KY20260044

Building

Davis-Bacon Act general wage determination for building construction in Kentucky.

Modification 2, revised 05/18/2026 34 trade rates 1 county View on SAM.gov

Track KY20260044

Get an email when this wage determination gets a new modification.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Wage Rates

Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.

ASBE0008-011 Effective 03/01/2025
Trade Rate Fringe Total
ASBESTOS WORKER/HEAT & FROST INSULATOR $35.23 $23.04 $58.27
BOIL0040-002 Effective 01/01/2025
Trade Rate Fringe Total
BOILERMAKER $43.85 $28.44 $72.29
BRKY0018-001 Effective 06/01/2024
Trade Rate Fringe Total
BRICKLAYER $35.00 $17.13 $52.13
BRKY0018-002 Effective 09/01/2024
Trade Rate Fringe Total
TILE SETTER $33.41 $17.51 $50.92
BRKY0018-003 Effective 09/01/2024
Trade Rate Fringe Total
TILE FINISHER $28.87 $17.46 $46.33
ELEC0212-015 Effective 06/02/2025
Trade Rate Fringe Total
ELECTRICIAN (INCLUDES LOW VOLTAGE WIRING) $38.05 $22.97 $61.02
ENGI0181-054 Effective 06/01/2025
Trade Rate Fringe Total
POWER EQUIPMENT OPERATOR (DRILL) $40.65 $19.60 $60.25
ENGI0181-079 Effective 06/01/2025
Trade Rate Fringe Total
POWER EQUIPMENT OPERATOR: LOADER $40.65 $19.60 $60.25
ENGI0181-090 Effective 06/01/2025
Trade Rate Fringe Total
POWER EQUIPMENT OPERATOR: CRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $.50 ABOVE THE WAGE RATE $41.98 $19.60 $61.58
ENGI0181-091 Effective 06/01/2025
Trade Rate Fringe Total
POWER EQUIPMENT OPERATOR: FORKLIFT $41.98 $19.60 $61.58
ENGI0181-093 Effective 06/01/2025
Trade Rate Fringe Total
POWER EQUIPMENT OPERATOR (OILER) $34.99 $19.60 $54.59
IRON0044-016 Effective 06/01/2025
Trade Rate Fringe Total
IRONWORKER: STRUCTURAL AND ORNAMENTAL $37.77 $23.90 $61.67
IRON0044-018 Effective 06/01/2025
Trade Rate Fringe Total
IRONWORKER, REINFORCING $38.27 $23.90 $62.17
LABO0265-013 Effective 06/01/2025
Trade Rate Fringe Total
LABORER (COMMON OR GENERAL) $27.30 $18.75 $46.05
LABO1445-002 Effective 06/01/2025
Trade Rate Fringe Total
LABORER: POWER TOOL OPERATOR $31.35 $23.18 $54.53
PAIN0123-002 Effective 05/01/2024
Trade Rate Fringe Total
PAINTER: BRUSH AND ROLLER $28.29 $14.01 $42.30
PAIN0387-003 Effective 11/01/2023
Trade Rate Fringe Total
GLAZIER $31.95 $16.65 $48.60
PLAS0132-015 Effective 06/01/2025
Trade Rate Fringe Total
CEMENT MASON/CONCRETE FINISHER $33.60 $16.05 $49.65
PLUM0452-015 Effective 11/01/2024
Trade Rate Fringe Total
PLUMBER $41.00 $21.66 $62.66
PLUM0452-020 Effective 11/01/2024
Trade Rate Fringe Total
PIPEFITTER $41.00 $21.66 $62.66
ROOF0042-008 Effective 08/01/2025
Trade Rate Fringe Total
ROOFER $34.38 $19.94 $54.32
SFKY0669-002 Effective 04/01/2025
Trade Rate Fringe Total
SPRINKLER FITTER $44.15 $26.08 $70.23
SHEE0024-031 Effective 06/01/2023
Trade Rate Fringe Total
SHEET METAL WORKER (INCLUDES HVAC DUCT INSTALLATION) $33.53 $26.71 $60.24
SUKY2015-025 Effective 06/02/2015
Trade Rate Fringe Total
TRUCK DRIVER: DUMP TRUCK $24.35 $14.59 $38.94
PAINTER: SPRAY $22.81 $11.87 $34.68
OPERATOR: ROLLER $23.60 $12.65 $36.25
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) $22.52 $4.00 $26.52
OPERATOR: BULLDOZER $19.69 $4.71 $24.40
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $24.66 $10.81 $35.47
LABORER: PIPELAYER $20.36 $9.90 $30.26
LABORER: MASON TENDER - CEMENT/CONCRETE $25.10 $13.67 $38.77
LABORER: MASON TENDER - BRICK $22.65 $9.04 $31.69
CARPENTER, EXCLUDES FORM WORK $22.25 $11.41 $33.66
CARPENTER (FORM WORK ONLY) $23.87 $9.66 $33.53

Modification History

Modification Publication Date
1 01/30/2026
2 05/18/2026

Counties Covered

This wage determination applies to 1 county in Kentucky.

Get notified when KY20260044 is modified

This determination has been revised 2 times. We'll email you when a new modification is published.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.