Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.

SUAK2023-001 Effective 08/08/2022
Trade Rate Fringe Total
CARPENTER North of 63 Latitude $43.34 $27.92 $71.26
South of N63 Latitude $43.34 $28.46 $71.80
CEMENT MASON/CONCRETE FINISHER $44.43 $22.13 $66.56
ELECTRICIAN Inside Journeyman Wireman (Technician) $44.44 $29.72 $74.16
IRONWORKER Fence Barrier Installer $37.99 $35.63 $73.62
Guardrail Installer $38.99 $35.63 $74.62
Guardrail Layout Man $38.73 $35.63 $74.36
Signalman, Stage Rigger, Structural, Ornamental, and Reinforcing $41.49 $35.63 $77.12
LABORER (North of N 63 Latitude and east of W138 longitude) Group 1 $36.00 $32.56 $68.56
Group 2 $37.00 $32.56 $69.56
Group 3 $37.90 $32.56 $70.46
Group 3A $41.78 $32.56 $74.34
Group 3B $47.36 $28.51 $75.87
LABORERS CLASSIFICATIONS Concrete Labor (curb & gutter, chute handler, curing, grouting, screeding); Crusher Plant Laborer; Demolition Laborer; Ditch Digger; Dumper; Environmental Laborer (hazard/toxic waste, oil spill); Fence Installer; Fire Watch Laborer; Flagger; Form Stripper; General Laborer; Guardrail Laborer, or Planter; Laying of Mortarless Decorative Block (retaining walls, flowered decorative block 4 feet or less - highway or landscape work); Material Handler; Pneumatic or Power Tools; Portable or Chemical Toilet Servicer; Pump Person or Mixer Person; Railroad Track Laborer; Sandblast, Pot Tender; Saw Tender; Slurry Work; Steam Cleaner Operator; Steam Point or Water Jet Operator; Storm Water Pollution Protection Plan Worker (SWPPP Worker-erosion and sediment control Laborer); Tank Cleaning; Utiliwalk & Utilidor Laborer GROUP 2: Burning & Cutting Torch; Cement or Lime Dumper or Handler (sack or bulk); Choker Splicer; Chucktender (wagon, air-track & hydraulic drills); Concrete Laborer (power buggy, concrete saws, pumpcrete nozzle person, vibrator person); Laborer (asbestos, marine work); Foam Gun or Foam Machine Operator; Gunite Operator; Hod Carrier; Jackhammer/Chipping Mortarless Decorative Block (retaining walls, flowered decorative block over 4 feet - highway or landscape work); Mason Tender & Mud Mixer (sewer work); Pilot Car; Plasterer, Bricklayer & Cement Finisher Tender; Power Saw Operator; Railroad Switch Layout Laborer; Sandblaster; Scaffold Building & Erecting; Sewer Caulker; Filer; Timber person GROUP 3: Bit Grinder; Camera/Tool/Video Operator; Guardrail Machine Operator; High Rigger & Tree Topper; High Scaler; Multiplate; Plastic Welding; Slurry Seal Squeegee Person GROUP 3A: Asphalt Raker, Asphalt Belly Dump Lay Down; Drill wagon drills, air-track drills, hydraulic drills); Pioneer Powder person (Employee Possessor); Storm Water Pollution Protection Specialist (SWPPP Specialist) air-track drills, hydraulic drills; over 5,000 hours); Grade Checking (setting or transferring of grade marks, line and grade, GPS, drones); Pioneer Drilling & Stake Hopper LABORER (South of N 63 Latitude and west of W138 longitude) Group 1 $36.00 $32.56 $68.56
Group 2 $37.00 $32.56 $69.56
Group 3 $37.90 $32.56 $70.46
Group 3A $41.78 $32.56 $74.34
Group 3B $47.36 $28.51 $75.87
LABORERS CLASSIFICATIONS Concrete Labor (curb & gutter, chute handler, curing, grouting, screeding); Crusher Plant Laborer; Demolition Laborer; Ditch Digger; Dumper; Environmental Laborer (hazard/toxic waste, oil spill); Fence Installer; Fire Watch Laborer; Flagger; Form Stripper; General Laborer; Guardrail Laborer, or Planter; Laying of Mortarless Decorative Block (retaining walls, flowered decorative block 4 feet or less - highway or landscape work); Material Handler; Pneumatic or Power Tools; Portable or Chemical Toilet Servicer; Pump Person or Mixer Person; Railroad Track Laborer; Sandblast, Pot Tender; Saw Tender; Slurry Work; Steam Cleaner Operator; Steam Point or Water Jet Operator; Storm Water Pollution Protection Plan Worker (SWPPP Worker-erosion and sediment control Laborer); Tank Cleaning; Utiliwalk & Utilidor Laborer GROUP 2: Burning & Cutting Torch; Cement or Lime Dumper or Handler (sack or bulk); Choker Splicer; Chucktender (wagon, air-track & hydraulic drills); Concrete Laborer (power buggy, concrete saws, pumpcrete nozzle person, vibrator person); Laborer (asbestos, marine work); Foam Gun or Foam Machine Operator; Gunite Operator; Hod Carrier; Jackhammer/Chipping Mortarless Decorative Block (retaining walls, flowered decorative block over 4 feet - highway or landscape work); Mason Tender & Mud Mixer (sewer work); Pilot Car; Plasterer, Bricklayer & Cement Finisher Tender; Power Saw Operator; Railroad Switch Layout Laborer; Sandblaster; Scaffold Building & Erecting; Sewer Caulker; Filer; Timber person GROUP 3: Bit Grinder; Camera/Tool/Video Operator; Guardrail Machine Operator; High Rigger & Tree Topper; High Scaler; Multiplate; Plastic Welding; Slurry Seal Squeegee Person GROUP 3A: Asphalt Raker, Asphalt Belly Dump Lay Down; Drill wagon drills, air-track drills, hydraulic drills); Pioneer Powder person (Employee Possessor); Storm Water Pollution Protection Specialist (SWPPP Specialist) air-track drills, hydraulic drills; over 5,000 hours); Grade Checking (setting or transferring of grade marks, line and grade, GPS, drones); Pioneer Drilling & Stake Hopper LINE CONSTRUCTION Line Installer $50.78 $33.42 $84.20
Powderperson $61.44 $34.53 $95.97
Power Journeyworker Line (including Equipment Operator) $63.44 $34.59 $98.03
Tree Trimmer $40.71 $29.27 $69.98
PAINTER (Region 1: North of N 63 Latitude) Brush and Roller $36.08 $25.45 $61.53
Sandblast and Spray $36.60 $25.45 $62.05
PAINTER (South of N 63 Latitude) Brush, Roll and Spray $33.22 $26.30 $59.52
Sandblast and Structural Steel Painter $34.57 $26.30 $60.87
PILEDRIVER PERSON Piledriver, Sheet Stabber $43.34 $27.92 $71.26
Piledriver-Welder $48.90 $27.92 $76.82
PLUMBER/PIPEFITTER (First Judicial District) $41.50 $28.12 $69.62
PLUMBER/PIPEFITTER (North of N 63 Latitude) $46.06 $30.70 $76.76
PLUMBER/PIPEFITTER (South of N 63 Latitude) $41.00 $28.70 $69.70
POWER EQUIPMENT OPERATOR Group 1 $47.74 $27.15 $74.89
Group 1A $49.64 $27.15 $76.79
Group 2 $46.91 $27.15 $74.06
Group 3 $46.13 $27.15 $73.28
Group 4 $39.42 $27.15 $66.57
POWER EQUIPMENT OPERATOR CLASSIFICATIONS Back Filler; Barrier Machine (Zipper); Beltcrete with Power Pack & similar conveyors; Bending Machine; Boat Coxswain; Coating Machine; Concrete Hydro Blaster; Cranes (45 tons & under or 150 feet of boom & under (including jib & attachments)), (a) Hydralifts or Transporters, (all track or truck type), (b) Derricks, (c) Overhead; Crushers; Deck or over); Drag Scraper, Yarder, and similar types; Drilling Machines, Core, Cable, Rotary and Exploration; Finishing Machine Operator, Concrete Paving, Laser Screed, Sidewalk, Curb & Gutter Machine; Grade Checker and/or Line and Grade including Drone; Helicopters; Hover Craft, Flex Craft, Loadmaster, Air Cushion, All-Terrain Vehicle, Rollagon, Bargecable, Nodwell, & Snow Cat; Hydro Ax, Feller Buncher & similar; Hydro Excavation (Vac-Truck and Similar); Loaders (2 1/2 yards through 5 yards, including all attachments): (a) Forklifts (with telescopic boom & swing attachment), (b) Front End & Overhead, (2-1/2 yards through 5 yards), (c) Loaders, (with forks or pipe clamp), (d) Loaders, elevating belt type, Euclid & similar types); Material Transfer Mechanic, Bodyperson, Electrical; Micro Tunneling Machine; Mixers: Mobile type with hoist combination; Motor Patrol Grader; Mucking Machine: Mole, Tunnel Drill, paving breaker; Plant Operator (Asphalt & Concrete); Power Plant, Turbine Operator 200 k.w & over (power plants or combination of power units over 300 k.w.); Remote Controlled Engineer; Shot Blast Machine; Shovels, Backhoes, Excavators with all attachments, and Gradealls (3 yards & under); Sideboom (under 45 tons); Sub Grader (Gurries & similar types); Tack Tractor; Truck Mounted Concrete Pump, Conveyor/Tele-belt, & Creter; Wate Kote Machine Group 1A: Camera/Tool/Video Operator (Slipline); Electrical or 150 feet including jib & attachments) (a) Clamshells & Draglines (over 3 yards), (b) Tower Cranes; Licensed Motor Patrol Grader, Dozer, Grade Tractor (finish: when finishing to final grade and/or to hubs, or for asphalt); Mill; Quad; Scrapers (over 40 yards); Screed; Shovels, Backhoes, Excavators with all attachments (over 3 yards); Sidebooms (over 45 tons); Slip Form Paver, C.M.I. & similar types; Topside (Asphalt Paver, Slurry machine, Spreaders, and similar types) Group 2: Boiler ? Fireperson; Cement Hogs & Concrete Pump on Steel Erection, Towermobiles & Air Tuggers; Horizontal/Directional Drill Locator; Locomotives, Rod & Geared Engines; Mixers; Screening, Washing Plant; Sideboom (cradling rock drill, regardless of size); Skidder; Trenching Machines (under 16 inches); Water/Waste Water Treatment Operator tow rig); Boring Machine; Brooms, Power (sweeper, elevator, vacuum, or similar); Bump Cutter; Compressor; Farm Tractor; Forklift, Industrial Type; Gin Truck or Winch Truck (with poles when used for hoisting); Hoists, Air Tuggers, Elevators; (b) Forklifts or Lumber Carrier (on construction job sites), (c) Forklifts, (with tower), (d) Overhead & Front End, (under 2-l/2 yards); Locomotives: Dinkey (air, steam, gas & electric) Speeders; Mechanics, Light Duty; Oil, Blower Distribution; Roller (other than Asphalt); Saws, Concrete; Skid Hustler; Skid Steer (with all attachments); Stake Hopper; Straightening Machine; Tow Tractor Coordinator; Spotter; Steam Cleaner; Swamper (on trenching machines or shovel type equipment) TRUCK DRIVER Group 1 $46.84 $27.32 $74.16
Group 1A $48.19 $27.32 $75.51
Group 2 $45.51 $27.32 $72.83
Group 3 $44.64 $27.32 $71.96
Group 4 $44.02 $27.32 $71.34
Group 5 $43.22 $27.32 $70.54

Modification History

Modification Publication Date
0 01/02/2026

Counties Covered

This wage determination applies to 1 county in Alaska.

Get notified when AK20260002 is modified

This determination has been revised 1 time. We'll email you when a new modification is published.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.