MS20260068

Heavy

Davis-Bacon Act general wage determination for heavy construction in Mississippi.

Modification 2, revised 05/18/2026 10 trade rates 1 county View on SAM.gov

Track MS20260068

Get an email when this wage determination gets a new modification.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Wage Rates

Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.

ELEC0917-009 Effective 12/01/2025
Trade Rate Fringe Total
ELECTRICIAN $33.30 $11.63 $44.93
IRON0469-001 Effective 06/01/2017
Trade Rate Fringe Total
IRONWORKER: STRUCTURAL $21.00 $8.81 $29.81
SUMS2015-034 Effective 04/03/2017
Trade Rate Fringe Total
TRUCK DRIVER: DUMP TRUCK, INCLUDES WATER SEWER LINES $13.25 $0.00 $13.25
OPERATOR: BULLDOZER, INCLUDES WATER SEWER LINES $14.71 $0.00 $14.71
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, INCLUDES WATER SEWER LINES $14.68 $0.00 $14.68
LABORER: PIPELAYER, INCLUDES WATER SEWER LINES $12.00 $0.00 $12.00
LABORER: COMMON OR GENERAL, INCLUDES WATER SEWER LINES $9.00 $1.88 $10.88
IRONWORKER, REINFORCING $18.50 $0.00 $18.50
CEMENT MASON/CONCRETE FINISHER, INCLUDES WATER SEWER LINES $14.98 $0.00 $14.98
CARPENTER, INCLUDES FORM WORK $16.54 $0.00 $16.54

Modification History

Modification Publication Date
1 01/23/2026
2 05/18/2026

Counties Covered

This wage determination applies to 1 county in Mississippi.

Get notified when MS20260068 is modified

This determination has been revised 2 times. We'll email you when a new modification is published.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.