ME20260025
HeavyDavis-Bacon Act general wage determination for heavy construction in Maine.
Track ME20260025
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
ENGI0004-002 Effective 12/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: BULLDOZER | $43.60 | $33.86 | $77.46 |
| POWER EQUIPMENT OPERATOR: BACKHOE,EXCAVATOR, LOADER, TRACKHOE | $43.86 | $33.86 | $77.72 |
LABO0327-001 Effective 12/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: COMMON OR GENERAL | $25.40 | $21.28 | $46.68 |
LABO0327-002 Effective 12/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: FLAGGER | $25.40 | $21.28 | $46.68 |
SUME2014-006 Effective 01/30/2017 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: DUMP TRUCK | $15.40 | $3.09 | $18.49 |
| OPERATOR: CRANE | $24.57 | $6.89 | $31.46 |
| LABORER: PIPELAYER | $21.96 | $5.99 | $27.95 |
| IRONWORKER, STRUCTURAL | $24.57 | $11.13 | $35.70 |
| ELECTRICIAN | $24.94 | $9.00 | $33.94 |
| CARPENTER, INCLUDES FORM WORK | $20.04 | $10.48 | $30.52 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 0 | 01/02/2026 |
| 1 | 05/18/2026 |
Counties Covered
This wage determination applies to 1 county in Maine.
Get notified when ME20260025 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.