NJ20260036

Building

Davis-Bacon Act general wage determination for building construction in New Jersey.

Modification 1, revised 05/18/2026 36 trade rates 1 county View on SAM.gov

Track NJ20260036

Get an email when this wage determination gets a new modification.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Wage Rates

Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.

BRNJ0002-015 Effective 11/01/2019
Trade Rate Fringe Total
BRICKLAYER Work on high stacks: 22% per hour additional $43.56 $32.50 $76.06
BRNJ0007-020 Effective 06/02/2025
Trade Rate Fringe Total
TILE SETTER (MIDDLESEX COUNTY (NORTH OF ROUTE 33)) $64.90 $37.28 $102.18
TILE FINISHER (MIDDLESEX COUNTY (NORTH OF ROUTE 33)) WORK GROUTING ALL EPOXY: $10.00 ADDITIONAL PER DAY $50.05 $33.90 $83.95
BRNJ0007-021 Effective 06/02/2025
Trade Rate Fringe Total
TILE SETTER (MIDDLESEX COUNTY (SOUTH OF ROUTE 33)) $64.90 $37.28 $102.18
TILE FINISHER (MIDDLESEX COUNTY (SOUTH OF ROUTE 33)) WORK GROUTING ALL EPOXY: $10.00 ADDITIONAL PER DAY $50.05 $33.90 $83.95
CARP0006-009 Effective 05/01/2025
Trade Rate Fringe Total
CARPENTER (SCAFFOLD The first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter $57.42 $34.17 $91.59
CARP0006-011 Effective 05/01/2025
Trade Rate Fringe Total
CARPENTER (INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING AND FORMWORK) $57.42 $34.17 $91.59
ENGI0825-020 Effective 07/01/2025
Trade Rate Fringe Total
POWER EQUIPMENT OPERATORS: GROUP 4 BOBCAT/SKID LOADER; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); HYDROSEEDER; ROLLER, GRADE; PUMP, HYDRAULIC HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY $56.59 $37.50 $94.09
POWER EQUIPMENT OPERATORS: GROUP 3 ASPHALT SPREADER; BULLDOZER;COMPRESSOR (2 OR 3) (IN BATTERY) (WITHIN 100 FT.); FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS THAN 2 CU. YD.); LULL; MECHANIC; PAVER, ASPHALT; ROLLER, BLACKTOP; TRACTOR; HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY $58.22 $37.50 $95.72
SCRAPER; SIDE BOOM HAZARDOUS WASTE REMOVAL WORK: POWER EQUIPMENT OPERATORS: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THAN 5 CU. YD.); WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY $60.13 $37.50 $97.63
SCRAPER; SIDE BOOM HAZARDOUS WASTE REMOVAL WORK: POWER EQUIPMENT OPERATORS: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-THE-HOLE DRILL, ROTARY DRILL, SELF-PROPELLED HYDRAULIC DRILL, SELF-POWERED DRILL); ELEVATING GRADER; EXCAVATOR; FRONT END LOADER (5 CU. YD. AND OVER); PILEDRIVER (LENGTH OF BOOM, INCLUDING LENGTH OF LEADS, SHALL DETERMINE PREMIUM RATE APPLICABLE); TRENCHER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY $61.72 $37.50 $99.22
IRON0011-011 Effective 07/01/2025
Trade Rate Fringe Total
IRONWORKERS: REINFORCING (MIDDLESEX COUNTY (NORTHERN HALF OF COUNTY)) $49.94 $50.32 $100.26
IRONWORKERS: STRUCTURAL, ORNAMENTAL, RIGGER (MIDDLESEX COUNTY (NORTHERN HALF OF COUNTY)) $52.24 $50.32 $102.56
IRON0399-019 Effective 07/01/2024
Trade Rate Fringe Total
IRONWORKER: STRUCTURAL, ORNAMENTAL, RIGGER (MIDDLESEX COUNTY (SOUTHERN HALF OF COUNTY)) HAZARDOUS WASTE REMOVAL WORK, ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS REQUIRED TO WEAR LEVEL A, B OR C PERSONAL PROTECTION: $3.00 PER HOUR ADDITIONAL $54.24 $38.40 $92.64
IRONWORKER: REINFORCING (MIDDLESEX COUNTY (SOUTHERN HALF OF COUNTY)) HAZARDOUS WASTE REMOVAL WORK, ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS REQUIRED TO WEAR LEVEL A, B OR C PERSONAL PROTECTION: $3.00 PER HOUR ADDITIONAL $53.24 $38.40 $91.64
LABO0077-002 Effective 05/01/2022
Trade Rate Fringe Total
LABORER: MASON TENDER: BRICK/CEMENT/CONCRETE $36.50 $30.22 $66.72
LABO0077-005 Effective 05/01/2022
Trade Rate Fringe Total
LABORER: ASPHALT SHOVELER, ASPHALT SPREADER, COMMON OR GENERAL LABORER, LANDSCAPE LABORER, PIPELAYER, POWER TOOL OPERATOR AND SCREEDMAN $35.75 $30.22 $65.97
PAIN0711-018 Effective 05/01/2025
Trade Rate Fringe Total
DRYWALL FINISHER/TAPER $44.87 $30.15 $75.02
PAIN0711-020 Effective 05/01/2025
Trade Rate Fringe Total
PAINTER (BRUSH & ROLLER) $45.55 $29.86 $75.41
PAINTER (PAPERHANGER) $45.55 $29.86 $75.41
PAINTER (SPRAY) $45.55 $29.86 $75.41
PLAS0008-008 Effective 05/01/2021
Trade Rate Fringe Total
PLASTERER $38.37 $31.64 $70.01
PLAS0592-036 Effective 05/01/2025
Trade Rate Fringe Total
CEMENT MASON/CONCRETE FINISHER $53.21 $33.42 $86.63
PLUM0009-021 Effective 07/01/2025
Trade Rate Fringe Total
PLUMBER: EXCLUDING HVAC PIPE INSTALLATION (MIDDLESEX COUNTY (DOES NOT INCLUDE THE BOROUGHS OF DUNELLEN AND MIDDLESEX; BOROUGH OF SOUTH PLAINFIELD)) $59.57 $46.45 $106.02
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION (MIDDLESEX COUNTY (DOES NOT INCLUDE THE BOROUGHS OF DUNELLEN AND MIDDLESEX; BOROUGH OF SOUTH PLAINFIELD)) $59.57 $46.45 $106.02
PIPEFITTER: SERVICE AND REPAIR (MIDDLESEX COUNTY (DOES NOT INCLUDE THE BOROUGHS OF DUNELLEN AND MIDDLESEX; BOROUGH OF SOUTH PLAINFIELD)) $46.23 $29.23 $75.46
PLUMBER: SERVICE AND REPAIR (MIDDLESEX COUNTY (DOES NOT INCLUDE THE BOROUGHS OF DUNELLEN AND MIDDLESEX; BOROUGH OF SOUTH PLAINFIELD)) $46.23 $29.23 $75.46
PLUM0024-016 Effective 05/01/2025
Trade Rate Fringe Total
PLUMBER: EXCLUDING HVAC PIPE INSTALLATION (MIDDLESEX COUNTY (BOROUGHS OF DUNELLEN AND MIDDLESEX; TOWNSHIP OF PISCATAWAY; BOROUGH OF SOUTH PLAINFIELD)) $62.09 $45.05 $107.14
PLUM0475-016 Effective 05/01/2025
Trade Rate Fringe Total
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION (MIDDLESEX COUNTY (BOROUGHS OF DUNELLEN AND MIDDLESEX; TOWNSHIP OF PISCATAWAY; BOROUGH OF SOUTH PLAINFIELD)) $56.34 $50.80 $107.14
ROOF0004-008 Effective 06/01/2024
Trade Rate Fringe Total
ROOFER (INCLUDES ALL TYPES OF ROOFERS) (MIDDLESEX COUNTY (north and east of Route #18)) $44.52 $32.25 $76.77
ROOF0030-030 Effective 05/01/2025
Trade Rate Fringe Total
ROOFER: SLATE AND TILE (MIDDLESEX COUNTY (SOUTH AND WEST OF ROUTE #18)) MOPPER, AND OPERATOR OF FELT-LAYING MACHINE: $.50 PER HOUR ADDITIONAL. WORK APPLYING ROOFING MATERIAL, ON ANY NEW CONSTRUCTION JOB, ON THOSE DAYS ON WHICH A FELT-LAYING MACHINE OR SLAG-DISPENSING MACHINE IS USED: $.50 PER HOUR ADDITIONAL. PAID HOLIDAY: THE LAST WORKING DAY BEFORE CHRISTMAS, TO BE PAID AT THE RATE OF FOUR HOURS PAY $38.95 $21.85 $60.80
ROOFER: SHINGLES (MIDDLESEX COUNTY (SOUTH AND WEST OF ROUTE #18)) MOPPER, AND OPERATOR OF FELT-LAYING MACHINE: $.50 PER HOUR ADDITIONAL. WORK APPLYING ROOFING MATERIAL, ON ANY NEW CONSTRUCTION JOB, ON THOSE DAYS ON WHICH A FELT-LAYING MACHINE OR SLAG-DISPENSING MACHINE IS USED: $.50 PER HOUR ADDITIONAL. PAID HOLIDAY: THE LAST WORKING DAY BEFORE CHRISTMAS, TO BE PAID AT THE RATE OF FOUR HOURS PAY $35.95 $21.85 $57.80
ROOFER: ALL OTHER WORK (MIDDLESEX COUNTY (SOUTH AND WEST OF ROUTE #18)) MOPPER, AND OPERATOR OF FELT-LAYING MACHINE: $.50 PER HOUR ADDITIONAL. WORK APPLYING ROOFING MATERIAL, ON ANY NEW CONSTRUCTION JOB, ON THOSE DAYS ON WHICH A FELT-LAYING MACHINE OR SLAG-DISPENSING MACHINE IS USED: $.50 PER HOUR ADDITIONAL. PAID HOLIDAY: THE LAST WORKING DAY BEFORE CHRISTMAS, TO BE PAID AT THE RATE OF FOUR HOURS PAY $46.03 $34.27 $80.30
SFNJ0669-009 Effective 07/01/2025
Trade Rate Fringe Total
SPRINKLER FITTER: FIRE SPRINKLERS (MIDDLESEX COUNTY (PRINCETON, SOUTH BRUNSWICK AND MONROE TOWNSHIPS)) $69.97 $41.35 $111.32
SFNJ0696-005 Effective 01/01/2025
Trade Rate Fringe Total
SPRINKLER FITTER: FIRE SPRINKLERS (MIDDLESEX COUNTY (REMAINDER OF COUNTY)) $67.97 $39.35 $107.32
SHEE0027-010 Effective 06/01/2024
Trade Rate Fringe Total
SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) $59.08 $47.06 $106.14

Modification History

Modification Publication Date
0 01/02/2026
1 05/18/2026

Counties Covered

This wage determination applies to 1 county in New Jersey.

Get notified when NJ20260036 is modified

This determination has been revised 2 times. We'll email you when a new modification is published.