CA20260023

Building

Davis-Bacon Act general wage determination for building construction in California.

Modification 1, revised 05/18/2026 127 trade rates 1 county View on SAM.gov

Track CA20260023

Get an email when this wage determination gets a new modification.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Wage Rates

Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.

SUCA1985-003 Effective 07/01/1985
Trade Rate Fringe Total
TRUCK DRIVERS: GROUP 37 Over 80 to 95 yds $22.34 $7.04 $29.38
TRUCK DRIVERS: GROUP 36 Over 65 to 80 yds $19.99 $7.04 $27.03
TRUCK DRIVERS: GROUP 35 Bulk cement spreader (with or without auger, over 50 yds. and under 65 yds. water level); Dump (over 50 yds. and under 65 yds. water level); Dumpcrete (over 50 yds. and under 65 yds. water level); Dumpster (over 50 yds. and under 65 yds. water level); Helicopter pilot (when transporting workers ormaterials); Skid (debris box, over 50 yds. and under 65 yds. water level); Truck (dry pre-batch concrete mix, over 50 yds. and under 65 yds. water level) $19.04 $7.04 $26.08
TRUCK DRIVERS: GROUP 33 Bulk cement spreader (with or without auger, over 35 yds. and including 50 yds. water level); Dump (over 35 yds. and including 50 yds. water level); Dumpcrete (over 35 yds. and including 50 yds. water level); Dumpster (over 35 yds. and including 50 yds. water level); Skid (debris box, over 35 yds. and including 50 yds. water level); Truck (dry pre-batch concrete mix, over 35 yds. and including 50 yds. water level) $19.69 $7.04 $26.73
TRUCK DRIVERS: GROUP 32 Bulk cement spreader (with or without auger, over 24 yds. and including 35 yds. water level); Dump (over 24 yds. and including 35 yds. water level); Dumpcrete (over 24 yds. and including 35 yds. water level); Dumpster (over 24 yds. and including 35 yds. water level); DW 10's, 20's, 21's and other similar Cat type, Terra Cobra, LeTournapulls, Tournarocker, Euclid and similar type equipment when pulling fuel and/or grease tank trailers or other miscellaneous trailers; Skid (debris box, over 24 yds. and including 35 yds. water level); Truck (dry pre- batch concrete mix, over 24 yds. and including 35 yds. water level) $19.47 $7.04 $26.51
TRUCK DRIVERS: GROUP 31 Bulk cement spreader (with or without auger, over 18 yds. and including 24 yds. water level); Combination dump and dump trailer; Dump (over 18 yds. and including 24 yds. water level); Dumpcrete (over 18 yds. and including 24 yds. water level); Dumpster (over 18 yds. and including 24 yds. water level); Skid (debris box, over 18 yds. and including 24 yds. water level); Transit mix agitator (over 12 yds. through 16 yds.); Truck (dry pre-batch concrete mix, over 18 yds. and including 24 yds. water level) $19.54 $7.04 $26.58
TRUCK DRIVERS: GROUP 30 Truck repair; Hydro-lift or Swedish crane type (including when Swedish crane is used for jetting); Hydro-lift extension or retracting crane (boom-type) $19.48 $7.04 $26.52
TRUCK DRIVERS: GROUP 29 Transit mix agitator (over 14 yds. through 16 yds.) $19.45 $7.04 $26.49
TRUCK DRIVERS: GROUP 28 P.B. or similar type self-loading truck $19.44 $7.04 $26.48
TRUCK DRIVERS: GROUP 27 Double gooseneck (7 or more axles); Heavy-duty transport tiller $19.40 $7.04 $26.44
TRUCK DRIVERS: GROUP 26 Ammonia nitrate distributor driver and mixer; Bulk cement spreader (with or without auger, over 12 yds. and including 18 yds. water level); Dump (over 12 yds. and including 18 yds. water level); Dumpcrete (over 12 yds. and including 18 yds. water level); Dumpster (over 12 yds. and including 18 yds. water level); Skid (debris box, over 12 yds. and including 18 yds. water level); Truck (dry pre-batch concrete mix, over 12 yds. and including 18 yds. water level) $19.38 $7.04 $26.42
TRUCK DRIVERS: GROUP 25 Heavy-duty transport (gooseneck lowbed); Transit mix or agitator (over 12 yds. through 14 yds.) $19.35 $7.04 $26.39
TRUCK DRIVERS: GROUP 24 Bulk cement spreader (with or without auger, 8 ys. and including 12 yds. water level); Dump (8 yds. and including 12 yds. water level); Dumpcrete (8 yds. and including 12 yds. water level); Dumpster (8 yds. and including 12 yds. water level); Self-propelled street sweeper with self-contained refuse bin; Skid (debris box, 8 yds. and including 12 yds. water level); Snow Go and/or snow plow; Truck (dry pre-batch concrete mix, 8 yds. and including 12 yds. water level) $19.34 $7.04 $26.38
TRUCK DRIVERS: GROUP 23 Transit mix or agitator (over 10 yds. through 12 yds.) $19.25 $7.04 $26.29
TRUCK DRIVERS: GROUP 22 Combination boot person and road oiler $19.24 $7.04 $26.28
TRUCK DRIVERS: GROUP 21 Jetting truck and water truck (5,000 gallons and under 7,000 gallons) $19.21 $7.04 $26.25
TRUCK DRIVERS: GROUP 20 Vacuum truck (5,500 gallons and under 7,500 gallons) $19.16 $7.04 $26.20
TRUCK DRIVERS: GROUP 19 Transit mix or agitator (8 yds. through 10 yds.) $19.15 $7.04 $26.19
TRUCK DRIVERS: GROUP 18 Ross Hyster and similar straddle carrier $19.14 $7.04 $26.18
TRUCK DRIVERS: GROUP 17 Heavy-duty transport (high bed) $19.12 $7.04 $26.16
TRUCK DRIVERS: GROUP 16 A-frame, winch truck; Buggymobile; Jetting and water truck (4,000 gallons and under 5,000 gallons); Rubber-tired truck jumbo $19.11 $7.04 $26.15
TRUCK DRIVERS: GROUP 15 Bulk cement spreader (with or without auger, 6 yds. and under 8 yds. water level); Dump (6 yds. and under 8 yds. water level); Dumpcrete (6 yds. and under 8 yds. water level); Dumpster (6 yds. and under 8 yds. water level); Skid (debris box, 6 yds. and under 8 yds. water level); Truck (dry pre-batch concrete mix, 6 yds. and under 8 yds. water level) $19.40 $7.04 $26.44
TRUCK DRIVERS: GROUP 14 Rubber-tired muck car (not self-loaded) $19.07 $7.04 $26.11
TRUCK DRIVERS: GROUP 13 Vacuum truck, 3,500 gallons and under 5,500 gallons $19.26 $7.04 $26.30
TRUCK DRIVERS: GROUP 12 Combination winch truck with hoist; Transit mix or agitator (6 yds. and under 8 yds.) $19.25 $7.04 $26.29
TRUCK DRIVERS: GROUP 11 Jetting truck and water truck, 2,500 gallons and under 4,000 gallons $19.01 $7.04 $26.05
TRUCK DRIVERS: GROUP 10 Scissor truck; Single unit flat rack (3-axle unit); Industrial lift truck (mechanical tailgate); Small rubber-tired tractor (when used within teamsters' jurisdiction) $19.00 $7.04 $26.04
TRUCK DRIVERS: GROUP 9 Vacuum truck, under 3,500 gallons $17.98 $7.04 $25.02
TRUCK DRIVERS: GROUP 8 Fuel and/or grease truck driver or fuel worker $17.97 $7.04 $25.01
TRUCK DRIVERS: GROUP 7 Transit mix, agitator (under 6 yds.) $17.95 $7.04 $24.99
TRUCK DRIVERS: GROUP 6 Lift jitney, fork lift $17.93 $7.04 $24.97
TRUCK DRIVERS: GROUP 5 Road oil truck or boot $17.92 $7.04 $24.96
TRUCK DRIVERS: GROUP 4 Jetting truck and water truck (under 2,500 gallons) $17.91 $7.04 $24.95
TRUCK DRIVERS: GROUP 3 Bulk cement spreader (with or without auger, 4 yd. and under 6 yds. water level); Dump (4 yds. and under 6 yds. water level); Dumpcrete (4 yds. and under 6 yds. water level); Dumpster (4 yds. and under 6 yds. water level); Skid (debris box, 4 yds. and under 6 yds. water level); Single unit flat rack (2-axle unit); Industrial lift truck (mechanical tailgate); Truck (dry pre-batch concrete mix, 4 yds. and under 6 yds. water level) $17.90 $7.04 $24.94
TRUCK DRIVERS: GROUP 2 Teamster oiler and/or greaser and/or service $17.88 $7.04 $24.92
TRUCK DRIVERS: GROUP 1 Bulk cement spreader (with or without auger, under 4 yds. water level); Bus driver; Concrete pump machine; Concrete pump truck (when flat rack truck is used appropriate flat rack rate shall apply); Dump (under 4 yds. water level); Dumpcrete truck (under 4 yds. water level); Dumpster (under 4 yds. water level); Escort or pilot car driver; Nipper truck (when flat rack truck is used appropriate flat rack rate shall apply); Pick-up; Skid (debris box, under 4 yds. water level); Team driver; Truck (dry pre-batch concrete mix, under 4 yds. water level) $17.20 $7.04 $24.24
TILE SETTER $18.92 $3.29 $22.21
TILE FINISHER $10.68 $1.65 $12.33
TERRAZZO FINISHER (BASE MACHINE OPERATOR) $16.72 $3.95 $20.67
TERRAZZO FINISHER $16.02 $3.95 $19.97
SPRINKLER FITTER $21.87 $3.23 $25.10
SHEET METAL WORKER $18.37 $7.26 $25.63
ROOFERS: SLATE, TILE AND COMPOSITION $15.00 $7.64 $22.64
ROOFERS: ENAMELER AND PITCH $17.65 $7.64 $25.29
POWER EQUIPMENT OPERATORS:: GROUP 11-C Operator of helicopter (when used in erection work); Remote-controlled earthmoving equipment AREA 1: AREA LYING WESTERLY OF THE EAST LINE OF RANGE 14E $24.65 $9.60 $34.25
POWER EQUIPMENT OPERATORS:: GROUP 9 Canal finger drain digger; Chicago boom; Combination mixer and compressor (gunite); Combination slurry mixer and/or cleaner; Highline cable (5 tons and under); Lull Hi- lift or similar (20 ft. or over); Mucking machine (rubber-tired, rail or track type); Tractor (with boom) (D-6 or larger and similar) AREA 1: AREA LYING WESTERLY OF THE EAST LINE OF RANGE 14E $21.10 $9.60 $30.70
POWER EQUIPMENT OPERATORS:: GROUP 8 Armor-Coater (or similar); Asphalt plant engineer; Cast-in-place pipe laying machine; Combination slusher and motor operator; Concrete batch plant (multiple units); Dozer; Heading shield operator; Heavy-duty repair and/or welder; Ken Seal machine (or similar); Kolman loader; Loader (up to 2 yds.); Mechanical trench shield; Portable crushing and screening plant; Push cat; Rubber-tired earth-moving equipment (up to and including 45 cu. yds. """"struck"""" m.r.c.) (Euclids, T-Pulls, DW-10, 20, 21 and similar); Rubber-tired dozer; Self-propelled compactor with dozer; Sheepfoot; Timber skidder (rubber-tired or similar equipment); Tractor-drawn scraper; Tractor; Trenching machine; Tri-batch paver; Tunnel mole boring machine; Woods-Mixer (and other similar Pugmill equipment) AREA 1: AREA LYING WESTERLY OF THE EAST LINE OF RANGE 14E $19.76 $9.60 $29.36
POWER EQUIPMENT OPERATORS:: GROUP 5 Compressor operator (over 2); Concrete mixer (over 1 yd.); Concrete pump or pumpcrete gun; Generator; Grouting machine; Pressweld (air operated); Pumps (over 1); Welding machines (powered other than by electricity) AREA 1: AREA LYING WESTERLY OF THE EAST LINE OF RANGE 14E $17.60 $9.60 $27.20
POWER EQUIPMENT OPERATORS: GROUP 11-C Operator of helicopter (when used in erection work); Remote-controlled earthmoving equipment AREA 2 (REMAINDER OF COUNTY) $26.65 $9.60 $36.25
POWER EQUIPMENT OPERATORS: GROUP 11-B Loader (over 18 yds.) AREA 2 (REMAINDER OF COUNTY) $26.14 $9.60 $35.74
POWER EQUIPMENT OPERATORS: GROUP 11-B Loader (over 18 yds.) AREA 1: AREA LYING WESTERLY OF THE EAST LINE OF RANGE 14E $24.14 $9.60 $33.74
POWER EQUIPMENT OPERATORS: GROUP 11-A Band wagon (in conjunction with wheel excavator); Crane (over 125 tons); Loader (over 12 cu. yds. up to and including 18 cu. yds.); Power shovel, clamshell, backhoe, gradall and dragline (over 7 cu. yds. m.r.c.); Rubber-tired multi-purpose earthmoving machine (2 units over 75 cu. yds.""struck"" m.r.c.); Wheel excavator (over 750 cu. yds. per hour) AREA 2 (REMAINDER OF COUNTY) $25.71 $9.60 $35.31
POWER EQUIPMENT OPERATORS: GROUP 11-A Band wagon (in conjunction with wheel excavator); Crane (over 125 tons); Loader (over 12 cu. yds. up to and including 18 cu. yds.); Power shovel, clamshell, backhoe, gradall and dragline (over 7 cu. yds. m.r.c.); Rubber-tired multi-purpose earthmoving machine (2 units over 75 cu. yds. ""struck"" m.r.c.); Wheel excavator (over 750 cu. yds. per hour) AREA 1: AREA LYING WESTERLY OF THE EAST LINE OF RANGE 14E $21.71 $9.60 $31.31
POWER EQUIPMENT OPERATORS: GROUP 11 Automatic concrete slip-form paver (Gradesetter, Screed); Automatic railroad car dumper; Canal trimmer with ditching attachment; Cary-lift, Campbell or similar; Continuous flight tie back auger (crane attached, single controls); Crane (over 25 tons up to and including 125 tons); Drott travelift 650- A-1 or similar (45 tons or over); Euclid loader when controlled from the Pullcat; Highline cableway (over 5 tons); Loader (over 4 cu. yds. up to and including 12 cu. yds.); Miller formless M-900 slope paver or similar (grade setter required); Multiple engine scraper (when used as Push Pull); Power blade operator (multi- engine); Power shovel, clamshell, dragline, backhoe, gradall (over 1 cu. yd. up to and including 7 cu. yds. m.r.c., long boom pay); Rubber-tired earthmoving machine (multiple propulsion power units and two or more scrapers) (up to and including 75 cu. yds. struck m.r.c.); Self-propelled compactor boom-type lifting device (center mount) (over 25 tons m.r.c.); Single engine rubber-tired earthmoving machine (with tandem scrapers); Slip form paver (concrete or asphalt) (screed required); Tandem cat; Tower crane mobile (including rail mounted); Trencher (pulling attached shield); Tower cranes, Universal Liebher and similar types (in the erection, dismantling and moving of equipment); Wheel excavator (up to and including 750 cu. yds. per hour); Whirley crane (over 25 tons); Multi-earthmoving equipment (up to and including 75 cu. yds. """"struck"""" m.r.c.); Truck-mounted hydraulic crane when remote control equipped (over 10 tons up to and including 25 tons) AREA 2 (REMAINDER OF COUNTY) $24.91 $9.60 $34.51
POWER EQUIPMENT OPERATORS: GROUP 11 Automatic concrete slip-form paver (Gradesetter, Screed); Automatic railroad car dumper; Canal trimmer with ditching attachment; Cary-lift, Campbell or similar; Continuous flight tie back auger (crane attached, single controls); Crane (over 25 tons up to and including 125 tons); Drott travelift 650- A-1 or similar (45 tons or over); Euclid loader when controlled from the Pullcat; Highline cableway (over 5 tons); Loader (over 4 cu. yds. up to and including 12 cu. yds.); Miller formless M-900 slope paver or similar (grade setter required); Multiple engine scraper (when used as Push Pull); Power blade operator (multi- engine); Power shovel, clamshell, dragline, backhoe, gradall (over 1 cu. yd. up to and including 7 cu. yds. m.r.c., long boom pay); Rubber-tired earthmoving machine (multiple propulsion power units and two or more scrapers) (up to and including 75 cu. yds. struck m.r.c.); Self-propelled compactor boom-type lifting device (center mount) (over 25 tons m.r.c.); Single engine rubber-tired earthmoving machine (with tandem scrapers); Slip form paver (concrete or asphalt) (screed required); Tandem cat; Tower crane mobile (including rail mounted); Trencher (pulling attached shield); Tower cranes, Universal Liebher and similar types (in the erection, dismantling and moving of equipment); Wheel excavator (up to and including 750 cu. yds. per hour); Whirley crane (over 25 tons); Multi-earthmoving equipment (up to and including 75 cu. yds. """"struck"""" m.r.c.); Truck-mounted hydraulic crane when remote control equipped (over 10 tons up to and including 25 tons) AREA 1: AREA LYING WESTERLY OF THE EAST LINE OF RANGE 14E $21.91 $9.60 $31.51
POWER EQUIPMENT OPERATORS: GROUP 10-A Backhoe (hydraulic) (up to and including 1 cu. yd. m.r.c.); Backhoe (cable) (up to and including 1 cu. yd. m.r.c.); Combination backhoe and loader (over 3/4 cu. yd. m.r.c.); Continuous flight tie back auger (crane attached/separate controls); Crane not over 25 tons, Hammerhead and Gantry; Gradall (up to and including 1 cu. yd.); Power blade operator (single engine); Power shovel, clamshell, dragline (up to and including 1 cu. yd. m.r.c.) (long boom pay); Rubber- tired scraper, self-loading (Paddle Wheel, twin engine); Self- propelled boom-type lifting device (center mount); over 10 tons up to and including 25 tons); CMI dual land auto grader SP-30 or similar AREA 1: AREA LYING WESTERLY OF THE EAST LINE OF RANGE 14E $21.64 $9.60 $31.24
POWER EQUIPMENT OPERATORS: GROUP 10-A Backhoe (hydraulic) (up to and including 1 cu. yd. m.r.c.); Backhoe (cable) (up to and including 1 cu. yd. m.r.c.); Combination backhoe and loader (over 3/4 cu. yd. m.r.c.); Continuous flight tie back auger (crane attached/separate controls); Crane not over 25 tons, Hammerhead and Gantry; Gradall (up to and including 1 cu. yd.); Power blade operator (single engine); Power shovel, clamshell, dragline (up to and including 1 cu. yd. m.r.c.) (long boom pay); Rubber- tired scraper, self-loading (Paddle Wheel, twin engine); Self- propelled boom-type lifting device (center mount); over 10 tons up to and including 25 tons); CMI dual land auto grader SP-30 or similar AREA 2 (REMAINDER OF COUNTY) $23.64 $9.60 $33.24
POWER EQUIPMENT OPERATORS: GROUP 10 Boom-type backfilling machine; Bridge crane; Cary- lift (or similar); Chemical grouting machine, truck-mounted; Combination backhoe and loader (up to and including 1/2 cu. yd. m.r.c.); Derrick (2 operators required when swing engine remote from hoist); Derrick barge (except excavation work); Do-mor loader; Adams elegrader; Elevating grader; Heavy rotary drill rig (including caisson foundation work and Euclid loader and similar type); Robbins type drill; Koehring Skooper (or similar); Lift slab machine (Vagtborg and similar types); Loader (2 yds. up to and including 4 yds.); Locomotive, 100 tons (single or multiple units); Multiple engine earthmoving machine (Euclids, dozers, etc.) (no tandem scraper); Pre-stress wire wrapping machine; Reservoir-debris tug (self-propelled floating); Rubber-tired scraper, self-loading (paddle wheels, etc.); Shuttle car (reclaim station); Single-engine scraper over 45 yds.; Soil stabilizer (P & H or equal); Sub-grader (Gurrier or other automatic type); Tractor, compressor drill combination; Track-laying-type earthmoving machine (single engine with tandem scrapers); Train loading station; Trenching machine, multi-engine with sloping attachment, Jeffco or similar; Vacuum cooling plant; Whirley crane (up to and including 25 tons) AREA 1: AREA LYING WESTERLY OF THE EAST LINE OF RANGE 14E $21.45 $9.60 $31.05
POWER EQUIPMENT OPERATORS: GROUP 10 Boom-type backfilling machine; Bridge crane; Cary- lift (or similar); Chemical grouting machine, truck-mounted; Combination backhoe and loader (up to and including 1/2 cu. yd. m.r.c.); Derrick (2 operators required when swing engine remote from hoist); Derrick barge (except excavation work); Do-mor loader; Adams elegrader; Elevating grader; Heavy rotary drill rig (including caisson foundation work and Euclid loader and similar type); Robbins type drill; Koehring Skooper (or similar); Lift slab machine (Vagtborg and similar types); Loader (2 yds. up to and including 4 yds.); Locomotive, 100 tons (single or multiple units); Multiple engine earthmoving machine (Euclids, dozers, etc.) (no tandem scraper); Pre-stress wire wrapping machine; Reservoir-debris tug (self-propelled floating); Rubber-tired scraper, self-loading (paddle wheels, etc.); Shuttle car (reclaim station); Single-engine scraper over 45 yds.; Soil stabilizer (P & H or equal); Sub-grader (Gurrier or other automatic type); Tractor, compressor drill combination; Track-laying-type earthmoving machine (single engine with tandem scrapers); Train loading station; Trenching machine, multi-engine with sloping attachment, Jeffco or similar; Vacuum cooling plant; Whirley crane (up to and including 25 tons) AREA 2 (REMAINDER OF COUNTY) $23.45 $9.60 $33.05
POWER EQUIPMENT OPERATORS: GROUP 9 Canal finger drain digger; Chicago boom; Combination mixer and compressor (gunite); Combination slurry mixer and/or cleaner; Highline cable (5 tons and under); Lull Hi- lift or similar (20 ft. or over); Mucking machine (rubber-tired, rail or track type); Tractor (with boom) (D-6 or larger and similar) AREA 2 (REMAINDER OF COUNTY) $23.10 $9.60 $32.70
POWER EQUIPMENT OPERATORS: GROUP 8 Armor-Coater (or similar); Asphalt plant engineer; Cast-in-place pipe laying machine; Combination slusher and motor operator; Concrete batch plant (multiple units); Dozer; Heading shield operator; Heavy-duty repair and/or welder; Ken Seal machine (or similar); Kolman loader; Loader (up to 2 yds.); Mechanical trench shield; Portable crushing and screening plant; Push cat; Rubber-tired earth-moving equipment (up to and including 45 cu. yds. ""struck"" m.r.c.) (Euclids, T-Pulls, DW-10, 20, 21 and similar); Rubber-tired dozer; Self-propelled compactor with dozer; Sheepfoot; Timber skidder (rubber-tired or similar equipment); Tractor-drawn scraper; Tractor; Trenching machine; Tri-batch paver; Tunnel mole boring machine; Woods-Mixer (and other similar Pugmill equipment) AREA 2 (REMAINDER OF COUNTY) $22.76 $9.60 $32.36
POWER EQUIPMENT OPERATORS: GROUP 7 Concrete conveyor or concrete pump, truck or equipment mounted (boom length to apply); Concrete conveyor, building site; Deck engineer; Dual drum mixer; Fuller Kenyon pump and similar types; Gantry rider (or similar); Hydra-hammer (or similar); Material hoist (2 or more drums); Mechanical finisher or spreader machine (asphalt, Barber-Greene and similar); Mine or shaft hoist; Mixermobile; Pavement breaker with or without compressor combination; Pipe bending machine (pipelines only); Pipe cleaning machine (tractor propelled and supported); Pipe wrapping machine (tractor propelled and supported); Refrigeration plant; Roller operator (finish asphalt); Self-propelled boom-type lifting device (center mount) (10 tons or less m.r.c.); Self-propelled elevating grader plane; Slusher operator; Small tractor (with boom); Soil tester; Truck- type loader; Welding machine (gasoline or diesel) AREA 2 (REMAINDER OF COUNTY) $21.08 $9.60 $30.68
POWER EQUIPMENT OPERATORS: GROUP 7 Concrete conveyor or concrete pump, truck or equipment mounted (boom length to apply); Concrete conveyor, building site; Deck engineer; Dual drum mixer; Fuller Kenyon pump and similar types; Gantry rider (or similar); Hydra-hammer (or similar); Material hoist (2 or more drums); Mechanical finisher or spreader machine (asphalt, Barber-Greene and similar); Mine or shaft hoist; Mixermobile; Pavement breaker with or without compressor combination; Pipe bending machine (pipelines only); Pipe cleaning machine (tractor propelled and supported); Pipe wrapping machine (tractor propelled and supported); Refrigeration plant; Roller operator (finish asphalt); Self-propelled boom-type lifting device (center mount) (10 tons or less m.r.c.); Self-propelled elevating grader plane; Slusher operator; Small tractor (with boom); Soil tester; Truck- type loader; Welding machine (gasoline or diesel) AREA 1: AREA LYING WESTERLY OF THE EAST LINE OF RANGE 14E $19.08 $9.60 $28.68
POWER EQUIPMENT OPERATORS: GROUP 6 BLH Lima road pactor or similar; Boom truck or dual-purpose A-frame truck; Concrete batch plant (wet or dry); Concrete saw (self-propelled unit) on streets, highways, airports and canals; Drilling and boring machinery, vertical and horizontal (not to apply to waterliners, wagon drills or jackhammers); Gradesetter, grade checker (mechanical or otherwise); Highline cableway signal; Locomotive (steam of over 30 tons); Maginnis internal full slab vibrator (on airports, highways, canals and warehouses); Mechanical finisher (concrete) (Clary, Johnson, Bidwell Bridge deck or similar types); Mechanical burm, curb and/or curb and gutter machine, concrete or asphalt; Portable crusher; Post driver (M-1500 and similar); Power jumbo operator (setting slip forms, etc., in tunnels); Roller (except asphalt); Screed (Barber-Greene and similar) (asphaltic concrete paving); Self-propelled compactor (single engine); Self-propelled pipeline wrapping machine, Perault, CRC, or similar types; Slip form pump (lifting device for concrete forms); Small rubber-tired tractor; Surface heater; Self- propelled power sweeper; Self-propelled tape machine; Auger-type drilling equipment, up to and including 30 ft. depth digging capacity m.r.c. AREA 2 (REMAINDER OF COUNTY) $20.83 $9.60 $30.43
POWER EQUIPMENT OPERATORS: GROUP 6 BLH Lima road pactor or similar; Boom truck or dual-purpose A-frame truck; Concrete batch plant (wet or dry); Concrete saw (self-propelled unit) on streets, highways, airports and canals; Drilling and boring machinery, vertical and horizontal (not to apply to waterliners, wagon drills or jackhammers); Gradesetter, grade checker (mechanical or otherwise); Highline cableway signal; Locomotive (steam of over 30 tons); Maginnis internal full slab vibrator (on airports, highways, canals and warehouses); Mechanical finisher (concrete) (Clary, Johnson, Bidwell Bridge deck or similar types); Mechanical burm, curb and/or curb and gutter machine, concrete or asphalt; Portable crusher; Post driver (M-1500 and similar); Power jumbo operator (setting slip forms, etc., in tunnels); Roller (except asphalt); Screed (Barber-Greene and similar) (asphaltic concrete paving); Self-propelled compactor (single engine); Self-propelled pipeline wrapping machine, Perault, CRC, or similar types; Slip form pump (lifting device for concrete forms); Small rubber-tired tractor; Surface heater; Self- propelled power sweeper; Self-propelled tape machine; Auger-type drilling equipment, up to and including 30 ft. depth digging capacity m.r.c. AREA 1: AREA LYING WESTERLY OF THE EAST LINE OF RANGE 14E $18.83 $9.60 $28.43
POWER EQUIPMENT OPERATORS: GROUP 5 Compressor operator (over 2); Concrete mixer (over 1 yd.); Concrete pump or pumpcrete gun; Generator; Grouting machine; Pressweld (air operated); Pumps (over 1); Welding machines (powered other than by electricity) AREA 2 (REMAINDER OF COUNTY) $20.60 $9.60 $30.20
POWER EQUIPMENT OPERATORS: GROUP 4 Ballast jack tamper; Ballast regulation; Ballast tamper multipurpose; Box (asphalt plant); Elevator operator (inside); Fork lift or lumber stacker (construction job site); Line master; Material hoist (1 drum); Shuttlecar; Tie spacer; Towermobile AREA 2 (REMAINDER OF COUNTY $20.27 $9.60 $29.87
POWER EQUIPMENT OPERATORS: GROUP 4 Ballast jack tamper; Ballast regulation; Ballast tamper multipurpose; Box (asphalt plant); Elevator operator (inside); Fork lift or lumber stacker (construction job site); Line master; Material hoist (1 drum); Shuttlecar; Tie spacer; Towermobile AREA 1: AREA LYING WESTERLY OF THE EAST LINE OF RANGE 14E $18.27 $9.60 $27.87
POWER EQUIPMENT OPERATORS: GROUP 3 Box operator (bunker); Helicopter radio operator (signal); Motor operator; Locomotive (30 tons or under); Oiler; Ross Carrier (construction job site); Rotomist operator; Screed (except asphaltic concrete paving); Self-propelled, automatically applied concrete curing machine (on streets, highways, airports and canals); Trenching machine (maximum digging capacity 5 ft. depth); Tugger hoist, single drum; Truck crane oiler; Boiler tender AREA 2 (REMAINDER OF COUNTY) $19.42 $9.60 $29.02
POWER EQUIPMENT OPERATORS: GROUP 3 Box operator (bunker); Helicopter radio operator (signal); Motor operator; Locomotive (30 tons or under); Oiler; Ross Carrier (construction job site); Rotomist operator; Screed (except asphaltic concrete paving); Self-propelled, automatically applied concrete curing machine (on streets, highways, airports and canals); Trenching machine (maximum digging capacity 5 ft. depth); Tugger hoist, single drum; Truck crane oiler; Boiler tender AREA 1: AREA LYING WESTERLY OF THE EAST LINE OF RANGE 14E $16.42 $9.60 $26.02
POWER EQUIPMENT OPERATORS: GROUP 2 Compressor operator; Concrete mixer (up to and including 1 yd.); Conveyor belt operator (tunnel); Fire tender, hot plant; Hydraulic monitor; Mechanical conveyor (handling building materials); Mixer box operator (concrete plant); Pump operator; Spreader box (with screeds); Tar pot fire tender (power agitated) AREA 2 (REMAINDER OF COUNTY) $19.09 $9.60 $28.69
POWER EQUIPMENT OPERATORS: GROUP 2 Compressor operator; Concrete mixer (up to and including 1 yd.); Conveyor belt operator (tunnel); Fire tender, hot plant; Hydraulic monitor; Mechanical conveyor (handling building materials); Mixer box operator (concrete plant); Pump operator; Spreader box (with screeds); Tar pot fire tender (power agitated) AREA 1: AREA LYING WESTERLY OF THE EAST LINE OF RANGE 14E $18.09 $9.60 $27.69
POWER EQUIPMENT OPERATORS: GROUP 1-A Landscape irrigation trencher, Davis trencher (300 or similar and all small trenchers including all trenching equipment with seats) capacity up to 3 ft. in depth AREA 2 (REMAINDER OF COUNTY) $15.76 $9.60 $25.36
POWER EQUIPMENT OPERATORS: GROUP 1-A Landscape irrigation trencher, Davis trencher (300 or similar and all small trenchers including all trenching equipment with seats) capacity up to 3 ft. in depth AREA 1: AREA LYING WESTERLY OF THE EAST LINE OF RANGE 14E $14.76 $9.60 $24.36
POWER EQUIPMENT OPERATORS: GROUP 1 Assistant to engineer (Brake; Fire tender; Heavy duty repair tender; Oiler; Deckhand; Signal; Switch; Tar pot fire tender) AREA 2 (REMAINDER OF COUNTY) $18.54 $9.60 $28.14
POWER EQUIPMENT OPERATORS: GROUP 1 Assistant to engineer (Brake; Fire tender; Heavy duty repair tender; Oiler; Deckhand; Signal; Switch; Tar pot fire tender) AREA 1: AREA LYING WESTERLY OF THE EAST LINE OF RANGE 14E $17.54 $9.60 $27.14
PLUMBER AND STEAMFITTER (AMADOR COUNTY (SOUTHERN HALF)) $22.03 $6.35 $28.38
PLUMBER AND STEAMFITTER (AMADOR COUNTY (NORTHERN HALF)) $19.72 $6.71 $26.43
PLASTERER $17.36 $6.35 $23.71
PARKING LOT STRIPING; HIGHWAY MARKERS: (SLURRY SEAL OPERATION: APPLICATOR OPERATION; SHUTTLE; SQUEEGEE) $13.37 $2.00 $15.37
PARKING LOT STRIPING: HIGHWAY MARKERS: (TRAFFIC SURFACE PROTECTIVE COATING APPLICATOR) b. Employer contributes $ .80 per hour to vacation fund for the first year of employment; 1 year but less than 5 years, 1.13 per hour to vacation fund; 5 years but less than 10 years, 1.48 per hour to vacation fund; over 10 years 1.83 per hour to vacation fund $14.48 $2.00 $16.48
PARKING LOT STRIPING: HIGHWAY MARKERS: (TRAFFIC DELINEATING DEVICE APPLICATOR) b. Employer contributes $ .80 per hour to vacation fund for the first year of employment; 1 year but less than 5 years, 1.13 per hour to vacation fund; 5 years but less than 10 years, 1.48 per hour to vacation fund; over 10 years 1.83 per hour to vacation fund $14.83 $2.00 $16.83
PARKING LOT STRIPING: HIGHWAY MARKERS: (SANDBLASTER; STRIPER; WHEEL STOP INSTALLER) b. Employer contributes $ .80 per hour to vacation fund for the first year of employment; 1 year but less than 5 years, 1.13 per hour to vacation fund; 5 years but less than 10 years, 1.48 per hour to vacation fund; over 10 years 1.83 per hour to vacation fund $14.30 $2.00 $16.30
PARKING LOT STRIPING: HIGHWAY MARKERS: (MIXER OPERATOR) b. Employer contributes $ .80 per hour to vacation fund for the first year of employment; 1 year but less than 5 years, 1.13 per hour to vacation fund; 5 years but less than 10 years, 1.48 per hour to vacation fund; over 10 years 1.83 per hour to vacation fund $13.95 $2.00 $15.95
PARKING LOT STRIPING: HIGHWAY MARKERS: (COMPACTOR, TOP, TRAFFIC CONTROL, SERVICE AND SPREADER) b. Employer contributes $ .80 per hour to vacation fund for the first year of employment; 1 year but less than 5 years, 1.13 per hour to vacation fund; 5 years but less than 10 years, 1.48 per hour to vacation fund; over 10 years 1.83 per hour to vacation fund $12.39 $2.00 $14.39
PAINTERS: SPRAY $14.64 $4.60 $19.24
PAINTERS: SANDBLASTER; SCAFFOLD; SHEETROCK; STRUCTURAL STEEL; SWING STAGE; TAPER $15.79 $4.60 $20.39
PAINTERS: BRUSH $14.39 $4.60 $18.99
MARBLE SETTER, TERRAZZO WORKER $17.57 $4.60 $22.17
MARBLE FINISHER $15.92 $4.67 $20.59
LABORERS: WRECKING WORK GROUP 3 General laborer (includes all clean-up work, loading lumber, loading and burning of debris) $12.88 $5.36 $18.24
LABORERS: WRECKING WORK GROUP 2 Semi-skilled wrecker (salvaging of other building materials) $12.98 $5.36 $18.34
LABORERS: WRECKING WORK GROUP 1 Skilled wrecker (removing and salvaging of sash, windows, doors, plumbing and electric fixtures) $13.11 $5.36 $18.47
LABORERS: GROUP 4 Brick cleaner; Lumber cleaner $9.66 $5.36 $15.02
LABORERS: GROUP 2 Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and digger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Chuck tender; High pressure nozzle operator, adductor; Grout-crew; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Singlefoot, hand held, pneumatic tamper; All pneumatic, air, gas and electric tools not listed in Groups 1 through 1-f; Jacking of pipe under 12 inches $13.98 $5.36 $19.34
LABORERS: GROUP 1-F Wire winding machine in connection with guniting or shotcrete-aligner $13.62 $5.36 $18.98
LABORERS: GROUP 1-E Laborer on general construction work on or in bell hole footings and shaft $13.59 $5.36 $18.95
LABORERS: GROUP 1-D Repair track and road beds (cut and cover work of subway after the temporary cover has been placed) $13.36 $5.36 $18.72
LABORERS: GROUP 1-C Burning and welding in connection with laborers' work $13.76 $5.36 $19.12
LABORERS: GROUP 1-B Sewer cleaner receives an additional $4.00 per day; $5.00 per day on recently active large diameter sewers or sewer manholes $13.32 $5.36 $18.68
LABORERS: GROUP 1 Asphalt ironer and raker; Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Chainsaw, faller, logloader and bucker; Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete saw; Concrete sander; Cribber and/or shoring; Cut granite curb setter; Form raiser; Slip form; Green Cutter, headerboard, hubsetter, aligner; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactors; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials; Lagging, sheeting, whaling, bracing, trenchjacking, handguided lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); Perma curb; Precast-manhole setter; Cast-in-place manhole form setter; Pressure pipe tester; Pavement breaker and spader, including tool grinder; Pipelayer, caulker, bander, pipewrapper, conduit layer, plastic pipelayer, post hole digger, air, gas and electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry); Rotary Scarifier, multiple head concrete chipper; Davis trencher, 300 or similar type (and all small trenchers); Roto and Ditch Witch; Roto-tiller; Sandblaster, pot, gun, nozzle operator; Signalling and rigging; Tank cleaner; Tree climber; Vibrascreed, bull float in connection with laborers' work; Vibrator; Dri-pak-it machine; High pressure blow pipe (1-1/2-inch. or over, 100 lbs. pressure and over); Hydro seeder and similar type; Laser beam in connection with laborers' work $13.31 $5.36 $18.67
LABORER: GUNITE GROUP 3 General laborer $12.88 $5.36 $18.24
LABORER: GUNITE GROUP 2 Rebound $13.00 $5.36 $18.36
LABORER: GUNITE GROUP 1 Nozzle operator (including gun, pot); Ground $13.52 $5.36 $18.88
IRONWORKERS: ORNAMENTAL, REINFORCING AND STRUCTURAL $18.90 $8.95 $27.85
IRONWORKERS: FENCE ERECTOR $18.01 $8.93 $26.94
INSULATOR/ASBESTOS WORKER (INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS) $24.85 $5.61 $30.46
GLAZIER $17.75 $6.44 $24.19
FLOOR LAYER: CARPET $16.06 $3.00 $19.06
ELEVATOR CONSTRUCTOR $29.39 $3.29 $32.68
ELECTRICIANS: SOUND AND SIGNAL TECHNICIAN $15.65 $1.50 $17.15
ELECTRICIANS: RESIDENTIAL ELECTRICIAN $14.50 $3.30 $17.80
ELECTRICIANS: CABLE SPLICER $17.93 $3.92 $21.85
ELECTRICIAN $16.30 $3.87 $20.17
DRYWALL INSTALLERS/LATHERS: DRYWALL STOCKER, SCRAPPER & CLEAN-UP $10.07 $3.34 $13.41
DRYWALL INSTALLERS/LATHERS: DRYWALL INSTALLER/LATHER $18.14 $6.48 $24.62
CEMENT MASONS: SWING OR SLIP FORM SCAFFOLDS; MASTIC, MAGNESITE, GYPSUM, EPOXY, POLYESTER, RESIN AND ALL COMPOSITION $17.16 $6.18 $23.34
CEMENT MASONS: CEMENT MASON $16.91 $6.18 $23.09
CARPENTERS: PILEDRIVER, BRIDGE, WHARF AND DOCK BUILDER $19.38 $9.71 $29.09
CARPENTERS: MILLWRIGHT $20.48 $7.86 $28.34
CARPENTERS: HARDWOOD FLOORLAYER; POWER SAW OPERATOR; SAW FILER; SHINGLER; STEEL SCAFFOLD ERECTOR AND STEEL SHORING $18.73 $6.46 $25.19
CARPENTER $18.58 $6.46 $25.04
BRICKLAYER, STONEMASON $17.57 $4.04 $21.61
BRICK TENDER $15.80 $3.46 $19.26
BOILERMAKER - BLACKSMITH (STORAGE TANK REPAIR) $17.05 $4.00 $21.05
BOILERMAKER - BLACKSMITH (STORAGE TANK ERECTION)) $19.25 $4.00 $23.25
BOILERMAKER $22.60 $4.25 $26.85

Modification History

Modification Publication Date
0 01/02/2026
1 05/18/2026

Counties Covered

This wage determination applies to 1 county in California.

Get notified when CA20260023 is modified

This determination has been revised 2 times. We'll email you when a new modification is published.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.