NJ20260026
BuildingDavis-Bacon Act general wage determination for building construction in New Jersey.
Track NJ20260026
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
ASBE0032-008 Effective 09/19/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/ HEAT & FROST INSULATOR (Includes the application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems; also, the application of firestopping material to openings and penetrations in walls, floors, ceilings and curtain walls; also, all lead abatement) | $51.74 | $46.20 | $97.94 |
BRNJ0002-014 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER (INCLUDING CAULKING, CLEANING AND Work on high stacks: 22% per hour additional. | $49.60 | $37.96 | $87.56 |
BRNJ0002-016 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| MASON - Work on high stacks: 22% per hour additional | $49.60 | $37.96 | $87.56 |
BRNJ0004-001 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CEMENT MASON | $49.60 | $37.96 | $87.56 |
BRNJ0007-003 Effective 07/07/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| MARBLE SETTER | $64.66 | $40.97 | $105.63 |
BRNJ0007-022 Effective 06/02/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TILE SETTER | $64.90 | $37.28 | $102.18 |
CARP0006-009 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (SCAFFOLD The first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter | $57.42 | $34.17 | $91.59 |
CARP0006-010 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORMWORK, BATT AND BLOWN INSULATION) | $57.42 | $34.17 | $91.59 |
CARP0029-008 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SOFT FLOOR LAYER | $57.42 | $34.17 | $91.59 |
ELEC0164-006 Effective 06/03/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRCIAN (INCLUDING LOW Work on line voltage of 440 or 480 volts: 10% per hour Work from trusses, scaffolds, frames, ladders and poles, 40 ft. or more above the ground or floor (does not include work from a manlift): 20% per hour Work on radio towers, transmission towers and smokestacks: 21% per hour additional | $62.90 | $39.31 | $102.21 |
| ELECTRICIAN (INCLUDING LOW VOLTAGE) CABLE Work on line voltage of 440 or 480 volts: 10% per hour Work from trusses, scaffolds, frames, ladders and poles, 40 ft. or more above the ground or floor (does not include work from a manlift): 20% per hour Work on radio towers, transmission towers and smokestacks: 21% per hour additional | $73.59 | $45.99 | $119.58 |
ENGI0825-020 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: GROUP 4 BOBCAT/SKID LOADER; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); HYDROSEEDER; ROLLER, GRADE; PUMP, HYDRAULIC HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $56.59 | $37.50 | $94.09 |
| POWER EQUIPMENT OPERATORS: GROUP 3 ASPHALT SPREADER; BULLDOZER;COMPRESSOR (2 OR 3) (IN BATTERY) (WITHIN 100 FT.); FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS THAN 2 CU. YD.); LULL; MECHANIC; PAVER, ASPHALT; ROLLER, BLACKTOP; TRACTOR; HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $58.22 | $37.50 | $95.72 |
| SCRAPER; SIDE BOOM HAZARDOUS WASTE REMOVAL WORK: POWER EQUIPMENT OPERATORS: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THAN 5 CU. YD.); WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $60.13 | $37.50 | $97.63 |
| SCRAPER; SIDE BOOM HAZARDOUS WASTE REMOVAL WORK: POWER EQUIPMENT OPERATORS: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-THE-HOLE DRILL, ROTARY DRILL, SELF-PROPELLED HYDRAULIC DRILL, SELF-POWERED DRILL); ELEVATING GRADER; EXCAVATOR; FRONT END LOADER (5 CU. YD. AND OVER); PILEDRIVER (LENGTH OF BOOM, INCLUDING LENGTH OF LEADS, SHALL DETERMINE PREMIUM RATE APPLICABLE); TRENCHER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $61.72 | $37.50 | $99.22 |
IRON0011-012 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER: STRUCTURAL, ORNAMENTAL | $52.24 | $50.32 | $102.56 |
| IRONWORKER: REINFORCING | $49.94 | $50.32 | $100.26 |
LABO0077-002 Effective 05/01/2022 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: MASON TENDER: BRICK/CEMENT/CONCRETE | $36.50 | $30.22 | $66.72 |
LABO0077-006 Effective 05/01/2022 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: ASPHALT SHOVELER, ASPHALT SPREADER, COMMON OR GENERAL LABORER, LANDSCAPE LABORER, POWER TOOL OPERATOR AND SCREEDMAN | $35.75 | $30.22 | $65.97 |
PAIN0711-018 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| DRYWALL FINISHER/TAPER | $44.87 | $30.15 | $75.02 |
PAIN0711-019 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PAINTER (BRUSH & ROLLER) | $45.55 | $29.86 | $75.41 |
| PAINTER (SPRAY) | $45.55 | $29.86 | $75.41 |
PLAS0029-003 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLASTERER | $54.64 | $30.95 | $85.59 |
PLUM0024-001 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLUMBER (EXCLUDING HVAC PIPE INSTALLATION) | $62.09 | $45.05 | $107.14 |
PLUM0274-003 Effective 05/01/2022 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PIPEFITTER (INCLUDING HVAC PIPE INSTALLATION) | $57.97 | $40.22 | $98.19 |
ROOF0010-003 Effective 06/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ROOFER (INCLUDES ALL TYPES OF ROOFS) | $45.40 | $29.14 | $74.54 |
SFNJ0696-006 Effective 01/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SPRINKLER FITTER (FIRE SPRINKLERS) | $67.97 | $39.35 | $107.32 |
SHEE0025-005 Effective 06/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) | $51.30 | $51.55 | $102.85 |
SUNJ2004-002 Effective 01/02/2009 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: PIPELAYER | $38.85 | $0.14 | $38.99 |
| ELEVATOR MECHANIC | $40.21 | $11.22 | $51.43 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 0 | 01/02/2026 |
| 1 | 05/18/2026 |
Counties Covered
This wage determination applies to 1 county in New Jersey.
Get notified when NJ20260026 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.