Wage Rates

Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.

CARP0055-005 Effective 05/01/2025
Trade Rate Fringe Total
CARPENTER (INLUDES ACOUSTICAL CEILING INSTALLATION; EXCLUDES DRYWALL FINISHING/TAPING, DRYWALL HANGING AND METAL STUD INSTALLATION) $35.09 $13.84 $48.93
CARP1607-001 Effective 06/01/2025
Trade Rate Fringe Total
MILLWRIGHT $42.10 $19.02 $61.12
ELEC0068-012 Effective 06/01/2025
Trade Rate Fringe Total
ELECTRICIAN (INCLUDES LOW VOLTAGE WIRING) $46.80 $19.53 $66.33
ENGI0009-017 Effective 05/01/2024
Trade Rate Fringe Total
POWER EQUIPMENT OPERATOR: CRANE (91 TO 140 TONS) $37.34 $15.20 $52.54
POWER EQUIPMENT OPERATOR: CRANE (51 TO 90 TONS) $36.09 $15.20 $51.29
POWER EQUIPMENT OPERATOR: CRANE (50 TONS AND UNDER) $35.78 $15.20 $50.98
POWER EQUIPMENT OPERATOR: CRANE (141 TONS AND OVER) $39.80 $15.20 $55.00
IRON0024-009 Effective 11/01/2024
Trade Rate Fringe Total
IRONWORKER: ORNAMENTAL $39.21 $12.50 $51.71
IRON0024-010 Effective 11/01/2024
Trade Rate Fringe Total
IRONWORKER, STRUCTURAL $39.21 $12.50 $51.71
PAIN0079-008 Effective 08/01/2025
Trade Rate Fringe Total
PAINTER: BRUSH, ROLLER, AND SPRAY $27.41 $11.56 $38.97
PAIN0419-001 Effective 06/01/2022
Trade Rate Fringe Total
SOFT FLOOR LAYER (VINYL AND CARPET) $18.25 $14.33 $32.58
PAIN0930-002 Effective 07/01/2025
Trade Rate Fringe Total
GLAZIER $37.26 $13.15 $50.41
PLUM0003-009 Effective 06/01/2025
Trade Rate Fringe Total
PLUMBER (EXCLUDES HVAC DUCT, PIPE AND UNIT INSTALLATION) $47.23 $21.68 $68.91
PLUM0208-008 Effective 06/01/2025
Trade Rate Fringe Total
PIPEFITTER (INCLUDES HVAC PIPE AND UNIT INSTALLATION; EXCLUDES HVAC DUCT INSTALLATION) $45.40 $22.11 $67.51
SFCO0669-002 Effective 04/01/2025
Trade Rate Fringe Total
SPRINKLER FITTER (FIRE SPRINKLERS) $48.60 $27.57 $76.17
SHEE0009-005 Effective 07/01/2025
Trade Rate Fringe Total
SHEET METAL WORKER (EXCLUDES HVAC DUCT, PIPE AND UNIT INSTALLATION) $43.05 $22.65 $65.70
SUCO2013-007 Effective 07/31/2015
Trade Rate Fringe Total
WATERPROOFER $16.94 $0.00 $16.94
TRUCK DRIVER: DUMP TRUCK $17.34 $0.00 $17.34
SHEET METAL WORKER (HVAC UNIT INSTALLATION ONLY) $24.96 $8.60 $33.56
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) $25.20 $7.55 $32.75
ROOFER $16.96 $0.00 $16.96
OPERATOR: GRADER/BLADE $21.50 $0.00 $21.50
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $19.10 $3.89 $22.99
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $20.78 $5.78 $26.56
LABORER: PIPELAYER $16.96 $3.68 $20.64
LABORER: MASON TENDER - CEMENT/CONCRETE $16.00 $0.00 $16.00
LABORER: MASON TENDER - BRICK $15.99 $0.00 $15.99
LABORER: COMMON OR GENERAL $16.04 $4.95 $20.99
INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) $23.12 $7.97 $31.09
CEMENT MASON/CONCRETE FINISHER $20.33 $6.76 $27.09
CARPENTER (METAL STUD INSTALLATION ONLY) $17.68 $0.00 $17.68
CARPENTER (INCLUDES DRYWALL FINISHING/TAPING AND DRYWALL HANGING) $17.00 $0.00 $17.00
BRICKLAYER $21.96 $0.00 $21.96

Modification History

Modification Publication Date
0 01/02/2026
1 05/18/2026

Counties Covered

This wage determination applies to 1 county in Colorado.

Get notified when CO20260021 is modified

This determination has been revised 2 times. We'll email you when a new modification is published.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.