AK20260005
ResidentialDavis-Bacon Act general wage determination for residential construction in Alaska.
Track AK20260005
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
ENGI0302-005 Effective 01/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| KOTE MACHINE; UNLICENSED OFF ROAD HAULER FOOTNOTE: POWER EQUIPMENT OPERATOR: GROUP 1 (TUNNEL WORK) ASPHALT ROLLER: BREAKDOWN, INTERMEDIATE, AND FINISH; BACK FILLER; BARRIER MACHINE (ZIPPER); BELTCRETE WITH POWER PACK AND SIMILAR CONVEYORS; BENDING MACHINE; BOAT COXWAINS; BULLDOZERS; CABLEWAYS, HIGHLINES AND CABLECARS; CLEANING MACHINE; COATING MACHINE; CONCRETE HYDRO BLASTER; CRANES-45 TONS AND UNDER OR 150 FOOT BOOM AND UNDER (INCLUDING JIB AND ATTACHMENTS): (A) HYDRALIFTS OR TRANSPORTERS, ALL TRACK OR TRUCK TYPE,(B) DERRICKS; CRUSHERS; DECK WINCHES-DOUBLE DRUM; DITCHING OR TRENCHING MACHINE (16 INCH OR OVER); DRILLING MACHINES, CORE, CABLE, ROTARY AND EXPLORATION; FINISHING MACHINE OPERATOR, CONCRETE PAVING, LASER SCREED, SIDEWALK, CURB AND GUTTER MACHINE; HELICOPTERS; HOVER CRAFT, FLEX CRAFT, LOADMASTER, AIR CUSHION, ALL TERRAIN VEHICLE, ROLLAGON, BARGECABLE, NODWELL, AND SNOW CAT; HYDRO AX: FELLER BUNCHER AND SIMILAR; LOADERS (2 1/2 YARDS THROUGH 5 YARDS, INCLUDING ALL ATTACHMENTS): FORKLIFTS WITH TELESCOPIC BOOM AND SWING ATTACHMENT, OVERHEAD AND FRONT END, 2 1/2 YARDS THROUGH 5 YARDS, LOADERS WITH FORKS OR PIPE CLAMPS; LOADERS, ELEVATING BELT TYPE, EUCLID AND SIMILAR TYPES; MECHANICS, BODYMAN; MICRO TUNNELING MACHINE; MIXERS: MOBILE TYPE W/HOIST COMBINATION; MOTOR PATROL GRADER; MUCKING MACHINES: MOLE, TUNNEL DRILL, HORIZONTAL/DIRECTIONAL DRILL OPERATOR, AND/OR SHIELD; OPERATOR ON DREDGES; PILEDRIVER ENGINEERS, L. B. FOSTER, PULLER OR SIMILAR PAVING BREAKER; POWER PLANT, TURBINE OPERATOR, 200 K.W. AND OVER (POWER PLANTS OR COMBINATION OF POWER UNITS OVER 300 K.W.); SCRAPERS-THROUGH 40 YARDS; SERVICE OILER/SERVICE ENGINEER; SIDEBOOMS-UNDER 45 TONS; SHOT BLAST MACHINE; SHOVELS, BACKHOES, EXCAVATORS WITH ALL ATTACHMENTS, AND GRADEALLS (3 YARDS AND UNDER), SPREADERS, BLAW KNOX, CEDARAPIDS, BARBER GREENE, SLURRY MACHINE; SUB-GRADER (GURRIES, RECLAIMER, AND SIMILAR TYPES); TACK TRACTOR; TRUCK MOUNTED CONCRETE PUMPS, CONVEYOR, CRETER; WATER GROUPS 1-4 RECEIVE 10% PREMIUM WHILE PERFORMING TUNNEL OR UNDERGROUND WORK. RIG OILER/CRANE ASSISTANT ENGINEER SHALL BE REQUIRED ON CRANES OVER 85 TONS OR OVER 100 FEET OF BOOM | $58.55 | $29.50 | $88.05 |
| KOTE MACHINE; UNLICENSED OFF ROAD HAULER FOOTNOTE: POWER EQUIPMENT OPERATOR GROUP 4 (TUNNEL WORK) RIG OILER/CRANE ASSISTANT ENGINEER;PARTS AND EQUIPMENT COORDINATOR; SWAMPER (ON TRENCHING MACHINES OR SHOVEL TYPE EQUIPMENT); SPOTTER; STEAM CLEANER; DRILL HELPER. FOOTNOTE: GROUPS 1-4 RECEIVE 10% PREMIUM WHILE PERFORMING TUNNEL OR UNDERGROUND WORK. RIG OILER/CRANE ASSISTANT ENGINEER SHALL BE REQUIRED ON CRANES OVER 85 TONS OR OVER 100 FEET OF BOOM. FOOTNOTE: GROUPS 1-4 RECEIVE 10% PREMIUM WHILE PERFORMING TUNNEL OR UNDERGROUND WORK. RIG OILER/CRANE ASSISTANT ENGINEER SHALL BE REQUIRED ON CRANES OVER 85 TONS OR OVER 100 FEET OF BOOM | $48.47 | $29.50 | $77.97 |
| KOTE MACHINE; UNLICENSED OFF ROAD HAULER FOOTNOTE: POWER EQUIPMENT OPERATOR GROUP 3 (TUNNEL WORK) ""A"" FRAME TRUCKS, DECK WINCHES: SINGLE POWER DRUM; BOMBARDIER (TACK OR TOW RIG); BORING MACHINE; BROOMS-POWER; BUMP CUTTER; COMPRESSOR; FARM TRACTOR; FORKLIFT, INDUSTRIAL TYPE; GIN TRUCK OR WINCH TRUCK WITH POLES WHEN USED FOR HOISTING; GRADE CHECKER AND STAKE HOPPER; HOIST, AIR TUGGERS, ELEVATORS; LOADERS: (A) ELEVATING-ATHEY, BARBER GREEN AND SIMILAR TYPES (B) FORKLIFTS OR LUMBER CARRIER (ON CONSTRUCTION JOB SITE) (C) FORKLIFTS WITH TOWER (D) OVERHEAD AND FRONT-END, UNDER 2 1/2 YDS. LOCOMOTIVES:DINKEY (AIR, STEAM, GAS AND ELECTRIC) SPEEDERS; MECHANICS (LIGHT DUTY); OIL, BLOWER DISTRIBUTION; POST HOLE DIGGERS, MECHANICAL; POT FIREMAN (POWER AGITATED); POWER PLANT, TURBINE OPERATOR, UNDER 200 K.W.; PUMPS-WATER; ROLLER-OTHER THAN PLANTMIX; SAWS, CONCRETE; SKID STEER WITH ALL ATTACHMENTS; STRAIGHTENING MACHINE; TOW TRACTOR PERFORMING TUNNEL OR UNDERGROUND WORK. RIG OILER/CRANE ASSISTANT ENGINEER SHALL BE REQUIRED ON CRANES OVER 85 TONS OR OVER 100 FEET OF BOOM | $56.60 | $29.50 | $86.10 |
| KOTE MACHINE; UNLICENSED OFF ROAD HAULER FOOTNOTE: POWER EQUIPMENT OPERATOR GROUP 2 (TUNNEL WORK) BOILER-FIREMAN; CEMENT HOG AND CONCRETE PUMP OPERATOR; CONVEYORS (EXCEPT AS LISTED IN GROUP 1); HOIST ON STEEL ERECTION; TOWERMOBILES AND AIR TUGGERS; HORIZONTAL/DIRECTIONAL DRILL LOCATOR;LICENSED GRADE TECHNICIAN; LOADERS, (I.E., ELEVATING GRADER AND MATERIAL TRANSFER VEHICLE); LOCOMOTIVES: ROD AND GEARED ENGINES; MIXERS; SCREENING, WASHING PLANT; SIDEBOOM (CRADLING ROCK DRILL REGARDLESS OF SIZE); SKIDDER; TRENCING MACHINE UNDER 16 INCHES; WASTE/ WASTE WATER TREATMENT OPERATOR. FOOTNOTE: GROUPS 1-4 RECEIVE 10% PREMIUM WHILE PERFORMING TUNNEL OR UNDERGROUND WORK. RIG OILER/CRANE ASSISTANT ENGINEER SHALL BE REQUIRED ON CRANES OVER 85 TONS OR OVER 100 FEET OF BOOM | $57.55 | $29.50 | $87.05 |
| KOTE MACHINE; UNLICENSED OFF ROAD HAULER FOOTNOTE: POWER EQUIPMENT OPERATOR GROUP 1A (TUNNEL WORK) CAMERA/TOOL/VIDEO OPERATOR (SLIPLINE), CRANES-OVER 45 TONS OR 150 FOOT (INCLUDING JIB AND ATTACHMENTS): (A) CLAMSHELLS AND DRAGLINES (OVER 3 YARDS), (B) TOWER CRANES; LICENSED WATER/WASTE WATER TREATMENT OPERATOR; LOADERS OVER 5 YDS.; CERTIFIED WELDER, ELECTRICAL MECHANIC, CAMP MAINTENANCE ENGINEER, MECHANIC (OVER 10,000 HOURS); MOTOR PATROL GRADER, DOZER, GRADE TRACTOR, ROTO-MILL/PROFILER (FINISH: WHEN FINISHING TO FINAL GRADE AND/OR TO HUBS, OR FOR ASPHALT); POWER PLANTS: 1000 K.W. AND OVER; QUAD; SCREED; SHOVELS, BACKHOES, EXCAVATORS WITH ALL ATTACHMENTS (OVER 3 YARDS), SIDEBOOMS OVER 45 TONS; SLIP FORM PAVER, C.M.I. AND SIMILAR TYPES; SCRAPERS OVER 40 YARDS; | $60.86 | $29.50 | $90.36 |
| KOTE MACHINE; UNLICENSED OFF ROAD HAULER FOOTNOTE: POWER EQUIPMENT OPERATOR (GROUP 4) RIG OILER/CRANE ASSISTANT ENGINEER;PARTS AND EQUIPMENT COORDINATOR; SWAMPER (ON TRENCHING MACHINES OR SHOVEL TYPE EQUIPMENT); SPOTTER; STEAM CLEANER; DRILL HELPER. PERFORMING TUNNEL OR UNDERGROUND WORK. RIG OILER/CRANE ASSISTANT ENGINEER SHALL BE REQUIRED ON CRANES OVER 85 TONS OR OVER 100 FEET OF BOOM | $44.06 | $29.50 | $73.56 |
| KOTE MACHINE; UNLICENSED OFF ROAD HAULER FOOTNOTE: POWER EQUIPMENT OPERATOR (GROUP 3) ""A"" FRAME TRUCKS, DECK WINCHES: SINGLE POWER DRUM; BOMBARDIER (TACK OR TOW RIG); BORING MACHINE; BROOMS-POWER; BUMP CUTTER; COMPRESSOR; FARM TRACTOR; FORKLIFT, INDUSTRIAL TYPE; GIN TRUCK OR WINCH TRUCK WITH POLES WHEN USED FOR HOISTING; GRADE CHECKER AND STAKE HOPPER; HOIST, AIR TUGGERS, ELEVATORS; LOADERS: (A) ELEVATING-ATHEY, BARBER GREEN AND SIMILAR TYPES (B) FORKLIFTS OR LUMBER CARRIER (ON CONSTRUCTION JOB SITE) (C) FORKLIFTS WITH TOWER (D) OVERHEAD AND FRONT-END, UNDER 2 1/2 YDS. LOCOMOTIVES:DINKEY (AIR, STEAM, GAS AND ELECTRIC) SPEEDERS; MECHANICS (LIGHT DUTY); OIL, BLOWER DISTRIBUTION; POST HOLE DIGGERS, MECHANICAL; POT FIREMAN (POWER AGITATED); POWER PLANT, TURBINE OPERATOR, UNDER 200 K.W.; PUMPS-WATER; ROLLER-OTHER THAN PLANTMIX; SAWS, CONCRETE; SKID STEER WITH ALL ATTACHMENTS; STRAIGHTENING MACHINE; TOW TRACTOR | $51.46 | $29.50 | $80.96 |
| KOTE MACHINE; UNLICENSED OFF ROAD HAULER FOOTNOTE: POWER EQUIPMENT OPERATOR (GROUP 2) BOILER-FIREMAN; CEMENT HOG AND CONCRETE PUMP OPERATOR; CONVEYORS (EXCEPT AS LISTED IN GROUP 1); HOIST ON STEEL ERECTION; TOWERMOBILES AND AIR TUGGERS; HORIZONTAL/DIRECTIONAL DRILL LOCATOR;LICENSED GRADE TECHNICIAN; LOADERS, (I.E., ELEVATING GRADER AND MATERIAL TRANSFER VEHICLE); LOCOMOTIVES: ROD AND GEARED ENGINES; MIXERS; SCREENING, WASHING PLANT; SIDEBOOM (CRADLING ROCK DRILL REGARDLESS OF SIZE); SKIDDER; TRENCING MACHINE UNDER 16 INCHES; WASTE/ WASTE WATER TREATMENT OPERATOR | $52.32 | $29.50 | $81.82 |
| KOTE MACHINE; UNLICENSED OFF ROAD HAULER FOOTNOTE: POWER EQUIPMENT OPERATOR (GROUP 1A) CAMERA/TOOL/VIDEO OPERATOR (SLIPLINE), CRANES-OVER 45 TONS OR 150 FOOT (INCLUDING JIB AND ATTACHMENTS): (A) CLAMSHELLS AND DRAGLINES (OVER 3 YARDS), (B) TOWER CRANES; LICENSED WATER/WASTE WATER TREATMENT OPERATOR; LOADERS OVER 5 YDS.; CERTIFIED WELDER, ELECTRICAL MECHANIC, CAMP MAINTENANCE ENGINEER, MECHANIC (OVER 10,000 HOURS); MOTOR PATROL GRADER, DOZER, GRADE TRACTOR, ROTO-MILL/PROFILER (FINISH: WHEN FINISHING TO FINAL GRADE AND/OR TO HUBS, OR FOR ASPHALT); POWER PLANTS: 1000 K.W. AND OVER; QUAD; SCREED; SHOVELS, BACKHOES, EXCAVATORS WITH ALL ATTACHMENTS (OVER 3 YARDS), SIDEBOOMS OVER 45 TONS; SLIP FORM PAVER, C.M.I. AND SIMILAR TYPES; SCRAPERS OVER 40 YARDS; | $55.33 | $29.50 | $84.83 |
| KOTE MACHINE; UNLICENSED OFF ROAD HAULER FOOTNOTE: POWER EQUIPMENT OPERATOR (GROUP 1) ASPHALT ROLLER: BREAKDOWN, INTERMEDIATE, AND FINISH; BACK FILLER; BARRIER MACHINE (ZIPPER); BELTCRETE WITH POWER PACK AND SIMILAR CONVEYORS; BENDING MACHINE; BOAT COXWAINS; BULLDOZERS; CABLEWAYS, HIGHLINES AND CABLECARS; CLEANING MACHINE; COATING MACHINE; CONCRETE HYDRO BLASTER; CRANES-45 TONS AND UNDER OR 150 FOOT BOOM AND UNDER (INCLUDING JIB AND ATTACHMENTS): (A) HYDRALIFTS OR TRANSPORTERS, ALL TRACK OR TRUCK TYPE,(B) DERRICKS; CRUSHERS; DECK WINCHES-DOUBLE DRUM; DITCHING OR TRENCHING MACHINE (16 INCH OR OVER); DRILLING MACHINES, CORE, CABLE, ROTARY AND EXPLORATION; FINISHING MACHINE OPERATOR, CONCRETE PAVING, LASER SCREED, SIDEWALK, CURB AND GUTTER MACHINE; HELICOPTERS; HOVER CRAFT, FLEX CRAFT, LOADMASTER, AIR CUSHION, ALL TERRAIN VEHICLE, ROLLAGON, BARGECABLE, NODWELL, AND SNOW CAT; HYDRO AX: FELLER BUNCHER AND SIMILAR; LOADERS (2 1/2 YARDS THROUGH 5 YARDS, INCLUDING ALL ATTACHMENTS): FORKLIFTS WITH TELESCOPIC BOOM AND SWING ATTACHMENT, OVERHEAD AND FRONT END, 2 1/2 YARDS THROUGH 5 YARDS, LOADERS WITH FORKS OR PIPE CLAMPS; LOADERS, ELEVATING BELT TYPE, EUCLID AND SIMILAR TYPES; MECHANICS, BODYMAN; MICRO TUNNELING MACHINE; MIXERS: MOBILE TYPE W/HOIST COMBINATION; MOTOR PATROL GRADER; MUCKING MACHINES: MOLE, TUNNEL DRILL, HORIZONTAL/DIRECTIONAL DRILL OPERATOR, AND/OR SHIELD; OPERATOR ON DREDGES; PILEDRIVER ENGINEERS, L. B. FOSTER, PULLER OR SIMILAR PAVING BREAKER; POWER PLANT, TURBINE OPERATOR, 200 K.W. AND OVER (POWER PLANTS OR COMBINATION OF POWER UNITS OVER 300 K.W.); SCRAPERS-THROUGH 40 YARDS; SERVICE OILER/SERVICE ENGINEER; SIDEBOOMS-UNDER 45 TONS; SHOT BLAST MACHINE; SHOVELS, BACKHOES, EXCAVATORS WITH ALL ATTACHMENTS, AND GRADEALLS (3 YARDS AND UNDER), SPREADERS, BLAW KNOX, CEDARAPIDS, BARBER GREENE, SLURRY MACHINE; SUB-GRADER (GURRIES, RECLAIMER, AND SIMILAR TYPES); TACK TRACTOR; TRUCK MOUNTED CONCRETE PUMPS, CONVEYOR, CRETER; WATER KOTE MACHINE; UNLICENSED OFF ROAD HAULER | $53.23 | $29.50 | $82.73 |
LABO0341-001 Effective 04/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: TUNNELS, SHAFTS, AND RAISES GROUP 3B (SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 DEGREES) GRADE CHECKER (SETTING OR TRANSFERING OF GRADE MARKS, LINE AND GRADE) | $59.41 | $28.81 | $88.22 |
| LABORER: TUNNELS, SHAFTS, AND RAISES GROUP 3A (SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 DEGREES) ASPHALT RAKER, ASPHALT BELLY DUMP LAY DOWN; DRILL DOCTOR (IN THE FIELD); DRILLERS (INCLUDING, BUT NOT LIMITED TO, WAGON DRILLS, AIR TRACK DRILLS; HYDRAULIC DRILLS); POWDERMAN; PIONEER DRILLING AND DRILLING OFF TUGGER (ALL TYPE DRILLS); PIPELAYERS | $51.18 | $34.26 | $85.44 |
| LABORER: TUNNELS, SHAFTS, AND RAISES GROUP 3 (SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 DEGREES) ALARM INSTALLER; BIT GRINDER; GUARDRAIL MACHINE OPERATOR; HIGH RIGGER AND TREE TOPPER; HIGH SCALER; MULTIPLATE; SLURRY SEAL SQUEEGEE MAN | $46.37 | $34.26 | $80.63 |
| LABORER: TUNNELS, SHAFTS, AND RAISES GROUP 2 (SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 DEGREES) BURNING AND CUTTING TORCH; CEMENT OR LIME DUMPER OR HANDLER (SACK OR BULK); CHOKER SPLICER; CHUCKTENDER (WAGON, AIRTRACK AND HYDRAULIC DRILLS); CONCRETE LABORERS (POWER BUGGY, CONCRETE SAWS, PUMPCRETE NOZZLEMAN, VIBRATORMAN); CULVERT PIPE LABORER; CURED IN PLACE PIPELAYER; ENVIRONMENTAL LABORER (MARINE WORK, OIL SPILL SKIMMER OPERATOR, SMALL BOAT OPERATOR); FOAM GUN OR FOAM MACHINE OPERATOR; GREEN CUTTER (DAM WORK); GUNNITE OPERATOR; HOD CARRIERS; JACKHAMMER OR PAVEMENT BREAKERS (MORE THAN 45 POUNDS);LAYING OF DECORATIVE BLOCK (RETAINING WALLS, FLOWERED DECORATIVE BLOCK ABOVE 4 FEET); MASON TENDER AND MUD MIXER (SEWER WORK); PILOT CAR; PLASTERER, BRICKLAYER AND CEMENT FINISHER TENDERS; POWER SAW OPERATOR; RAILROAD SWITCH LAYOUT LABORER; SANDBLASTER; SEWER CAULKERS; SEWER PLANT MAINTENANCE MAN; THERMAL PLASTIC APPLICATOR; TIMBER FALLER, CHAIN SAW OPERATOR, FILER; TIMBERMAN | $45.38 | $34.26 | $79.64 |
| LABORER: TUNNELS, SHAFTS, AND RAISES GROUP 1 (SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 DEGREES) ASPHALT WORKERS (SHOVELMAN, PLANT CREW); BRUSH CUTTERS; CAMP MAINTENANCE LABORER; CARPENTER TENDERS; CHOKE SETTERS, HOOK TENDER, RIGGER, SIGNALMAN; CONCRETE LABORER(CURB AND GUTTER, CHUTE HANDLER, GROUTING, CURING, SCREEDING); CRUSHER PLANT LABORER; DEMOLITION LABORER; DITCH DIGGERS; DUMP MAN; ENVIRONMENTAL LABORER (ASBESTOS (LIMITED TO NONMECHANICAL SYSTEMS), HAZARDOUS AND TOXIC WASTE, OIL SPILL); FENCE INSTALLER; FIRE WATCH LABORER; FLAGMAN; FORM STRIPPERS; GENERAL LABORER; GUARDRAIL LABORER, BRIDGE RAIL INSTALLERS; HYDRO-SEEDER NOZZLEMAN; LABORERS (BUILDING); LANDSCAPE OR PLANTER; LAYING OF DECORATIVE BLOCK (RETAINING WALLS, FLOWERED DECORATIVE BLOCK 4 FEET AND BELOW); MATERIAL HANDLERS; PNEUMATIC OR POWER TOOLS; PORTABLE OR CHEMICAL TOILET SERVICEMAN; PUMP MAN OR MIXER MAN; RAILROAD TRACK LABORER; SANDBLAST, POT TENDER; SAW TENDERS; SCAFFOLD BUILDING AND ERECTING; SLURRY WORK; STAKE HOPPER; STEAM POINT OR WATER JET OPERATOR; STEAM CLEANER OPERATOR; TANK CLEANING; UTILIWALK, UTILIDOR LABORER AND CONDUIT INSTALLER; WATCHMAN (CONSTRUCTION PROJECTS); WINDOW CLEANER | $44.28 | $34.26 | $78.54 |
| LABORER: GROUP 4 (SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 DEGREES) FINAL BUILDING CLEANUP TUNNELS, SHAFTS, AND RAISES CLASSIFICATIONS | $29.82 | $34.26 | $64.08 |
| LABORER: GROUP 3B (SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 DEGREES) GRADE CHECKER (SETTING OR TRANSFERING OF GRADE MARKS, LINE AND GRADE) | $54.01 | $28.81 | $82.82 |
| LABORER: GROUP 3A (SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 DEGREES) ASPHALT RAKER, ASPHALT BELLY DUMP LAY DOWN; DRILL DOCTOR (IN THE FIELD); DRILLERS (INCLUDING, BUT NOT LIMITED TO, WAGON DRILLS, AIR TRACK DRILLS; HYDRAULIC DRILLS); POWDERMAN; PIONEER DRILLING AND DRILLING OFF TUGGER (ALL TYPE DRILLS); PIPELAYERS | $46.53 | $34.26 | $80.79 |
| LABORER: GROUP 3 (SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 DEGREES) ALARM INSTALLER; BIT GRINDER; GUARDRAIL MACHINE OPERATOR; HIGH RIGGER AND TREE TOPPER; HIGH SCALER; MULTIPLATE; SLURRY SEAL SQUEEGEE MAN | $42.15 | $34.26 | $76.41 |
| LABORER: GROUP 2 (SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 DEGREES) BURNING AND CUTTING TORCH; CEMENT OR LIME DUMPER OR HANDLER (SACK OR BULK); CHOKER SPLICER; CHUCKTENDER (WAGON, AIRTRACK AND HYDRAULIC DRILLS); CONCRETE LABORERS (POWER BUGGY, CONCRETE SAWS, PUMPCRETE NOZZLEMAN, VIBRATORMAN); CULVERT PIPE LABORER; CURED IN PLACE PIPELAYER; ENVIRONMENTAL LABORER (MARINE WORK, OIL SPILL SKIMMER OPERATOR, SMALL BOAT OPERATOR); FOAM GUN OR FOAM MACHINE OPERATOR; GREEN CUTTER (DAM WORK); GUNNITE OPERATOR; HOD CARRIERS; JACKHAMMER OR PAVEMENT BREAKERS (MORE THAN 45 POUNDS);LAYING OF DECORATIVE BLOCK (RETAINING WALLS, FLOWERED DECORATIVE BLOCK ABOVE 4 FEET); MASON TENDER AND MUD MIXER (SEWER WORK); PILOT CAR; PLASTERER, BRICKLAYER AND CEMENT FINISHER TENDERS; POWER SAW OPERATOR; RAILROAD SWITCH LAYOUT LABORER; SANDBLASTER; SEWER CAULKERS; SEWER PLANT MAINTENANCE MAN; THERMAL PLASTIC APPLICATOR; TIMBER FALLER, CHAIN SAW OPERATOR, FILER; TIMBERMAN | $41.25 | $34.26 | $75.51 |
| LABORER: GROUP 1 (SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 DEGREES) ASPHALT WORKERS (SHOVELMAN, PLANT CREW); BRUSH CUTTERS; CAMP MAINTENANCE LABORER; CARPENTER TENDERS; CHOKE SETTERS, HOOK TENDER, RIGGER, SIGNALMAN; CONCRETE LABORER(CURB AND GUTTER, CHUTE HANDLER, GROUTING, CURING, SCREEDING); CRUSHER PLANT LABORER; DEMOLITION LABORER; DITCH DIGGERS; DUMP MAN; ENVIRONMENTAL LABORER (ASBESTOS (LIMITED TO NONMECHANICAL SYSTEMS), HAZARDOUS AND TOXIC WASTE, OIL SPILL); FENCE INSTALLER; FIRE WATCH LABORER; FLAGMAN; FORM STRIPPERS; GENERAL LABORER; GUARDRAIL LABORER, BRIDGE RAIL INSTALLERS; HYDRO-SEEDER NOZZLEMAN; LABORERS (BUILDING); LANDSCAPE OR PLANTER; LAYING OF DECORATIVE BLOCK (RETAINING WALLS, FLOWERED DECORATIVE BLOCK 4 FEET AND BELOW); MATERIAL HANDLERS; PNEUMATIC OR POWER TOOLS; PORTABLE OR CHEMICAL TOILET SERVICEMAN; PUMP MAN OR MIXER MAN; RAILROAD TRACK LABORER; SANDBLAST, POT TENDER; SAW TENDERS; SCAFFOLD BUILDING AND ERECTING; SLURRY WORK; STAKE HOPPER; STEAM POINT OR WATER JET OPERATOR; STEAM CLEANER OPERATOR; TANK CLEANING; UTILIWALK, UTILIDOR LABORER AND CONDUIT INSTALLER; WATCHMAN (CONSTRUCTION PROJECTS); WINDOW CLEANER | $40.25 | $34.26 | $74.51 |
LABO0942-001 Effective 04/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORERS: NORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES; GROUP 3B (TUNNELS, SHAFTS, AND RAISES) GRADE CHECKER (SETTING OR TRANSFERING OF GRADE MARKS, LINE AND GRADE) | $59.41 | $28.81 | $88.22 |
| LABORERS: NORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES: GROUP 3 (TUNNELS, SHAFTS, AND RAISES) ALARM INSTALLER; BIT GRINDER; GUARDRAIL MACHINE OPERATOR; HIGH RIGGER AND TREE TOPPER; HIGH SCALER; MULTIPLATE; SLURRY SEAL SQUEEGEE MAN | $46.37 | $34.26 | $80.63 |
| LABORERS: NORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES: GROUP 2 (TUNNELS, SHAFTS, AND RAISES) BURNING AND CUTTING TORCH; CEMENT OR LIME DUMPER OR HANDLER (SACK OR BULK); CHOKER SPLICER; CHUCKTENDER (WAGON, AIRTRACK AND HYDRAULIC DRILLS); CONCRETE LABORERS (POWER BUGGY, CONCRETE SAWS, PUMPCRETE NOZZLEMAN, VIBRATORMAN); CULVERT PIPE LABORER; CURED IN PLACE PIPELAYER; ENVIRONMENTAL LABORER (MARINE WORK, OIL SPILL SKIMMER OPERATOR, SMALL BOAT OPERATOR); FOAM GUN OR FOAM MACHINE OPERATOR; GREEN CUTTER (DAM WORK); GUNNITE OPERATOR; HOD CARRIERS; JACKHAMMER OR PAVEMENT BREAKERS (MORE THAN 45 POUNDS);LAYING OF DECORATIVE BLOCK (RETAINING WALLS, FLOWERED DECORATIVE BLOCK ABOVE 4 FEET); MASON TENDER AND MUD MIXER (SEWER WORK); PILOT CAR; PLASTERER, BRICKLAYER AND CEMENT FINISHER TENDERS; POWER SAW OPERATOR; RAILROAD SWITCH LAYOUT LABORER; SANDBLASTER; SEWER CAULKERS; SEWER PLANT MAINTENANCE MAN; THERMAL PLASTIC APPLICATOR; TIMBER FALLER, CHAIN SAW OPERATOR, FILER; TIMBERMAN | $45.38 | $34.26 | $79.64 |
| LABORERS: NORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES: GROUP 1 (TUNNELS, SHAFTS, AND RAISES) ASPHALT WORKERS (SHOVELMAN, PLANT CREW); BRUSH CUTTERS; CAMP MAINTENANCE LABORER; CARPENTER TENDERS; CHOKE SETTERS, HOOK TENDER, RIGGER, SIGNALMAN; CONCRETE LABORER(CURB AND GUTTER, CHUTE HANDLER, GROUTING, CURING, SCREEDING); CRUSHER PLANT LABORER; DEMOLITION LABORER; DITCH DIGGERS; DUMP MAN; ENVIRONMENTAL LABORER (ASBESTOS (LIMITED TO NONMECHANICAL SYSTEMS), HAZARDOUS AND TOXIC WASTE, OIL SPILL); FENCE INSTALLER; FIRE WATCH LABORER; FLAGMAN; FORM STRIPPERS; GENERAL LABORER; GUARDRAIL LABORER, BRIDGE RAIL INSTALLERS; HYDRO-SEEDER NOZZLEMAN; LABORERS (BUILDING); LANDSCAPE OR PLANTER; LAYING OF DECORATIVE BLOCK (RETAINING WALLS, FLOWERED DECORATIVE BLOCK 4 FEET AND BELOW); MATERIAL HANDLERS; PNEUMATIC OR POWER TOOLS; PORTABLE OR CHEMICAL TOILET SERVICEMAN; PUMP MAN OR MIXER MAN; RAILROAD TRACK LABORER; SANDBLAST, POT TENDER; SAW TENDERS; SCAFFOLD BUILDING AND ERECTING; SLURRY WORK; STAKE HOPPER; STEAM POINT OR WATER JET OPERATOR; STEAM CLEANER OPERATOR; TANK CLEANING; UTILIWALK, UTILIDOR LABORER AND CONDUIT INSTALLER; WATCHMAN (CONSTRUCTION PROJECTS); WINDOW CLEANER | $44.28 | $34.26 | $78.54 |
| LABORERS: NORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES (GROUP 4) FINAL BUILDING CLEANUP TUNNELS, SHAFTS, AND RAISES CLASSIFICATIONS | $29.82 | $34.26 | $64.08 |
| LABORERS: NORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES (GROUP 3B) GRADE CHECKER (SETTING OR TRANSFERING OF GRADE MARKS, LINE AND GRADE) | $54.01 | $28.81 | $82.82 |
| LABORERS: NORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES (GROUP 3A) ASPHALT RAKER, ASPHALT BELLY DUMP LAY DOWN; DRILL DOCTOR (IN THE FIELD); DRILLERS (INCLUDING, BUT NOT LIMITED TO, WAGON DRILLS, AIR TRACK DRILLS; HYDRAULIC DRILLS); POWDERMAN; PIONEER DRILLING AND DRILLING OFF TUGGER (ALL TYPE DRILLS); PIPELAYERS | $46.53 | $34.26 | $80.79 |
| LABORERS: NORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES (GROUP 3) ALARM INSTALLER; BIT GRINDER; GUARDRAIL MACHINE OPERATOR; HIGH RIGGER AND TREE TOPPER; HIGH SCALER; MULTIPLATE; SLURRY SEAL SQUEEGEE MAN | $42.15 | $34.26 | $76.41 |
| LABORERS: NORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES (GROUP 2) BURNING AND CUTTING TORCH; CEMENT OR LIME DUMPER OR HANDLER (SACK OR BULK); CHOKER SPLICER; CHUCKTENDER (WAGON, AIRTRACK AND HYDRAULIC DRILLS); CONCRETE LABORERS (POWER BUGGY, CONCRETE SAWS, PUMPCRETE NOZZLEMAN, VIBRATORMAN); CULVERT PIPE LABORER; CURED IN PLACE PIPELAYER; ENVIRONMENTAL LABORER (MARINE WORK, OIL SPILL SKIMMER OPERATOR, SMALL BOAT OPERATOR); FOAM GUN OR FOAM MACHINE OPERATOR; GREEN CUTTER (DAM WORK); GUNNITE OPERATOR; HOD CARRIERS; JACKHAMMER OR PAVEMENT BREAKERS (MORE THAN 45 POUNDS);LAYING OF DECORATIVE BLOCK (RETAINING WALLS, FLOWERED DECORATIVE BLOCK ABOVE 4 FEET); MASON TENDER AND MUD MIXER (SEWER WORK); PILOT CAR; PLASTERER, BRICKLAYER AND CEMENT FINISHER TENDERS; POWER SAW OPERATOR; RAILROAD SWITCH LAYOUT LABORER; SANDBLASTER; SEWER CAULKERS; SEWER PLANT MAINTENANCE MAN; THERMAL PLASTIC APPLICATOR; TIMBER FALLER, CHAIN SAW OPERATOR, FILER; TIMBERMAN | $41.25 | $34.26 | $75.51 |
| LABORERS: NORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES (GROUP 1) ASPHALT WORKERS (SHOVELMAN, PLANT CREW); BRUSH CUTTERS; CAMP MAINTENANCE LABORER; CARPENTER TENDERS; CHOKE SETTERS, HOOK TENDER, RIGGER, SIGNALMAN; CONCRETE LABORER(CURB AND GUTTER, CHUTE HANDLER, GROUTING, CURING, SCREEDING); CRUSHER PLANT LABORER; DEMOLITION LABORER; DITCH DIGGERS; DUMP MAN; ENVIRONMENTAL LABORER (ASBESTOS (LIMITED TO NONMECHANICAL SYSTEMS), HAZARDOUS AND TOXIC WASTE, OIL SPILL); FENCE INSTALLER; FIRE WATCH LABORER; FLAGMAN; FORM STRIPPERS; GENERAL LABORER; GUARDRAIL LABORER, BRIDGE RAIL INSTALLERS; HYDRO-SEEDER NOZZLEMAN; LABORERS (BUILDING); LANDSCAPE OR PLANTER; LAYING OF DECORATIVE BLOCK (RETAINING WALLS, FLOWERED DECORATIVE BLOCK 4 FEET AND BELOW); MATERIAL HANDLERS; PNEUMATIC OR POWER TOOLS; PORTABLE OR CHEMICAL TOILET SERVICEMAN; PUMP MAN OR MIXER MAN; RAILROAD TRACK LABORER; SANDBLAST, POT TENDER; SAW TENDERS; SCAFFOLD BUILDING AND ERECTING; SLURRY WORK; STAKE HOPPER; STEAM POINT OR WATER JET OPERATOR; STEAM CLEANER OPERATOR; TANK CLEANING; UTILIWALK, UTILIDOR LABORER AND CONDUIT INSTALLER; WATCHMAN (CONSTRUCTION PROJECTS); WINDOW CLEANER | $40.25 | $34.26 | $74.51 |
| LABORERS: NORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES; GROUP 3A (TUNNELS, SHAFTS, AND RAISES) ASPHALT RAKER, ASPHALT BELLY DUMP LAY DOWN; DRILL DOCTOR (IN THE FIELD); DRILLERS (INCLUDING, BUT NOT LIMITED TO, WAGON DRILLS, AIR TRACK DRILLS; HYDRAULIC DRILLS); POWDERMAN; PIONEER DRILLING AND DRILLING OFF TUGGER (ALL TYPE DRILLS); PIPELAYERS | $51.18 | $34.26 | $85.44 |
SUAK1999-008 Effective 05/14/1999 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER (EXCLUDING DUMP, OVER 8 YARDS AND DUMP 8 YARDS OR UNDER) | $17.56 | $0.00 | $17.56 |
| SHEET METAL WORKER (HVAC DUCT WORK) | $16.79 | $0.00 | $16.79 |
| ROOFER | $19.27 | $0.00 | $19.27 |
| PLUMBER/PIPEFITTER (EXCLUDING HVAC WORK) | $22.80 | $0.00 | $22.80 |
| PIPEFITTER (HVAC PIPING) | $14.00 | $0.00 | $14.00 |
| PAINTER (EXCLUDING DRYWALL FINISHING) | $20.60 | $4.47 | $25.07 |
| LABORER, GENERAL (EXCLUDING SITE AND STREET WORK) | $13.88 | $0.00 | $13.88 |
| INSTALLER (BATT & BLOWN) | $18.55 | $0.00 | $18.55 |
| FLOOR LAYER: CARPET (CARPET) | $20.64 | $0.00 | $20.64 |
| FENCE ERECTOR (INCLUDING WOOD AND CHAIN LINK) | $13.18 | $0.00 | $13.18 |
| ELECTRICIAN/WIREMAN | $17.45 | $3.18 | $20.63 |
| DRYWALL HANGER | $15.00 | $0.00 | $15.00 |
| DRYWALL FINISHER/TAPER | $20.10 | $0.00 | $20.10 |
| CEMENT MASON/CONCRETE FINISHER | $20.00 | $0.00 | $20.00 |
| CARPENTER (EXCLUDING BATT & BLOW INSULATION AND DRYWALL HANGING) | $17.68 | $0.00 | $17.68 |
TEAM0959-004 Effective 01/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER ((1A) DUMP, OVER 8 YARDS) | $48.50 | $26.43 | $74.93 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 0 | 01/02/2026 |
| 1 | 05/18/2026 |
Counties Covered
This wage determination applies to 19 counties in Alaska.
Get notified when AK20260005 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.