NJ20260041

Building

Davis-Bacon Act general wage determination for building construction in New Jersey.

Modification 1, revised 05/18/2026 43 trade rates 1 county View on SAM.gov

Track NJ20260041

Get an email when this wage determination gets a new modification.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Wage Rates

Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.

ASBE0042-003 Effective 07/01/2025
Trade Rate Fringe Total
ASBESTOS WORKER/HEAT & FROST INSULATOR (INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS; ALSO, THE APPLICATION OF FIRESTOPPING MATERIAL TO OPENINGS AND PENETRATIONS IN WALLS, FLOORS, CEILINGS AND CURTAIN WALLS; ALSO, ALL LEAD ABATEMENT) $47.34 $30.99 $78.33
BRNJ0002-013 Effective 05/01/2021
Trade Rate Fringe Total
BRICKLAYER WORK ON HIGH STACKS: 22% PER HOUR ADDITIONAL. $45.20 $33.26 $78.46
BRNJ0007-012 Effective 07/07/2025
Trade Rate Fringe Total
MARBLE SETTER $64.66 $40.97 $105.63
BRNJ0007-014 Effective 07/01/2025
Trade Rate Fringe Total
TERRAZZO WORKER/SETTER $61.77 $42.82 $104.59
BRNJ0007-017 Effective 06/02/2025
Trade Rate Fringe Total
TILE SETTER $52.31 $38.01 $90.32
TILE FINISHER WORK GROUTING ALL EPOXY: $10.00 ADDITIONAL PER DAY $43.63 $32.12 $75.75
CARP0006-009 Effective 05/01/2025
Trade Rate Fringe Total
CARPENTER: SCAFFOLD BUILDER THE FIRST SIXTY FEET AT THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER. $57.42 $34.17 $91.59
CARP0006-010 Effective 05/01/2025
Trade Rate Fringe Total
CARPENTER: INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORMWORK, BATT AND BLOWN INSULATION $57.42 $34.17 $91.59
CARP0029-006 Effective 05/01/2025
Trade Rate Fringe Total
SOFT FLOOR LAYER $57.42 $34.17 $91.59
ELEC0351-007 Effective 09/30/2004
Trade Rate Fringe Total
ELECTRICIAN: CABLE SPLICER ON LEAD CABLE (INCLUDING LOW VOLTAGE WIRING) $46.51 $34.39 $80.90
ELECTRICIAN AND CABLE SPLICER: INCLUDING LOW VOLTAGE WIRING $55.05 $48.76 $103.81
ELECTRICIAN: CABLE SPLICER ON LEAD CABLE (INCLUDING LOW VOLTAGE WIRING) $46.51 $34.39 $80.90
ELECTRICIAN AND CABLE SPLICER: INCLUDING LOW VOLTAGE WIRING $55.05 $48.76 $103.81
ELEC0351-007 Effective 09/30/2024
Trade Rate Fringe Total
ELECTRICIAN: CABLE SPLICER ON LEAD CABLE (INCLUDING LOW VOLTAGE WIRING) $46.51 $34.39 $80.90
ELECTRICIAN AND CABLE SPLICER: INCLUDING LOW VOLTAGE WIRING $55.05 $48.76 $103.81
ELECTRICIAN: CABLE SPLICER ON LEAD CABLE (INCLUDING LOW VOLTAGE WIRING) $46.51 $34.39 $80.90
ELECTRICIAN AND CABLE SPLICER: INCLUDING LOW VOLTAGE WIRING $55.05 $48.76 $103.81
ENGI0825-020 Effective 07/01/2025
Trade Rate Fringe Total
HAZARDOUS WASTE REMOVAL WORK: POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID LOADER; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); HYDROSEEDER; ROLLER, GRADE; PUMP, HYDRAULIC HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY $56.59 $37.50 $94.09
REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: POWER EQUIPMENT OPERATOR: GROUP 3 ASPHALT SPREADER; BULLDOZER;COMPRESSOR (2 OR 3) (IN BATTERY) (WITHIN 100 FT.); FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS THAN 2 CU. YD.); LULL; MECHANIC; PAVER, ASPHALT; ROLLER, BLACKTOP; TRACTOR HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY $58.22 $37.50 $95.72
REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: POWER EQUIPMENT OPERATOR: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THAN 5 CU. YD.); SCRAPER; SIDE BOOM HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY $60.13 $37.50 $97.63
REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: POWER EQUIPMENT OPERATOR: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-THE-HOLE DRILL, ROTARY DRILL, SELF-PROPELLED HYDRAULIC DRILL, SELF-POWERED DRILL); ELEVATING GRADER; EXCAVATOR; FRONT END LOADER (5 CU. YD. AND OVER); PILEDRIVER (LENGTH OF BOOM, INCLUDING LENGTH OF LEADS, SHALL DETERMINE PREMIUM RATE APPLICABLE); TRENCHER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY $61.72 $37.50 $99.22
IRON0399-007 Effective 07/01/2025
Trade Rate Fringe Total
IRONWORKER: STRUCTURAL AND ORNAMENTAL $54.24 $40.40 $94.64
IRONWORKER: REINFORCING $53.24 $40.40 $93.64
LABO0077-002 Effective 05/01/2022
Trade Rate Fringe Total
LABORER: MASON TENDER: BRICK/CEMENT/CONCRETE $36.50 $30.22 $66.72
LABO0077-005 Effective 05/01/2022
Trade Rate Fringe Total
LABORER: ASPHALT SHOVELER, ASPHALT SPREADER, COMMON OR GENERAL LABORER, LANDSCAPE LABORER, POWER TOOL OPERATOR AND SCREEDMAN $35.75 $30.22 $65.97
PAIN0021-035 Effective 05/01/2025
Trade Rate Fringe Total
GLAZIER WORK AT 30 FT. ABOVE THE WORKING SURFACE, OR ON A SWING STAGE: $1.00 PER HOUR ADDITIONAL $49.96 $35.11 $85.07
PAIN0711-018 Effective 05/01/2025
Trade Rate Fringe Total
DRYWALL FINISHER/TAPER $44.87 $30.15 $75.02
PAIN0711-019 Effective 05/01/2025
Trade Rate Fringe Total
PAINTER: BRUSH AND ROLLER $45.55 $29.86 $75.41
PAINTER: SPRAY $45.55 $29.86 $75.41
PLAS0592-035 Effective 05/01/2025
Trade Rate Fringe Total
CEMENT MASON/CONCRETE FINISHER $49.57 $37.06 $86.63
PLUM0322-009 Effective 05/01/2025
Trade Rate Fringe Total
PLUMBER: EXCLUDING HVAC PIPE INSTALLATION $56.30 $50.76 $107.06
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION $56.30 $50.76 $107.06
SFNJ0669-005 Effective 04/01/2025
Trade Rate Fringe Total
SPRINKLER FITTER: FIRE SPRINKLERS (SALEM COUNTY (DOES NOT INCLUDE PENNS GROVE, BUT INCLUDES PENNS GROVE AIRPORT)) $59.19 $36.51 $95.70
SFNJ0692-002 Effective 05/01/2021
Trade Rate Fringe Total
SPRINKLER FITTER: FIRE SPRINKLERS (WITHIN 15 MILES BEYOND THE CITY LIMITS OF PHILADELPHIA) $60.83 $30.34 $91.17
SHEE0019-018 Effective 05/01/2025
Trade Rate Fringe Total
SHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATION PAID HOLIDAY: ELECTION DAY $62.62 $50.66 $113.28
SHEET METAL WORKER: SIGN MAKERS & HANGERS PAID HOLIDAY: ELECTION DAY $35.13 $24.76 $59.89
SHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATION PAID HOLIDAY: ELECTION DAY $62.62 $50.66 $113.28
SHEET METAL WORKER: SIGN MAKERS & HANGERS PAID HOLIDAY: ELECTION DAY $35.13 $24.76 $59.89
SHEE0019-018 Effective 07/15/2025
Trade Rate Fringe Total
SHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATION PAID HOLIDAY: ELECTION DAY $62.62 $50.66 $113.28
SHEET METAL WORKER: SIGN MAKERS & HANGERS PAID HOLIDAY: ELECTION DAY $35.13 $24.76 $59.89
SHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATION PAID HOLIDAY: ELECTION DAY $62.62 $50.66 $113.28
SHEET METAL WORKER: SIGN MAKERS & HANGERS PAID HOLIDAY: ELECTION DAY $35.13 $24.76 $59.89
SUNJ2004-017 Effective 01/02/2009
Trade Rate Fringe Total
PLASTERER $42.33 $0.00 $42.33

Modification History

Modification Publication Date
0 01/02/2026
1 05/18/2026

Counties Covered

This wage determination applies to 1 county in New Jersey.

Get notified when NJ20260041 is modified

This determination has been revised 2 times. We'll email you when a new modification is published.