 | |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER Heavy ELEC1249-004 (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | $49.25 | $31.15 | $80.40 | |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Substation:) Heavy ELEC1249-004 | $49.25 | $31.15 | $80.40 | |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN Heavy ELEC1249-004 (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable ins | $61.56 | $36.21 | $97.77 | |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:) Heavy ELEC1249-004 | $61.56 | $36.21 | $97.77 | |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC Heavy ELEC1249-004 (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) | $49.25 | $31.15 | $80.40 | |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC Heavy ELEC1249-004 (Substation:) | $49.25 | $31.15 | $80.40 | |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC Heavy ELEC1249-004 (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | $49.25 | $31.15 | $80.40 | |
| ELEVATOR MECHANIC Building ELEV0035-004 | $57.73 | $38.44 | $96.17 | |
| GLAZIER Heavy PAIN0677-003 | $30.00 | $31.95 | $61.95 | |
| GLAZIER Building PAIN0677-006 | $27.90 | $27.50 | $55.40 | |
| HAZARDOUS MATERIAL HANDLER Heavy ASBE0030-001 (SCOPE OF WORK: DUTIES LIMITED TO PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING, AND DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT FROM MECHANICAL SYSTEM) | $38.50 | $25.04 | $63.54 | |
| HAZARDOUS MATERIAL HANDLER Heavy ASBE0030-001 (SCOPE OF WORK: DUTIES LIMITED TO PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING, AND DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT FROM MECHANICAL SYSTEM) | $38.50 | $25.04 | $63.54 | |
| INSTALLER - METAL STUD Building CARP0279-012 | $44.72 | $31.23 | $75.95 | |
| IRONWORKER, REINFORCING Building IRON0417-002 | $42.63 | $53.70 | $96.33 | |
| IRONWORKER, STRUCTURAL Building IRON0417-002 | $42.63 | $53.70 | $96.33 | |
| IRONWORKER: ORNAMENTAL Building IRON0006-007 | $35.49 | $32.30 | $67.79 | |
| IRONWORKER: STRUCTURAL, ORNAMENTAL, RODMAN, MACHINERY MOVER, RIGGER, FENCE ERECTOR, REINFORCEMENT, AND STONE DERRICKMAN Heavy IRON0440-001 (REMANINDER OF COUNTY) | $35.50 | $31.39 | $66.89 | |
| IRONWORKERS: SHEETER Heavy IRON0012-008 (OTSEGO COUNTY (TOWNSHIPS OF BUTTERNUTS, LAURENS,MARYLAND, MILFORD, MORRIS, ONEONTA, OTEGO, UNADILLA, WORCESTER)) | $38.75 | $25.48 | $64.23 | |
| IRONWORKERS: SHEETER, BUCKER-UP Heavy IRON0012-008 (OTSEGO COUNTY (TOWNSHIPS OF BUTTERNUTS, LAURENS,MARYLAND, MILFORD, MORRIS, ONEONTA, OTEGO, UNADILLA, WORCESTER)) | $38.75 | $25.48 | $64.23 | |
| IRONWORKERS: STRUCTURAL, ORNAMENTAL, RODMAN, MACHINERY, MOVER, RIGGER, FENCE ERECTOR, REINFORCING, STONE DERRICKMEN Heavy IRON0012-008 (OTSEGO COUNTY (TOWNSHIPS OF BUTTERNUTS, LAURENS,MARYLAND, MILFORD, MORRIS, ONEONTA, OTEGO, UNADILLA, WORCESTER)) | $38.50 | $25.48 | $63.98 | |
| LABORER (COMMON OR GENERAL) Building LABO0017-008 | $43.55 | $29.75 | $73.30 | |
| LABORER: COMMON OR GENERAL Residential SUNY2013-005 | $15.54 | 0.00 | $15.54 | |
| LABORER: MASON TENDER - CEMENT/CONCRETE Residential SUNY2013-005 | $16.00 | $10.45 | $26.45 | |
| LABORER: MASON TENDER - CEMENT/CONCRETE Building LABO0633-010 | $28.27 | $22.20 | $50.47 | |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE Residential SUNY2013-005 | $27.59 | 0.00 | $27.59 | |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER Residential SUNY2013-005 | $27.74 | 0.00 | $27.74 | |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER Building SUNY2017-015 | $41.10 | $19.26 | $60.36 | |
| OPERATOR: BULLDOZER Residential SUNY2013-005 | $21.72 | 0.00 | $21.72 | |
| PAINTER (BRUSH AND ROLLER) Residential SUNY2013-005 | $18.47 | 0.00 | $18.47 | |
| PAINTER (BRUSH AND ROLLER) Building SUNY2017-015 | $25.37 | $19.91 | $45.28 | |
| PAINTER (SPRAY) Building PAIN0038-004 | $28.35 | $25.21 | $53.56 | |
| PAINTERS: (BRIDGES) Heavy PAIN0004-006 | $42.06 | $30.59 | $72.65 | |
| PIPEFITTER Building PLUM0022-017 | $37.47 | $27.40 | $64.87 | |
| PLUMBER Residential SUNY2013-005 | $24.01 | $9.83 | $33.84 | |
| PLUMBER, INCLUDING STEAMFITTING Heavy PLUM0112-009 (SOUTHERN ZONE REMAINING TOWNSHIPS) | $44.91 | $33.31 | $78.22 | |
| PLUMBER, INCLUDING STEAMFITTING Heavy PLUM0112-009 (NORTHERN ZONE TOWNSHIPS OF CHERRY VALLEY, EXETER, MIDDLEFIELD, OTSEGO, PLAINFIELD, RICKFIELD, ROSEBOOM, SPRINGFIELD) | $45.93 | $33.77 | $79.70 | |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE Building ENGI0825-001 | $60.13 | $37.50 | $97.63 | |
| POWER EQUIPMENT OPERATOR: CRANE Building ENGI0825-001 | $61.72 | $37.50 | $99.22 | |
| POWER EQUIPMENT OPERATORS Heavy ENGI0158-028 (HEAVY & HIGHWAY): GROUP 7 MASTER MECHANIC FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY | $58.91 | $33.55 | $92.46 | |
| POWER EQUIPMENT OPERATORS Heavy ENGI0158-028 (HEAVY & HIGHWAY): GROUP 6 CRANES 49 TONS AND BELOW FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY | $60.30 | $33.55 | $93.85 | |
| POWER EQUIPMENT OPERATORS Heavy ENGI0158-028 (HEAVY & HIGHWAY): GROUP 5 CRANES 50 TONS AND OVER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY | $61.80 | $33.55 | $95.35 | |
| POWER EQUIPMENT OPERATORS Heavy ENGI0158-028 (HEAVY & HIGHWAY): GROUP 4 TOWER CRANES FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY | $63.30 | $33.55 | $96.85 | |
| POWER EQUIPMENT OPERATORS Heavy ENGI0158-028 (HEAVY & HIGHWAY): GROUP 2 ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PLANT (NONAUTOMATED), BLAST OR ROTARY DRILL (TRUCK OR TRACTOR MOUNTED), BORING MACHINE, CAGE HOIST, CENTRAL MIX PLANT (NONAUTOMATED) AND ALL CONCRETE BATCHING PLANTS, CHERRY PICKER (5 TONS CAPACITY AND UNDER), CONCRETE PAVER (OVER 16S), CRAWLER DRILL, SELF-CONTAINED, CRUSHER, DIESEL POWER UNIT, DRILL RIGS, TRACTOR MOUNTED, FRONT END LOADER (UNDER 4 CU. YD.), GREASEMAN/LUBRICATION ENGINEER, HIPRESSURE BOILER (15 LBS. AND OVER), HOIST (ONE DRUM), HYDRO-AXE, KOLMAN PLANT LOADER AND SIMILAR TYPE LOADERS, L.C.M. WORK BOAT OPERATOR, LOCOMOTIVE MIXER (FOR STABILIZED BASE SELFPROPELLED), MONORAIL MACHINE, PLANT ENGINEER, PROFILER (105 H.P. AND UNDER), GRINDER, POST HOLE DIGGER AND POST DRIVER, POWER BROOM (TOWED), POWER HEATERMAN, POWER SWEEPER, REVINIUS WIDENER, ROLLER (GRADE AND FILL), SCARIFIER, RIDE-ON, SHELL WINDER, SKID STEER LOADER (BOBCAT OR SIMILAR), SPAN-SAW, RIDE-ON, STEAM CLEANER, PUG MILL, PUMP CRETE READY MIX CONCRETE PLANT REFRIGERATION EQUIPMENT (FOR SOIL STABILIZATION)ROAD WIDENER, ROLLER (ALL ABOVE SUBGRADE), SEA MULE, SELF-CONTAINED RIDE-ON ROCK DRILL, EXCLUDING AIR-TRACK TYPE DRILL, SKIDDER, TRACTOR WITH DOZER AND/OR PUSHER, TRENCHER. TUGGER HOIST, VERMEER SAW (RIDE ON, ANY SIZE OR TYPE), WINCH, WINCH CAT FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY | $56.39 | $33.55 | $89.94 | |
| POWER EQUIPMENT OPERATORS Heavy ENGI0158-028 (HEAVY & HIGHWAY): GROUP 1 ASPHALT CURB MACHINE, SELF PROPELLED, SLIPFORM, AUTOMATED CONCRETE SPREADER (CMI TYPE), AUTOMATIC FINE GRADER, BACKHOE (EXCEPT TRACTOR MOUNTED, RUBBER TIRED), BACKHOE EXCAVATOR FULL SWING (CAT 212 OR SIMILAR TYPE), BACK FILLING MACHINE, BELT PLACER (CMI TYPE), BLACKTOP PLANT (AUTOMATED), BOOM TRUCK , CABLEWAY, CAISSON AUGER, CENTRAL MIX CONCRETE PLANT (AUTOMATED), CONCRETE CURB MACHINE, SELF PROPELLED, SLIPFORM, CONCRETE PUMP, CRANE, CHERRY PICKER, DERRICKS (STEEL ERECTION), DRAGLINE, OVERHEAD CRANE (GANTRY OR STRADDLE TYPE), PILE DRIVER, TRUCK CRANE, DIRECTIONAL DRILLING MACHINE, DREDGE, DUAL DRUM PAVER, EXCAVATOR (ALL PURPOSE HYDRAULICALLY OPERATED) (GRADALL OR SIMILAR), FRONT END LOADER ( 4 CU. YD. AND OVER), HEAD TOWER (SAUERMAN OR EQUAL), HOIST (TWO OR THREE DRUM), HOLLAND LOADER, MAINTENANCE ENGINEER, MINE HOIST, MUCKING MACHINE OR MOLE PAVEMENT BREAKER(SP) WERTGEN; PB-4 AND SIMILAR TYPE, POWER GRADER, PROFILER (OVER 105 H.P.) QUAD 9, QUARRY MASTER (OR EQUIVALENT), SCRAPER, FIREMAN, FORM TAMPER, GROUT PUMP, GUNITE MACHINE, HAMMERS (HYDRAULIC SELF-PROPELLED), HYDRA-SPIKER, RIDE-ON, HYDRAULIC PUMP (JACKING SYSTEM), HYDRO-BLASTER (WATER), MULCHING MACHINE, OILER, PARAPET CONCRETE OR PAVEMENT, SHOVEL, SIDE BOOM, SLIP FORM PAVER, TRACTOR DRAWN, BELTTYPE LOADER, TRUCK OR TRAILER MOUNTED LOG , CHIPPER (SELF FEEDER), TUG OPERATOR (MANNED RENTED EQUIPMENT EXCLUDED), TUNNEL SHOVEL MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY | $57.30 | $33.55 | $90.85 | |
| POWER EQUIPMENT OPERATORS: GROUP 3 Heavy ENGI0158-028 | $53.82 | $33.55 | $87.37 | |
| ROOFER Heavy ROOF0203-001 | $30.50 | $19.84 | $50.34 | |
| ROOFER Residential SUNY2013-005 | $16.61 | 0.00 | $16.61 | |
| ROOFER Building ROOF0008-006 | $50.25 | $39.62 | $89.87 | |
| SHEET METAL WORKER Heavy SHEE0112-004 | $35.94 | $20.89 | $56.83 | |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) Residential SUNY2013-005 | $17.41 | $2.46 | $19.87 | |
| SOFT FLOOR LAYER (HARDWOOD FLOORS) Building CARP0277-031 | $28.90 | $21.63 | $50.53 | |
| SPRINKLER FITTER Heavy SFNY0669-001 | $47.85 | $28.94 | $76.79 | |
| TILE SETTER Building BRNY0003-020 | $30.69 | $20.91 | $51.60 | |
| TRUCK DRIVER GROUP 1 PICKUPS, PANEL TRUCKS, FLATBOY MATERIAL TRUCKS Heavy TEAM0317-003 (STRAIGHT JOBS), SINGLE-AXLE DUMP TRUCKS, DUPSTERS, RECEIVERS, GREASERS, TRUCK TIREMEN, TANDEMS AND BATCH TRUCKS, SEMI-TRAILERS, LOW-BOY TRUCKS, ASPHALT DISTRIBUTOR TRUCKS, & AGITATOR, MIXER TRUCKS & DUMPCRETE TYPE VEHICLES, FUEL TRUCKS FOOTNOTES: PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY PROVIDED EMPLOYEE HAS WORKED THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY. WORK ON HAZARDOUS WASTE SITES RECEIVE ADDITIONAL $1.50/HR | $35.48 | $31.58 | $67.06 | |
| TRUCK DRIVER GROUP 2 SPECIALIZED EARTH MOVING EQUIPMENT-EUCLID TYPE, OR SIMILAR OFF-HIGHWAY EQUIPMENT, WHERE NOT SELF LOADED,STRADDLE Heavy TEAM0317-003 (ROSS) CARRIER, AND SELF-CONTAINED CONCRETE MOBILE UNIT, OFF-HIGHWAY TANDEM BACK-DUMP, TWIN ENGINE EUIPMENT AND DOUBLE-HITCHED EQUIPMENT WHERE NOT SELF LOADED. MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY PROVIDED EMPLOYEE HAS WORKED THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY. WORK ON HAZARDOUS WASTE SITES RECEIVE ADDITIONAL $1.50/HR | $35.83 | $31.58 | $67.41 |
No trade rates match your search and filter selection.
Heavy
Applies to
Albany, Allegany, Bronx, Broome, Cattaraugus, Cayuga, Chautauqua, Chemung, Chenango, Clinton +52 more
Heavy, Highway
Residential
Applies to
Cayuga, Chenango, Cortland, Delaware, Otsego, Sullivan
Building