Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
ASBE0006-014 Effective 09/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $44.36 | $36.63 | $80.99 |
BOIL0029-004 Effective 01/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | $42.83 | $25.29 | $68.12 |
BRNH0003-001 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER | $43.91 | $28.47 | $72.38 |
ELEC0490-006 Effective 01/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (INCLUDES LOW VOLTAGE WIRING AND ALARM INSTALLATION) | $36.12 | $22.92 | $59.04 |
IRON0007-037 Effective 09/16/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER (REINFORCING AND STRUCTURAL) | $33.65 | $26.12 | $59.77 |
LABO0976-008 Effective 12/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: COMMON OR GENERAL | $25.40 | $21.43 | $46.83 |
PLUM0131-004 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PIPEFITTER | $45.76 | $26.19 | $71.95 |
SUNH2015-008 Effective 06/16/2017 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| WATERPROOFER | $26.69 | $0.00 | $26.69 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $31.29 | $9.78 | $41.07 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION | $24.88 | $5.46 | $30.34 |
| ROOFER | $19.22 | $0.00 | $19.22 |
| PLUMBER, INCLUDES HVAC PIPE INSTALLATION | $26.72 | $5.56 | $32.28 |
| PAINTER: SPRAY | $22.99 | $3.28 | $26.27 |
| PAINTER (BRUSH AND ROLLER) | $18.10 | $1.58 | $19.68 |
| OPERATOR: ROLLER | $23.56 | $3.28 | $26.84 |
| OPERATOR: LOADER | $22.25 | $2.13 | $24.38 |
| OPERATOR: CRANE | $27.42 | $3.83 | $31.25 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $24.02 | $4.25 | $28.27 |
| LABORER: MASON TENDER - BRICK | $16.52 | $4.74 | $21.26 |
| GLAZIER | $26.75 | $3.48 | $30.23 |
| DRYWALL HANGER, INCLUDES METAL STUD INSTALLATION | $25.00 | $0.00 | $25.00 |
| DRYWALL FINISHER/TAPER | $25.00 | $0.00 | $25.00 |
| CEMENT MASON/CONCRETE FINISHER | $22.04 | $9.70 | $31.74 |
| CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION AND FORM WORK (EXCLUDES DRYWALL HANGING AND DRYWALL FINISHING/TAPING | $24.47 | $8.55 | $33.02 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 0 | 01/02/2026 |
| 1 | 05/18/2026 |
Counties Covered
This wage determination applies to 1 county in New Hampshire.
Get notified when NH20260022 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.