UT20260006
rev 1Residential
16 trades
Applies to
Kane, Millard
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Get an email when wage determinations covering Millard County, Utah are modified.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Click a row to save its rate for later, then export your selections from the Saved panel.
| Save | Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|---|
| BOILERMAKER Building BOIL0004-001 | $44.37 | $26.87 | $71.24 | |
| BRICKLAYER Residential SUUT1997-004 | $7.25 | $0.47 | $7.72 | |
| BRICKLAYER Building SUUT2012-012 | $23.88 | 0.00 | $23.88 | |
| CARPENTER Residential SUUT1997-004 | $7.25 | 0.00 | $7.25 | |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) Building SUUT2012-012 | $20.64 | $0.80 | $21.44 | |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION Building SUUT2012-012 | $19.51 | $4.71 | $24.22 | |
| CARPENTER, INCLUDES FORM WORK Highway SUUT2019-007 | $22.07 | $6.88 | $28.95 | |
| CARPENTER, INCLUDES FORM WORK Heavy SUUT2008-026 (EXCLUDES NATURAL GAS PIPELINE CONSTRUCTION FORM WORK) | $14.75 | $3.03 | $17.78 | |
| CEMENT MASON/CONCRETE FINISHER Residential SUUT1997-004 | $7.25 | 0.00 | $7.25 | |
| CEMENT MASON/CONCRETE FINISHER Highway SUUT2019-007 | $17.36 | $2.04 | $19.40 | |
| CEMENT MASON/CONCRETE FINISHER Heavy SUUT2008-026 | $14.00 | $0.56 | $14.56 | |
| CEMENT MASON/CONCRETE FINISHER Building SUUT2012-012 | $21.11 | 0.00 | $21.11 | |
| DRYWALL MECHANIC Residential SUUT1997-004 | $7.25 | 0.00 | $7.25 | |
| ELECTRICIAN Residential SUUT1997-004 | $7.25 | 0.00 | $7.25 | |
| ELECTRICIAN Highway SUUT2019-007 | $26.83 | 0.00 | $26.83 | |
| ELECTRICIAN (EXCLUDING LOW VOLTAGE WIRING) Building ELEC0354-003 | $41.23 | $17.66 | $58.89 | |
| ELECTRICIAN (LOW VOLTAGE WIRING ONLY) Building SUUT2012-012 | $23.36 | $6.06 | $29.42 | |
| HIGHWAY/PARKING LOT STRIPING: PAINTER Highway SUUT2019-007 | $16.76 | $1.62 | $18.38 | |
| HVAC MECHANIC Residential SUUT1997-004 | $7.25 | 0.00 | $7.25 | |
| INSTALLER - GUARDRAIL Highway SUUT2019-007 | $17.79 | 0.00 | $17.79 | |
| INSTALLER - SIDING (METAL/ALUMINUM/VINYL) Building SUUT2012-012 | $14.75 | 0.00 | $14.75 | |
| INSTALLER - SIGN Highway SUUT2019-007 | $18.22 | $2.79 | $21.01 | |
| INSULATOR - BATT Building SUUT2012-012 | $13.77 | 0.00 | $13.77 | |
| IRONWORKER, REINFORCING Building SUUT2012-012 | $15.00 | 0.00 | $15.00 | |
| IRONWORKER, STRUCTURAL Building SUUT2012-012 | $17.41 | $6.13 | $23.54 | |
| LABORER Residential SUUT1997-004 | $7.25 | 0.00 | $7.25 | |
| LABORER CHAIN SAW AND POWER DRILL: NATURAL GAS PIPELINE CONSTRUCTION ONLY Heavy LABO0295-018 | $20.85 | $8.65 | $29.50 | |
| LABORER COMMON OR GENERAL, NAIL GUN, PIPELAYER, POT TENDER: NATURAL GAS PIPELINE CONSTRUCTION ONLY Heavy LABO0295-018 | $20.59 | $8.65 | $29.24 | |
| LABORER FORMWORKER: NATURAL GAS PIPELINE CONSTRUCTION ONLY Heavy LABO0295-018 | $20.85 | $8.65 | $29.50 | |
| LABORER POWDERMAN: NATURAL GAS PIPELINE CONSTRUCTION ONLY Heavy LABO0295-018 | $21.65 | $8.65 | $30.30 | |
| LABORER SANDBLASTER: NATURAL GAS PIPELINE CONSTRUCTION ONLY Heavy LABO0295-018 | $20.85 | $8.65 | $29.50 | |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR Highway SUUT2019-007 | $19.88 | $5.71 | $25.59 | |
| LABORER: COMMON OR GENERAL Highway SUUT2019-007 | $16.09 | $2.65 | $18.74 | |
| LABORER: COMMON OR GENERAL Heavy SUUT2008-026 (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) | $10.92 | 0.00 | $10.92 | |
| LABORER: COMMON OR GENERAL Building SUUT2012-012 | $10.63 | 0.00 | $10.63 | |
| LABORER: LANDSCAPE Highway SUUT2019-007 | $14.45 | $2.79 | $17.24 | |
| LABORER: MASON TENDER Residential SUUT1997-004 | $7.25 | 0.00 | $7.25 | |
| LABORER: MASON TENDER - BRICK Building SUUT2012-012 | $16.54 | 0.00 | $16.54 | |
| LABORER: MASON TENDER - CEMENT/CONCRETE Highway SUUT2019-007 | $17.03 | $0.36 | $17.39 | |
| LABORER: MASON TENDER - CEMENT/CONCRETE Heavy SUUT2008-026 | $9.00 | $0.36 | $9.36 | |
| LABORER: PIPELAYER Highway SUUT2019-007 | $15.52 | $2.79 | $18.31 | |
| LABORER: PIPELAYER Heavy SUUT2008-026 (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) | $9.00 | 0.00 | $9.00 | |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE Highway SUUT2019-007 | $20.70 | $6.02 | $26.72 | |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE Building SUUT2012-012 | $16.59 | $0.79 | $17.38 | |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER Highway SUUT2019-007 | $20.05 | $3.31 | $23.36 | |
| OPERATOR: BROOM/SWEEPER Highway SUUT2019-007 | $18.29 | $5.65 | $23.94 | |
| OPERATOR: BULLDOZER Highway SUUT2019-007 | $21.77 | $4.40 | $26.17 | |
| OPERATOR: CONCRETE FINISHING MACHINE Highway SUUT2019-007 | $22.57 | $6.55 | $29.12 | |
| OPERATOR: GRADER/BLADE Highway SUUT2019-007 | $23.69 | $5.95 | $29.64 | |
| OPERATOR: GRADER/BLADE, EXCLUDES NATURAL GAS PIPELINE CONSTRUCTION Heavy SUUT2008-026 | $13.61 | 0.00 | $13.61 | |
| OPERATOR: LOADER Highway SUUT2019-007 | $23.73 | $6.92 | $30.65 | |
| OPERATOR: LOADER (FRONT END) Heavy SUUT2008-026 | $11.38 | 0.00 | $11.38 | |
| OPERATOR: MECHANIC Highway SUUT2019-007 | $25.24 | $10.96 | $36.20 | |
| OPERATOR: MILLING MACHINE Highway SUUT2019-007 | $26.53 | $6.00 | $32.53 | |
| OPERATOR: OILER Highway SUUT2019-007 | $19.00 | $5.44 | $24.44 | |
| OPERATOR: PAVER Highway SUUT2019-007 (ASPHALT, AGGREGATE, AND CONCRETE) | $23.43 | $8.13 | $31.56 | |
| OPERATOR: POWER EQUIPMENT (3) BACKHOE/EXCAVATOR Heavy ENGI0003-046 | $30.78 | $16.09 | $46.87 | |
| OPERATOR: POWER EQUIPMENT BACKHOE/EXCAVATOR/TRACKHOE, BLADE/GRADER, BOOM, BULLDOZER, CRANE, MECHANIC, TRENCHER: NATURAL GAS PIPELINE CONSTRUCTION ONLY Heavy ENGI0003-054 | $35.68 | $17.57 | $53.25 | |
| OPERATOR: POWER EQUIPMENT OILER: NATURAL GAS PIPELINE CONSTRUCTION ONLY Heavy ENGI0003-054 | $22.03 | $11.88 | $33.91 | |
| OPERATOR: ROLLER Highway SUUT2019-007 | $18.19 | $5.07 | $23.26 | |
| OPERATOR: ROLLER (DIRT AND GRADE COMPACTION) Heavy SUUT2008-026 | $10.89 | 0.00 | $10.89 | |
| OPERATOR: SCREED Highway SUUT2019-007 | $19.89 | $5.45 | $25.34 | |
| OPERATOR: TRACKHOE Heavy SUUT2008-026 (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) | $13.63 | 0.00 | $13.63 | |
| PAINTER: BRUSH ONLY Residential SUUT1997-004 | $7.25 | 0.00 | $7.25 | |
| PLUMBER Residential SUUT1997-004 | $7.25 | 0.00 | $7.25 | |
| PLUMBER Building SUUT2012-012 | $24.00 | $4.62 | $28.62 | |
| POWER EQUIPMENT OPERATORS: BULLDOZERS Residential SUUT1997-004 | $7.25 | 0.00 | $7.25 | |
| POWER EQUIPMENT OPERATORS: CRANES, DERRICKS, DRAGLINES Residential SUUT1997-004 | $7.25 | 0.00 | $7.25 | |
| POWER EQUIPMENT OPERATORS: TRENCHING MACHINES Residential SUUT1997-004 | $7.25 | 0.00 | $7.25 | |
| ROOFER Residential SUUT1997-004 | $7.25 | 0.00 | $7.25 | |
| SHEET METAL WORKER Residential SUUT1997-004 | $7.25 | 0.00 | $7.25 | |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) Building SHEE0312-001 | $46.79 | $14.89 | $61.68 | |
| SPRINKLER FITTER (FIRE SPRINKLERS) Building SFUT0669-003 | $42.17 | $26.63 | $68.80 | |
| TILE FINISHER Building SUUT2012-012 | $17.00 | 0.00 | $17.00 | |
| TILE SETTER Building SUUT2012-012 | $19.40 | 0.00 | $19.40 | |
| TRAFFIC CONTROL: FLAGGER Highway SUUT2019-007 | $10.47 | $2.53 | $13.00 | |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER Highway SUUT2019-007 | $17.14 | $2.79 | $19.93 | |
| TRUCK DRIVER Residential SUUT1997-004 | $7.25 | 0.00 | $7.25 | |
| TRUCK DRIVER Heavy SUUT2008-026 (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) | $12.00 | 0.00 | $12.00 | |
| TRUCK DRIVER: DUMP TRUCK Highway SUUT2019-007 | $19.13 | $4.52 | $23.65 | |
| TRUCK DRIVER: GROUP 3 AMBULANCE , BUS, DUMP TRUCK Heavy TEAM0222-020 (2 AND 3 AXLE), FLATBED TRUCK (2 AND 3 AXLE), GREASE TRUCK, HOT PASS TRUCK (3 AXLE), JEEP, PICK-UP, SINGLE AXLE FLOAT (3 AXLE), SKID TRUCK (2 AND 3 AXLE), STATION WAGON, STRINGER BEAD & HOT PASS (2 AXLE), SWAMP BUGGY/ MARSH BUGGY, OR SIMILAR TYPE EQUIPMENT, TEAM DRIVER, WATER TRUCK (2 AND 3 AXLE) NATURAL GAS PIPELINE CONSTRUCTION ONLY PREMIUM PAY: ADD $2.25 TO THE ABOVE RATE FOR THE FOLLOWING CLASSIFICATIONS GROUP 1: LOW BOY AND TRUCK MECHANIC GROUP 2: STRINGER TRUCK | $41.90 | $15.75 | $57.65 | |
| TRUCK DRIVER: NATURAL GAS PIPELINE CONSTRUCTION ONLY: GROUP 1 LOW BOY AND TRUCK MECHANIC PREMIUM PAY: ADD $2.25 TO THE ABOVE RATE Heavy TEAM0222-020 | $46.65 | $15.75 | $62.40 | |
| TRUCK DRIVER: NATURAL GAS PIPELINE CONSTRUCTION ONLY: GROUP 2 STRINGER TRUCK PREMIUM PAY: ADD $2.25 TO THE ABOVE RATE Heavy TEAM0222-020 | $46.02 | $15.75 | $61.77 | |
| TRUCK DRIVER: WATER TRUCK Highway TEAM0222-005 | $29.53 | $14.65 | $44.18 |
No trade rates match your search and filter selection.
Residential
Applies to
Kane, Millard
Highway
Heavy
Building
Applies to
Emery, Kane, Millard, Sevier, Wayne