AZ20260034
HighwayDavis-Bacon Act general wage determination for highway construction in Arizona.
Track AZ20260034
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
ENGI0012-068 Effective 12/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: (DRILL RIG/AUGER) | $35.56 | $18.12 | $53.68 |
IRON0075-013 Effective 08/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER | $39.50 | $19.91 | $59.41 |
LABO1184-025 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $29.91 | $9.26 | $39.17 |
LABO1184-030 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: MASON TENDER | $29.91 | $9.26 | $39.17 |
LABO1184-038 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: PIPELAYER | $31.98 | $9.26 | $41.24 |
SUAZ2023-019 Effective 11/19/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: WATER | $28.90 | $4.18 | $33.08 |
| TRUCK DRIVER: DUMP | $24.50 | $2.20 | $26.70 |
| TRAFFIC CONTROL | $19.38 | $2.54 | $21.92 |
| POWER EQUIPMENT OPERATOR: PAVER/SPREADER/FINISH EQUIPMENT (ASPHALT, AGGREGATE, & CONCRETE) | $31.55 | $0.06 | $31.61 |
| POWER EQUIPMENT OPERATOR: OILER | $31.86 | $10.01 | $41.87 |
| POWER EQUIPMENT OPERATOR: MOTOR GRADER/BLADE | $36.47 | $3.61 | $40.08 |
| POWER EQUIPMENT OPERATOR: LOADER/FRONT END LOADER | $26.07 | $3.80 | $29.87 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $38.31 | $9.20 | $47.51 |
| POWER EQUIPMENT OPERATOR: EXCAVATOR/TRACKHOE | $39.48 | $0.00 | $39.48 |
| POWER EQUIPMENT OPERATOR: CRANE / DERRICKS | $44.33 | $13.07 | $57.40 |
| POWER EQUIPMENT OPERATOR: CONCRETE SCREED | $33.90 | $0.00 | $33.90 |
| POWER EQUIPMENT OPERATOR: COMPACTOR/ROLLER | $26.76 | $4.76 | $31.52 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $32.53 | $0.00 | $32.53 |
| PAINTER: SIGN AND DISPLAY ERECTOR | $19.06 | $2.99 | $22.05 |
| LABORER: GENERAL | $23.96 | $2.15 | $26.11 |
| CARPENTER: FORMWORK CONCRETE | $32.51 | $10.13 | $42.64 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 0 | 01/02/2026 |
| 1 | 05/18/2026 |
Counties Covered
This wage determination applies to 1 county in Arizona.
Get notified when AZ20260034 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.