ASBE0017-001 Effective 06/01/2024
| Trade | Rate | Fringe | Total |
| HAZARDOUS MATERIAL HANDLER (INCLUDES PREPARATION, WETTING, STRIPPING REMOVAL SCRAPPING, VACUUMING, BAGGING AND DISPOSAL OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS) | $41.27 | $32.76 | $74.03 |
| FIRE STOP TECHNICIAN | $44.02 | $32.76 | $76.78 |
| ASBESTOS WORKER/INSULATOR (INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS) | $55.02 | $35.75 | $90.77 |
BOIL0001-001 Effective 05/01/2024
| Trade | Rate | Fringe | Total |
| BOILERMAKER | $53.10 | $38.54 | $91.64 |
BRIL0021-001 Effective 06/01/2016
| Trade | Rate | Fringe | Total |
| BRICKLAYER | $44.88 | $26.62 | $71.50 |
BRIL0021-004 Effective 06/01/2017
| Trade | Rate | Fringe | Total |
| MARBLE MASON | $44.63 | $26.83 | $71.46 |
BRIL0021-006 Effective 06/01/2017
| Trade | Rate | Fringe | Total |
| TILE SETTER | $45.49 | $25.72 | $71.21 |
| TILE FINISHER | $38.56 | $22.10 | $60.66 |
| TERRAZZO WORKER/SETTER | $44.38 | $25.84 | $70.22 |
BRIL0021-009 Effective 06/01/2017
| Trade | Rate | Fringe | Total |
| MARBLE FINISHER | $33.95 | $26.03 | $59.98 |
BRIL0021-012 Effective 06/01/2017
| Trade | Rate | Fringe | Total |
| POINTER, CLEANER AND CAULKER | $45.42 | $24.06 | $69.48 |
CARP0555-001 Effective 06/01/2022
| Trade | Rate | Fringe | Total |
| CARPENTER: CARPENTER, LATHER, MILLWRIGHT, PILEDRIVER, AND SOFT FLOOR LAYER (Heavy & Highway) | $52.01 | $38.85 | $90.86 |
| CARPENTER: CARPENTER, LATHER, MILLWRIGHT, PILEDRIVER, AND SOFT FLOOR LAYER (Building) | $52.01 | $38.85 | $90.86 |
CARP0555-002 Effective 10/01/2023
| Trade | Rate | Fringe | Total |
| CARPENTER (RESIDENTIAL CONSTRUCTION) | $45.61 | $35.31 | $80.92 |
ELEC0009-003 Effective 05/26/2024
| Trade | Rate | Fringe | Total |
| LINE CONSTRUCTION: GROUNDMAN | $48.44 | $29.09 | $77.53 |
| LINE CONSTRUCTION (LINEMAN AND EQUIPMENT OPERATOR) | $62.10 | $37.29 | $99.39 |
ELEC0134-001 Effective 06/02/2025
| Trade | Rate | Fringe | Total |
| ELECTRICIAN | $57.75 | $42.89 | $100.64 |
ENGI0150-006 Effective 06/01/2025
| Trade | Rate | Fringe | Total |
| OPERATOR: POWER EQUIPMENT, GROUP 4 (BUILDING AND RESIDENTIAL CONSTRUCTION) BOBCATS AND/OR OTHER SKID STEER LOADERS; BRICK FORKLIFTS; OILERS | $59.20 | $51.00 | $110.20 |
| OPERATOR: POWER EQUIPMENT, GROUP 3 (BUILDING AND RESIDENTIAL CONSTRUCTION) AIR COMPRESSOR-SMALL 250 AND UNDER (1 TO 5 NOT TO EXCEED A TOTAL OF 300 FT); AIR COMPRESSOR-LARGE OVER 250; COMBINATION-SMALL EQUIPMENT OPERATOR; GENERATOR- SMALL 50 KW AND UNDER; GENERATOR-LARGE OVER 50 KW; HEATERS, MECHANICAL; HOISTS, INSIDE ELEVATORS (REMODELING OR RENOVATIN WORK); HYDRUALIC POWER UNITS (PILE DRIVING, EXTRACTING, AND DRILLING); LOW BOYS; PUMPS OVER 3"" (1 TO 3 NOT TO EXCEED A TOTAL OF 300 FT); PUMPS, WELL POINTS; WELDING MACHINES (2 THROUGH 5); WINCHES, 4 SMALL ELECTRIC DRILL WINCHES; BOBCAT (UP TO AND INCLUDING 3/4 CU YD) | $60.95 | $51.00 | $111.95 |
| OPERATOR: POWER EQUIPMENT, GROUP 2 (BUILDING AND RESIDENTIAL CONSTRUCTION) BOBCAT (OVER 3/4 CU YD); BOILERS; BROOM, POWER PROPELLED; BULLDOZERS; CONCRETE MIXER (TWO BAG AND OVER); CONVEYOR, PORTABLE; FORKLIFT TRUCKS; GREASER ENGINEER; HIGHLIFT SHOVELS OR FRONT END LOADERS UNDER 2 1/4 CU YD; AOTOMATIC HOISTS, HOISTS, INSIDE ELEVATORS; HOISTS, SEWER DRAGGING MACHINE; HOISTS, TUGGER SINGLE DRUM; LASER SCREED; ROCK DRILL (SELF-PROPELLED); ROCK DRILL (TRUCK MOUNTED)*; ROLLERS; STEAM GENERATORS; TRACTORS; TRACTOR DRAWN VIBRATORY ROLLER (RECEIVES AN ADDITIONAL $.50 PER HOUR); WINCH TRUCKS WITH ""A"" FRAME. *-REQUIRES OILER | $63.50 | $51.00 | $114.50 |
| OPERATOR: POWER EQUIPMENT, GROUP 1 (BUILDING AND RESIDENTIAL CONSTRUCTION) MECHANIC; ASPHALT PLANT*; ASPHALT SPREADER; AUTOGRADE*; BACKHOES WITH CAISSON ATTACHMENT*:BATCH PLANT*; BENOTO(REQUIRES TWO ENGINEERS); BOILER AND THROTTLE VALVE; CAISSON RIGS*; CENTRAL REDI-MIX PLANT*; COMBINATION BACKHOE FRONT ENDLOADER MACHINE; COMPRESSOR AND THROTTLE VALVE; CONCRETE BREAKER (TRUCK MOUNTED)*; CONCRETE CONVEYOR; CONCRETE CONVEYOR, TRUCK MOUNTED; CONCRETE PAVER OVER 27E CU. FT.*; CONCRETE PAVER 27E CU FT AND UNDER*; CONCRETE PLACER*; CONCRETE PLACING BOOM; CONCRETE PUMP (TRUCK MOUNTED); CONCRETE TOWER; CRANES*; CRANES, HAMMERHEAD*; CRANES, (GCI AND SIMILAR TYPE REQUIRES TWO OPERATORS ONLY); CRETER CRANE; CRUSHER, STONE, ETC; DERRICKS; DERRICKS, TRAVELING*; FORMLESS CURB AND GUTTER MACHINE*; GRADER, ELEVATING; GROUTING MACHINES; HIGHLIFT SHOVELS OR FRONT ENDLOADER 2 1/4 YD. AND OVER; HOISTS, ELEVATORS, OUTSIDE TYPE RACK AND PINION AND SIMILAR MACHINES; HOISTS, ONE, TWO, AND THREE DRUM; HOISTS, TWO TUGGER ONE FLOOR; HYDRAULIC BACKHOES*; HYDRAULIC BOOM TRUCKS; HYDRAULIC VAC (AND SIMILAR EQUIPMENT);LOCOMOTIVES; MOTOR PATROL*; PILE DRIVERS AMD SKID RIG*; POST HOLE DIGGER; PRE- STRESS MACHINE; PUMP CRETES DUAL RAM(REQUIRING FREQUENT LUBRICATION AND WATER); PUMP CRETES; SQUEEZE CRETES-SCREW TYPE PUMPS GYPSUM BULKER AND PUMP; RAISED AND BLIND HOLE DRILL*; ROTO MILL GRINDER (36"" AND OVER)*; ROTO MILL GRINDER (LESS THAN 36"")*; SCOOPS-TRACTOR DRAWN; SLIP-FORM PAVER*; STRADDLE BUGGIES; TOURNAPULL; TRACTOR WITH BOOM, AND SIDE BOOM; AND TRENCHING MACHINES*. *-REQUIRES OILER | $64.80 | $51.00 | $115.80 |
ENGI0150-025 Effective 06/01/2025
| Trade | Rate | Fringe | Total |
| OPERATOR: POWER EQUIPMENT, GROUP 5 (HEAVY AND HIGHWAY CONSTRUCTION) BOBCATS (ALL); BRICK FORKLIFTS; OILERS; DIRECTIONAL BORING | $57.80 | $51.00 | $108.80 |
| OPERATOR: POWER EQUIPMENT, GROUP 4 (HEAVY AND HIGHWAY CONSTRUCTION) AIR COMPRESSOR - SMALL 250 AND UNDER (1 TO 5 NOT TO EXCEED A TOTAL OF 300 FT); AIR COMPRESSOR - LARGE OVER 250; COMBINATION - SMALL EQUIPMENT OPERATOR; DIRECTIONAL BORING MACHINE; GENERATORS - SMALL 50 KW AND UNDER; GENERATORS - LARGE , OVER 50 KW; HEATERS, MECHANICAL; HYDRAULIC POWER UNIT (PILE DRIVING, EXTRACTING OR DRILLING); LIGHT PLANTS (1 TO 5); PUMPS, OVER 3"" (1 TO 3, NOT TO EXCEED A TOTAL OF 300 FT); PUMPS, WELL POINTS; TRACTAIRE; WELDING MACHINES (2 THROUGH 5); WINCHES, 4 SMALL ELECTRIC DRILL WINCHES; | $59.00 | $51.00 | $110.00 |
| OPERATOR: POWER EQUIPMENT, GROUP 3 (HEAVY AND HIGHWAY CONSTRUCTION) BOILERS; BROOMS, ALL POWER PROPELLED; CEMENT SUPPLY TENDER; COMPRESSOR, COMMON RECEIVER (2); CONCRETE MIXER, TWO BAG AND OVER; CONVEYOR, PORTABLE; FARM TYPE TRACTORS USED FOR MOWING, SEEDING, ETC; FIREMAN ON BOILERS; FORKLIFT TRUCKS; GROUTING MACHINES; HOISTS, AUTOMATIC; HOISTS, ALL ELEVATORS; HOISTS, TUGGER SINGLE DRUM; JEEP DIGGERS; LOW BOYS; PIPE JACKING MACHINES; POST-HOLE DIGGER; POWER SAW, CONCRETE, POWER DRIVEN; PUG MILLS; ROLLERS, OTHER THAN ASPHALT; SEED AND STRAW BLOWER; STEAM GENERATORS; STUMP MACHINE; WINCH TRUCKS WITH A-FRAME; WORK BOATS; TAMPER-FORM MOTOR DRIVEN | $60.40 | $51.00 | $111.40 |
| OPERATOR: POWER EQUIPMENT, GROUP 2 (HEAVY AND HIGHWAY CONSTRUCTION) BATCH PLANT*; BITUMINOUS MIXER; BOILER AND THROTTLE VALVE; BULLDOZER; CAR LOADER TRAILING CONVEYORS; COMBINATION BACKKHOE FRONT END LOADER MACHINE, (LESS THAN 1 CU YD BACKHOE BUCKET WITH ATTACHMENTS); COMPRESSOR AND THROTTLE VALVE; COMPRESSOR, COMMON RECEIVER (3); CONCRETE BREAKER OR HYDRO HAMMER; CONCRETE GRINDING MACHINE; CONCRETE MIXER OR PAVER 7S SERIES TO AND INCLUDING 27 CU FT; CONCRETE SPREADER; CONCRETE CURING MACHINE; BURLAP MACHINE; BELTING MACHINE AND SEALING MACHINE; CONCRETE WHEEL SAW; CONVEYOR MUCK CARS (HAGLUND OR SIMILAR TYPE); DRILLS (ALL); FINISHING MACHINE-CONCRETE; GREASER ENGINEER; HIGHLIFT SHOVELS OR FRONT END LOADER; HOIST- SEWER DRAGGING MACHINE; HYDRAULIC BOOM TRUCKS, ALL ATTACHMENTS; HYDRO-BLASTER (REQUIRES TWO OPERATORS); LASER SCREED*; LOCOMOTIVES, DINKY; OFF-ROAD HAULING UNITS (INCLUDING ARTICULATING); PUMP CRETES; SQUEEZE CRETES-SCREW TYPE PUMPS, GYPSUM BULKER AND PUMP; ROLLER ASPHALT; ROTARY SNOW PLOWS; ROTOTILLER, SEAMAN, SELF-PROPELLED; SCOOPS-TRACTOR DRAWN; SELF- PROPELLED COMPACTOR; SPREADER-CHIP-STONE; SCRAPER; SCRAPER-PRIME MOVER IN TANDEM REGARDLESS OF SIZE (ADD $1.00 TO GROUP 2 HOURLY RATE FOR EACH HOUR AND FOR EACH MACHINE ATTACHED THERETO ADD $1.00 TO GROUP 2 HOURLY RATE FOR EACH HOUR); TANK CAR HEATER; TRACTORS, PUSH, PULLING SHEEPS FOOT, DISC, OR COMPACTOR, ETC; TUG BOATS *REQUIRES OILER | $62.45 | $51.00 | $113.45 |
| OPERATOR: POWER EQUIPMENT, GROUP 1 (HEAVY AND HIGHWAY CONSTRUCTION) ASPHALT PLANT*; ASPHALT HEATER AND PLANER COMBINATION; ASPHALT HEATER SCARFIRE*, ASPHALT SPREADER; AUTOGRADER/ GOMACO OR SIMILAR; ABG PAVER*, BACKHOES WITH CAISSON ATTACHMENT*, BALLAST REGULATOR, BELT LOADER*; CAISSON RIGS*CAR DUMPER, CENTRAL REDI-MIX PLANT*, COMBINATION BACKHOE; FRONT END LOADER MACHINE (1 CU YD OR OVER BACKHOE BUCKET OR WITH ATTACHMENTS); CONCRETE BREAKER (TRUCK MOUNTED); CONCRETE CONVEYOR; CONCRETE PAVER OVER 27E CU FT*; CONCRETE PLACER*; CONCRETE TUBE FLOAT; CRANES, ALL ATTACHMENTS*; CRANES, HAMMERHEAD, LINDEN, PECO AND MACHINES OF A LIKE NATURE*; CRETER CRANE; CRUSHER, STONE; ALL DERRICKS; DERRICK BOATS; DERRICKS, TRAVELING*; DOWELL MACHINE WITH AIR COMPRESSOR ($1.00 ABOVE CLASS 1); DREDGES*; FIELD MECHANIC WELDER; FORMLESS CURB AND GUTTER MACHINE*; GRADALL AND MACHINES OF A LIKE NATURE*; GRADER, ELEVATING; GRADER, MOTOR GRADER, MOTOR PATROL, AUTO PATROL, FORM GRADER, PULL GRADER, SUBGRADER; GUARD RAIL POST DRIVER MOUNTED*; HOISTS, ONE, TWO, AND THREE DRUM; HYDRAULIC BACKHOES*; BACKHOES WITH SHEAR ATTACHMENTS*; MUCKING MACHINE; PILE DRIVERS AND SKID RIG*; PRE-STRESS MACHINE; PUMP CRETES DUAL RAM (REQUIRES FREQUENT LUBRICATION AND WATER)*; ROCK DRILL- CRAWLER OR SKID RIG*; ROCK DRILL TRUCK MOUNTED*; ROCK/ TRACK TAMPER; ROTO MILL GRINDER, (36"" AND OVER)*; SLIP-FORM PAVER*; SOIL TEST DRILL RIG, TRUCK MOUNTED*; STRADDLE BUGGIES; HYDRAULIC TELESCOPING FORM (TUNNEL); TRACTOR DRAWN BELT LOADER*; TRACTOR DRAWN BELT LOADER WITH ATTACHED PUSHER (TWO ENGINEERS); TRACTOR WITH BOOM; TRACTAIRE WITH ATTACHMENT; TRAFFIC BARRIER TRANSFER MACHINE*; TRENCHING MACHINE; TRUCK MOUNTED CONCRETE PUMP WITH BOOM*; UNDERGROUND BORING AND/OR MINING MACHINES 5 FT IN DIAMETER AND OVER TUNNEL, ETC.*; WHEEL EXCAVATOR* & WIDENER (APSCO); RAISED OR BLIND HOE DRILL, TUNNEL & SHAFT* *REQUIRES OILER | $63.00 | $51.00 | $114.00 |
IRON0001-026 Effective 06/01/2025
| Trade | Rate | Fringe | Total |
| IRONWORKER: STRUCTURAL AND REINFORCING | $62.46 | $46.58 | $109.04 |
| IRONWORKER: SHEETER | $62.71 | $46.58 | $109.29 |
IRON0063-001 Effective 06/01/2025
| Trade | Rate | Fringe | Total |
| IRONWORKER: ORNAMENTAL | $59.26 | $44.81 | $104.07 |
IRON0063-002 Effective 06/01/2025
| Trade | Rate | Fringe | Total |
| IRONWORKER (FENCE ERECTOR) | $52.25 | $34.31 | $86.56 |
IRON0136-001 Effective 07/01/2025
| Trade | Rate | Fringe | Total |
| IRONWORKER: MASTER RIGGERS | $56.75 | $47.38 | $104.13 |
| IRONWORKER (MACHINERY MOVERS; RIGGERS; MACHINERY ERECTORS) | $54.25 | $47.38 | $101.63 |
LABO0002-006 Effective 06/01/2025
| Trade | Rate | Fringe | Total |
| LABORER, BUILDING & RESIDENTIAL: GROUP 12 DOSIMETER USE (ANY DEVICE) MONITORING NUCLEAR EXPOSURE); ASBESTOS ABATEMENT LABORER; TOXIC AND HAZARDOUS WASTE REMOVAL LABORERS | $52.40 | $36.94 | $89.34 |
| LABORER, BUILDING & RESIDENTIAL: GROUP 11 JACKHAMMERMEN ON FIRE BRICK WORK ONLY | $51.68 | $36.94 | $88.62 |
| LABORER, BUILDING & RESIDENTIAL: GROUP 10 BOILER SETTER PLASTIC LABORERS | $51.85 | $36.94 | $88.79 |
| LABORER, BUILDING & RESIDENTIAL: GROUP 9 CHIMNEY ON FIRE BRICK; CAISSON DIGGERS; & WELL POINT SYSTEM MEN | $51.75 | $36.94 | $88.69 |
| LABORER, BUILDING & RESIDENTIAL: GROUP 8 FIREBRICK & BOILER LABORERS | $51.73 | $36.94 | $88.67 |
| LABORER, BUILDING & RESIDENTIAL: GROUP 7 JACKHAMMERMEN; POWER DRIVEN CONCRETE SAWS; AND OTHER POWER TOOLS | $51.63 | $36.94 | $88.57 |
| LABORER, BUILDING & RESIDENTIAL: GROUP 6 STONE DERRICKMEN & HANDLERS | $51.60 | $36.94 | $88.54 |
| LABORER, BUILDING & RESIDENTIAL: GROUP 5 CEMENT GUN NOZZLE LABORERS (GUNITE); WINDLASS AND CAPSTAN PERSON | $51.55 | $36.94 | $88.49 |
| LABORER, BUILDING & RESIDENTIAL: GROUP 4 CHIMNEY OVER 40 FT.; SCAFFOLD LABORERS | $51.50 | $36.94 | $88.44 |
| LABORER, BUILDING & RESIDENTIAL: GROUP 3 CEMENT GUN | $51.48 | $36.94 | $88.42 |
| LABORER, BUILDING & RESIDENTIAL: GROUP 2 FIREPROOFING AND FIRE SHOP LABORERS | $51.40 | $36.94 | $88.34 |
| LABORER, BUILDING & RESIDENTIAL: GROUP 1 BUILDING LABORERS; PLASTERER TENDERS; PUMPS FOR DEWATERING; AND OTHER UNCLASSIFIED LABORERS | $51.40 | $36.94 | $88.34 |
LABO0002-007 Effective 06/01/2025
| Trade | Rate | Fringe | Total |
| LABORER, HEAVY & HIGHWAY: GROUP 5 ASBESTOS ABATEMENT LABORERS; TOXIC AND HAZARDOUS WASTE REMOVAL LABORERS, DOSIMETER (ANY DEVICE) MONITORING NUCLEAR EXPOSURE | $51.40 | $36.94 | $88.34 |
| LABORER, HEAVY & HIGHWAY: GROUP 4 RAKERS, LUTEMEN; MACHINE-SCREWMEN; KETTLEMEN; MIXERMEN; DRUN-MEN; JACKHAMMERMEN (ASPHALT); PAINTMEN; MITRE BOX SPREADERS; LABORERS ON BIRCH, OVERMAN AND SIMILAR SPREADER EQUIPMENT; LABORERS ON APSCO; LABORERS ON AIR COMPRESSOR; PAVING FORM SETTER; JACKHAMMERMEN (CONCRETE); POWER DRIVE CONCRETE SAWS; OTHER POWER TOOLS | $51.68 | $36.94 | $88.62 |
| LABORER, HEAVY & HIGHWAY: GROUP 3 CEMENT GUN NOZZLE (LABORERS), GUNITE | $51.55 | $36.94 | $88.49 |
| LABORER, HEAVY & HIGHWAY: GROUP 2 ASPHALT TAMPERS & SMOOTHERS; CEMENT GUN LABORERS | $51.48 | $36.94 | $88.42 |
| LABORER, HEAVY & HIGHWAY: GROUP 1 COMMON LABORER; TENDERS; MATERIAL EXPEDITOR (ASPHALT PLANT); STREET PAVING, GRADE SEPARATION, SIDEWALK, CURB & GUTTER, STRIPPERS & ALL LABORERS NOT OTHERWISE MENTIONED | $51.40 | $36.94 | $88.34 |
LABO0002-008 Effective 06/01/2025
| Trade | Rate | Fringe | Total |
| LABORER, TUNNEL AND SEWER: GROUP 5 ASBESTOS ABATEMENT LABORER; TOXIC AND HAZARDOUS WASTE REMOVAL LABORER; DOSIMETER (ANY DEVICE) MONITORING NUCLEAR EXPOSURE LABORER CLASSIFICATIONS (SEWER) | $51.40 | $36.94 | $88.34 |
| LABORER, TUNNEL AND SEWER: GROUP 3 CONCRETE REPAIRMEN; LOCK TENDERS (PRESSURE SIDE); MORTAR MEN; MUCKERS; GROUT MACHINE OPERATORS; TRACK LAYERS | $51.63 | $36.94 | $88.57 |
| LABORER, TUNNEL AND SEWER: GROUP 2 AIR HOIST OPERATOR; KEY BOARD OPERATOR; CONCRETE LABORER; GROUT; LOCK TENDERS (FREE AIR SIDE); STEEL SETTERS; TUGGERS; SWITCHMEN; CAR PUSHER | $51.53 | $36.94 | $88.47 |
| LABORER, TUNNEL AND SEWER: GROUP 1 CAGE TENDERS; DUMPMEN; FLAGMEN; SIGNALMEN; TOP LABORERS | $51.40 | $36.94 | $88.34 |
| LABORER, COMPRESSED AIR: 34 - AND OVER | $55.40 | $36.94 | $92.34 |
| LABORER, COMPRESSED AIR: 27 - 33 POUNDS | $54.40 | $36.94 | $91.34 |
| LABORER, COMPRESSED AIR: 21 - 26 POUNDS | $53.40 | $36.94 | $90.34 |
| LABORER, COMPRESSED AIR: 16 - 20 POUNDS | $52.90 | $36.94 | $89.84 |
| LABORER, COMPRESSED AIR: 0 - 15 POUNDS | $52.40 | $36.94 | $89.34 |
LABO0225-001 Effective 06/01/2025
| Trade | Rate | Fringe | Total |
| LABORER, DEMOLITION/WRECKING: GROUP 3 ASBESTOS WORK WITH COMPLETE DEMOLITION/WRECKING OR STRIP OUT WORK | $51.40 | $36.94 | $88.34 |
| LABORER, DEMOLITION/WRECKING: GROUP 2 INTERIOR WRECKING AND STRIP OUT WORK | $51.40 | $36.94 | $88.34 |
| LABORER, DEMOLITION/WRECKING: GROUP 1 COMPLETE DEMOLITION | $46.40 | $36.94 | $83.34 |
PAIN0014-001 Effective 06/01/2024
| Trade | Rate | Fringe | Total |
| PAINTER (INCLUDING TAPER) | $53.05 | $33.91 | $86.96 |
PAIN0027-001 Effective 06/01/2024
| Trade | Rate | Fringe | Total |
| GLAZIER | $51.55 | $44.09 | $95.64 |
PLAS0005-002 Effective 07/01/2015
| Trade | Rate | Fringe | Total |
| PLASTERER | $42.25 | $26.65 | $68.90 |
PLAS0502-001 Effective 06/01/2025
| Trade | Rate | Fringe | Total |
| CEMENT MASON/CONCRETE FINISHER | $53.10 | $43.80 | $96.90 |
PLUM0130-001 Effective 06/01/2025
| Trade | Rate | Fringe | Total |
| PLUMBER | $60.50 | $39.02 | $99.52 |
PLUM0597-002 Effective 06/01/2023
| Trade | Rate | Fringe | Total |
| PIPEFITTER | $55.00 | $38.62 | $93.62 |
ROOF0011-001 Effective 12/01/2024
| Trade | Rate | Fringe | Total |
| ROOFER | $50.25 | $30.43 | $80.68 |
SFIL0281-001 Effective 07/01/2025
| Trade | Rate | Fringe | Total |
| SPRINKLER FITTER | $63.25 | $36.50 | $99.75 |
SHEE0073-001 Effective 06/01/2022
| Trade | Rate | Fringe | Total |
| SHEET METAL WORKER | $49.10 | $42.91 | $92.01 |
SHEE0073-002 Effective 06/08/2018
| Trade | Rate | Fringe | Total |
| SHEET METAL WORKER (ALUMINUM GUTTER WORK) | $31.32 | $37.02 | $68.34 |
TEAM0731-001 Effective 06/01/2025
| Trade | Rate | Fringe | Total |
| TRUCK DRIVER: 6 AXLES (COOK COUNTY - HEAVY AND HIGHWAY) FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. C. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR HEALTH AND WELFARE: $448.80 PER WEEK PENSION: $562.80 PER WEEK | $46.20 | $30.27 | $76.47 |
| TRUCK DRIVER: 5 AXLES (COOK COUNTY - HEAVY AND HIGHWAY) FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. C. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR HEALTH AND WELFARE: $448.80 PER WEEK PENSION: $562.80 PER WEEK | $46.00 | $30.27 | $76.27 |
| TRUCK DRIVER: 4 AXLES (COOK COUNTY - HEAVY AND HIGHWAY) FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. C. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR HEALTH AND WELFARE: $448.80 PER WEEK PENSION: $562.80 PER WEEK | $45.80 | $30.27 | $76.07 |
| TRUCK DRIVER: 2 OR 3 AXLES (COOK COUNTY - HEAVY AND HIGHWAY) FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. C. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR HEALTH AND WELFARE: $448.80 PER WEEK PENSION: $562.80 PER WEEK | $45.55 | $30.27 | $75.82 |
TEAM0731-002 Effective 04/01/2025
| Trade | Rate | Fringe | Total |
| TRAFFIC CONTROL DEVICE MONITOR (TRAFFIC SAFETY WORKER: PRIMARY DUTIES INCLUDE BUT ARE NOT LIMITED TO THE DELIVERY, MAINTENANCE AND PICK-UP OF TRAFFIC CONTROL DEVICES, THE SET-UP AND INSTALLATION OF TRAFFIC SIGNS, PAVEMENT MARKINGS, BARRICADES, CRASH BARRELS AND GLARE SCREENS, TRAFFIC CONTROL SURVEILLANCE, THE REPAIR AND MAINTENANCE TRUCKS, CARS, ARROW BOARDS, MESSAGE SIGNS, BARRICADE AND SIGN FABRICATION EQUIPMENT) | $43.40 | $22.71 | $66.11 |
TEAM0786-001 Effective 06/01/2025
| Trade | Rate | Fringe | Total |
| TRUCK DRIVER: 6 AXLES (COOK COUNTY - BUILDING AND RESIDENTIAL) FOOTNOTES: A. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR. HEALTH AND WELFARE: $445.00 PER WEEK PENSION: $408 PER WEEK. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY | $54.64 | $0.30 | $54.94 |
| TRUCK DRIVER: 5 AXLES (COOK COUNTY - BUILDING AND RESIDENTIAL) FOOTNOTES: A. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR. HEALTH AND WELFARE: $445.00 PER WEEK PENSION: $408 PER WEEK. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY | $54.43 | $0.30 | $54.73 |
| TRUCK DRIVER: 4 AXLES (COOK COUNTY - BUILDING AND RESIDENTIAL) FOOTNOTES: A. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR. HEALTH AND WELFARE: $445.00 PER WEEK PENSION: $408 PER WEEK. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY | $54.21 | $0.30 | $54.51 |
| TRUCK DRIVER: 2 & 3 AXLES (COOK COUNTY - BUILDING AND RESIDENTIAL) FOOTNOTES: A. AN ADDITIONAL MORE THAN SIX (6) AXLES. LOW-BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR. HEALTH AND WELFARE: $445.00 PER WEEK PENSION: $408 PER WEEK. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY | $53.95 | $0.30 | $54.25 |
No trade rates match your search.