Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.

ASBE0082-002 Effective 08/01/2024
Trade Rate Fringe Total
HEAT AND FROST INSULATOR $43.81 $21.87 $65.68
BOIL0011-002 Effective 01/01/2025
Trade Rate Fringe Total
BOILERMAKER $38.75 $32.31 $71.06
BRMT0012-002 Effective 06/01/2020
Trade Rate Fringe Total
BRICKLAYER $30.55 $15.75 $46.30
ELEC0532-006 Effective 06/01/2025
Trade Rate Fringe Total
ELECTRICIAN $43.92 $18.17 $62.09
ENGI0400-003 Effective 05/01/2025
Trade Rate Fringe Total
POWER EQUIPMENT OPERATOR: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, TOWER (ALL) ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE ROAD MILES OVER THE SHORTEST PRACTICAL MAINTAINED ROUTE FROM THE NEAREST COUNTY COURT HOUSE OF THE FOLLOWING LISTED TOWNS TO THE CENTER OF THE JOB: BILLINGS, BOZEMAN, BUTTE, GREAT FALLS, HELENA, KALISPELL, MISSOULA ZONE 1: 0 TO 30 MILES - BASE PAY ZONE 2: 30 TO 60 MILES - BASE PAY + $3.50 ZONE 3: OVER 60 MILES - BASE PAY + $5.50 $42.00 $16.20 $58.20
POWER EQUIPMENT OPERATOR: (6) CRANES 75 TO 144 TONS, WHIRLEY CRANES ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE ROAD MILES OVER THE SHORTEST PRACTICAL MAINTAINED ROUTE FROM THE NEAREST COUNTY COURT HOUSE OF THE FOLLOWING LISTED TOWNS TO THE CENTER OF THE JOB: BILLINGS, BOZEMAN, BUTTE, GREAT FALLS, HELENA, KALISPELL, MISSOULA ZONE 1: 0 TO 30 MILES - BASE PAY ZONE 2: 30 TO 60 MILES - BASE PAY + $3.50 ZONE 3: OVER 60 MILES - BASE PAY + $5.50 $40.00 $16.20 $56.20
POWER EQUIPMENT OPERATOR: (5) CRANES 45-74 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE ROAD MILES OVER THE SHORTEST PRACTICAL MAINTAINED ROUTE FROM THE NEAREST COUNTY COURT HOUSE OF THE FOLLOWING LISTED TOWNS TO THE CENTER OF THE JOB: BILLINGS, BOZEMAN, BUTTE, GREAT FALLS, HELENA, KALISPELL, MISSOULA ZONE 1: 0 TO 30 MILES - BASE PAY ZONE 2: 30 TO 60 MILES - BASE PAY + $3.50 ZONE 3: OVER 60 MILES - BASE PAY + $5.50 $38.00 $16.20 $54.20
POWER EQUIPMENT OPERATOR: (4) CRANES 25-44 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE ROAD MILES OVER THE SHORTEST PRACTICAL MAINTAINED ROUTE FROM THE NEAREST COUNTY COURT HOUSE OF THE FOLLOWING LISTED TOWNS TO THE CENTER OF THE JOB: BILLINGS, BOZEMAN, BUTTE, GREAT FALLS, HELENA, KALISPELL, MISSOULA ZONE 1: 0 TO 30 MILES - BASE PAY ZONE 2: 30 TO 60 MILES - BASE PAY + $3.50 ZONE 3: OVER 60 MILES - BASE PAY + $5.50 $38.00 $16.20 $54.20
POWER EQUIPMENT OPERATOR: (1) A-FRAME TRUCK CRANE ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE ROAD MILES OVER THE SHORTEST PRACTICAL MAINTAINED ROUTE FROM THE NEAREST COUNTY COURT HOUSE OF THE FOLLOWING LISTED TOWNS TO THE CENTER OF THE JOB: BILLINGS, BOZEMAN, BUTTE, GREAT FALLS, HELENA, KALISPELL, MISSOULA ZONE 1: 0 TO 30 MILES - BASE PAY ZONE 2: 30 TO 60 MILES - BASE PAY + $3.50 ZONE 3: OVER 60 MILES - BASE PAY + $5.50 $21.51 $16.20 $37.71
IRON0732-014 Effective 06/01/2024
Trade Rate Fringe Total
IRONWORKER, REINFORCING $36.83 $25.30 $62.13
PLUM0030-005 Effective 09/01/2024
Trade Rate Fringe Total
PLUMBER/PIPEFITTER (Excluding HVAC Pipe Installation) $44.35 $21.87 $66.22
SHEE0103-009 Effective 06/01/2025
Trade Rate Fringe Total
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) $40.00 $22.07 $62.07
SUMT2011-027 Effective 01/04/2011
Trade Rate Fringe Total
TRUCK DRIVER: DUMP TRUCK $18.88 $4.66 $23.54
ROOFER $17.36 $3.83 $21.19
PLUMBER (HVAC PIPE INSTALLATION) $25.75 $10.87 $36.62
PAINTER: BRUSH, ROLLER AND SPRAY $19.18 $0.00 $19.18
OPERATOR: FORKLIFT $21.44 $8.05 $29.49
OPERATOR: EXCAVATOR $22.98 $5.57 $28.55
LABORER: MASON TENDER - BRICK $18.37 $5.94 $24.31
LABORER: COMMON OR GENERAL $14.47 $3.11 $17.58
IRONWORKER, STRUCTURAL $20.45 $12.76 $33.21
CEMENT MASON/CONCRETE FINISHER $18.27 $1.50 $19.77
CARPENTER, EXCLUDES DRYWALL HANGING, AND FORM WORK $16.70 $2.31 $19.01
CARPENTER (DRYWALL HANGING ONLY) $22.69 $0.00 $22.69

Modification History

Modification Publication Date
0 01/02/2026
1 05/18/2026

Counties Covered

This wage determination applies to 1 county in Montana.

Get notified when MT20260051 is modified

This determination has been revised 2 times. We'll email you when a new modification is published.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.