ID20260010
BuildingDavis-Bacon Act general wage determination for building construction in Idaho.
Track ID20260010
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
BOIL0242-001 Effective 01/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | $47.67 | $28.38 | $76.05 |
BRID0003-001 Effective 06/01/2019 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER | $32.05 | $18.27 | $50.32 |
CARP0001-041 Effective 06/01/2021 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (FORM WORK ONLY) | $33.41 | $17.84 | $51.25 |
ELEC0073-006 Effective 08/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | $49.55 | $19.09 | $68.64 |
IRON0014-003 Effective 06/03/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER: REINFORCING AND STRUCTURAL | $43.40 | $30.27 | $73.67 |
LABO0238-011 Effective 06/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: COMMON OR GENERAL ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $2.00 BASE POINTS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE. ZONE 2: 45 RADIUS MILES AND OVER FROM THE MAIN POST OFFICE | $32.15 | $16.30 | $48.45 |
LABO0238-012 Effective 06/01/2018 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER (MASON TENDER (CEMENT/CONCRETE, BRICK (HOD)) | $26.84 | $12.35 | $39.19 |
PLUM0044-005 Effective 06/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLUMBER (ZONE 1) | $44.57 | $26.58 | $71.15 |
SHEE0055-002 Effective 07/01/2022 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SHEET METAL WORKER (INCLUDES HVAC DUCT INSTALLATION) | $39.00 | $22.42 | $61.42 |
SUID2010-003 Effective 08/08/2012 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: DUMP TRUCK | $17.82 | $2.18 | $20.00 |
| ROOFER | $16.00 | $0.00 | $16.00 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $19.31 | $4.41 | $23.72 |
| OPERATOR: CRANE | $27.29 | $10.53 | $37.82 |
| OPERATOR: BACKHOE/EXCAVATOR | $20.75 | $4.42 | $25.17 |
| LABORER: CARPENTER TENDER | $17.71 | $1.82 | $19.53 |
| INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | $20.13 | $1.80 | $21.93 |
| DRYWALL FINISHER/TAPER | $20.27 | $3.50 | $23.77 |
| CEMENT MASON/CONCRETE FINISHER | $26.08 | $9.93 | $36.01 |
| CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING AND SCAFFOLD BUILDING (EXCLUDES FORM WORK) | $30.14 | $7.75 | $37.89 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 0 | 01/02/2026 |
| 1 | 05/18/2026 |
Counties Covered
This wage determination applies to 1 county in Idaho.
Get notified when ID20260010 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.