FL20260053
ResidentialDavis-Bacon Act general wage determination for residential construction in Florida.
Track FL20260053
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
ENGI0673-009 Effective 05/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: OILER | $23.05 | $13.60 | $36.65 |
| POWER EQUIPMENT OPERATOR: (GANTRY CRANE, BRIDGE CRANE) | $35.41 | $13.60 | $49.01 |
| POWER EQUIPMENT OPERATOR: (CRAWLER CRANE, HYDRO CRANE, LOCOMOTIVE CRANE, TOWER CRANE, TRUCK CRANE) | $35.41 | $13.60 | $49.01 |
IRON0597-002 Effective 04/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER: ORNAMENTAL, REINFORCING, AND STRUCTURAL | $29.50 | $12.98 | $42.48 |
PLUM0234-003 Effective 09/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLUMBER, INCLUDING HVAC PIPE INSTALLATION | $37.50 | $17.59 | $55.09 |
SHEE0435-001 Effective 04/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SHEET METAL WORKER (EXCLUDES HVAC DUCT AND METAL ROOF INSTALLATION) | $31.64 | $15.98 | $47.62 |
SUFL2009-092 Effective 06/08/2009 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: LOWBOY TRUCK | $12.14 | $0.00 | $12.14 |
| TRUCK DRIVER, INCLUDES DUMP TRUCK | $10.62 | $0.00 | $10.62 |
| TILE SETTER | $12.46 | $0.00 | $12.46 |
| ROOFER: METAL ROOF | $16.99 | $0.00 | $16.99 |
| ROOFER, INCLUDES BUILT UP, MODIFIED BITUMEN, AND SHAKE & SHINGLE ROOFS (EXCLUDES METAL ROOFS) | $9.68 | $0.00 | $9.68 |
| PLASTERER | $15.10 | $0.00 | $15.10 |
| PAINTER: INCLUDES BRUSH, ROLLER AND SPRAY (EXCLUDES DRYWALL FINISHING/TAPING) | $10.68 | $0.00 | $10.68 |
| OPERATOR: TRACTOR | $10.20 | $0.00 | $10.20 |
| OPERATOR: TRACKHOE | $15.68 | $0.00 | $15.68 |
| OPERATOR: SCREED | $10.93 | $0.00 | $10.93 |
| OPERATOR: ROLLER | $10.59 | $0.00 | $10.59 |
| OPERATOR: LOADER | $12.75 | $0.00 | $12.75 |
| OPERATOR: GRADER/BLADE | $15.50 | $0.00 | $15.50 |
| OPERATOR: FORKLIFT | $17.50 | $0.00 | $17.50 |
| OPERATOR: DISTRIBUTOR | $11.41 | $0.00 | $11.41 |
| OPERATOR: BULLDOZER | $12.40 | $0.00 | $12.40 |
| OPERATOR: BACKHOE/EXCAVATOR | $12.72 | $0.00 | $12.72 |
| OPERATOR: BACKHOE LOADER COMBO | $17.04 | $0.00 | $17.04 |
| OPERATOR: ASPHALT PAVER | $11.63 | $0.00 | $11.63 |
| LATHER | $14.20 | $0.00 | $14.20 |
| LABORER: ROOF TEAROFF | $9.00 | $0.00 | $9.00 |
| LABORER: PIPELAYER | $11.93 | $0.00 | $11.93 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $10.46 | $0.00 | $10.46 |
| LABORER: MASON TENDER - BRICK | $11.51 | $0.00 | $11.51 |
| LABORER: LANDSCAPE & IRRIGATION | $8.05 | $0.00 | $8.05 |
| LABORER: COMMON OR GENERAL | $9.00 | $0.00 | $9.00 |
| LABORER: ASPHALT RAKER | $10.12 | $0.00 | $10.12 |
| HVAC MECHANIC (INSTALLATION OF HVAC DUCT) | $13.99 | $0.00 | $13.99 |
| FORM WORKER | $12.00 | $0.46 | $12.46 |
| FLOOR LAYER: CARPET | $10.00 | $0.00 | $10.00 |
| ELECTRICIAN | $11.79 | $0.00 | $11.79 |
| DRYWALL HANGER | $12.35 | $0.00 | $12.35 |
| DRYWALL FINISHER/TAPER | $16.13 | $0.00 | $16.13 |
| CEMENT MASON/CONCRETE FINISHER | $12.97 | $0.00 | $12.97 |
| CARPENTER, EXCLUDES DRYWALL HANGING, AND FORM WORK | $14.14 | $0.00 | $14.14 |
| BRICKLAYER | $20.00 | $0.00 | $20.00 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 0 | 01/02/2026 |
| 1 | 05/18/2026 |
Counties Covered
This wage determination applies to 1 county in Florida.
Get notified when FL20260053 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.