OR20260001
rev 0Highway
Applies to
Baker, Benton, Clackamas, Clatsop, Columbia, Coos, Crook, Curry, Deschutes, Douglas +26 more
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Get an email when wage determinations covering Clackamas County, Oregon are modified.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Click a row to save its rate for later, then export your selections from the Saved panel.
| Save | Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|---|
| BRICK FINISHER Building BROR0001-008 | $32.68 | $16.48 | $49.16 | |
| BRICKLAYER Highway BROR0001-031 | $49.60 | $25.15 | $74.75 | |
| BRICKLAYER Residential BROR0001-032 | $49.60 | $25.15 | $74.75 | |
| BRICKLAYER Heavy BROR0001-033 | $49.60 | $25.15 | $74.75 | |
| BRICKLAYER Building BROR0001-005 | $49.60 | $25.15 | $74.75 | |
| CABLE SPLICER Highway ELEC0112-001 (BAKER, GILLIAM, GRANT, MORROW, UMATILLA, UNION, WALLOWA, AND WHEELER COUNTIES) | $63.00 | $27.87 | $90.87 | |
| CABLE SPLICER Highway ELEC0280-003 (BENTON, CROOK, DESCHUTES, JEFFERSON, LANE (EAST OF A LINE RUNNING NORTH AND SOUTH FROM THE NORTHEAST CORNER OF COOS COUNTY TO THE SOUTHEAST CORNER OF LINCOLN COUNTY), LINN, MARION, POLK AND YAMHILL (SOUTHERN HALF) COUNTIES) | $60.80 | $22.24 | $83.04 | |
| CABLE SPLICER Highway ELEC0280-003 (BENTON, CROOK, DESCHUTES, JEFFERSON, LANE (EAST OF A LINE RUNNING NORTH AND SOUTH FROM THE NORTHEAST CORNER OF COOS COUNTY TO THE SOUTHEAST CORNER OF LINCOLN COUNTY), LINN, MARION, POLK AND YAMHILL (SOUTHERN HALF) COUNTIES) | $60.80 | $22.24 | $83.04 | |
| CABLE SPLICER Highway ELEC0659-004 (DOUGLAS (EAST OF A LINE RUNNING NORTH AND SOUTH FROM THE NE CORNER OF COOS COUNTY TO THE SE CORNER OF LINCOLN COUNTY), HARNEY, JACKSON, JOSEPHINE, KLAMATH AND LAKE COUNTIES) ZONE PAY: BASE POINTS ARE FROM THE DOWNTOWN POST OFFICE IN GRANTS PASS, KLAMATH FALLS, ROSEBURG AND MEDFORD. ZONE 1: 0-20 MILES MILES $5.00 PER HOUR ZONE 5: >50-60 MILES $6.80 PER HOUR ZONE 6: >60 MILES $9.50 PER HOUR *THESE ARE NOT MILES DRIVEN. ZONES ARE BASED ON DELORNE STREET ATLAS USA 5.0 | $64.58 | $23.31 | $87.89 | |
| CABLE SPLICER Highway ELEC0659-004 (DOUGLAS (EAST OF A LINE RUNNING NORTH AND SOUTH FROM THE NE CORNER OF COOS COUNTY TO THE SE CORNER OF LINCOLN COUNTY), HARNEY, JACKSON, JOSEPHINE, KLAMATH AND LAKE COUNTIES) ZONE PAY: BASE POINTS ARE FROM THE DOWNTOWN POST OFFICE IN GRANTS PASS, KLAMATH FALLS, ROSEBURG AND MEDFORD. ZONE 1: 0-20 MILES MILES $5.00 PER HOUR ZONE 5: >50-60 MILES $6.80 PER HOUR ZONE 6: >60 MILES $9.50 PER HOUR *THESE ARE NOT MILES DRIVEN. ZONES ARE BASED ON DELORNE STREET ATLAS USA 5.0 | $64.58 | $23.31 | $87.89 | |
| CABLE SPLICER (MALHEUR COUNTY) Highway ELEC0291-006 | $46.81 | $19.86 | $66.67 | |
| CAPACITY OR LESS; HYDRAULIC HOES EXCAVATOR: POWER EQUIPMENT OPERATOR GROUP 1A HYDRAULIC CRANE: HYDRAULIC OPERATOR, 200 TONS AND OVER Residential ENGI0701-019 (WITH LUFFING OR TOWER ATTACHMENT); LATTICE BOOM CRANE: OPERATOR, 200 TONS THROUGH 299 TONS, WITH OVER 200 FEET BOOM; ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $3.00 ZONE 3 - $6.00 FOR THE FOLLOWING METROPOLITAN COUNTIES: MULTNOMAH; CLACKAMAS; MARION; WASHINGTON; YAMHILL; AND COLUMBIA; CLARK; AND COWLITZ COUNTY, WASHINGTON WITH MODIFICATIONS AS INDICATED: ALL JOBS OR PROJECTS LOCATED IN MULTNOMAH, CLACKAMAS AND MARION COUNTIES, WEST OF THE WESTERN BOUNDARY OF MT. HOOD NATIONAL FOREST AND WEST OF MILE POST 30 ON INTERSTATE 84 AND WEST OF MILE POST 30 ON STATE HIGHWAY 26 AND WEST OF MILE POST 30 ON HIGHWAY 22 AND ALL JOBS OR PROJECTS LOCATED IN YAMHILL COUNTY, WASHINGTON COUNTY AND COLUMBIA COUNTY AND ALL JOBS OR PORJECTS LOCATED IN CLARK & COWLITZ COUNTY, WASHINGTON EXCEPT THAT PORTION OF COWLITZ COUNTY IN THE MT. ST. HELENS ""BLAST ZONE"" SHALL RECEIVE ZONE I PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED IN THE AREA OUTSIDE THE IDENTIFIED BOUNDARY ABOVE, BUT LESS THAN 50 MILES FROM THE PORTLAND CITY HALL SHALL RECEIVE ZONE II PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 50 MILES FROM THE PORTLAND CITY HALL, BUT OUTSIDE THE IDENTIFIED BORDER ABOVE, SHALL RECEIVE ZONE III PAY FOR ALL CLASSIFICATIONS. FOR THE FOLLOWING CITIES: ALBANY; BEND; COOS BAY; EUGENE; GRANTS PASS; KLAMATH FALLS; MEDFORD; ROSEBURG ALL JOBS OR PROJECTS LOCATED WITHIN 30 MILES OF THE RESPECTIVE CITY HALL OF THE ABOVE MENTIONED CITIES SHALL RECEIVE ZONE I PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 30 MILES AND LESS THAN 50 MILES FROM THE RESPECTIVE CITY HALL OF THE ABOVE MENTIONED CITIES SHALL RECEIVE ZONE II PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 50 MILES FROM THE RESPECTIVE CITY HALL OF THE ABOVE MENTIONED CITIES SHALL RECEIVE ZONE III PAY FOR ALL CLASSIFICATIONS | $58.82 | $16.90 | $75.72 | |
| CAPACITY OR LESS; HYDRAULIC HOES EXCAVATOR: POWER EQUIPMENT OPERATOR GROUP 2 CRANE: CABLEWAY OPERATOR, 25 TONS AND OVER; HYDRAULIC CRANE: HYDRAULIC CRANE OPERATOR 90 TONS THROUGH 199 TONS Residential ENGI0701-019 (WITHOUT LUFFING OR TOWER ATTACHMENT); TOWER/WHIRLEY OPERATOR: TOWER CRANE OPERATOR; WHIRLEY OPERATOR, UNDER 90 TONS; LATTICE BOOM CRANE: 90 THROUGH 199 TONS AND/OR 150 TO 200 FEET BOOM; EXCAVATOR: EXCAVATOR OVER 130,000 LBS.; HYDRAULIC CRANE: HYDRAULIC CRANE OPERATOR, 50 TONS THROUGH 89 TONS (WITH LUFFING OR TOWER ATTACHMENT); BLADE: AUTO GRADER;BLADE OPERATOR-ROBOTIC; RUBBER TIRED SCRAPER WITH TANDOM SCRAPERS, MULTI-ENGINE ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - METROPOLITAN COUNTIES: MULTNOMAH; CLACKAMAS; MARION; WASHINGTON; YAMHILL; AND COLUMBIA; CLARK; AND COWLITZ COUNTY, WASHINGTON WITH MODIFICATIONS AS INDICATED: ALL JOBS OR PROJECTS LOCATED IN MULTNOMAH, CLACKAMAS AND MARION COUNTIES, WEST OF THE WESTERN BOUNDARY OF MT. HOOD NATIONAL FOREST AND WEST OF MILE POST 30 ON INTERSTATE 84 AND WEST OF MILE POST 30 ON STATE HIGHWAY 26 AND WEST OF MILE POST 30 ON HIGHWAY 22 AND ALL JOBS OR PROJECTS LOCATED IN YAMHILL COUNTY, WASHINGTON COUNTY AND COLUMBIA COUNTY AND ALL JOBS OR PORJECTS LOCATED IN CLARK & COWLITZ COUNTY, WASHINGTON EXCEPT THAT PORTION OF COWLITZ COUNTY IN THE MT. ST. HELENS ""BLAST ZONE"" SHALL RECEIVE ZONE I PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED IN THE AREA OUTSIDE THE IDENTIFIED BOUNDARY ABOVE, BUT LESS THAN 50 MILES FROM THE PORTLAND CITY HALL SHALL RECEIVE ZONE II PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 50 MILES FROM THE PORTLAND CITY HALL, BUT OUTSIDE THE IDENTIFIED BORDER ABOVE, SHALL RECEIVE ZONE III PAY FOR ALL CLASSIFICATIONS. FOR THE FOLLOWING CITIES: ALBANY; BEND; COOS BAY; EUGENE; GRANTS PASS; KLAMATH FALLS; MEDFORD; ROSEBURG ALL JOBS OR PROJECTS LOCATED WITHIN 30 MILES OF THE RESPECTIVE CITY HALL OF THE ABOVE MENTIONED CITIES SHALL RECEIVE ZONE I PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 30 MILES AND LESS THAN 50 MILES FROM THE RESPECTIVE CITY HALL OF THE ABOVE MENTIONED CITIES SHALL RECEIVE ZONE II PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 50 MILES FROM THE RESPECTIVE CITY HALL OF THE ABOVE MENTIONED CITIES SHALL RECEIVE ZONE III PAY FOR ALL CLASSIFICATIONS | $54.75 | $16.90 | $71.65 | |
| CAPACITY OR LESS; HYDRAULIC HOES EXCAVATOR: POWER EQUIPMENT OPERATOR GROUP 3 HYDRAULIC CRANE: HYDRAULIC CRANE OPERATOR, 50 TONS THROUGH 89 TONS Residential ENGI0701-019 (WITHOUT LUFFING OR TOWER ATTACHMENT); LATTICE BOOM CRANES: LATTICE BOOM CRANE-50 THROUGH 89 TONS (AND LESS THAN 150 FEET BOOM); EXCAVATOR: EXCAVATOR OVER 80,000 LBS. THROUGH 130,000 LBS.; RUBBER TIRED SCRAPER: WITH TANDOM SCRAPERS; SELF LOADING, PADDLE WHEEL, AUGER TYPE, FINISH AND/OR 2 OR MORE UNITS. ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - METROPOLITAN COUNTIES: MULTNOMAH; CLACKAMAS; MARION; WASHINGTON; YAMHILL; AND COLUMBIA; CLARK; AND COWLITZ COUNTY, WASHINGTON WITH MODIFICATIONS AS INDICATED: ALL JOBS OR PROJECTS LOCATED IN MULTNOMAH, CLACKAMAS AND MARION COUNTIES, WEST OF THE WESTERN BOUNDARY OF MT. HOOD NATIONAL FOREST AND WEST OF MILE POST 30 ON INTERSTATE 84 AND WEST OF MILE POST 30 ON STATE HIGHWAY 26 AND WEST OF MILE POST 30 ON HIGHWAY 22 AND ALL JOBS OR PROJECTS LOCATED IN YAMHILL COUNTY, WASHINGTON COUNTY AND COLUMBIA COUNTY AND ALL JOBS OR PORJECTS LOCATED IN CLARK & COWLITZ COUNTY, WASHINGTON EXCEPT THAT PORTION OF COWLITZ COUNTY IN THE MT. ST. HELENS ""BLAST ZONE"" SHALL RECEIVE ZONE I PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED IN THE AREA OUTSIDE THE IDENTIFIED BOUNDARY ABOVE, BUT LESS THAN 50 MILES FROM THE PORTLAND CITY HALL SHALL RECEIVE ZONE II PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 50 MILES FROM THE PORTLAND CITY HALL, BUT OUTSIDE THE IDENTIFIED BORDER ABOVE, SHALL RECEIVE ZONE III PAY FOR ALL CLASSIFICATIONS. FOR THE FOLLOWING CITIES: ALBANY; BEND; COOS BAY; EUGENE; GRANTS PASS; KLAMATH FALLS; MEDFORD; ROSEBURG ALL JOBS OR PROJECTS LOCATED WITHIN 30 MILES OF THE RESPECTIVE CITY HALL OF THE ABOVE MENTIONED CITIES SHALL RECEIVE ZONE I PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 30 MILES AND LESS THAN 50 MILES FROM THE RESPECTIVE CITY HALL OF THE ABOVE MENTIONED CITIES SHALL RECEIVE ZONE II PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 50 MILES FROM THE RESPECTIVE CITY HALL OF THE ABOVE MENTIONED CITIES SHALL RECEIVE ZONE III PAY FOR ALL CLASSIFICATIONS | $53.60 | $16.90 | $70.50 | |
| CARPENTER (DRYWALL HANGING ONLY) Residential SUOR2009-010 | $19.31 | $2.30 | $21.61 | |
| CARPENTER (FORM WORK ONLY) Residential SUOR2009-010 | $19.50 | $4.95 | $24.45 | |
| CARPENTER (INCLUDING FORM WORK) Heavy CARP0503-017 | $53.94 | $16.81 | $70.75 | |
| CARPENTER, INCLUDES FORM WORK Building CARP0503-003 | $52.62 | $16.81 | $69.43 | |
| CARPENTER, INCLUDING ACCOUSTICAL CEILING INSTALLATION AND METAL STUD INSTALLATION Residential CARP0503-009 (SINGLE UNIT) | $33.48 | $14.03 | $47.51 | |
| CARPENTER, INCLUDING ACCOUSTICAL CEILING INSTALLATION AND METAL STUD INSTALLATION Residential CARP0503-009 (MULTI UNIT) | $36.27 | $14.03 | $50.30 | |
| CARPENTERS: EMPLOYEES MAY BE REQUIRED TO PERFORM ANY COMBINATION OF WORK WITHIN THE DIVING TEAM/CREW Highway CARP0503-020 (EXCEPT FOR DIVE SUPERVISOR) PROVIDED THEY ARE PAID AT THE HIGHEST RATE OF PAY THAT THEY RECEIVED DURING THEIR SHIFT | $53.94 | $16.81 | $70.75 | |
| CAULKER Building BROR0001-010 | $47.58 | $28.45 | $76.03 | |
| CEMENT MASON Highway PLAS0555-001 (ZONE1) ZONE DIFFERENTIAL FOR CEMENT MASON - ADD TO BASIC HOURLY RATE FOR THE FOLLOWING CITIES: (REFERENCE CITY) BEND, PORTLAND, PENDLETON, MEDFORD, CORVALLIS, SALEM, EUGENE, THE DALLES, VANCOUVER WHEN A CONTRACTOR TAKES CURRENT EMPLOYEES TO A PROJECT THAT IS LOCATED MORE THAN 59 MILES FROM THE CITY HALL OF THE REFERENCE CITY THAT IS CLOSEST TO THE CONTRACTOR'S PLACE OF BUSINESS, ZONE PAY IS TO BE PAID FOR THE DISTANCE BETWEEN THE CITY HALL OF THE IDENTIFIED REFERENCE CITY AND THE PROJECT SITE, PER THE FOLLOWING: ZONE A - 60-79 MILES - ADDITIONAL $3.00 HOURLY PREMIUM ABOVE THE BASE RATE OF ALL CLASSIFICATION AS LISTED IN SCHEDULE ""A"". ZONE B - 80-99 MILES - ADDITIONAL CLASSIFICATIONS AS LISTED IN SCHEDULE ""A"" ZONE C -100 OR MORE MILES - ADDITIONAL $10.00 HOURLY PREMIUM ABOVE THE BASE RATE OF ALL CLASSIFICATIONS AS LISTED IN SCHEDULE ""A"" | $46.13 | $20.31 | $66.44 | |
| CEMENT MASON/CONCRETE FINISHER Residential PLAS0555-003 | $46.13 | $20.31 | $66.44 | |
| CEMENT MASON/CONCRETE FINISHER Heavy PLAS0555-006 | $46.13 | $20.31 | $66.44 | |
| CEMENT MASON/CONCRETE FINISHER Building PLAS0555-007 | $46.13 | $20.31 | $66.44 | |
| CEMENT MASONS Highway PLAS0555-001 (ZONE1) ON SUSPENDED, SWINGING AND/OR HANGING SCAFFOLD ZONE DIFFERENTIAL FOR CEMENT MASON - ADD TO BASIC HOURLY RATE FOR THE FOLLOWING CITIES: BEND, PORTLAND, PENDLETON, MEDFORD, CORVALLIS, SALEM, EUGENE, THE DALLES, VANCOUVER WHEN A CONTRACTOR TAKES CURRENT EMPLOYEES TO A PROJECT THAT IS LOCATED MORE THAN 59 MILES FROM THE CITY HALL OF THE REFERENCE CITY THAT IS CLOSEST TO THE CONTRACTOR'S PLACE OF BUSINESS, ZONE PAY IS TO BE PAID FOR THE DISTANCE BETWEEN THE CITY HALL OF THE IDENTIFIED REFERENCE CITY AND THE PROJECT SITE, PER THE FOLLOWING: ZONE A - 60-79 MILES - ADDITIONAL $3.00 HOURLY PREMIUM ABOVE THE BASE RATE OF ALL CLASSIFICATION AS LISTED IN SCHEDULE ""A"". ZONE B - 80-99 MILES - ADDITIONAL $5.00 HOURLY PREMIUM ABOVE THE BASE RATE OF ALL CLASSIFICATIONS AS LISTED IN SCHEDULE ""A"" ZONE C -100 OR MORE MILES - ADDITIONAL $10.00 HOURLY PREMIUM ABOVE THE BASE RATE OF ALL CLASSIFICATIONS AS LISTED IN SCHEDULE ""A | $47.09 | $20.31 | $67.40 | |
| CEMENT MASONS Highway PLAS0555-001 (ZONE 1) DOING BOTH COMPOSITION/POWER MACHINERY AND SUSPENDED/HANGING SCAFFOLD ZONE DIFFERENTIAL FOR CEMENT MASON - ADD TO BASIC HOURLY RATE FOR THE FOLLOWING CITIES: BEND, PORTLAND, PENDLETON, MEDFORD, CORVALLIS, SALEM, EUGENE, THE DALLES, VANCOUVER WHEN A CONTRACTOR TAKES CURRENT EMPLOYEES TO A PROJECT THAT IS LOCATED MORE THAN 59 MILES FROM THE CITY HALL OF THE REFERENCE CITY THAT IS CLOSEST TO THE CONTRACTOR'S PLACE OF BUSINESS, ZONE PAY IS TO BE PAID FOR THE DISTANCE BETWEEN THE CITY HALL OF THE IDENTIFIED REFERENCE CITY AND THE PROJECT SITE, PER THE FOLLOWING: ZONE A - 60-79 MILES - ADDITIONAL $3.00 HOURLY PREMIUM ABOVE THE BASE RATE OF ALL CLASSIFICATION AS LISTED IN SCHEDULE ""A"". ZONE B - 80-99 MILES - ADDITIONAL CLASSIFICATIONS AS LISTED IN SCHEDULE ""A"" ZONE C -100 OR MORE MILES - ADDITIONAL $10.00 HOURLY PREMIUM ABOVE THE BASE RATE OF ALL CLASSIFICATIONS AS LISTED IN SCHEDULE ""A | $48.05 | $20.31 | $68.36 | |
| DRYWALL FINISHER/TAPER Building PAIN0010-009 | $45.52 | $22.03 | $67.55 | |
| DRYWALL HANGER Building CARP0503-001 | $52.43 | $17.01 | $69.44 | |
| ELECTRICIAN Highway ELEC0112-001 (BAKER, GILLIAM, GRANT, MORROW, UMATILLA, UNION, WALLOWA, AND WHEELER COUNTIES) | $60.00 | $27.78 | $87.78 | |
| ELECTRICIAN Highway ELEC0280-003 (BENTON, CROOK, DESCHUTES, JEFFERSON, LANE (EAST OF A LINE RUNNING NORTH AND SOUTH FROM THE NORTHEAST CORNER OF COOS COUNTY TO THE SOUTHEAST CORNER OF LINCOLN COUNTY), LINN, MARION, POLK AND YAMHILL (SOUTHERN HALF) COUNTIES) | $56.46 | $23.05 | $79.51 | |
| ELECTRICIAN Highway ELEC0280-003 (BENTON, CROOK, DESCHUTES, JEFFERSON, LANE (EAST OF A LINE RUNNING NORTH AND SOUTH FROM THE NORTHEAST CORNER OF COOS COUNTY TO THE SOUTHEAST CORNER OF LINCOLN COUNTY), LINN, MARION, POLK AND YAMHILL (SOUTHERN HALF) COUNTIES) | $56.46 | $23.05 | $79.51 | |
| ELECTRICIAN Highway ELEC0659-004 (DOUGLAS (EAST OF A LINE RUNNING NORTH AND SOUTH FROM THE NE CORNER OF COOS COUNTY TO THE SE CORNER OF LINCOLN COUNTY), HARNEY, JACKSON, JOSEPHINE, KLAMATH AND LAKE COUNTIES) ZONE PAY: BASE POINTS ARE FROM THE DOWNTOWN POST OFFICE IN GRANTS PASS, KLAMATH FALLS, ROSEBURG AND MEDFORD. ZONE 1: 0-20 MILES $0.00 PER HOUR ZONE 2: > 20-30 MILES MILES $6.80 PER HOUR ZONE 6: >60 MILES $9.50 PER HOUR *THESE ARE NOT MILES DRIVEN. ZONES ARE BASED ON DELORNE STREET ATLAS USA 5.0 | $47.04 | $21.84 | $68.88 | |
| ELECTRICIAN Highway ELEC0659-004 (DOUGLAS (EAST OF A LINE RUNNING NORTH AND SOUTH FROM THE NE CORNER OF COOS COUNTY TO THE SE CORNER OF LINCOLN COUNTY), HARNEY, JACKSON, JOSEPHINE, KLAMATH AND LAKE COUNTIES) ZONE PAY: BASE POINTS ARE FROM THE DOWNTOWN POST OFFICE IN GRANTS PASS, KLAMATH FALLS, ROSEBURG AND MEDFORD. ZONE 1: 0-20 MILES $0.00 PER HOUR ZONE 2: > 20-30 MILES MILES $6.80 PER HOUR ZONE 6: >60 MILES $9.50 PER HOUR *THESE ARE NOT MILES DRIVEN. ZONES ARE BASED ON DELORNE STREET ATLAS USA 5.0 | $47.04 | $21.84 | $68.88 | |
| ELECTRICIAN Highway ELEC0932-004 (COOS, CURRY, LINCOLN, DOUGLAS AND LANE COUNTIES (AREA LYING WEST OF A LINE NORTH AND SOUTH FROM THE N.E. CORNER OF COOS COUNTY TO THE S.E. CORNER OF LINCOLN COUNTY)) | $50.03 | $24.00 | $74.03 | |
| ELECTRICIAN Residential ELEC0048-016 | $41.67 | $19.08 | $60.75 | |
| ELECTRICIAN Heavy ELEC0048-018 Scope differs by code/WD | $63.50 | $29.73 | $93.23 | |
| ELECTRICIAN Heavy ELEC0048-026 (LOW VOLTAGE WIRING INSTALLER FOR FIRE ALARM, NURSE CALL, BURGLAR ALARM, SECURITY AND VOICE EVACUATION SYSTEMS AND OTHER SYSTEMS THAT ARE PART OF A FIRE OR LIFE SAFETY SYSTEM.) | $52.12 | $24.37 | $76.49 | |
| ELECTRICIAN Heavy ELEC0048-026 (LOW VOLTAGE WIRING INSTALLER FOR ALL OTHER WORK) | $42.68 | $23.14 | $65.82 | |
| ELECTRICIAN Building ELEC0048-005 (COMMUNICATION TECHNICIAN/LOW VOLTAGE WIRING ONLY) | $52.12 | $24.37 | $76.49 | |
| ELECTRICIAN Building ELEC0048-009 Scope differs by code/WD | $63.50 | $29.73 | $93.23 | |
| ELECTRICIAN (MALHEUR COUNTY) Highway ELEC0291-006 | $42.55 | $19.86 | $62.41 | |
| FENCE ERECTOR (CHAIN LINK/CYCLONE FENCE) Residential SUOR2009-010 | $16.30 | $2.22 | $18.52 | |
| FLOOR LAYER: SOFT FLOORS Building PAIN1236-001 | $41.77 | $21.18 | $62.95 | |
| FOR THE FOLLOWING METROPOLITAN COUNTIES: POWER EQUIPMENT OPERATOR GROUP 1A HYDRAULIC CRANE: HYDRAULIC OPERATOR, 200 TONS AND OVER Heavy ENGI0701-029 (WITH LUFFING OR TOWER ATTACHMENT); LATTICE BOOM CRANE: OPERATOR, 200 TONS THROUGH 299 TONS, WITH OVER 200 FEET BOOM; ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $3.00 ZONE 3 - $6.00 FOR THE FOLLOWING METROPOLITAN COUNTIES: MULTNOMAH; CLACKAMAS; MARION; WASHINGTON; YAMHILL; AND COLUMBIA; CLARK; AND COWLITZ COUNTY, WASHINGTON WITH MODIFICATIONS AS INDICATED: ALL JOBS OR PROJECTS LOCATED IN MULTNOMAH, CLACKAMAS AND MARION COUNTIES, WEST OF THE WESTERN BOUNDARY OF MT. HOOD NATIONAL FOREST AND WEST OF MILE POST 30 ON INTERSTATE 84 AND WEST OF MILE POST 30 ON STATE HIGHWAY 26 AND WEST OF MILE POST 30 ON HIGHWAY 22 AND ALL JOBS OR PROJECTS LOCATED IN YAMHILL COUNTY, WASHINGTON COUNTY AND COLUMBIA COUNTY AND ALL JOBS OR PORJECTS LOCATED IN CLARK & COWLITZ COUNTY, WASHINGTON EXCEPT THAT PORTION OF COWLITZ COUNTY IN THE MT. ST. HELENS ""BLAST ZONE"" SHALL RECEIVE ZONE I PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED IN THE AREA OUTSIDE THE IDENTIFIED BOUNDARY ABOVE, BUT LESS THAN 50 MILES FROM THE PORTLAND CITY HALL SHALL RECEIVE ZONE II PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 50 MILES FROM THE PORTLAND CITY HALL, BUT OUTSIDE THE IDENTIFIED BORDER ABOVE, SHALL RECEIVE ZONE III PAY FOR ALL CLASSIFICATIONS. FOR THE FOLLOWING CITIES: ALBANY; BEND; COOS BAY; EUGENE; GRANTS PASS; KLAMATH FALLS; MEDFORD; ROSEBURG ALL JOBS OR PROJECTS LOCATED WITHIN 30 MILES OF THE RESPECTIVE CITY HALL OF THE ABOVE MENTIONED CITIES SHALL RECEIVE ZONE I PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 30 MILES AND LESS THAN 50 MILES FROM THE RESPECTIVE CITY HALL OF THE ABOVE MENTIONED CITIES SHALL RECEIVE ZONE II PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 50 MILES FROM THE RESPECTIVE CITY HALL OF THE ABOVE MENTIONED CITIES SHALL RECEIVE ZONE III PAY FOR ALL CLASSIFICATIONS | $58.82 | $16.90 | $75.72 | |
| FOR THE FOLLOWING METROPOLITAN COUNTIES: POWER EQUIPMENT OPERATOR GROUP 2 CRANE: CABLEWAY OPERATOR, 25 TONS AND OVER; HYDRAULIC CRANE: HYDRAULIC CRANE OPERATOR 90 TONS THROUGH 199 TONS Heavy ENGI0701-029 (WITHOUT LUFFING OR TOWER ATTACHMENT); TOWER/WHIRLEY OPERATOR: TOWER CRANE OPERATOR; WHIRLEY OPERATOR, UNDER 90 TONS; LATTICE BOOM CRANE: 90 THROUGH 199 TONS AND/OR 150 TO 200 FEET BOOM; HYDRAULIC CRANE: HYDRAULIC CRANE OPERATOR, 50 TONS THROUGH 89 TONS (WITH LUFFING OR TOWER ATTACHMENT); RUBBER TIRED SCRAPER WITH TANDOM SCRAPERS, MULTI-ENGINETRENCHING MACHINE-WHEEL OPERATOR; LOADER 120,000 LBS AND ABOVE; BLADE: AUTO GRADER; BLADE OPERATOR-ROBOTIC; BULLDOZER OVER 120,000 LBS AND ABOVE; CRANE: DERRICK BARGE OPERATOR 30 TON BUT LESS THAN 150 TON; EXCAVATOR OVER 130,000 LBS AND ABOVE ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $3.00 ZONE 3 - $6.00 MULTNOMAH; CLACKAMAS; MARION; WASHINGTON; YAMHILL; AND COLUMBIA; CLARK; AND COWLITZ COUNTY, WASHINGTON WITH MODIFICATIONS AS INDICATED: ALL JOBS OR PROJECTS LOCATED IN MULTNOMAH, CLACKAMAS AND MARION COUNTIES, WEST OF THE WESTERN BOUNDARY OF MT. HOOD NATIONAL FOREST AND WEST OF MILE POST 30 ON INTERSTATE 84 AND WEST OF MILE POST 30 ON STATE HIGHWAY 26 AND WEST OF MILE POST 30 ON HIGHWAY 22 AND ALL JOBS OR PROJECTS LOCATED IN YAMHILL COUNTY, WASHINGTON COUNTY AND COLUMBIA COUNTY AND ALL JOBS OR PORJECTS LOCATED IN CLARK & COWLITZ COUNTY, WASHINGTON EXCEPT THAT PORTION OF COWLITZ COUNTY IN THE MT. ST. HELENS ""BLAST ZONE"" SHALL RECEIVE ZONE I PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED IN THE AREA OUTSIDE THE IDENTIFIED BOUNDARY ABOVE, BUT LESS THAN 50 MILES FROM THE PORTLAND CITY HALL SHALL RECEIVE ZONE II PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 50 MILES FROM THE PORTLAND CITY HALL, BUT OUTSIDE THE IDENTIFIED BORDER ABOVE, SHALL RECEIVE ZONE III PAY FOR ALL CLASSIFICATIONS. FOR THE FOLLOWING CITIES: ALBANY; BEND; COOS BAY; EUGENE; GRANTS PASS; KLAMATH FALLS; MEDFORD; ROSEBURG ALL JOBS OR PROJECTS LOCATED WITHIN 30 MILES OF THE RESPECTIVE CITY HALL OF THE ABOVE MENTIONED CITIES SHALL RECEIVE ZONE I PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 30 MILES AND LESS THAN 50 MILES FROM THE RESPECTIVE CITY HALL OF THE ABOVE MENTIONED CITIES SHALL RECEIVE ZONE II PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 50 MILES FROM THE RESPECTIVE CITY HALL OF THE ABOVE MENTIONED CITIES SHALL RECEIVE ZONE III PAY FOR ALL CLASSIFICATIONS | $54.75 | $16.90 | $71.65 | |
| FOR THE FOLLOWING METROPOLITAN COUNTIES: POWER EQUIPMENT OPERATOR GROUP 3 HYDRAULIC CRANE: HYDRAULIC CRANE OPERATOR, 50 TONS THROUGH 89 TONS Heavy ENGI0701-029 (WITHOUT LUFFING OR TOWER ATTACHMENT); LATTICE BOOM CRANES: LATTICE BOOM CRANE-50 THROUGH 89 TONS (AND LESS THAN 150 FEET BOOM); RUBBER TIRED SCRAPER: WITH TANDOM SCRAPERS; SELF LOADING, PADDLE WHEEL, AUGER TYPE, FINISH AND/OR 2 OR MORE UNITS; LOADER 60,000 LBS AND LESS THAN 120,000 LBS; BULLDOZER OVER 70,000 LBS UP TO AND INCLUDING 120,000 LBS; EXCAVATOR OVER 80,000 LBS THROUGH 130,000 LBS ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $3.00 ZONE 3 - $6.00 FOR THE FOLLOWING METROPOLITAN COUNTIES: MULTNOMAH; CLACKAMAS; MARION; WASHINGTON; YAMHILL; AND COLUMBIA; CLARK; AND COWLITZ COUNTY, WASHINGTON WITH MODIFICATIONS AS INDICATED: ALL JOBS OR PROJECTS LOCATED IN MULTNOMAH, CLACKAMAS AND MARION COUNTIES, WEST OF THE WESTERN BOUNDARY OF MT. HOOD NATIONAL FOREST AND WEST OF MILE POST 30 ON INTERSTATE 84 AND WEST OF MILE POST 30 ON STATE HIGHWAY 26 AND WEST OF MILE POST 30 ON HIGHWAY 22 AND ALL JOBS OR PROJECTS LOCATED IN YAMHILL COUNTY, WASHINGTON COUNTY AND COLUMBIA COUNTY AND ALL JOBS OR PORJECTS LOCATED IN CLARK & COWLITZ COUNTY, WASHINGTON EXCEPT THAT PORTION OF COWLITZ COUNTY IN THE MT. ST. HELENS ""BLAST ZONE"" SHALL RECEIVE ZONE I PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED IN THE AREA OUTSIDE THE IDENTIFIED BOUNDARY ABOVE, BUT LESS THAN 50 MILES FROM THE PORTLAND CITY HALL SHALL RECEIVE ZONE II PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 50 MILES FROM THE PORTLAND CITY HALL, BUT OUTSIDE THE IDENTIFIED BORDER ABOVE, SHALL RECEIVE ZONE III PAY FOR ALL CLASSIFICATIONS. FOR THE FOLLOWING CITIES: ALBANY; BEND; COOS BAY; EUGENE; GRANTS PASS; KLAMATH FALLS; MEDFORD; ROSEBURG ALL JOBS OR PROJECTS LOCATED WITHIN 30 MILES OF THE RESPECTIVE CITY HALL OF THE ABOVE MENTIONED CITIES SHALL RECEIVE ZONE I PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 30 MILES AND LESS THAN 50 MILES FROM THE RESPECTIVE CITY HALL OF THE ABOVE MENTIONED CITIES SHALL RECEIVE ZONE II PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 50 MILES FROM THE RESPECTIVE CITY HALL OF THE ABOVE MENTIONED CITIES SHALL RECEIVE ZONE III PAY FOR ALL CLASSIFICATIONS | $53.60 | $16.90 | $70.50 | |
| GLAZIER Building PAIN0740-001 | $53.15 | $23.21 | $76.36 | |
| HEAT & FROST INSULATOR Building ASBE0036-003 | $62.02 | $22.36 | $84.38 | |
| HEAT & FROST INSULATOR (FIRE STOP TECHNICIAN) Building ASBE0036-005 | $46.64 | $18.88 | $65.52 | |
| HIGHWAY/PARKING LOT STRIPING: PAINTER Residential PAIN0010-003 | $41.19 | $17.09 | $58.28 | |
| IRONWORKER Highway IRON0029-004 | $48.31 | $34.52 | $82.83 | |
| IRONWORKER Heavy IRON0029-011 (ORNAMENTAL, REINFORCING, AND STRUCTURAL) | $48.31 | $34.52 | $82.83 | |
| IRONWORKER Building IRON0029-001 | $48.31 | $34.52 | $82.83 | |
| LABORER: ASPHALT SPREADER Heavy SUOR2009-051 | $22.18 | $9.39 | $31.57 | |
| LABORER: COMMON OR GENERAL Heavy SUOR2009-051 | $22.34 | $7.86 | $30.20 | |
| LABORER: COMMON OR GENERAL Building LABO0737-035 | $39.11 | $17.30 | $56.41 | |
| LABORER: CONCRETE SAW Building LABO0737-037 | $40.41 | $17.30 | $57.71 | |
| LABORER: FLAGGER Heavy SUOR2009-051 | $20.70 | $5.48 | $26.18 | |
| LABORER: FORM-STRIPPING Heavy SUOR2009-051 | $19.27 | $6.32 | $25.59 | |
| LABORER: HOD CARRIER Building LABO0737-036 | $43.79 | $17.05 | $60.84 | |
| LABORER: LANDSCAPE Heavy SUOR2009-051 | $19.01 | $7.45 | $26.46 | |
| LABORER: LANDSCAPE Building SUOR2018-015 | $16.02 | 0.00 | $16.02 | |
| LABORER: MASON TENDER - BRICK Residential SUOR2009-010 | $20.60 | 0.00 | $20.60 | |
| LABORER: MASON TENDER - BRICK Heavy SUOR2009-051 | $28.14 | $4.53 | $32.67 | |
| LABORER: MASON TENDER - CEMENT/CONCRETE Residential SUOR2009-010 | $22.18 | $7.40 | $29.58 | |
| LABORER: MASON TENDER - CEMENT/CONCRETE Building LABO0737-025 | $43.79 | $17.05 | $60.84 | |
| LABORER: PIPELAYER Heavy SUOR2009-051 | $23.93 | $7.46 | $31.39 | |
| LABORER: PIPELAYER Building LABO0737-038 | $40.41 | $17.30 | $57.71 | |
| LABORER: WATER, SEWER, UNDERGROUND Heavy SUOR2009-051 | $17.00 | $1.75 | $18.75 | |
| LABORERS: (MASON TENDER-CEMENT/CONCRETE) Heavy LABO0737-005 | $43.79 | $17.05 | $60.84 | |
| LABORERS: GROUP 1 BLASTER, DEMOLITION; CHAIN SAW Heavy LABO0737-024 | $39.11 | $17.30 | $56.41 | |
| LABORERS: GROUP 1 COMMON OR GENERAL LABORER Residential LABO0737-011 | $39.11 | $17.30 | $56.41 | |
| LABORERS: GROUP 2 ASPHALT RAKER; GRADE CHECKER; PIPELAYERS Residential LABO0737-011 | $40.41 | $17.30 | $57.71 | |
| LABORERS: GROUP 2 GRADE CHECKER; VIBRATING PLATE Heavy LABO0737-024 | $40.41 | $17.30 | $57.71 | |
| LABORERS: GROUP 3 TRAFFIC CONTROL-CONE SETTER Heavy LABO0737-024 | $34.39 | $17.30 | $51.69 | |
| LABORERS: GROUP 3 TRAFFIC FLAGGERS Residential LABO0737-011 | $34.39 | $17.30 | $51.69 | |
| LABORERS:: GROUP 1 Highway LABO0737-008 (ZONE 1: LABORERS (SEE FOOTNOTE C)) | $39.00 | $17.30 | $56.30 | |
| LABORERS:: GROUP 2 Highway LABO0737-008 (ZONE 1: LABORERS (SEE FOOTNOTE C)) | $40.41 | $17.30 | $57.71 | |
| LABORERS:: GROUP 3 Highway LABO0737-008 (ZONE 1: LABORERS (SEE FOOTNOTE C)) | $34.39 | $17.30 | $51.69 | |
| MASON TENDER/HOD CARRIER Highway LABO0737-001 (TENDERS TO BRICKLAYERS, TILE SETTERS, MARBLE SETTERS AND TERRAZZO WORKERS, TOPPING FOR CEMENT FINISHERS AND MORTAR MIXERS) | $43.79 | $17.05 | $60.84 | |
| MILLWRIGHT Highway CARP0096-005 | $59.35 | $22.38 | $81.73 | |
| MILLWRIGHT Heavy CARP0096-006 | $59.35 | $22.38 | $81.73 | |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE Building ENGI0701-006 | $54.75 | $16.90 | $71.65 | |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER Building SUOR2018-015 | $20.43 | $2.31 | $22.74 | |
| OPERATOR: BULLDOZER Building ENGI0701-001 | $54.75 | $16.90 | $71.65 | |
| OPERATOR: COMPACTOR Heavy SUOR2009-051 | $28.99 | $5.02 | $34.01 | |
| OPERATOR: CRANE (300-399 TON) Building ENGI0701-044 | $58.82 | $16.90 | $75.72 | |
| OPERATOR: CRANE (90-199 TON) Building ENGI0701-044 | $54.75 | $16.90 | $71.65 | |
| OPERATOR: DRILL Building SUOR2018-015 | $29.27 | 0.00 | $29.27 | |
| OPERATOR: FORKLIFT Building ENGI0701-041 | $45.81 | $16.90 | $62.71 | |
| OPERATOR: GRADER/BLADE Building ENGI0701-001 | $54.75 | $16.90 | $71.65 | |
| OPERATOR: LOADER Building ENGI0701-001 | $54.75 | $16.90 | $71.65 | |
| OPERATOR: OILER Building ENGI0701-041 | $45.81 | $16.90 | $62.71 | |
| OPERATOR: PAVER Building SUOR2018-015 (ASPHALT, AGGREGATE, AND CONCRETE) | $35.76 | $3.60 | $39.36 | |
| OPERATOR: PUMP Building ENGI0701-043 | $49.03 | $16.90 | $65.93 | |
| OPERATOR: ROLLER Building ENGI0701-042 | $50.27 | $16.90 | $67.17 | |
| OPERATOR: ROTOMILL Heavy SUOR2009-051 | $28.25 | $9.70 | $37.95 | |
| OPERATOR: TRACTOR Heavy SUOR2009-051 | $20.00 | $0.73 | $20.73 | |
| PAINTER Highway PAIN0010-008 | $40.25 | $16.67 | $56.92 | |
| PAINTER Building PAIN0010-010 | $40.85 | $16.68 | $57.53 | |
| PAINTER (HIGHWAY & PARKING LOT STRIPER) Highway PAIN0010-005 | $41.19 | $17.09 | $58.28 | |
| PAINTER (HIGHWAY & PARKING LOT STRIPER) Heavy PAIN0010-005 | $41.19 | $17.09 | $58.28 | |
| PAINTERS: (BRUSH, ROLLER AND SPRAY) Residential PAIN0010-002 | $40.85 | $16.68 | $57.53 | |
| PAINTERS: (BRUSH, ROLLER AND SPRAY) Heavy PAIN0010-006 | $39.94 | $16.68 | $56.62 | |
| PILEDRIVER Highway CARP0196-003 | $55.79 | $15.81 | $71.60 | |
| PILEDRIVERMAN Heavy CARP0503-017 | $53.94 | $16.81 | $70.75 | |
| PIPEFITTER Heavy PLUM0290-012 | $60.77 | $34.72 | $95.49 | |
| PIPEFITTER Building PLUM0290-001 | $60.77 | $34.72 | $95.49 | |
| PLASTERER Residential SUOR2009-010 | $19.91 | 0.00 | $19.91 | |
| PLASTERER Building SUOR2018-015 | $23.66 | 0.00 | $23.66 | |
| PLUMBER Building PLUM0290-002 | $60.77 | $34.72 | $95.49 | |
| PLUMBER (INCLUDING HVAC PIPE INSTALLATION) Residential PLUM0290-007 | $48.62 | $34.72 | $83.34 | |
| POWER EQUIPMENT OPERATOR GROUP 1 Highway ENGI0701-005 (ZONE 1: POWER EQUIPMENT OPERATORS (SEE FOOTNOTE C)) | $56.66 | $16.90 | $73.56 | |
| POWER EQUIPMENT OPERATOR GROUP 1A Highway ENGI0701-005 (ZONE 1: POWER EQUIPMENT OPERATORS (SEE FOOTNOTE C)) | $58.82 | $16.90 | $75.72 | |
| POWER EQUIPMENT OPERATOR GROUP 1B Highway ENGI0701-005 (ZONE 1: POWER EQUIPMENT OPERATORS (SEE FOOTNOTE C)) | $60.98 | $16.90 | $77.88 | |
| POWER EQUIPMENT OPERATOR GROUP 2 Highway ENGI0701-005 (ZONE 1: POWER EQUIPMENT OPERATORS (SEE FOOTNOTE C)) | $54.75 | $16.90 | $71.65 | |
| POWER EQUIPMENT OPERATOR GROUP 3 Highway ENGI0701-005 (ZONE 1: POWER EQUIPMENT OPERATORS (SEE FOOTNOTE C)) | $53.60 | $16.90 | $70.50 | |
| POWER EQUIPMENT OPERATOR GROUP 4 Highway ENGI0701-005 (ZONE 1: POWER EQUIPMENT OPERATORS (SEE FOOTNOTE C)) | $50.27 | $16.90 | $67.17 | |
| POWER EQUIPMENT OPERATOR GROUP 5 Highway ENGI0701-005 (ZONE 1: POWER EQUIPMENT OPERATORS (SEE FOOTNOTE C)) | $49.03 | $16.90 | $65.93 | |
| POWER EQUIPMENT OPERATOR GROUP 5 TRACKHOE/BACKHOE HYDRAULIC: TRACK TYPE UP TO AND INCLUDING 20,000 LBS, WHEEL TYPE Heavy ENGI0701-029 (FORD, JOHN DEER, CASE TYPE); BOOM TRUCK OPERATOR; DRILLING: CHURM DRILL AND EARTH BORING MACHINE OPERATOR; DIRECTIONAL DRILL OPERATOR LESS THAN 20,000 LBS PULLBACK; CONCRETE PUMPER; CONCRETE PAVER: COMPACTOR; LOADERS, RUBBER TIRED TYPE , LESS THAN 25,00 LBS; FORKLIFT OVER 5 TON, BULLDOZER 20,000 LBS OR 100 HORSES OR LESS; MIXER OPERATOR; ROLLER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $3.00 ZONE 3 - $6.00 FOR THE FOLLOWING METROPOLITAN COUNTIES: MULTNOMAH; CLACKAMAS; MARION; WASHINGTON; YAMHILL; AND COLUMBIA; CLARK; AND COWLITZ COUNTY, WASHINGTON WITH MODIFICATIONS AS INDICATED: ALL JOBS OR PROJECTS LOCATED IN MULTNOMAH, CLACKAMAS AND MARION COUNTIES, WEST OF THE WESTERN BOUNDARY OF MT. HOOD NATIONAL FOREST AND WEST OF MILE POST 30 ON INTERSTATE 84 AND WEST OF MILE POST 30 ON STATE HIGHWAY 26 AND WEST OF MILE POST 30 ON HIGHWAY 22 AND ALL JOBS OR PROJECTS LOCATED IN YAMHILL COUNTY, WASHINGTON COUNTY AND COLUMBIA COUNTY AND ALL JOBS OR PORJECTS LOCATED IN CLARK & COWLITZ COUNTY, WASHINGTON EXCEPT THAT PORTION OF COWLITZ COUNTY IN THE MT. ST. HELENS ""BLAST ZONE"" SHALL RECEIVE ZONE I PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED IN THE AREA OUTSIDE THE IDENTIFIED BOUNDARY ABOVE, BUT LESS THAN 50 MILES FROM THE PORTLAND CITY HALL SHALL RECEIVE ZONE II PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 50 MILES FROM THE PORTLAND CITY HALL, BUT OUTSIDE THE IDENTIFIED BORDER ABOVE, SHALL RECEIVE ZONE III PAY FOR ALL CLASSIFICATIONS. FOR THE FOLLOWING CITIES: ALBANY; BEND; COOS BAY; EUGENE; GRANTS PASS; KLAMATH FALLS; MEDFORD; ROSEBURG ALL JOBS OR PROJECTS LOCATED WITHIN 30 MILES OF THE RESPECTIVE CITY HALL OF THE ABOVE MENTIONED CITIES SHALL RECEIVE ZONE I PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 30 MILES AND LESS THAN 50 MILES FROM THE RESPECTIVE CITY HALL OF THE ABOVE MENTIONED CITIES SHALL RECEIVE ZONE II PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 50 MILES FROM THE RESPECTIVE CITY HALL OF THE ABOVE MENTIONED CITIES SHALL RECEIVE ZONE III PAY FOR ALL CLASSIFICATIONS | $49.03 | $16.90 | $65.93 | |
| POWER EQUIPMENT OPERATOR GROUP 6 Highway ENGI0701-005 (ZONE 1: POWER EQUIPMENT OPERATORS (SEE FOOTNOTE C)) | $45.81 | $16.90 | $62.71 | |
| POWER EQUIPMENT OPERATOR GROUP 6 LOADERS: Residential ENGI0701-019 (LESS THAN 1 CU YD.); ROLLER (NON-ASPHALT); OILER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - METROPOLITAN COUNTIES: MULTNOMAH; CLACKAMAS; MARION; WASHINGTON; YAMHILL; AND COLUMBIA; CLARK; AND COWLITZ COUNTY, WASHINGTON WITH MODIFICATIONS AS INDICATED: ALL JOBS OR PROJECTS LOCATED IN MULTNOMAH, CLACKAMAS AND MARION COUNTIES, WEST OF THE WESTERN BOUNDARY OF MT. HOOD NATIONAL FOREST AND WEST OF MILE POST 30 ON INTERSTATE 84 AND WEST OF MILE POST 30 ON STATE HIGHWAY 26 AND WEST OF MILE POST 30 ON HIGHWAY 22 AND ALL JOBS OR PROJECTS LOCATED IN YAMHILL COUNTY, WASHINGTON COUNTY AND COLUMBIA COUNTY AND ALL JOBS OR PORJECTS LOCATED IN CLARK & COWLITZ COUNTY, WASHINGTON EXCEPT THAT PORTION OF COWLITZ COUNTY IN THE MT. ST. HELENS ""BLAST ZONE"" SHALL RECEIVE ZONE I PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED IN THE AREA OUTSIDE THE IDENTIFIED BOUNDARY ABOVE, BUT LESS THAN 50 MILES FROM THE PORTLAND CITY HALL SHALL RECEIVE ZONE II PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 50 MILES FROM THE PORTLAND CITY HALL, BUT OUTSIDE THE IDENTIFIED BORDER ABOVE, SHALL RECEIVE ZONE III PAY FOR ALL CLASSIFICATIONS. FOR THE FOLLOWING CITIES: ALBANY; BEND; COOS BAY; EUGENE; GRANTS PASS; KLAMATH FALLS; MEDFORD; ROSEBURG ALL JOBS OR PROJECTS LOCATED WITHIN 30 MILES OF THE RESPECTIVE CITY HALL OF THE ABOVE MENTIONED CITIES SHALL RECEIVE ZONE I PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 30 MILES AND LESS THAN 50 MILES FROM THE RESPECTIVE CITY HALL OF THE ABOVE MENTIONED CITIES SHALL RECEIVE ZONE II PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 50 MILES FROM THE RESPECTIVE CITY HALL OF THE ABOVE MENTIONED CITIES SHALL RECEIVE ZONE III PAY FOR ALL CLASSIFICATIONS | $45.81 | $16.90 | $62.71 | |
| POWER EQUIPMENT OPERATOR GROUP 6 LOADERS: Heavy ENGI0701-029 (LESS THAN 1 CU YD.); OILER; BOBCAT/SKID LOADER; GRADE CHECKER; CRANE OILER; FORKLIFT; ASPHALT SPREADER; BROOM OPERATOR; FORKLIFT; ROLLER (NON-ASPHALT) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - METROPOLITAN COUNTIES: MULTNOMAH; CLACKAMAS; MARION; WASHINGTON; YAMHILL; AND COLUMBIA; CLARK; AND COWLITZ COUNTY, WASHINGTON WITH MODIFICATIONS AS INDICATED: ALL JOBS OR PROJECTS LOCATED IN MULTNOMAH, CLACKAMAS AND MARION COUNTIES, WEST OF THE WESTERN BOUNDARY OF MT. HOOD NATIONAL FOREST AND WEST OF MILE POST 30 ON INTERSTATE 84 AND WEST OF MILE POST 30 ON STATE HIGHWAY 26 AND WEST OF MILE POST 30 ON HIGHWAY 22 AND ALL JOBS OR PROJECTS LOCATED IN YAMHILL COUNTY, WASHINGTON COUNTY AND COLUMBIA COUNTY AND ALL JOBS OR PORJECTS LOCATED IN CLARK & COWLITZ COUNTY, WASHINGTON EXCEPT THAT PORTION OF COWLITZ COUNTY IN THE MT. ST. HELENS ""BLAST ZONE"" SHALL RECEIVE ZONE I PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED IN THE AREA OUTSIDE THE IDENTIFIED BOUNDARY ABOVE, BUT LESS THAN 50 MILES FROM THE PORTLAND CITY HALL SHALL RECEIVE ZONE II PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 50 MILES FROM THE PORTLAND CITY HALL, BUT OUTSIDE THE IDENTIFIED BORDER ABOVE, SHALL RECEIVE ZONE III PAY FOR ALL CLASSIFICATIONS. FOR THE FOLLOWING CITIES: ALBANY; BEND; COOS BAY; EUGENE; GRANTS PASS; KLAMATH FALLS; MEDFORD; ROSEBURG ALL JOBS OR PROJECTS LOCATED WITHIN 30 MILES OF THE RESPECTIVE CITY HALL OF THE ABOVE MENTIONED CITIES SHALL RECEIVE ZONE I PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 30 MILES AND LESS THAN 50 MILES FROM THE RESPECTIVE CITY HALL OF THE ABOVE MENTIONED CITIES SHALL RECEIVE ZONE II PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 50 MILES FROM THE RESPECTIVE CITY HALL OF THE ABOVE MENTIONED CITIES SHALL RECEIVE ZONE III PAY FOR ALL CLASSIFICATIONS | $45.81 | $16.90 | $62.71 | |
| ROOFER Residential SUOR2009-010 | $12.00 | 0.00 | $12.00 | |
| ROOFER Building SUOR2018-015 | $27.49 | 0.00 | $27.49 | |
| SEASIDE AND ASTORIA ZONE PAY: CABLE SPLICER Highway ELEC0048-006 (CLACKAMAS, CLATSOP, COLUMBIA, HOOD RIVER, MULTNOMAH, TILLAMOOK, WASCO, WASHINGTON, SHERMAN AND YAMHILL (NORTH) COUNTIES) HOURLY ZONE PAY: HOURLY ZONE PAY SHALL BE PAID ON JOBS LOCATED OUTSIDE OF THE FREE ZONE COMPUTED FROM THE PORTLAND, THE DALLES, HOOD RIVER, TILLAMOOK, ZONE 1: 31-50 MILES $1.50/HOUR ZONE 2: 51-70 MILES $3.50/HOUR ZONE 3: 71-90 MILES $5.50/HOUR ZONE 4: BEYOND 90 MILES $9.00/HOUR *THESE ARE NOT MILES DRIVEN. ZONES ARE BASED ON DELORRNE STREET ATLAS USA 2006 PLUS | $69.85 | $30.44 | $100.29 | |
| SEASIDE AND ASTORIA ZONE PAY: ELECTRICIAN Highway ELEC0048-006 (CLACKAMAS, CLATSOP, COLUMBIA, HOOD RIVER, MULTNOMAH, TILLAMOOK, WASCO, WASHINGTON, SHERMAN AND YAMHILL (NORTH) COUNTIES) HOURLY ZONE PAY: HOURLY ZONE PAY SHALL BE PAID ON JOBS LOCATED OUTSIDE OF THE FREE ZONE COMPUTED FROM THE PORTLAND, THE DALLES, HOOD RIVER, TILLAMOOK, ZONE 1: 31-50 MILES $1.50/HOUR ZONE 2: 51-70 MILES $3.50/HOUR ZONE 3: 71-90 MILES $5.50/HOUR ZONE 4: BEYOND 90 MILES $9.00/HOUR *THESE ARE NOT MILES DRIVEN. ZONES ARE BASED ON DELORRNE STREET ATLAS USA 2006 PLUS | $63.50 | $29.73 | $93.23 | |
| SHEET METAL WORKER Building SHEE0016-003 | $54.99 | $33.92 | $88.91 | |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) Residential SUOR2009-010 | $25.67 | 0.00 | $25.67 | |
| SPRINKLER FITTER Building SFOR0669-003 | $51.65 | $27.57 | $79.22 | |
| TILE FINISHER Residential BROR0001-034 | $32.68 | $16.48 | $49.16 | |
| TILE FINISHER Building BROR0001-008 | $32.68 | $16.48 | $49.16 | |
| TILE SETTER Residential BROR0001-034 | $43.93 | $21.81 | $65.74 | |
| TILE SETTER Building BROR0001-008 | $43.93 | $21.81 | $65.74 | |
| TIMBER SALES ROADS: (LABORERS) Highway SUOR1991-003 | $8.35 | $4.30 | $12.65 | |
| TIMBER SALES ROADS: (OPERATING ENGINEERS) Highway SUOR1991-003 | $10.37 | $4.15 | $14.52 | |
| TIMBER SALES ROADS: (POWER SAW, DRILLER, POWDERMAN) Highway SUOR1991-003 | $9.12 | $4.30 | $13.42 | |
| TIMBER SALES ROADS: (TEAMSTERS) Highway SUOR1991-003 | $9.74 | $3.74 | $13.48 | |
| TRUCK DRIVER GROUP 1 FLATBED TRUCK; OFF THE ROAD TRUCK; WATER TRUCK UP TO 3,000 GALLONS Heavy TEAM0037-010 | $35.41 | $18.30 | $53.71 | |
| TRUCK DRIVER GROUP 2 VACTOR TRUCK; WATER TRUCK OVER 3,000 TO 5,000 GALLONS Heavy TEAM0037-010 | $35.57 | $18.30 | $53.87 | |
| TRUCK DRIVER GROUP 3 WATER TRUCK OVER 5,000 TO 10,000 GALLONS Heavy TEAM0037-010 | $35.74 | $18.30 | $54.04 | |
| TRUCK DRIVER GROUP 4 WATER TRUCK OVER 10,000 TO 15,000 GALLONS Heavy TEAM0037-010 | $36.08 | $18.30 | $54.38 | |
| TRUCK DRIVER: DUMP TRUCK Residential SUOR2009-010 | $16.91 | 0.00 | $16.91 | |
| TRUCK DRIVER: DUMP TRUCK Heavy SUOR2009-051 | $19.58 | $6.47 | $26.05 | |
| TRUCK DRIVER: DUMP TRUCK Building SUOR2018-015 | $21.30 | $5.66 | $26.96 | |
| TRUCK DRIVER: LOWBOY TRUCK Heavy SUOR2009-051 | $17.07 | $5.50 | $22.57 | |
| TRUCK DRIVER: WATER TRUCK Residential SUOR2009-010 | $17.00 | $5.95 | $22.95 | |
| TRUCK DRIVERS:: GROUP 1 Highway TEAM0037-004 (ZONE 1: TRUCK DRIVERS (SEE FOOTNOTE C):) | $35.41 | $18.30 | $53.71 | |
| TRUCK DRIVERS:: GROUP 2 Highway TEAM0037-004 (ZONE 1: TRUCK DRIVERS (SEE FOOTNOTE C):) | $35.57 | $18.30 | $53.87 | |
| TRUCK DRIVERS:: GROUP 3 Highway TEAM0037-004 (ZONE 1: TRUCK DRIVERS (SEE FOOTNOTE C):) | $35.74 | $18.30 | $54.04 | |
| TRUCK DRIVERS:: GROUP 4 Highway TEAM0037-004 (ZONE 1: TRUCK DRIVERS (SEE FOOTNOTE C):) | $36.08 | $18.30 | $54.38 | |
| TRUCK DRIVERS:: GROUP 5 Highway TEAM0037-004 (ZONE 1: TRUCK DRIVERS (SEE FOOTNOTE C):) | $36.35 | $18.30 | $54.65 | |
| TRUCK DRIVERS:: GROUP 6 Highway TEAM0037-004 (ZONE 1: TRUCK DRIVERS (SEE FOOTNOTE C):) | $36.57 | $18.30 | $54.87 | |
| TRUCK DRIVERS:: GROUP 7 Highway TEAM0037-004 (ZONE 1: TRUCK DRIVERS (SEE FOOTNOTE C):) | $36.82 | $18.30 | $55.12 |
No trade rates match your search and filter selection.
Highway
Applies to
Baker, Benton, Clackamas, Clatsop, Columbia, Coos, Crook, Curry, Deschutes, Douglas +26 more
Residential
Heavy
Heavy
Applies to
Baker, Benton, Clackamas, Clatsop, Columbia, Coos, Crook, Curry, Deschutes, Douglas +26 more
Building