RI20260001
rev 3Building, Heavy, Highway
39 trades
Applies to
Bristol, Kent, Newport, Providence, Washington
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Get an email when wage determinations covering Newport County, Rhode Island are modified.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Click a row to save its rate for later, then export your selections from the Saved panel.
| Save | Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|---|
| ASBESTOS WORKER/INSULATOR Building ASBE0006-008 (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS & FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS) | $49.91 | $36.63 | $86.54 | |
| BOILERMAKER Building BOIL0029-001 | $50.62 | $28.82 | $79.44 | |
| BRICKLAYER Residential SURI1999-003 | $21.70 | $10.85 | $32.55 | |
| BRICKLAYER, STONEMASON, POINTER, CAULKER & CLEANER Building BRRI0003-001 | $46.86 | $29.14 | $76.00 | |
| CARPENTER Residential SURI1999-003 (INCLUDING DRYWALL HANGING METAL STUD FRAMING, FORM SETTING, BATT INSULATION, DOWNSPOUTS & GUTTER INSTALLATION) | $12.95 | $5.51 | $18.46 | |
| CARPENTER: INCLUDES SOFT FLOOR LAYER Building CARP0330-001 Scope differs by code/WD | $47.88 | $30.50 | $78.38 | |
| CARPENTER: INCLUDES SOFT FLOOR LAYER Building CARP0330-001 Scope differs by code/WD | $47.88 | $30.50 | $78.38 | |
| CEMENT MASON/CONCRETE FINISHER Building PLAS0040-001 (BUILDING CONSTRUCTION) FOOTNOTE: CEMENT MASON: WORK ON FREE SWINGING SCAFFOLDS UNDER 3 PLANKS WIDTH AND WHICH IS 20 OR MORE FEET ABOVE GROUND AND ANY OFFSET STRUCTURE: $.30 PER HOUR ADDITIONAL | $44.75 | $29.10 | $73.85 | |
| CEMENT MASON/CONCRETE FINISHER Building PLAS0040-002 (HEAVY AND HIGHWAY CONSTRUCTION) | $44.75 | $29.10 | $73.85 | |
| DREDGING: CLASS A1: DECK CAPTAIN; MECHANICAL DREDGE OPERATOR, LEVERMAN, LICENSED TUG OPERATOR OVER 1000 HP. INCENTIVE PAY: Heavy ENGI0025-001 (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 FOOTNOTES APPLICABLE TO ABOVE CRAFTS: A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED | $48.48 | $15.34 | $63.82 | |
| DREDGING: CLASS A2: CRANE OPERATOR Heavy ENGI0025-001 (360 SWING) INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 FOOTNOTES APPLICABLE TO ABOVE CRAFTS: A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED | $43.20 | $14.99 | $58.19 | |
| DREDGING: CLASS B1: DERRICK OPERATOR Heavy ENGI0025-001 (180 SWING), SPIDER/SPILL BARGE OPERATOR, ENGINEER, ELECTRICIAN, CHIEF WELDER, CHIEF MATE, FILL PLACER, OPERATOR II, MAINTENANCE ENGINEER, LICENSED BOAT OPERATOR, LICENSED CREW BOAT OPERATOR. INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED | $41.93 | $14.90 | $56.83 | |
| DREDGING: CLASS B2: CERTIFIED WELDER. INCENTIVE PAY: Heavy ENGI0025-001 (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED | $39.46 | $14.73 | $54.19 | |
| DREDGING: CLASS C1: MATE, DRAG BARGE OPERATOR, ASSISTANT FILL PLACER, WELDER, STEWARD. INCENTIVE PAY: Heavy ENGI0025-001 (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 FOOTNOTES APPLICABLE TO ABOVE CRAFTS: A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED | $38.38 | $14.66 | $53.04 | |
| DREDGING: CLASS C2: BOAT OPERATOR. INCENTIVE PAY: Heavy ENGI0025-001 (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED | $37.15 | $14.57 | $51.72 | |
| DREDGING: CLASS D: OILER, DECKHAND, SHOREMAN, RODMAN, SCOWMAN, COOK, MESSMAN, PORTER/JANITOR. INCENTIVE PAY: Heavy ENGI0025-001 (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 FOOTNOTES APPLICABLE TO ABOVE CRAFTS: A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED | $30.86 | $14.15 | $45.01 | |
| ELECTRICIAN Residential SURI1999-003 | $18.49 | $3.92 | $22.41 | |
| GLAZIER FOOTNOTES: SWING STAGE: $1.00 PER HOUR ADDITIONAL. PAID HOLIDAYS: LABOR DAY & CHRISTMAS DAY Building PAIN0011-006 | $41.63 | $26.15 | $67.78 | |
| HAZARDOUS MATERIAL HANDLER Building ASBE0006-006 (INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL SCRAPPING, VACUUMING, BAGGING & DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS) | $49.91 | $36.63 | $86.54 | |
| IRONWORKER Building IRON0037-001 | $43.03 | $33.53 | $76.56 | |
| LABORER COMPRESSED AIR GROUP 1 Building LABO0271-002 | $55.40 | $24.15 | $79.55 | |
| LABORER COMPRESSED AIR GROUP 2 Building LABO0271-002 | $52.93 | $24.15 | $77.08 | |
| LABORER COMPRESSED AIR GROUP 3 Building LABO0271-002 | $42.45 | $24.15 | $66.60 | |
| LABORER FREE AIR GROUP 1 Building LABO0271-002 | $46.00 | $24.15 | $70.15 | |
| LABORER FREE AIR GROUP 2 Building LABO0271-002 | $45.00 | $24.15 | $69.15 | |
| LABORER FREE AIR GROUP 3 Building LABO0271-002 | $42.45 | $24.15 | $66.60 | |
| LABORER GROUP 1 (BUILDING CONSTRUCTION) Building LABO0271-001 | $37.00 | $26.90 | $63.90 | |
| LABORER GROUP 2 (BUILDING CONSTRUCTION) Building LABO0271-001 | $37.00 | $26.90 | $63.90 | |
| LABORER GROUP 3 (BUILDING CONSTRUCTION) Building LABO0271-001 | $37.00 | $26.90 | $63.90 | |
| LABORER GROUP 4 (BUILDING CONSTRUCTION) Building LABO0271-001 | $37.00 | $26.90 | $63.90 | |
| LABORER GROUP 5 (BUILDING CONSTRUCTION) Building LABO0271-001 | $39.00 | $26.90 | $65.90 | |
| LABORER OPEN AIR CAISSON, UNDERPINNING WORK AND BORING CREW BOTTOM MAN Building LABO0271-002 | $41.50 | $24.15 | $65.65 | |
| LABORER OPEN AIR CAISSON, UNDERPINNING WORK AND BORING CREW TOP MAN & LABORER Building LABO0271-002 | $35.60 | $24.15 | $59.75 | |
| LABORER TEST BORING DRILLER Building LABO0271-002 | $41.95 | $24.15 | $66.10 | |
| LABORER TEST BORING LABORER Building LABO0271-002 | $41.95 | $24.15 | $66.10 | |
| LABORER, UNSKILLED Residential SURI1999-003 | $13.23 | $3.80 | $17.03 | |
| MARBLE SETTER, TERRAZZO WORKER & TILE SETTER Building BRRI0003-002 | $46.54 | $30.34 | $76.88 | |
| MARBLE, TILE & TERRAZZO FINISHER Building BRRI0003-003 | $38.78 | $29.61 | $68.39 | |
| MILLWRIGHT Building CARP1121-002 | $45.72 | $31.50 | $77.22 | |
| PAINTER Building PAIN0011-005 (EPOXY, TANKS, TOWERS, SWING STAGE & STRUCTURAL STEEL) | $41.57 | $26.60 | $68.17 | |
| PAINTER (BRIDGE WORK) Building PAIN0011-011 | $57.85 | $26.40 | $84.25 | |
| PAINTER (BRUSH AND ROLLER) Building PAIN0011-005 | $39.57 | $26.60 | $66.17 | |
| PAINTER (BRUSH AND ROLLER) Residential SURI1999-003 | $16.55 | $2.65 | $19.20 | |
| PAINTER (SPRAY, SAND & WATER BLASTING) Building PAIN0011-005 | $42.57 | $26.60 | $69.17 | |
| PIPEFITTER Residential SURI1999-003 | $17.83 | $3.07 | $20.90 | |
| PLASTERER Building PLAS0040-003 | $45.52 | $29.43 | $74.95 | |
| PLUMBER Residential SURI1999-003 | $23.69 | $8.76 | $32.45 | |
| PLUMBERS AND PIPEFITTERS Building PLUM0051-002 | $54.34 | $34.50 | $88.84 | |
| POWER EQUIPMENT OPERATOR (BACKHOE & BULLDOZER) Residential SURI1999-003 | $11.71 | $2.33 | $14.04 | |
| ROOFER Building ROOF0033-004 | $47.49 | $31.44 | $78.93 | |
| ROOFER Residential ROOF0033-002 | $47.49 | $31.44 | $78.93 | |
| SHEET METAL WORKER Building SHEE0017-002 | $44.42 | $41.94 | $86.36 | |
| SHEET METAL WORKER (HVAC DUCT WORK) Residential SURI1999-003 | $24.21 | $4.24 | $28.45 | |
| SIGN PAINTER Building PAIN0035-008 | $24.79 | $13.72 | $38.51 | |
| SPRINKLER FITTER Building SFRI0669-001 | $53.76 | $33.44 | $87.20 | |
| TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 7 TRAILERS WHEN USED ON A DOUBLE HOOK UP Building TEAM0251-001 (PULLING 2 TRAILERS) HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PLUS PRESIDENTS' DAY, COLUMBUS DAY, VETERAN'S DAY & V-J DAY, PROVIDING THE EMPLOYEE HAS WORKED AT LEAST ONE DAY IN THE CALENDAR WEEK IN WHICH THE HOLIDAY FALLS. B. EMPLOYEE WHO HAS BEEN ON THE PAYROLL FOR 1 YEAR OR MORE BUT LESS THAN 5 YEARS AND HAS WORKED 150 DAYS DURING THE LAST YEAR OF EMPLOYMENT SHALL RECEIVE 1 WEEK'S PAID VACATION; 5 TO 10 YEARS - 2 WEEKS' PAID VACATION; 10 OR MORE YEARS - 3 WEEK'S PAID VACATION. C. EMPLOYEES ON THE SENIORITY LIST SHALL BE PAID A ONE HUNDRED DOLLAR ($100.00) BONUS FOR EVERY FOUR HUNDRED (400) HOURS WORKED, UP TO A MAXIMUM OF FIVE HUNDRED DOLLARS ($500.00) ALL DRIVERS WORKING ON A DEFINED HAZARD MATERIAL JOB SITE SHALL BE PAID A PREMIUM OF $2.00 PER HOUR OVER APPLICABLE RATE. . | $32.81 | $34.51 | $67.32 |
No trade rates match your search and filter selection.
Building, Heavy, Highway
Applies to
Bristol, Kent, Newport, Providence, Washington
Residential
Heavy
Applies to
Bristol, Kent, Newport, Providence, Washington