NH20260041
HighwayDavis-Bacon Act general wage determination for highway construction in New Hampshire.
Track NH20260041
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
SUNH2019-010 Effective 11/22/2022 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: LOWBOY TRUCK | $22.75 | $4.95 | $27.70 |
| TRUCK DRIVER: DUMP TRUCK | $21.41 | $4.05 | $25.46 |
| TRAFFIC CONTROL: FLAGGER | $12.05 | $1.37 | $13.42 |
| PAINTER: SPRAY | $27.29 | $6.95 | $34.24 |
| OPERATOR: ROLLER | $24.43 | $4.32 | $28.75 |
| OPERATOR: POUNDER | $36.21 | $9.46 | $45.67 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $27.93 | $5.10 | $33.03 |
| OPERATOR: MILLING MACHINE | $28.55 | $6.88 | $35.43 |
| OPERATOR: MECHANIC | $24.33 | $8.36 | $32.69 |
| OPERATOR: LOADER | $25.93 | $5.55 | $31.48 |
| OPERATOR: GRADER/BLADE | $27.56 | $6.56 | $34.12 |
| OPERATOR: CRANE | $29.76 | $3.29 | $33.05 |
| OPERATOR: BULLDOZER | $25.97 | $6.59 | $32.56 |
| OPERATOR: BUCKET | $30.00 | $0.00 | $30.00 |
| OPERATOR: BROOM/SWEEPER | $25.08 | $4.60 | $29.68 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $25.01 | $9.93 | $34.94 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $26.43 | $5.27 | $31.70 |
| OPERATOR: AUGER | $26.07 | $0.00 | $26.07 |
| LABORER: PIPELAYER | $19.64 | $4.83 | $24.47 |
| LABORER: LANDSCAPE | $18.21 | $0.00 | $18.21 |
| LABORER: COMMON OR GENERAL | $18.79 | $2.60 | $21.39 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $20.38 | $5.47 | $25.85 |
| IRONWORKER, STRUCTURAL | $34.45 | $17.20 | $51.65 |
| IRONWORKER, REINFORCING | $22.21 | $8.19 | $30.40 |
| INSTALLER - GUARDRAIL | $29.70 | $8.11 | $37.81 |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | $20.87 | $0.00 | $20.87 |
| FENCE ERECTOR (CHAIN LINK FENCE) | $19.59 | $0.00 | $19.59 |
| ELECTRICIAN | $29.00 | $2.78 | $31.78 |
| CEMENT MASON/CONCRETE FINISHER | $21.78 | $0.00 | $21.78 |
| CARPENTER, EXCLUDES FORM WORK | $26.23 | $2.51 | $28.74 |
| CARPENTER (FORM WORK ONLY) | $24.04 | $2.60 | $26.64 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 0 | 01/02/2026 |
| 1 | 05/18/2026 |
Counties Covered
This wage determination applies to 1 county in New Hampshire.
Get notified when NH20260041 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.