NJ20260039

Building

Davis-Bacon Act general wage determination for building construction in New Jersey.

Modification 1, revised 05/18/2026 31 trade rates 1 county View on SAM.gov

Track NJ20260039

Get an email when this wage determination gets a new modification.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Wage Rates

Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.

ASBE0089-004 Effective 07/01/2025
Trade Rate Fringe Total
ASBESTOS WORKER/HEAT & FROST INSULATOR: (INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS; ALSO, THE APPLICATION OF FIRESTOPPING MATERIAL TO OPENINGS AND PENETRATIONS IN WALLS, FLOORS, CEILINGS AND CURTAIN WALLS; ALSO, ALL LEAD ABATEMENT) PAID HOLIDAYS: THE LAST DAY PRIOR TO THE CHRISTMAS AND NEW YEAR'S DAY OBSERVED HOLIDAY: 4 HRS. PAY $55.80 $40.80 $96.60
BRNJ0002-013 Effective 05/01/2021
Trade Rate Fringe Total
BRICKLAYER Work on high stacks: 22% per hour additional $45.20 $33.26 $78.46
BRNJ0007-017 Effective 06/02/2025
Trade Rate Fringe Total
TILE SETTER $52.31 $38.01 $90.32
TILE Work grouting all epoxy: $10.00 additional per day $43.63 $32.12 $75.75
CARP0006-011 Effective 05/01/2025
Trade Rate Fringe Total
CARPENTER (INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING AND FORMWORK) $57.42 $34.17 $91.59
ELEC0400-005 Effective 06/02/2025
Trade Rate Fringe Total
ELECTRICIAN & CABLE SPLICER (INCLUDING LOW VOLTAGE WIRING) $57.70 $45.92 $103.62
ENGI0825-020 Effective 07/01/2025
Trade Rate Fringe Total
POWER EQUIPMENT OPERATORS: GROUP 4 BOBCAT/SKID LOADER; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); HYDROSEEDER; ROLLER, GRADE; PUMP, HYDRAULIC HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY $56.59 $37.50 $94.09
POWER EQUIPMENT OPERATORS: GROUP 3 ASPHALT SPREADER; BULLDOZER;COMPRESSOR (2 OR 3) (IN BATTERY) (WITHIN 100 FT.); FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS THAN 2 CU. YD.); LULL; MECHANIC; PAVER, ASPHALT; ROLLER, BLACKTOP; TRACTOR; HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY $58.22 $37.50 $95.72
SCRAPER; SIDE BOOM HAZARDOUS WASTE REMOVAL WORK: POWER EQUIPMENT OPERATORS: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THAN 5 CU. YD.); WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY $60.13 $37.50 $97.63
SCRAPER; SIDE BOOM HAZARDOUS WASTE REMOVAL WORK: POWER EQUIPMENT OPERATORS: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-THE-HOLE DRILL, ROTARY DRILL, SELF-PROPELLED HYDRAULIC DRILL, SELF-POWERED DRILL); ELEVATING GRADER; EXCAVATOR; FRONT END LOADER (5 CU. YD. AND OVER); PILEDRIVER (LENGTH OF BOOM, INCLUDING LENGTH OF LEADS, SHALL DETERMINE PREMIUM RATE APPLICABLE); TRENCHER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY $61.72 $37.50 $99.22
IRON0011-008 Effective 07/01/2025
Trade Rate Fringe Total
IRONWORKER: STRUCTURAL AND ORNAMENTAL (NORTHERN THIRD OF COUNTY) $52.24 $50.32 $102.56
IRONWORKER: REINFORCING (NORTHERN THIRD OF COUNTY) $49.94 $50.32 $100.26
IRON0399-012 Effective 07/01/2024
Trade Rate Fringe Total
IRONWORKER: REINFORCING (MIDDLE THIRD AND SOUTHERN THIRD OF COUNTY) $53.24 $38.40 $91.64
IRONWORKER: STRUCTURAL AND ORNAMENTAL (MIDDLE THIRD AND SOUTHERN THIRD OF COUNTY) $54.24 $38.40 $92.64
LABO0077-002 Effective 05/01/2022
Trade Rate Fringe Total
LABORER: MASON TENDER: BRICK/CEMENT/CONCRETE $36.50 $30.22 $66.72
LABO0077-005 Effective 05/01/2022
Trade Rate Fringe Total
LABORER: ASPHALT SHOVELER, ASPHALT SPREADER, COMMON OR GENERAL LABORER, LANDSCAPE LABORER, PIPELAYER, POWER TOOL OPERATOR AND SCREEDMAN $35.75 $30.22 $65.97
PAIN0021-034 Effective 05/01/2025
Trade Rate Fringe Total
GLAZIER (OCEAN COUNTY (SOUTH OF A LINE DRAWN BETWEEN THESE CITIES: FLORENCE TO BUSTLETON TO COLUMBUS TO JOBSTOWN TO PEMBERTON TO ONGS HAT TO CHATSWORTH TO WHITING TO PINEWALD TO OCEAN GATE TO SEASIDE HEIGHTS)) WORK AT 30 FT. ABOVE THE WORKING SURFACE, OR ON A SWING STAGE: $1.00 PER HOUR ADDITIONAL $49.96 $35.11 $85.07
PAIN0711-016 Effective 05/01/2025
Trade Rate Fringe Total
GLAZIER (OCEAN COUNTY (NORTH OF A LINE DRAWN BETWEEN THESE CITIES: FLORENCE TO BUSTLETON TO COLUMBUS TO JOBSTOWN TO PEMBERTON TO ONGS HAT TO CHATSWORTH TO WHITING TO PINEWALD TO OCEAN GATE TO SEASIDE HEIGHTS):) WORK WELDING OR USING A CUTTING TORCH: $1.00 PER HOUR ADDITIONAL. WORK ON A SWING STAGE SCAFFOLD; ON A PIPE SCAFFOLD PROVIDING THE WORKING HEIGHT OF THE PLATFORM IS 30 FT. OR ABOVE; AND ON MOTORIZED LIFTS PROVIDED THAT THE HEIGHT OF THE LIFT PLATFORM IS ABOVE THE SECOND FLOOR OR ABOVE THIRTY FEET: $1.00 PER HOUR ADDITIONAL $52.68 $31.29 $83.97
PAIN0711-018 Effective 05/01/2025
Trade Rate Fringe Total
DRYWALL FINISHER/TAPER $44.87 $30.15 $75.02
PAIN0711-019 Effective 05/01/2025
Trade Rate Fringe Total
PAINTER (BRUSH & ROLLER) $45.55 $29.86 $75.41
PAINTER (SPRAY) $45.55 $29.86 $75.41
PLAS0008-007 Effective 05/01/2021
Trade Rate Fringe Total
PLASTERER $38.37 $31.64 $70.01
PLAS0592-036 Effective 05/01/2025
Trade Rate Fringe Total
CEMENT MASON/CONCRETE FINISHER $53.21 $33.42 $86.63
PLUM0009-018 Effective 07/01/2025
Trade Rate Fringe Total
PLUMBER: EXCLUDING HVAC PIPE INSTALLATION (OCEAN COUNTY (NORTH OF A LINE DRAWN FROM THE ATLANTIC OCEAN FOLLOWING A LINE WESTERLY THROUGH THE MIDDLE OF THE BARNEGAT INLET, CONTINUING WEST THROUGH BARNEGAT BAY INTO THE TOWN OF WARETOWN; THEN, CONTINUING ALONG COUNTY ROAD ROUTE 532 UNTIL COUNTY ROAD ROUTE 532 BECOMES STATE HIGHWAY ROUTE 72; THEN, CONTINUING ALONG STATE HIGHWAY ROUTE 72 UNTIL IT REACHES THE BURLINGTON COUNTY LINE) $59.57 $46.45 $106.02
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION (OCEAN COUNTY (NORTH OF A LINE DRAWN FROM THE ATLANTIC OCEAN FOLLOWING A LINE WESTERLY THROUGH THE MIDDLE OF THE BARNEGAT INLET, CONTINUING WEST THROUGH BARNEGAT BAY INTO THE TOWN OF WARETOWN; THEN, CONTINUING ALONG COUNTY ROAD ROUTE 532 UNTIL COUNTY ROAD ROUTE 532 BECOMES STATE HIGHWAY ROUTE 72; THEN, CONTINUING ALONG STATE HIGHWAY ROUTE 72 UNTIL IT REACHES THE BURLINGTON COUNTY LINE) $59.57 $46.45 $106.02
PIPEFITTER: SERVICE AND REPAIR (OCEAN COUNTY (NORTH OF A LINE DRAWN FROM THE ATLANTIC OCEAN FOLLOWING A LINE WESTERLY THROUGH THE MIDDLE OF THE BARNEGAT INLET, CONTINUING WEST THROUGH BARNEGAT BAY INTO THE TOWN OF WARETOWN; THEN, CONTINUING ALONG COUNTY ROAD ROUTE 532 UNTIL COUNTY ROAD ROUTE 532 BECOMES STATE HIGHWAY ROUTE 72; THEN, CONTINUING ALONG STATE HIGHWAY ROUTE 72 UNTIL IT REACHES THE BURLINGTON COUNTY LINE) $46.23 $29.23 $75.46
PLUMBER: SERVICE AND REPAIR (OCEAN COUNTY (NORTH OF A LINE DRAWN FROM THE ATLANTIC OCEAN FOLLOWING A LINE WESTERLY THROUGH THE MIDDLE OF THE BARNEGAT INLET, CONTINUING WEST THROUGH BARNEGAT BAY INTO THE TOWN OF WARETOWN; THEN, CONTINUING ALONG COUNTY ROAD ROUTE 532 UNTIL COUNTY ROAD ROUTE 532 BECOMES STATE HIGHWAY ROUTE 72; THEN, CONTINUING ALONG STATE HIGHWAY ROUTE 72 UNTIL IT REACHES THE BURLINGTON COUNTY LINE) $46.23 $29.23 $75.46
PLUM0322-007 Effective 05/01/2025
Trade Rate Fringe Total
PLUMBER: EXCLUDING HVAC PIPE INSTALLATION (OCEAN COUNTY (SOUTH OF A LINE DRAWN FROM THE ATLANTIC OCEAN FOLLOWING A LINE WESTERLY THROUGH THE MIDDLE OF THE BARNEGAT INLET, CONTINUING WEST THROUGH BARNEGAT BAY INTO THE TOWN OF WARETOWN; THEN, CONTINUING ALONG COUNTY ROAD ROUTE 532 UNTIL COUNTY ROAD ROUTE 532 BECOMES STATE HIGHWAY ROUTE 72; THEN, CONTINUING ALONG STATE HIGHWAY ROUTE 72 UNTIL IT REACHES THE BURLINGTON COUNTY LINE)) $56.30 $50.76 $107.06
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION (OCEAN COUNTY (SOUTH OF A LINE DRAWN FROM THE ATLANTIC OCEAN FOLLOWING A LINE WESTERLY THROUGH THE MIDDLE OF THE BARNEGAT INLET, CONTINUING WEST THROUGH BARNEGAT BAY INTO THE TOWN OF WARETOWN; THEN, CONTINUING ALONG COUNTY ROAD ROUTE 532 UNTIL COUNTY ROAD ROUTE 532 BECOMES STATE HIGHWAY ROUTE 72; THEN, CONTINUING ALONG STATE HIGHWAY ROUTE 72 UNTIL IT REACHES THE BURLINGTON COUNTY LINE)) $56.30 $50.76 $107.06
SFNJ0669-006 Effective 04/01/2025
Trade Rate Fringe Total
SPRINKLER FITTER (FIRE SPRINKLERS) $59.19 $36.51 $95.70
SHEE0027-009 Effective 06/01/2024
Trade Rate Fringe Total
SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) $59.08 $47.06 $106.14

Modification History

Modification Publication Date
0 01/02/2026
1 05/18/2026

Counties Covered

This wage determination applies to 1 county in New Jersey.

Get notified when NJ20260039 is modified

This determination has been revised 2 times. We'll email you when a new modification is published.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.