Iron

4 wage determinations 76 trade rates

Popular Trades In Iron

Track Iron County updates

Get an email when wage determinations covering Iron County, Utah are modified.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Trade Rates

Click a row to save its rate for later, then export your selections from the Saved panel.

Same trade names can appear multiple times when classification codes or coverage language differ. Compare the code badge, any italic scope text, and WD reference to identify the right line.
Save Trade & Classification Rate Fringe Total
BOILERMAKER Building
BOIL0004-001
$44.37 $26.87 $71.24
BRICKLAYER Building
SUUT2012-005
$23.88 0.00 $23.88
CARPENTER Residential
SUUT1997-002
$7.25 0.00 $7.25
CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) Building
SUUT2012-005
$20.64 $0.80 $21.44
CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION Building
SUUT2012-005
$21.29 $6.38 $27.67
CARPENTER, INCLUDES FORM WORK Highway
SUUT2019-005
$22.07 $6.88 $28.95
CARPENTER, INCLUDES FORM WORK Heavy
SUUT2008-025 (EXCLUDES NATURAL GAS PIPELINE CONSTRUCTION FORM WORK)
$14.75 $3.03 $17.78
CEMENT MASON/CONCRETE FINISHER Highway
SUUT2019-005
$17.36 $2.04 $19.40
CEMENT MASON/CONCRETE FINISHER Heavy
SUUT2008-025
$14.00 $0.56 $14.56
CEMENT MASON/CONCRETE FINISHER Building
SUUT2012-005
$21.11 0.00 $21.11
ELECTRICIAN Residential
SUUT1997-002
$7.25 0.00 $7.25
ELECTRICIAN Highway
SUUT2019-005
$26.83 0.00 $26.83
ELECTRICIAN (EXCLUDING LOW VOLTAGE WIRING) Building
ELEC0354-003
$41.23 $17.66 $58.89
ELECTRICIAN (LOW VOLTAGE WIRING) Building
SUUT2012-005
$23.36 $6.06 $29.42
HIGHWAY/PARKING LOT STRIPING: PAINTER Highway
SUUT2019-005
$16.76 $1.62 $18.38
INSTALLER - GUARDRAIL Highway
SUUT2019-005
$17.79 0.00 $17.79
INSTALLER - SIDING (METAL/ALUMINUM/VINYL) Building
SUUT2012-005
$14.75 0.00 $14.75
INSTALLER - SIGN Highway
SUUT2019-005
$18.22 $2.79 $21.01
INSULATOR - BATT Building
SUUT2012-005
$13.77 0.00 $13.77
IRONWORKER, REINFORCING Building
SUUT2012-005
$15.00 0.00 $15.00
IRONWORKER, STRUCTURAL Building
SUUT2012-005
$17.41 $6.13 $23.54
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR Highway
SUUT2019-005
$19.88 $5.71 $25.59
LABORER: CHAIN SAW AND POWER DRILL Heavy
LABO0295-018 (NATURAL GAS PIPELINE CONSTRUCTION ONLY)
$20.85 $8.65 $29.50
LABORER: COMMON OR GENERAL Highway
SUUT2019-005
$18.62 $2.06 $20.68
LABORER: COMMON OR GENERAL Heavy
SUUT2008-025 (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION)
$9.00 0.00 $9.00
LABORER: COMMON OR GENERAL Building
SUUT2012-005
$11.21 0.00 $11.21
LABORER: COMMON OR GENERAL, NAIL GUN, PIPELAYER, POT TENDER Heavy
LABO0295-018 (NATURAL GAS PIPELINE CONSTRUCTION ONLY)
$20.59 $8.65 $29.24
LABORER: FORMWORKER Heavy
LABO0295-018 (NATURAL GAS PIPELINE CONSTRUCTION ONLY)
$20.85 $8.65 $29.50
LABORER: LANDSCAPE Highway
SUUT2019-005
$14.45 $2.79 $17.24
LABORER: MASON TENDER - BRICK Building
SUUT2012-005
$16.54 0.00 $16.54
LABORER: MASON TENDER - CEMENT/CONCRETE Highway
SUUT2019-005
$17.03 $0.36 $17.39
LABORER: MASON TENDER - CEMENT/CONCRETE Heavy
SUUT2008-025
$9.00 $0.36 $9.36
LABORER: PIPELAYER Highway
SUUT2019-005
$15.52 $2.79 $18.31
LABORER: PIPELAYER Heavy
SUUT2008-025 (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION)
$9.00 0.00 $9.00
LABORER: POWDERMAN Heavy
LABO0295-018 (NATURAL GAS PIPELINE CONSTRUCTION ONLY)
$21.65 $8.65 $30.30
LABORER: SANDBLASTER Heavy
LABO0295-018 (NATURAL GAS PIPELINE CONSTRUCTION ONLY)
$20.85 $8.65 $29.50
LABORERS: HOD CARRIER Residential
SUUT1997-002
$7.25 0.00 $7.25
LABORERS: UNSKILLED Residential
SUUT1997-002
$7.25 0.00 $7.25
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE Highway
SUUT2019-005
$22.10 $5.97 $28.07
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE Building
SUUT2012-005
$16.59 $0.79 $17.38
OPERATOR: BOBCAT/SKID STEER/SKID LOADER Highway
SUUT2019-005
$20.05 $3.31 $23.36
OPERATOR: BROOM/SWEEPER Highway
SUUT2019-005
$18.29 $5.65 $23.94
OPERATOR: BULLDOZER Highway
SUUT2019-005
$21.77 $4.40 $26.17
OPERATOR: CONCRETE FINISHING MACHINE Highway
SUUT2019-005
$22.57 $6.55 $29.12
OPERATOR: GRADER/BLADE Highway
SUUT2019-005
$23.69 $5.95 $29.64
OPERATOR: GRADER/BLADE, EXCLUDES NATURAL GAS PIPELINE CONSTRUCTION Heavy
SUUT2008-025
$13.61 0.00 $13.61
OPERATOR: LOADER Highway
SUUT2019-005
$22.53 $6.92 $29.45
OPERATOR: LOADER (FRONT END) Heavy
SUUT2008-025
$11.38 0.00 $11.38
OPERATOR: MECHANIC Highway
SUUT2019-005
$25.24 $10.96 $36.20
OPERATOR: MILLING MACHINE Highway
SUUT2019-005
$26.53 $6.00 $32.53
OPERATOR: OILER Highway
SUUT2019-005
$19.00 $5.44 $24.44
OPERATOR: PAVER Highway
SUUT2019-005 (ASPHALT, AGGREGATE, AND CONCRETE)
$23.43 $8.13 $31.56
OPERATOR: POWER EQUIPMENT Heavy
ENGI0003-046 (3) BACKHOE/EXCAVATOR. (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION)
$30.78 $16.09 $46.87
OPERATOR: POWER EQUIPMENT BACKHOE/EXCAVATOR/TRACKHOE, BLADE/GRADER, BOOM, BULLDOZER, CRANE, MECHANIC, TRENCHER: Heavy
ENGI0003-054 (NATURAL GAS PIPELINE CONSTRUCTION ONLY)
$35.68 $17.57 $53.25
OPERATOR: POWER EQUIPMENT OILER Heavy
ENGI0003-054 (NATURAL GAS PIPELINE CONSTRUCTION ONLY)
$22.03 $11.88 $33.91
OPERATOR: ROLLER Highway
SUUT2019-005
$20.23 $5.61 $25.84
OPERATOR: ROLLER (DIRT AND GRADE COMPACTION) Heavy
SUUT2008-025
$10.89 0.00 $10.89
OPERATOR: SCREED Highway
SUUT2019-005
$19.89 $5.45 $25.34
OPERATOR: TRACKHOE Heavy
SUUT2008-025 (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION)
$13.63 0.00 $13.63
PAINTER Residential
SUUT1997-002
$7.25 0.00 $7.25
PLUMBER Residential
SUUT1997-002
$9.00 0.00 $9.00
PLUMBER Building
SUUT2012-005
$24.00 $4.62 $28.62
POWER EQUIPMENT OPERATOR - BACKHOE Residential
SUUT1997-002
$7.25 0.00 $7.25
ROOFER Residential
SUUT1997-002
$8.00 0.00 $8.00
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) Building
SHEE0312-001
$46.79 $14.89 $61.68
SPRINKLER FITTER (FIRE SPRINKLERS) Building
SFUT0669-003
$42.17 $26.63 $68.80
TILE FINISHER Building
SUUT2012-005
$17.00 0.00 $17.00
TILE SETTER Building
SUUT2012-005
$19.40 0.00 $19.40
TRAFFIC CONTROL: FLAGGER Highway
SUUT2019-005
$12.47 $2.53 $15.00
TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER Highway
SUUT2019-005
$17.14 $2.79 $19.93
TRUCK DRIVER Heavy
SUUT2008-025 (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION)
$12.00 0.00 $12.00
TRUCK DRIVER: DUMP TRUCK Highway
SUUT2019-005
$20.31 $4.06 $24.37
TRUCK DRIVER: GROUP 1- ARTICULATD END DUMP, LOW BOY, ROLLAGON OR SIMILAR TYPE EQUIPMENT, TRUCK MECHANIC Heavy
TEAM0222-020 (NATURAL GAS PIPELINE CONSTRUCTION ONLY) PREMIUM PAY: ADD $2.25 TO THE ABOVE RATE FOR THE FOLLOWING CLASSIFICATIONS: LOW BOY AND TRUCK MECHANIC
$46.65 $15.75 $62.40
TRUCK DRIVER: GROUP 2- A-FRAME, CHALLENGE Heavy
TEAM0222-020 (FOR TRANSPORTATION PURPOSES), FORKLIFT, FUEL TRUCK, GIN POLE, RUBBER-TIRED TRACTOR, TANDEM FLOAT (4 & 5 AXLE), TRACK TRUCK/ALL-TRACK DUMPER EQUIPMENT, VACUUM TRUCK, WINCH TRUCK. (NATURAL GAS PIPELINE CONSTRUCTION ONLY) PREMIUM PAY: ADD CLASSIFICATIONS: STRINGER TRUCK
$46.02 $15.75 $61.77
TRUCK DRIVER: GROUP 3- AMBULANCE , BUS, DUMP TRUCK Heavy
TEAM0222-020 (2 AND 3 AXLE), FLATBED TRUCK (2 AND 3 AXLE), GREASE TRUCK, HOT PASS TRUCK (3 AXLE), JEEP, PICK-UP, SINGLE AXLE FLOAT (3 AXLE), SKID TRUCK (2 AND 3 AXLE), STATION WAGON, STRINGER BEAD & HOT PASS (2 AXLE), SWAMP BUGGY/ MARSH BUGGY, OR SIMILAR TYPE EQUIPMENT, TEAM DRIVER, WATER TRUCK (2 AND 3 AXLE) (NATURAL GAS PIPELINE CONSTRUCTION ONLY) PREMIUM PAY: ADD $2.25 TO THE ABOVE RATE FOR THE FOLLOWING CLASSIFICATIONS
$41.90 $15.75 $57.65
TRUCK DRIVER: WATER TRUCK Highway
TEAM0222-005
$29.53 $14.65 $44.18

Wage Determinations

Residential

8 trades

Applies to

Beaver, Carbon, Daggett, Duchesne, Emery, Garfield, Grand, Iron, San Juan, Sanpete +2 more