CT20260003

Highway

Davis-Bacon Act general wage determination for highway construction in Connecticut.

Modification 2, revised 05/18/2026 37 trade rates 1 county View on SAM.gov

Track CT20260003

Get an email when this wage determination gets a new modification.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Wage Rates

Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.

BRCT0001-003 Effective 01/05/2026
Trade Rate Fringe Total
BRICKLAYERS, CEMENT MASONS, CEMENT FINISHERS, PLASTERERS, STONE MASONS $46.09 $36.29 $82.38
CARP0326-002 Effective 05/05/2025
Trade Rate Fringe Total
CARPENTERS: DIVERS (BERLIN, BRISTOL, BURLINGTON,CANTON, MARLBOROUGH, NEW BRITAIN, NEWINGTON, PLAINVILLE, SOUTHINGTON) $50.49 $29.19 $79.68
CARPENTERS: DIVER TENDERS (BERLIN, BRISTOL, BURLINGTON,CANTON, MARLBOROUGH, NEW BRITAIN, NEWINGTON, PLAINVILLE, SOUTHINGTON) $42.03 $29.19 $71.22
CARPENTERS, PILEDRIVERS (BERLIN, BRISTOL, BURLINGTON,CANTON, MARLBOROUGH, NEW BRITAIN, NEWINGTON, PLAINVILLE, SOUTHINGTON) $42.03 $29.19 $71.22
CARP0326-013 Effective 05/05/2025
Trade Rate Fringe Total
CARPENTERS: DIVERS (AVON, BLOOMFIED, EAST GRANBY, EAST HARTFORD, EAST WINDSOR, ENFIELD, FARMINGTON, GLASTONBURY, GRANBY, HARTFORD, HARTLAND, MANCHESTER, ROCKY HILL, SIMSBURY, SOUTH WINDSOR, SUFFIELD, WEST HARTFORD, WETHERSFIELD, WINDSOR, WINDSOR LOCKS) $50.49 $29.19 $79.68
CARPENTERS: DIVER TENDERS (AVON, BLOOMFIED, EAST GRANBY, EAST HARTFORD, EAST WINDSOR, ENFIELD, FARMINGTON, GLASTONBURY, GRANBY, HARTFORD, HARTLAND, MANCHESTER, ROCKY HILL, SIMSBURY, SOUTH WINDSOR, SUFFIELD, WEST HARTFORD, WETHERSFIELD, WINDSOR, WINDSOR LOCKS) $42.03 $29.19 $71.22
CARPENTERS, PILEDRIVERS (AVON, BLOOMFIED, EAST GRANBY, EAST HARTFORD, EAST WINDSOR, ENFIELD, FARMINGTON, GLASTONBURY, GRANBY, HARTFORD, HARTLAND, MANCHESTER, ROCKY HILL, SIMSBURY, SOUTH WINDSOR, SUFFIELD, WEST HARTFORD, WETHERSFIELD, WINDSOR, WINDSOR LOCKS) $42.03 $29.19 $71.22
CARP1121-006 Effective 01/05/2026
Trade Rate Fringe Total
MILLWRIGHT $45.14 $30.24 $75.38
ELEC0035-002 Effective 06/01/2025
Trade Rate Fringe Total
ELECTRICIANS: (ENTIRE COUNTY, EXCLUDING BERLIN, BRISTOL, HARTLAND, NEW BRITAIN, NEWINGTON, PLAINVILLE AND SOUTHINGTON) $48.25 $36.67 $84.92
ELEC0090-001 Effective 06/01/2025
Trade Rate Fringe Total
ELECTRICIANS: (BERLIN, BRISTOL, NEW BRITAIN, NEWINGTON, PLAINVILLE, SOUTHINGTON) $46.48 $38.05 $84.53
ELEC0488-004 Effective 06/01/2025
Trade Rate Fringe Total
ELECTRICIANS: $47.40 $36.74 $84.14
ENGI0478-002 Effective 04/06/2025
Trade Rate Fringe Total
POWER EQUIPMENT OPERATORS: GROUP 21 EXCAVATOR, GRADALL, MASTER MECHANIC, HOISTING ENGINEER (ALL TYPES OF EQUIPMENT WHERE A DRUM AND CABLE ARE USED TO HOIST OR DRAG MATERIAL REGARDLESS OF MOTIVE POWER OR OPERAING), RUBBER TIRE EXCAVATOR (DROTT 1085 SIMILAR), GRADER OPERATOR, BULLDOZER FINEGRADE (SLOPES SHAPING, LASER OR GPS, ECT) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY $51.92 $29.80 $81.72
POWER EQUIPMENT OPERATORS: GROUP 20 EXCAVATOR OVER 2 CUBIC YARDS; PILE DRIVER ($3.00 PREMIUM WHEN OPERATOR CONTROLS HAMMER). A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY $52.92 $29.80 $82.72
POWER EQUIPMENT OPERATORS: GROUP 19 FRONT END LOADER (7 CUBIC YARDS OR OVER); WORK BOAT 26 FT. AND OVER. A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY $53.33 $29.80 $83.13
POWER EQUIPMENT OPERATORS: GROUP 16 ELEVATOR OPERATOR; TOW MOTOR OPERATOR (SOLID TIRE NO ROUGH TERRAIN). A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY $43.60 $29.80 $73.40
POWER EQUIPMENT OPERATORS: GROUP 15 POWER SAFETY BOAT; VACUUM TRUCK; ZIM MIXER; SWEEPER; (MINIMUM FOR ANY JOB REQUIRING A CDL LICENSE) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY $44.70 $29.80 $74.50
POWER EQUIPMENT OPERATORS: GROUP 11 CONVEYOR; EARTH ROLLER; POWER PAVEMENT BREAKER (WHIPHAMMER); ROBOT DEMOLITION EQUIPMENT. A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY $45.96 $29.80 $75.76
POWER EQUIPMENT OPERATORS: GROUP 9 FRONT END LOADER (UNDER 3 CUBIC YARDS); SKID STEER LOADER (REGARDLESS OF ATTACHMENTS); (BOBCAT OR SIMILAR); FORK LIFT; POWER CHIPPER; LANDSCAPE EQUIPMENT (INCLUDING HYDROSEEDER).VACUUM EXCAVATION TRUCK AND HYDROVAC EXCAVATION TRUCK (27 HG PRESSURE OR GREATER). A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY $48.67 $29.80 $78.47
POWER EQUIPMENT OPERATORS: GROUP 7 ASPHALT ROLLER; CONCRETE SAWS AND CUTTERS (RIDE ON TYPES); VERMEER CONCRETE CUTTER; STUMP GRINDER; SCRAPER; SNOOPER; SKIDDER; MILLING MACHINE (24"" AND UNDER MANDREL). A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY $49.25 $29.80 $79.05
POWER EQUIPMENT OPERATORS: GROUP 6 FRONT END LOADER (3 CU. YDS. UP TO 7 CUBIC YARDS); BULLDOZER (ROUGH GRADE DOZER). A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY $50.22 $29.80 $80.02
POWER EQUIPMENT OPERATORS: GROUP 3 CRANES (UNDER 100 TON RATED CAPACITY). HAZARDOUS WASTE PREMIUM 150 FT. BOOM (INCLUDING JIB): $1.50 EXTRA. CRANE WITH 200 FT. BOOM (INCLUDING JIB): $2.50 EXTRA. CRANE WITH 250 FT. BOOM (INCLUDING JIB): $5.00 EXTRA. CRANE WITH 300 FT. BOOM (INCLUDING JIB): JIB); $10.00 EXTRA. 1) CRANE HANDLING OR ERECTING STRUCTURAL STEEL OR STONE, HOISTING ENGINEER(2 DRUMS OR OVER) 2) CRANES(100 TON RATED CAPACITY AND OVER) BAUER DRILL/CAISSON 3) CRANES(UNDER 100 TON RATED CAPACITY) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY $56.79 $29.80 $86.59
POWER EQUIPMENT OPERATORS: GROUP 2 CRANES (100 TON RATED CAPACITY AND OVER) BAUER DRILL/CAISSON. HAZARDOUS WASTE PREMIUM $3.00 PER HOUR OVER CLASSIFIED RATE. CRANE WITH 150 FT. BOOM (INCLUDING JIB): $1.50 EXTRA. CRANE WITH 200 FT. BOOM (INCLUDING JIB): $2.50 EXTRA. CRANE WITH 250 FT. BOOM (INCLUDING JIB): $5.00 EXTRA. CRANE WITH 300 FT. BOOM (INCLUDING JIB): $7.00 EXTRA. CRANE WITH 400 FT. BOOM (INCLUDING JIB); $10.00 EXTRA. 1) CRANE HANDLING OR ERECTING STRUCTURAL STEEL OR STONE, HOISTING ENGINEER(2 DRUMS OR OVER) 2) CRANES(100 TON RATED CAPACITY AND OVER) BAUER DRILL/CAISSON 3) CRANES(UNDER 100 TON RATED CAPACITY) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY $57.78 $29.80 $87.58
POWER EQUIPMENT OPERATORS: GROUP 1 CRANE HANDLING OR ERECTING STRUCTURAL STEEL OR TONE; HOISTING ENGINEER (2 DRUMS OR OVER). HAZARDOUS WASTE PREMIUM $3.00 PER HOUR OVER CLASSIFIED RATE. CRANE WITH 150 FT. BOOM (INCLUDING JIB): $1.50 EXTRA. CRANE WITH 200 FT. BOOM (INCLUDING JIB): JIB): $5.00 EXTRA. CRANE WITH 300 FT. BOOM (INCLUDING JIB): $7.00 EXTRA. CRANE WITH 400 FT. BOOM (INCLUDING JIB); $10.00 EXTRA. 1) CRANE HANDLING OR ERECTING STRUCTURAL STEEL OR STONE, HOISTING ENGINEER(2 DRUMS OR OVER) 2) CRANES(100 TON RATED CAPACITY AND OVER) BAUER DRILL/CAISSON 3) CRANES(UNDER 100 TON RATED CAPACITY) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY $58.19 $29.80 $87.99
LABO0146-001 Effective 04/06/2025
Trade Rate Fringe Total
LABORERS: GROUP 9: TOXIC WASTE REMOVERS A OR B WITH PPE (ON A SITE DESIGNATED AS A SUPERFUND SITE BY THE U.S. ARMY CORPS OF ENGINEERS AND IS DEEMED A HAZ-MAT SITE, AND APPLIES TO EMPLOYEES REQUIRED TO WEAR OSHA LEVAL A OR B EVEN IF THE PPE IS NOT WORN.) $38.70 $28.85 $67.55
LABORERS: GROUP 8: ACETYLENE BURNER (HOURS WORKED WITH A TORCH) $36.70 $28.85 $65.55
LABORERS: GROUP 7 TRAFFIC CONTROL SIGNALMAN $21.42 $28.85 $50.27
LABORERS: GROUP 6 TOXIC WASTE REMOVER $37.70 $28.85 $66.55
LABORERS: GROUP 5 BLASTERS $37.45 $28.85 $66.30
LABORERS: GROUP 4 ASBESTOS/LEAD REMOVAL $38.70 $28.85 $67.55
LABORERS: GROUP 3 PIPELAYERS, JACKHAMMER/PAVEMENT BREAKER (HANDHELD), MASON TENDERS/CATCH BASIN BUILDERS, ASPHALT RAKERS, AIR TRACK OPERATORS, BLOCK PAVER AND CURB SETTER $36.20 $28.85 $65.05
LABORERS: GROUP 2 CHAIN SAW OPERATORS, FENCE AND GUARD RAIL ERECTORS, PNEUMATIC TOOL OPERATORS AND POWDERMEN $35.95 $28.85 $64.80
LABORERS: GROUP 1 LABORERS (UNSKILLED), CONCRETE SPECIALIST $35.70 $28.85 $64.55
PAIN0011-003 Effective 06/01/2024
Trade Rate Fringe Total
PAINTERS: BRUSH, ROLLER, BLASTING (SAND, WATER, ETC.) SPRAY (BRIDGE CONSTRUCTION) $59.70 $26.90 $86.60
PAIN0011-004 Effective 06/01/2025
Trade Rate Fringe Total
PAINTERS: TANKS, TOWERS, SWING $41.57 $26.75 $68.32
PAINTERS: BRUSH AND ROLL $39.57 $26.75 $66.32
PAINTERS: BLAST AND SPRAY $42.57 $26.75 $69.32
TEAM0064-005 Effective 04/06/2025
Trade Rate Fringe Total
TRUCK DRIVERS: SPECIALIZED (EARTH MOVING EQUIPMENT OTHER THAN CONVENTIONAL TYPE ON-THE-ROAD TRUCKS AND SEMI-TRAILERS, INCLUDING EUCLIDS) HAZARDOUS WASTE REMOVAL WORK RECEIVES ADDITIONAL $1.25 PER HOUR. A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY AND GOOD FRIDAY, PROVIDED THE EMPLOYEE HAS AT LEAST 31 CALENDAR DAYS OF SERVICE AND WORKS THE LAST SCHEDULED DAY BEFORE AND THE FIRST SCHEDULED DAY AFTER THE HOLIDAY, UNLESS EXCUSED $36.44 $32.68 $69.12

Modification History

Modification Publication Date
1 01/23/2026
2 05/18/2026

Counties Covered

This wage determination applies to 1 county in Connecticut.

Get notified when CT20260003 is modified

This determination has been revised 2 times. We'll email you when a new modification is published.