VA20260001
rev 2Heavy
Applies to
Accomack, Albemarle, Alleghany, Amelia, Amherst, Appomattox, Arlington, Augusta, Bath, Bedford +122 more
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Get an email when wage determinations covering Danville* County, Virginia are modified.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Click a row to save its rate for later, then export your selections from the Saved panel.
| Save | Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|---|
| CARPENTER Heavy SUVA2010-038 | $18.08 | $1.09 | $19.17 | |
| CARPENTER Residential SUVA2012-005 | $17.00 | 0.00 | $17.00 | |
| CARPENTER (HYDRAULIC DREDGES UNDER 20"") Heavy SUVA1994-008 | $13.14 | $2.96 | $16.10 | |
| CARPENTER, INCLUDES FORM WORK Highway SUVA2016-022 | $17.77 | $0.96 | $18.73 | |
| CEMENT MASON/CONCRETE FINISHER Heavy SUVA2010-038 | $26.78 | $5.40 | $32.18 | |
| CEMENT MASON/CONCRETE FINISHER Highway SUVA2016-022 | $19.35 | 0.00 | $19.35 | |
| DECKHAND (HYDRAULIC DREDGES UNDER 20"") Heavy SUVA1994-008 | $9.50 | $2.96 | $12.46 | |
| DERRICK OPERATOR (HYDRAULIC DREDGES UNDER 20"") Heavy SUVA1994-008 | $13.20 | $2.96 | $16.16 | |
| DIPPER DREDGES (DECKHAND) Heavy SUVA1994-008 | $9.50 | $2.96 | $12.46 | |
| DIPPER DREDGES (ENGINEER) Heavy SUVA1994-008 | $14.04 | $2.96 | $17.00 | |
| DIPPER DREDGES (HANDYMAN) Heavy SUVA1994-008 | $9.50 | $2.96 | $12.46 | |
| DIPPER DREDGES (LAUNCHMAN) Heavy SUVA1994-008 | $10.12 | $2.96 | $13.08 | |
| DIPPER DREDGES (MATE) Heavy SUVA1994-008 | $12.39 | $2.96 | $15.35 | |
| DIPPER DREDGES (OILER) Heavy SUVA1994-008 | $10.12 | $2.96 | $13.08 | |
| DIPPER DREDGES (OPERATOR) Heavy SUVA1994-008 | $14.59 | $2.96 | $17.55 | |
| DIPPER DREDGES (RODMAN) Heavy SUVA1994-008 | $9.50 | $2.96 | $12.46 | |
| DIPPER DREDGES (SCOWMAN) Heavy SUVA1994-008 | $9.63 | $2.96 | $12.59 | |
| DIPPER DREDGES (WELDER) Heavy SUVA1994-008 | $12.78 | $2.96 | $15.74 | |
| DREDGING:, INCLUDES CLAMSHELL DREDGES, HYRDRAULIC DREDGES 20"" AND OVER: TUG BOATS: CLASS A2: CRANE OPERATOR Heavy ENGI0025-004 (360 SWING). INCENTIVE PAY: (Add to Hourly Rate) Operator (NCCCO License/Certification) (Assigned as Master) (USCG licensed Master of Towing Vessels (MOTV) $1.80; Licensed Boat Operator (Assigned as lead boat captain) USCG licensed boat operator $1.30; Engineer (QMED and Tankerman endorsement or licensed engineer (USCG) $1.80 Oiler (QMED and Tankerman endorsement (USCG) $1.80; All classifications (Tankerman endorsement only) USCG $1.55; Deckhand or Mate (AB with Lifeboatman endorsement (USCG) $1.80; All classifications (lifeboatman endorsement only (USCG) $1.55; Welder (ABS certification) $1.55 FOOTNOTES APPLICABLE TO ABOVE CRAFTS: a. PAID HOLIDAYS: New Year's Day, Martin Luther King, Jr.'s Birthday, Memorial Day, Good Friday, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day and Christmas Day b. VACATION: Eight percent (8%) of the straight time rate, multiplied by the total hours worked. (STATEWIDE) | $43.20 | $14.99 | $58.19 | |
| DREDGING:, INCLUDES CLAMSHELL DREDGES, HYRDRAULIC DREDGES 20"" AND OVER: TUG BOATS: CLASS B2: CERTIFIED WELDER. INCENTIVE PAY: Heavy ENGI0025-004 (Add to Hourly Rate) Operator (NCCCO License/Certification) (Assigned as Master) (USCG licensed Master of Towing Vessels (MOTV) $1.80; Licensed Boat Operator (Assigned as lead boat captain) USCG licensed boat operator $1.30; Engineer (QMED and Tankerman endorsement or licensed engineer (USCG) $1.80 Oiler (QMED and Tankerman endorsement (USCG) $1.80; All classifications (Tankerman endorsement only) USCG $1.55; Deckhand or Mate (AB with Lifeboatman endorsement (USCG) $1.80; All classifications (lifeboatman endorsement only (USCG) $1.55; Welder (ABS certification) $1.55 FOOTNOTES APPLICABLE TO ABOVE CRAFTS: a. PAID HOLIDAYS: New Year's Day, Martin Luther King, Jr.'s Birthday, Memorial Day, Good Friday, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day and Christmas Day b. VACATION: Eight percent (8%) of the straight time rate, multiplied by the total hours worked. (STATEWIDE) | $39.46 | $14.73 | $54.19 | |
| DREDGING:, INCLUDES CLAMSHELL DREDGES, HYRDRAULIC DREDGES 20"" AND OVER: TUG BOATS: CLASS C2: BOAT OPERATOR. INCENTIVE PAY: Heavy ENGI0025-004 (Add to Hourly Rate) Operator (NCCCO License/Certification) $1.80 Licensed Tug Operator over 1000 HP (Assigned as Master) (USCG licensed Master of Towing Vessels (MOTV) $1.80; Licensed Boat Operator (Assigned as lead boat captain) USCG licensed boat operator $1.30; Engineer (QMED and Tankerman endorsement or licensed engineer (USCG) $1.80 Oiler (QMED and Tankerman endorsement (USCG) endorsement only) USCG $1.55; Deckhand or Mate (AB with Lifeboatman endorsement (USCG) $1.80; All classifications (lifeboatman endorsement only (USCG) $1.55; Welder (ABS certification) $1.55 HOLIDAYS: New Year's Day, Martin Luther King, Jr.'s Birthday, Memorial Day, Good Friday, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day and Christmas Day b. VACATION: Eight percent (8%) of the straight time rate, multiplied by the total hours worked.(STATEWIDE) | $37.15 | $14.57 | $51.72 | |
| DREDGING:, INCLUDES CLAMSHELL DREDGES, HYRDRAULIC DREDGES 20"" AND OVER: TUG BOATS:CLASS B1: DERRICK OPERATOR Heavy ENGI0025-004 (180 SWING), SPIDER/SPILL BARGE OPERATOR, ENGINEER, ELECTRICIAN, CHIEF WELDER, CHIEF MATE, FILL PLACER, OPERATOR II, MAINTENANCE ENGINEER, LICENSED BOAT OPERATOR, LICENSED CREW BOAT OPERATOR. INCENTIVE PAY: (Add to Hourly Rate) Operator (NCCCO License/Certification) $1.80 Licensed Tug Operator over 1000 HP (Assigned as Master) (USCG licensed Master of Towing Vessels (MOTV) $1.80; Licensed Boat Operator (Assigned as lead boat captain) USCG licensed boat operator $1.30; Engineer (QMED and Tankerman endorsement or licensed engineer (USCG) $1.80 Oiler (QMED and Tankerman endorsement (USCG) endorsement only) USCG $1.55; Deckhand or Mate (AB with Lifeboatman endorsement (USCG) $1.80; All classifications (lifeboatman endorsement only (USCG) $1.55; Welder (ABS certification) $1.55 HOLIDAYS: New Year's Day, Martin Luther King, Jr.'s Birthday, Memorial Day, Good Friday, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day and Christmas Day b. VACATION: Eight percent (8%) of the straight time rate, multiplied by the total hours worked.(STATEWIDE) | $41.93 | $14.90 | $56.83 | |
| DRILL BOATS (BLASTER) Heavy SUVA1994-008 | $13.69 | $2.96 | $16.65 | |
| DRILL BOATS (DRILLER) Heavy SUVA1994-008 | $13.69 | $2.96 | $16.65 | |
| DRILL BOATS (ENGINEER) Heavy SUVA1994-008 | $14.18 | $2.96 | $17.14 | |
| ELECTRICIAN Heavy SUVA2010-038 | $31.12 | $8.88 | $40.00 | |
| ELECTRICIAN Residential SUVA2012-005 | $15.75 | 0.00 | $15.75 | |
| ELECTRICIAN (HYDRAULIC DREDGES UNDER 20"") Heavy SUVA1994-008 | $13.45 | $2.96 | $16.41 | |
| ENGINEER (HYDRAULIC DREDGES UNDER 20"") Heavy SUVA1994-008 | $14.18 | $2.96 | $17.14 | |
| HANDYMAN (HYDRAULIC DREDGES UNDER 20"") Heavy SUVA1994-008 | $9.50 | $2.96 | $12.46 | |
| IRONWORKER, REINFORCING Heavy SUVA2010-038 | $31.64 | $16.70 | $48.34 | |
| IRONWORKER, REINFORCING Highway SUVA2016-022 | $20.80 | 0.00 | $20.80 | |
| IRONWORKER, STRUCTURAL Heavy SUVA2010-038 | $28.97 | $11.63 | $40.60 | |
| JANITOR/PORTER (HYDRAULIC DREDGES UNDER 20"") Heavy SUVA1994-008 | $9.50 | $2.96 | $12.46 | |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR Highway SUVA2016-022 | $17.79 | 0.00 | $17.79 | |
| LABORER: COMMON OR GENERAL Highway SUVA2016-022 | $14.46 | 0.00 | $14.46 | |
| LABORER: COMMON OR GENERAL Residential SUVA2012-005 | $9.50 | 0.00 | $9.50 | |
| LABORER: PIPELAYER Highway SUVA2016-022 | $16.75 | 0.00 | $16.75 | |
| LABORERS COMMON OR GENERAL Heavy SUVA2010-038 | $12.63 | 0.00 | $12.63 | |
| LABORERS FLAGGER Heavy SUVA2010-038 | $10.42 | $0.28 | $10.70 | |
| LABORERS LANDSCAPE Heavy SUVA2010-038 | $14.10 | 0.00 | $14.10 | |
| LABORERS PIPELAYER Heavy SUVA2010-038 | $14.83 | $4.71 | $19.54 | |
| LEVERMAN (HYDRAULIC DREDGES UNDER 20"") Heavy SUVA1994-008 | $14.53 | $2.96 | $17.49 | |
| MATE (HYDRAULIC DREDGES UNDER 20"") Heavy SUVA1994-008 | $12.39 | $2.96 | $15.35 | |
| MESSMAN (HYDRAULIC DREDGES UNDER 20"") Heavy SUVA1994-008 | $9.32 | $2.96 | $12.28 | |
| NIGHT COOK (HYDRAULIC DREDGES UNDER 20"") Heavy SUVA1994-008 | $9.50 | $2.96 | $12.46 | |
| OILER (HYDRAULIC DREDGES UNDER 20"") Heavy SUVA1994-008 | $10.12 | $2.96 | $13.08 | |
| OPERATOR: ASPHALT SPREADER AND DISTRIBUTOR Highway SUVA2016-022 | $17.34 | 0.00 | $17.34 | |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE Highway SUVA2016-022 | $17.74 | 0.00 | $17.74 | |
| OPERATOR: BROOM/SWEEPER Highway SUVA2016-022 | $16.15 | $0.23 | $16.38 | |
| OPERATOR: BULLDOZER, INCLUDING UTILITY Highway SUVA2016-022 | $17.66 | 0.00 | $17.66 | |
| OPERATOR: CRANE Highway SUVA2016-022 | $26.68 | 0.00 | $26.68 | |
| OPERATOR: GRADER/BLADE, INCLUDES FINISHING Highway SUVA2016-022 | $26.13 | 0.00 | $26.13 | |
| OPERATOR: LOADER Highway SUVA2016-022 | $18.18 | 0.00 | $18.18 | |
| OPERATOR: LOADER Residential SUVA2012-005 | $18.75 | 0.00 | $18.75 | |
| OPERATOR: MECHANIC Highway SUVA2016-022 | $19.15 | 0.00 | $19.15 | |
| OPERATOR: MILLING MACHINE Highway SUVA2016-022 | $21.13 | 0.00 | $21.13 | |
| OPERATOR: PAVEMENT PLANER Highway SUVA2016-022 | $15.95 | 0.00 | $15.95 | |
| OPERATOR: PAVER Highway SUVA2016-022 (ASPHALT, AGGREGATE, AND CONCRETE) | $18.39 | 0.00 | $18.39 | |
| OPERATOR: ROLLER Highway SUVA2016-022 | $16.38 | 0.00 | $16.38 | |
| OPERATOR: ROLLER (FINISHING) Highway SUVA2016-022 | $16.55 | 0.00 | $16.55 | |
| OPERATOR: TRACTOR (UTILITY) Highway SUVA2016-022 | $13.94 | 0.00 | $13.94 | |
| PAINTER (BRUSH AND ROLLER) Residential SUVA2012-005 | $10.17 | 0.00 | $10.17 | |
| PAVEMENT MARKING TRUCK DRIVER Highway SUVA2016-022 | $21.40 | 0.00 | $21.40 | |
| PLUMBER Residential SUVA2012-005 | $19.84 | $3.38 | $23.22 | |
| POWER EQUIPMENT OPERATOR : BACKHOE Heavy SUVA2010-038 | $16.60 | $3.48 | $20.08 | |
| POWER EQUIPMENT OPERATOR : BULLDOZER Heavy SUVA2010-038 | $29.08 | $10.26 | $39.34 | |
| POWER EQUIPMENT OPERATOR : EXCAVATOR Heavy SUVA2010-038 | $17.62 | $0.76 | $18.38 | |
| POWER EQUIPMENT OPERATOR : LOADER Heavy SUVA2010-038 | $16.51 | $2.97 | $19.48 | |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER Heavy SUVA2010-038 | $16.07 | 0.00 | $16.07 | |
| POWER EQUIPMENT OPERATOR: CRANE, ALL TYPES Heavy SUVA2010-038 | $22.34 | $2.06 | $24.40 | |
| POWER EQUIPMENT OPERATOR: MECHANIC Heavy SUVA2010-038 | $37.75 | $8.91 | $46.66 | |
| POWER EQUIPMENT OPERATOR: TRACKHOE Heavy SUVA2010-038 | $17.97 | $1.75 | $19.72 | |
| POWER EQUIPMENT OPERATOR: TUGBOAT Heavy SUVA2010-038 | $26.78 | 0.00 | $26.78 | |
| RODMAN (HYDRAULIC DREDGES UNDER 20"") Heavy SUVA1994-008 | $9.50 | $2.96 | $12.46 | |
| SECOND COOK (HYDRAULIC DREDGES UNDER 20"") Heavy SUVA1994-008 | $9.50 | $2.96 | $12.46 | |
| SHOREMAN (HYDRAULIC DREDGES UNDER 20"") Heavy SUVA1994-008 | $9.32 | $2.96 | $12.28 | |
| SPIDER BARGE OPERATOR (HYDRAULIC DREDGES UNDER 20"") Heavy SUVA1994-008 | $12.97 | $2.96 | $15.93 | |
| SPILL BARGE OPERATOR (HYDRAULIC DREDGES UNDER 20"") Heavy SUVA1994-008 | $12.97 | $2.96 | $15.93 | |
| STEWARD (HYDRAULIC DREDGES UNDER 20"") Heavy SUVA1994-008 | $10.42 | $2.96 | $13.38 | |
| STEWARD DEPARTMENT Heavy SUVA1994-008 (ON DIPPER DREDGES) MESSMAN AND JANITOR | $8.61 | $2.96 | $11.57 | |
| STEWARD DEPARTMENT (ON DIPPER DREDGES) COOK Heavy SUVA1994-008 | $9.27 | $2.96 | $12.23 | |
| STEWARD DEPARTMENT (ON DIPPER DREDGES) MESS COOK Heavy SUVA1994-008 | $8.74 | $2.96 | $11.70 | |
| TRAFFIC CONTROL: FLAGGER Highway SUVA2016-022 | $11.99 | 0.00 | $11.99 | |
| TRUCK DRIVER : HEAVY 7CY & UNDER Highway SUVA2016-022 | $16.69 | 0.00 | $16.69 | |
| TRUCK DRIVER, INCLUDES ALL DUMP TRUCKS Heavy SUVA2010-038 | $15.62 | 0.00 | $15.62 | |
| TRUCK DRIVER: 1/SINGLE AXLE TRUCK Highway SUVA2016-022 | $15.79 | 0.00 | $15.79 | |
| TRUCK DRIVER: HEAVY OVER 7 CY Highway SUVA2016-022 | $17.74 | 0.00 | $17.74 | |
| TRUCK DRIVER: MULTI AXLE Highway SUVA2016-022 | $15.91 | $0.81 | $16.72 | |
| TUG BOATS, ASSISTANT ENGINEER Heavy SUVA1994-008 (TENDING DIPPER DREDGES) | $11.75 | $2.96 | $14.71 | |
| TUG BOATS, COOK (TENDING DIPPER DREDGES) Heavy SUVA1994-008 | $9.63 | $2.96 | $12.59 | |
| TUG BOATS, DECKHAND (TENDING DIPPER DREDGES) Heavy SUVA1994-008 | $9.37 | $2.96 | $12.33 | |
| TUG BOATS, ENGINEER (TENDING DIPPER DREDGES) Heavy SUVA1994-008 | $12.96 | $2.96 | $15.92 | |
| TUG BOATS, TUG MASTER (TENDING DIPPER DREDGES) Heavy SUVA1994-008 | $13.16 | $2.96 | $16.12 | |
| TUG BOATS, TUG MATE (TENDING DIPPER DREDGES) Heavy SUVA1994-008 | $11.87 | $2.96 | $14.83 | |
| TUG DECKHAND (HYDRAULIC DREDGES UNDER 20"") Heavy SUVA1994-008 | $9.50 | $2.96 | $12.46 | |
| TUG MASTER (HYDRAULIC DREDGES UNDER 20"") Heavy SUVA1994-008 | $12.29 | $2.96 | $15.25 | |
| TUG MATE (HYDRAULIC DREDGES UNDER 20"") Heavy SUVA1994-008 | $11.76 | $2.96 | $14.72 | |
| WELDER (HYDRAULIC DREDGES UNDER 20"") Heavy SUVA1994-008 | $12.78 | $2.96 | $15.74 |
No trade rates match your search and filter selection.
Heavy
Applies to
Accomack, Albemarle, Alleghany, Amelia, Amherst, Appomattox, Arlington, Augusta, Bath, Bedford +122 more
Heavy
Applies to
Pittsylvania, Danville*
Highway
Applies to
Pittsylvania, Danville*
Residential
Applies to
Brunswick, Charlotte, Cumberland, Greensville, Halifax, Lunenburg, Mecklenburg, Nottoway, Pittsylvania, Prince Edward +6 more