MN20260024

Residential

Davis-Bacon Act general wage determination for residential construction in Minnesota.

Modification 2, revised 05/18/2026 37 trade rates 3 counties View on SAM.gov

Track MN20260024

Get an email when this wage determination gets a new modification.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Wage Rates

Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.

CARP1382-030 Effective 04/29/2024
Trade Rate Fringe Total
CARPENTER (HOUSTON) $36.71 $20.17 $56.88
CARP1934-004 Effective 04/29/2024
Trade Rate Fringe Total
CARPENTER (CLAY, POLK) $31.14 $20.69 $51.83
ELEC0343-017 Effective 09/01/2025
Trade Rate Fringe Total
ELECTRICIAN (HOUSTON) $40.25 $23.32 $63.57
ELEC1426-019 Effective 06/01/2025
Trade Rate Fringe Total
ELECTRICIAN (CLAY, POLK) $37.41 $18.61 $56.02
ENGI0049-062 Effective 05/01/2011
Trade Rate Fringe Total
OPERATOR: POWER EQUIPMENT GROUP 8 OILER (CLAY, POLK) $26.80 $15.85 $42.65
OPERATOR: POWER EQUIPMENT GROUP 6 LOADER UP TO 1 CU YD, TRACTOR D2 OR SIMILAR SIZE. (CLAY, POLK) $29.75 $15.85 $45.60
OPERATOR: POWER EQUIPMENT GROUP 5 BULLDOZER, CURB MACHINE, FORKLIFT, LOADER OVER 1 CU YD, MECHANIC, ROLLER, SCRAPER, TRACTOR OVER D2. (CLAY, POLK) $31.17 $15.85 $47.02
OPERATOR: POWER EQUIPMENT GROUP 4 BACKHOE (CLAY, POLK) $31.33 $15.85 $47.18
OPERATOR: POWER EQUIPMENT GROUP 2 GRADER/BLADE (CLAY, POLK) $32.98 $15.85 $48.83
ENGI0049-063 Effective 05/01/2011
Trade Rate Fringe Total
OPERATOR: POWER EQUIPMENT GROUP 8OILER. (HOUSTON) $28.29 $15.85 $44.14
OPERATOR: POWER EQUIPMENT GROUP 6 LOADER UP TO 1 CU YD, TRACTOR D2 OR SIMILAR SIZE. (HOUSTON) $31.42 $15.85 $47.27
OPERATOR: POWER EQUIPMENT GROUP 5 BULLDOZER, CURB MACHINE, FORKLIFT, LOADER OVER 1 CU YD, MECHANIC, ROLLER, SCRAPER, TRACTOR OVER D2.(HOUSTON) $32.93 $15.85 $48.78
OPERATOR: POWER EQUIPMENT GROUP 4 BACKHOE (HOUSTON) $33.10 $15.85 $48.95
OPERATOR: POWER EQUIPMENT GROUP 2 GRADER/BLADE (HOUSTON) $34.85 $15.85 $50.70
IRON0512-039 Effective 04/04/2025
Trade Rate Fringe Total
IRONWORKER: STRUCTURAL (CLAY, POLK) $42.89 $36.86 $79.75
IRON0512-040 Effective 04/04/2025
Trade Rate Fringe Total
IRONWORKER: STRUCTURAL (HOUSTON) $46.35 $36.86 $83.21
LABO0405-016 Effective 05/01/2019
Trade Rate Fringe Total
LABORERS: (3) MASON TENDER (BRICK, CEMENT/CONCRETE) (HOUSTON) $25.42 $17.52 $42.94
LABORERS: (2) PIPELAYER (HOUSTON) $27.95 $17.52 $45.47
LABORERS: (1) COMMON OR GENERAL (HOUSTON) $27.25 $17.52 $44.77
LABO0563-024 Effective 05/01/2012
Trade Rate Fringe Total
LABORERS GROUP 2 PIPELAYER (CLAY (EXCEPT CITY OF MOORHEAD)) PROJECTS OVER $950,000: $1.75 ADDITIONAL PER HOUR $20.96 $14.97 $35.93
LABORERS GROUP 1 COMMON OR GENERAL; MASON TENDER (BRICK, CEMENT/CONCRETE) (CLAY (EXCEPT CITY OF MOORHEAD)) PROJECTS OVER $950,000: $1.75 ADDITIONAL PER HOUR $20.21 $14.97 $35.18
LABO0563-025 Effective 05/01/2012
Trade Rate Fringe Total
LABORERS: COMMON OR GENERAL LABORER, MASON TENDER (BRICK,CEMENT/CONCRETE), PIPELAYER (CLAY (CITY OF MOORHEAD) COUNTY $18.60 $13.44 $32.04
LABO1097-006 Effective 05/01/2017
Trade Rate Fringe Total
LABORERS: COMMON OR GENERAL LABORER, MASON TENDER (BRICK,CEMENT/CONCRETE), PIPELAYER (POLK (CITY OF EAST GRAND FORKS) COUNTY) $20.87 $17.39 $38.26
LABO1097-021 Effective 05/01/2023
Trade Rate Fringe Total
LABORER GROUP 2 (POLK (EXCLUDING THE CITY LIMITS OF EAST GRAND FORKS)) (Projects under $760,000:) $24.20 $21.74 $45.94
LABORER GROUP 2 (POLK (EXCLUDING THE CITY LIMITS OF EAST GRAND FORKS)) (Projects $760k and over) $28.47 $21.74 $50.21
LABORER GROUP 1 (POLK (EXCLUDING THE CITY LIMITS OF EAST GRAND FORKS)) (Projects under $760,000:) $23.86 $21.74 $45.60
LABORER GROUP 1 (POLK (EXCLUDING THE CITY LIMITS OF EAST GRAND FORKS)) (Projects $760k and over) $28.07 $21.74 $49.81
PAIN0681-024 Effective 05/05/2025
Trade Rate Fringe Total
PAINTER: SPRAY (HOUSTON) $19.00 $3.00 $22.00
PAIN0884-027 Effective 06/01/2010
Trade Rate Fringe Total
PAINTER: SPRAY (CLAY, POLK) $22.61 $8.66 $31.27
PLUM0006-012 Effective 05/01/2024
Trade Rate Fringe Total
PLUMBER (HOUSTON) $47.50 $30.33 $77.83
PLUM0011-026 Effective 05/01/2025
Trade Rate Fringe Total
PLUMBER (CLAY, POLK) $48.74 $21.34 $70.08
ROOF0096-059 Effective 05/01/2017
Trade Rate Fringe Total
ROOFER (CLAY, POLK) $36.01 $16.72 $52.73
ROOF0096-060 Effective 06/01/2024
Trade Rate Fringe Total
ROOFER (HOUSTON) $32.71 $16.99 $49.70
SHEE0010-089 Effective 06/02/2025
Trade Rate Fringe Total
SHEET METAL WORKER (POLK) $35.37 $21.12 $56.49
SHEE0010-090 Effective 06/01/2025
Trade Rate Fringe Total
SHEET METAL WORKER (CLAY) $35.76 $23.17 $58.93
SHEE0010-091 Effective 05/01/2025
Trade Rate Fringe Total
SHEET METAL WORKER (HOUSTON) $40.03 $28.95 $68.98
SUMN2009-061 Effective 07/27/2009
Trade Rate Fringe Total
LABORER: LANDSCAPE $11.50 $0.00 $11.50

Modification History

Modification Publication Date
1 01/30/2026
2 05/18/2026

Counties Covered

This wage determination applies to 3 counties in Minnesota.

Get notified when MN20260024 is modified

This determination has been revised 2 times. We'll email you when a new modification is published.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.