FL20260109
HeavyDavis-Bacon Act general wage determination for heavy construction in Florida.
Track FL20260109
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
ELEC1205-004 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | $33.50 | $13.85 | $47.35 |
IRON0597-005 Effective 04/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER, STRUCTURAL | $29.50 | $12.98 | $42.48 |
LABO0517-002 Effective 05/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: GRADE CHECKER | $22.61 | $11.59 | $34.20 |
PAIN0164-006 Effective 06/01/2021 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PAINTER: BRUSH, ROLLER AND SPRAY | $20.21 | $12.38 | $32.59 |
SUFL2009-148 Effective 06/24/2009 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: OFF THE ROAD TRUCK | $12.21 | $1.97 | $14.18 |
| TRUCK DRIVER: LOWBOY TRUCK | $13.06 | $2.18 | $15.24 |
| TRUCK DRIVER, INCLUDES DUMP TRUCK | $14.63 | $0.00 | $14.63 |
| OPERATOR: TRACTOR | $10.54 | $0.00 | $10.54 |
| OPERATOR: TRACKHOE | $20.92 | $5.50 | $26.42 |
| OPERATOR: SCRAPER | $11.00 | $1.74 | $12.74 |
| OPERATOR: ROLLER | $10.03 | $0.00 | $10.03 |
| OPERATOR: MECHANIC | $14.32 | $0.00 | $14.32 |
| OPERATOR: LOADER | $11.31 | $2.02 | $13.33 |
| OPERATOR: GRADER/BLADE | $16.00 | $2.84 | $18.84 |
| OPERATOR: CRANE | $22.38 | $0.00 | $22.38 |
| OPERATOR: BULLDOZER | $13.40 | $1.19 | $14.59 |
| OPERATOR: BACKHOE/EXCAVATOR | $13.91 | $1.39 | $15.30 |
| OPERATOR: BACKHOE LOADER COMBO | $16.10 | $2.44 | $18.54 |
| OPERATOR: ASPHALT PAVER | $11.59 | $0.00 | $11.59 |
| LABORER: POWER TOOL OPERATOR (HAND TOOLS, DRILLS, GRINDERS AND SKID STEER) | $10.63 | $2.20 | $12.83 |
| LABORER: PIPELAYER | $12.85 | $1.21 | $14.06 |
| LABORER: LANDSCAPE | $7.25 | $0.00 | $7.25 |
| LABORER: COMMON OR GENERAL | $9.89 | $1.58 | $11.47 |
| CEMENT MASON/CONCRETE FINISHER | $13.23 | $2.15 | $15.38 |
| CARPENTER | $15.80 | $0.00 | $15.80 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 0 | 01/02/2026 |
| 1 | 05/18/2026 |
Counties Covered
This wage determination applies to 1 county in Florida.
Get notified when FL20260109 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.