CT20260016
HeavyDavis-Bacon Act general wage determination for heavy construction in Connecticut.
Track CT20260016
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
BRCT0001-011 Effective 01/05/2026 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER | $46.09 | $36.29 | $82.38 |
BRCT0001-012 Effective 01/05/2026 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $46.09 | $36.29 | $82.38 |
CARP0326-011 Effective 05/05/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTERS, PILEDRIVERS (BEACON FALLS, BETHANY, BRANFORD, CHESHIRE, EAST HAVEN, GUILFORD, HAMDEN, MADISON, MERIDEN, MIDDLEBURY, NAUGATUCK, NEW HAVEN, NORTH BRANFORD, NORTH HAVEN, ORANGE (EAST OF ORANGE CENTER ROAD AND NORTH OF ROUTE 1, AND NORTH OF ROUTE 1 AND EAST OF THE OYSTER RIVER), PROSPECT, SOUTHBURY, WALLINGFORD, WATERBURY, WEST HAVEN, WOLCOTT, WOODBRIDGE) | $42.03 | $29.19 | $71.22 |
| CARPENTER: DIVER TENDER (BEACON FALLS, BETHANY, BRANFORD, CHESHIRE, EAST HAVEN, GUILFORD, HAMDEN, MADISON, MERIDEN, MIDDLEBURY, NAUGATUCK, NEW HAVEN, NORTH BRANFORD, NORTH HAVEN, ORANGE (EAST OF ORANGE CENTER ROAD AND NORTH OF ROUTE 1, AND NORTH OF ROUTE 1 AND EAST OF THE OYSTER RIVER), PROSPECT, SOUTHBURY, WALLINGFORD, WATERBURY, WEST HAVEN, WOLCOTT, WOODBRIDGE) | $42.03 | $29.19 | $71.22 |
| CARPENTER: DIVER (BEACON FALLS, BETHANY, BRANFORD, CHESHIRE, EAST HAVEN, GUILFORD, HAMDEN, MADISON, MERIDEN, MIDDLEBURY, NAUGATUCK, NEW HAVEN, NORTH BRANFORD, NORTH HAVEN, ORANGE (EAST OF ORANGE CENTER ROAD AND NORTH OF ROUTE 1, AND NORTH OF ROUTE 1 AND EAST OF THE OYSTER RIVER), PROSPECT, SOUTHBURY, WALLINGFORD, WATERBURY, WEST HAVEN, WOLCOTT, WOODBRIDGE) | $50.49 | $29.19 | $79.68 |
CARP0326-020 Effective 05/05/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER: DIVER TENDER (ANSONIA, DERBY, MILFORD, ORANGE (WEST OF ORANGE CENTER ROAD AND SOUTH OF ROUTE 1 AND WEST OF THE OYSTER RIVER), OXFORD, SEYMOUR) | $42.03 | $29.19 | $71.22 |
| CARPENTER: DIVER (ANSONIA, DERBY, MILFORD, ORANGE (WEST OF ORANGE CENTER ROAD AND SOUTH OF ROUTE 1 AND WEST OF THE OYSTER RIVER), OXFORD, SEYMOUR) | $50.49 | $29.19 | $79.68 |
| CARPENTER, PILEDRIVER (ANSONIA, DERBY, MILFORD, ORANGE (WEST OF ORANGE CENTER ROAD AND SOUTH OF ROUTE 1 AND WEST OF THE OYSTER RIVER), OXFORD, SEYMOUR) | $42.03 | $29.19 | $71.22 |
CARP1121-006 Effective 01/05/2026 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| MILLWRIGHT | $45.14 | $30.24 | $75.38 |
ELEC0090-004 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (ENTIRE COUNTY EXCLUDING BEACON FALLS, MIDDLEBURY, MILFORD, NAUGATUCK, OXFORD, PROSPECT, SEYMOUR, SOUTHBURY, WATERBURY AND WOLCOTT TOWNSHIPS) | $46.48 | $38.05 | $84.53 |
ELEC0488-007 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (BEACON FALLS, MIDDLEBURY, MILFORD, NAUGATUCK, OXFORD, PROSPECT, SEYMOUR, SOUTHBURY, WATERBURY AND WOLCOTT TOWNSHIPS) | $47.40 | $36.74 | $84.14 |
ENGI0478-001 Effective 04/06/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: GROUP 4 TRENCHING MACHINES, LIGHTER DERRICK, CONCRETE FINISHING MACHINE, CMI MACHINE OR SIMILAR, KOEHRING LOADER (SKOOPER). A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $51.92 | $29.80 | $81.72 |
| POWER EQUIPMENT OPERATORS: GROUP 21 EXCAVATOR, GRADALL, MASTER MECHANIC, HOISTING ENGINEER (ALL TYPES OF EQUIPMENT WHERE A DRUM AND CABLE ARE USED TO HOIST OR DRAG MATERIAL REGARDLESS OF MOTIVE POWER OR OPERAING), RUBBER TIRE EXCAVATOR (DROTT 1085 SIMILAR), GRADER OPERATOR, BULLDOZER FINEGRADE (SLOPES SHAPING, LASER OR GPS, ECT.) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $51.92 | $29.80 | $81.72 |
| POWER EQUIPMENT OPERATORS: GROUP 20 EXCAVATOR OVER 2 CUBIC YARDS; PILE DRIVER ($3.00 PREMIUM WHEN OPERATOR CONTROLS HAMMER). A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $52.92 | $29.80 | $82.72 |
| POWER EQUIPMENT OPERATORS: GROUP 19 FRONT END LOADER (7 CUBIC YARDS OR OVER); WORK BOAT 26 FT. AND OVER. A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $53.33 | $29.80 | $83.13 |
| POWER EQUIPMENT OPERATORS: GROUP 16 ELEVATOR OPERATOR, TOW MOTOR OPERATOR (SOLID TIRE NO ROUGH TERRAIN). A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $43.60 | $29.80 | $73.40 |
| POWER EQUIPMENT OPERATORS: GROUP 15 POWER SAFETY BOAT, VACUUM TRUCK, ZIM MIXER, SWEEPER; (MINIMUM FOR ANY JOB REQUIRING A CDL LICENSE) . A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $44.70 | $29.80 | $74.50 |
| POWER EQUIPMENT OPERATORS: GROUP 11 CONVEYOR, EARTH ROLLER, POWER PAVEMENT BREAKER (WHIPHAMMER), ROBOT DEMOLITION EQUIPMENT. A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $45.96 | $29.80 | $75.76 |
| POWER EQUIPMENT OPERATORS: GROUP 9 FRONT END LOADER (UNDER 3 CUBIC YARDS), SKID STEER LOADER (REGARDLESS OF ATTACHMENTS), BOBCAT OR SIMILAR, FORKLIFT, POWER CHIPPER, LANDSCAPE EQUIPMENT (INCLUDING HYDROSEEDER), VACUUM EXACAVATION TRUCK AND HYDROVAC EXCAVATION TRUCK (27 HG PRESSURE OR GREATER). A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $48.67 | $29.80 | $78.47 |
| POWER EQUIPMENT OPERATORS: GROUP 7 ASPHALT ROLLER, CONCRETE SAWS AND CUTTERS (RIDE ON TYPES), VERMEER CONCRETE CUTTER, STUMP GRINDER, SCRAPER, SNOOPER, SKIDDER, MILLING MACHINE (24"" AND UNDER MANDREL). A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $49.25 | $29.80 | $79.05 |
| POWER EQUIPMENT OPERATORS: GROUP 6 FRONT END LOADER (3 CU. YDS. UP TO 7 CU. YARDS), BULLDOZER (ROUGH GRADE DOZER) . A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $50.22 | $29.80 | $80.02 |
| POWER EQUIPMENT OPERATORS: GROUP 3 CRANES (UNDER 100 TON RATED CAPACITY) HAZARDOUS WASTE PREMIUM BOOM, INCLUDING JIB, 150 FEET - $1.50 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 200 FEET - $2.50 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 250 FEET - FEET - $7.00 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 400 FEET - $10.00 EXTRA 1) CRANE HANDLING OR ERECTING STRUCTURAL STEEL OR STONE, HOISTING ENGINEER(2 DRUMS OR OVER) 2) CRANES(100 TON RATED CAPACITY AND OVER) BAUER DRILL/CAISSON 3) CRANES(UNDER 100 TON RATED CAPACITY) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $56.79 | $29.80 | $86.59 |
| POWER EQUIPMENT OPERATORS: GROUP 2 CRANES (100 TON CAPACITY & OVER) BAUER DRILL/CAISSON HAZARDOUS WASTE PREMIUM $3.00 PER HOUR OVER CLASSIFIED RATE. CRANE WITH BOOM, INCLUDING JIB, 150 FEET - $1.50 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 200 FEET - $2.50 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 250 FEET - $5.00 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 300 FEET - $7.00 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 400 FEET - STRUCTURAL STEEL OR STONE, HOISTING ENGINEER(2 DRUMS OR OVER) 2) CRANES(100 TON RATED CAPACITY AND OVER) BAUER DRILL/CAISSON 3) CRANES(UNDER 100 TON RATED CAPACITY) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $57.78 | $29.80 | $87.58 |
| POWER EQUIPMENT OPERATORS: GROUP 1 CRANE HANDLING OR ERECTING STRUCTURAL STEEL OR STONE, HOISTING ENGINEER (2 DRUMS OR OVER) HAZARDOUS WASTE PREMIUM BOOM, INCLUDING JIB, 150 FEET - $1.50 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 200 FEET - $2.50 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 250 FEET - FEET - $7.00 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 400 FEET - $10.00 EXTRA 1) CRANE HANDLING OR ERECTING STRUCTURAL STEEL OR STONE, HOISTING ENGINEER(2 DRUMS OR OVER) 2) CRANES(100 TON RATED CAPACITY AND OVER) BAUER DRILL/CAISSON 3) CRANES(UNDER 100 TON RATED CAPACITY) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $58.19 | $29.80 | $87.99 |
ENGI0478-011 Effective 04/06/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: FRONT END LOADER (UNDER 3 CUBIC YARDS) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $48.67 | $29.80 | $78.47 |
| POWER EQUIPMENT OPERATOR: FRONT END LOADER (7 CUBIC YARDS OR OVER) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $53.33 | $29.80 | $83.13 |
| POWER EQUIPMENT OPERATOR: FRONT END LOADER (3 CUBIC YARDS UP TO 7 CUBIC YARDS) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $50.22 | $29.80 | $80.02 |
| POWER EQUIPMENT OPERATOR: CRANES (UNDER 100 TON RATED CAPACITY) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY. B. CRANE WITH BOOM, INCLUDING JIB, 150 FEET - $1.50 EXTRA . CRANE WITH BOOM, INCLUDING JIB, 200 FEET- $2.50 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 250 FEET - $5.00 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 300 FEET - $7.00 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 400 FEET - $10.00 EXTRA | $56.79 | $29.80 | $86.59 |
| POWER EQUIPMENT OPERATOR: CRANES (100 TON CAPACITY & OVER) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY. B. CRANE WITH BOOM, INCLUDING JIB, 150 FEET - $1.50 EXTRA . CRANE WITH BOOM, INCLUDING JIB, 200 FEET- $2.50 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 250 FEET - $5.00 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 300 FEET - $7.00 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 400 FEET - $10.00 EXTRA | $57.78 | $29.80 | $87.58 |
IRON0015-005 Effective 06/02/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER: REINFORCING A. PAID HOLIDAY: LABOR DAY PROVIDED EMPLOYEE HAS BEEN ON THE PAYROLL FOR THE 5 CONSECUTIVE WORK DAYS PRIOR TO LABOR DAY | $45.25 | $43.62 | $88.87 |
LABO0146-003 Effective 04/06/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORERS GROUP 9 TOXIC WASTE REMOVERS A OR B WITH PPE (ON A SITE DESIGNATED AS A SUPERFUND SITE BY THE U.S. ARMY CORPS OF ENGINEERS AND IS DEEMED A HAZ-MAT SITE, AND APPLIES TO EMPLOYEES REQUIRED TO WEAR OSHA LEVAL A OR B EVEN IF THE PPE IS NOT WORN.) | $38.70 | $28.85 | $67.55 |
| LABORERS GROUP 8: ACETYLENE BURNER (HOURS WORKED WITH A TORCH) | $36.70 | $28.85 | $65.55 |
| LABORERS GROUP 7 TRAFFIC CONTROL SIGNALMAN | $21.42 | $28.85 | $50.27 |
| LABORERS GROUP 6 TOXIC WASTE REMOVER | $37.70 | $28.85 | $66.55 |
| LABORERS GROUP 5 BLASTERS | $37.45 | $28.85 | $66.30 |
| LABORERS GROUP 4 ASBESTOS/LEAD REMOVAL | $38.70 | $28.85 | $67.55 |
| LABORERS GROUP 3 PIPELAYERS, JACKHAMMER/PAVEMENT BREAKER (HANDHELD), MASON TENDERS/CATCH BASIN BUILDERS, ASPHALT RAKERS, AIR TRACK OPERATORS, BLOCK PAVER AND CURB SETTER | $36.20 | $28.85 | $65.05 |
| LABORERS GROUP 2 CHAIN SAW OPERATORS, FENCE AND GUARD RAIL ERECTORS, PNEUMATIC TOOL OPERATORS AND POWDERMEN | $35.95 | $28.85 | $64.80 |
| LABORERS GROUP 1 LABORERS (UNSKILLED), CONCRETE SPECIALIST | $35.70 | $28.85 | $64.55 |
PAIN0011-013 Effective 06/01/2021 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PAINTER (STEEL ONLY) | $38.42 | $22.90 | $61.32 |
| PAINTER (SPRAY ONLY) | $39.42 | $22.90 | $62.32 |
| PAINTER (BRUSH AND ROLLER) | $36.42 | $22.90 | $59.32 |
SUCT2002-011 Effective 12/16/2008 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: BULLDOZER | $25.33 | $9.64 | $34.97 |
| IRONWORKER, STRUCTURAL | $24.85 | $13.83 | $38.68 |
TEAM0064-001 Effective 04/06/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVERS: SPECIALIZED (EARTH MOVING EQUIPMENT OTHER THAN CONVENTIONAL TYPE ON-THE-ROAD TRUCKS AND SEMI-TRAILERS, INCLUDING EUCLIDS) HAZARDOUS WASTE REMOVAL WORK RECEIVES ADDITIONAL $1.25 PER HOUR. A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY AND GOOD FRIDAY, PROVIDED THE EMPLOYEE HAS AT LEAST 31 CALENDAR DAYS OF SERVICE AND WORKS THE LAST SCHEDULED DAY BEFORE AND THE FIRST SCHEDULED DAY AFTER THE HOLIDAY, UNLESS EXCUSED | $36.44 | $32.68 | $69.12 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 1 | 01/23/2026 |
| 2 | 05/18/2026 |
Counties Covered
This wage determination applies to 1 county in Connecticut.
Get notified when CT20260016 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.