CO20260023

Building

Davis-Bacon Act general wage determination for building construction in Colorado.

Modification 1, revised 05/18/2026 31 trade rates 1 county View on SAM.gov

Track CO20260023

Get an email when this wage determination gets a new modification.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Wage Rates

Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.

CARP0055-004 Effective 05/01/2025
Trade Rate Fringe Total
CARPENTER (INCLUDES ACOUSTICAL CEILING INSTALLATION AND DRYWALL HANGING; EXCLUDES METAL STUD INSTALLATION) $35.09 $13.84 $48.93
CARP1607-001 Effective 06/01/2025
Trade Rate Fringe Total
MILLWRIGHT $42.10 $19.02 $61.12
ELEC0068-012 Effective 06/01/2025
Trade Rate Fringe Total
ELECTRICIAN (INCLUDES LOW VOLTAGE WIRING) $46.80 $19.53 $66.33
ENGI0009-017 Effective 05/01/2024
Trade Rate Fringe Total
POWER EQUIPMENT OPERATOR: CRANE (91 TO 140 TONS) $37.34 $15.20 $52.54
POWER EQUIPMENT OPERATOR: CRANE (51 TO 90 TONS) $36.09 $15.20 $51.29
POWER EQUIPMENT OPERATOR: CRANE (50 TONS AND UNDER) $35.78 $15.20 $50.98
POWER EQUIPMENT OPERATOR: CRANE (141 TONS AND OVER) $39.80 $15.20 $55.00
IRON0024-009 Effective 11/01/2024
Trade Rate Fringe Total
IRONWORKER: ORNAMENTAL $39.21 $12.50 $51.71
IRON0024-010 Effective 11/01/2024
Trade Rate Fringe Total
IRONWORKER, STRUCTURAL $39.21 $12.50 $51.71
PAIN0079-006 Effective 08/01/2024
Trade Rate Fringe Total
PAINTER: BRUSH, ROLLER AND SPRAY (EXCLUDES DRYWALL FINISHING/TAPING) $27.41 $11.56 $38.97
PAIN0079-007 Effective 08/01/2024
Trade Rate Fringe Total
DRYWALL FINISHER/TAPER $28.11 $11.56 $39.67
PAIN0419-001 Effective 06/01/2022
Trade Rate Fringe Total
SOFT FLOOR LAYER (VINYL AND CARPET) $18.25 $14.33 $32.58
PAIN0930-002 Effective 07/01/2025
Trade Rate Fringe Total
GLAZIER $37.26 $13.15 $50.41
PLUM0003-009 Effective 06/01/2025
Trade Rate Fringe Total
PLUMBER (EXCLUDES HVAC DUCT, PIPE AND UNIT INSTALLATION) $47.23 $21.68 $68.91
PLUM0208-010 Effective 09/01/2025
Trade Rate Fringe Total
PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION; EXCLUDES HVAC DUCT AND UNIT INSTALLATION) $45.55 $22.11 $67.66
SFCO0669-002 Effective 04/01/2025
Trade Rate Fringe Total
SPRINKLER FITTER (FIRE SPRINKLERS) $48.60 $27.57 $76.17
SHEE0009-006 Effective 07/01/2025
Trade Rate Fringe Total
SHEET METAL WORKER (INCLUDES HVAC DUCT AND UNIT INSTALLATION; EXCLUDES HVAC PIPE INSTALLATION) $43.05 $22.65 $65.70
SUCO2013-009 Effective 07/31/2015
Trade Rate Fringe Total
WATERPROOFER $16.94 $0.00 $16.94
TRUCK DRIVER: DUMP TRUCK $17.34 $0.00 $17.34
ROOFER $16.96 $0.00 $16.96
OPERATOR: GRADER/BLADE $21.50 $0.00 $21.50
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $19.10 $3.89 $22.99
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $20.78 $5.78 $26.56
LABORER: PIPELAYER $16.96 $3.68 $20.64
LABORER: MASON TENDER - CEMENT/CONCRETE $16.00 $0.00 $16.00
LABORER: MASON TENDER - BRICK $15.99 $0.00 $15.99
LABORER: COMMON OR GENERAL $15.42 $5.35 $20.77
INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) $23.12 $7.97 $31.09
CEMENT MASON/CONCRETE FINISHER $20.33 $6.76 $27.09
CARPENTER (METAL STUD INSTALLATION ONLY) $17.68 $0.00 $17.68
BRICKLAYER $21.96 $0.00 $21.96

Modification History

Modification Publication Date
0 01/02/2026
1 05/18/2026

Counties Covered

This wage determination applies to 1 county in Colorado.

Get notified when CO20260023 is modified

This determination has been revised 2 times. We'll email you when a new modification is published.