KY20260054
HeavyDavis-Bacon Act general wage determination for heavy construction in Kentucky.
Track KY20260054
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
CARP0064-007 Effective 04/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (FORM WORK ONLY) | $33.89 | $24.06 | $57.95 |
ELEC0369-004 Effective 09/04/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LINE CONSTRUCTION: LINEMAN | $43.84 | $18.80 | $62.64 |
| LINE CONSTRUCTION: GROUNDMAN | $25.77 | $14.10 | $39.87 |
| LINE CONSTRUCTION: EQUIPMENT OPERATOR | $39.15 | $17.58 | $56.73 |
ENGI0181-010 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR GROUP 4 Oiler | $38.37 | Employee... 9.50 | $38.37 |
| POWER EQUIPMENT OPERATOR GROUP 2 Bobcat/Skid Steer/Skid Loader; Forklift | $38.69 | Employee... 9.50 | $38.69 |
| POWER EQUIPMENT OPERATOR GROUP 1 Crane; Drill; Grader/Blade; Mechanic; Scraper Operators on cranes with booms 150 feet and over (including jib) shall receive $1.00 above Group 1 rate; 250 feet and over including jib shall receive $1.50 above Class 1 rate. Combination Rate: All crane operators operating cranes, where the length of the boom in combination with the length of the piling leads equal or exceeds 150 feet, shall receive $1.00 above the Group 1 rate | $41.55 | Employee... 9.50 | $41.55 |
IRON0782-010 Effective 08/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER (PROJECTS UNDER $20,000,000.00) | $35.63 | $26.49 | $62.12 |
| IRONWORKER (PROJECTS OVER $20,000,000.00) | $37.47 | $26.49 | $63.96 |
LABO0189-014 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: CONCRETE WORKER | $26.87 | $19.66 | $46.53 |
| LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND) | $27.12 | $19.66 | $46.78 |
SUKY2011-010 Effective 06/25/2014 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: LOADER | $30.35 | $0.00 | $30.35 |
| OPERATOR: BULLDOZER | $20.99 | $6.33 | $27.32 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $23.60 | $12.65 | $36.25 |
| LABORER: PIPELAYER | $20.13 | $8.63 | $28.76 |
| LABORER: FLAGGER | $18.31 | $8.89 | $27.20 |
| LABORER: COMMON OR GENERAL | $20.60 | $9.39 | $29.99 |
| ELECTRICIAN | $32.35 | $2.18 | $34.53 |
| CEMENT MASON/CONCRETE FINISHER | $21.60 | $10.35 | $31.95 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 0 | 01/02/2026 |
| 1 | 05/18/2026 |
Counties Covered
This wage determination applies to 1 county in Kentucky.
Get notified when KY20260054 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.