NJ20260066

Heavy

Davis-Bacon Act general wage determination for heavy construction in New Jersey.

Modification 2, revised 05/20/2026 17 trade rates 1 county View on SAM.gov

Track NJ20260066

Get an email when this wage determination gets a new modification.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Wage Rates

Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.

BRNJ0004-001 Effective 05/01/2025
Trade Rate Fringe Total
CEMENT MASON $49.60 $37.96 $87.56
CARP0006-009 Effective 05/01/2025
Trade Rate Fringe Total
CARPENTER: SCAFFOLD BUILDER. The first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter $57.42 $34.02 $91.44
CARP0006-013 Effective 05/01/2025
Trade Rate Fringe Total
CARPENTER: INCLUDING FORM WORK THE FIRST SIXTY FEET AT THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER $57.42 $34.02 $91.44
ELEC0102-026 Effective 06/02/2025
Trade Rate Fringe Total
ELECTRICIAN (ELECTRICIAN) WORK FORTY FT. OR MORE ABOVE THE GROUND OR PROTECTIVE RIGGING (DOES NOT APPLY TO POLE WORK, OR TO USE OF A MANLIFT OR HIGH REACH-TYPE LIFT): 10% PER HOUR ADDITIONAL. WORK WITH, OR THE REMOVAL OF, ASBESTOS MATERIALS: 112% TIMES THE JOURNEYMAN RATE $65.43 $42.86 $108.29
ELECTRICIAN (CABLE SPLICER) WORK FORTY FT. OR MORE ABOVE THE GROUND OR PROTECTIVE RIGGING (DOES NOT APPLY TO POLE WORK, OR TO USE OF A MANLIFT OR HIGH REACH-TYPE LIFT): 10% PER HOUR ADDITIONAL. WORK WITH, OR THE REMOVAL OF, ASBESTOS MATERIALS: 112% TIMES THE JOURNEYMAN RATE $71.97 $46.42 $118.39
ENGI0825-021 Effective 07/01/2025
Trade Rate Fringe Total
REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: POWER EQUIPMENT OPERATORS: GROUP 4 BROOM; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); ROLLER, GRADE; PUMP. HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY $56.59 $37.50 $94.09
REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: POWER EQUIPMENT OPERATORS: GROUP 3 ASPHALT SPREADER; BULLDOZER; COMPRESSOR (2 OR 3) (IN BATTERY) (WITHIN 100 FT.); CRUSHER; FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS THAN 2 CU. YD.); LULL; MECHANIC; PAVER, ASPHALT; ROLLER, BLACKTOP; TRACTOR. HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY $58.22 $37.50 $95.72
REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: POWER EQUIPMENT OPERATORS: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THAN 5 CU. YD.); SCRAPER; SIDE BOOM. HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY $60.13 $37.50 $97.63
REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: POWER EQUIPMENT OPERATORS: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-THE-HOLE DRILL, ROTARY DRILL, SELF-PROPELLED HYDRAULIC DRILL, SELF-POWERED DRILL); ELEVATING GRADER; EXCAVATOR; FRONT END LOADER (5 CU. YD. AND OVER); PILEDRIVER (LENGTH OF BOOM, INCLUDING LENGTH OF LEADS, SHALL DETERMINE PREMIUM RATE APPLICABLE). HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY $61.72 $37.50 $99.22
IRON0011-016 Effective 07/01/2024
Trade Rate Fringe Total
IRONWORKER: STRUCTURAL AND ORNAMENTAL $50.74 $49.37 $100.11
IRONWORKER: REINFORCING $48.44 $49.37 $97.81
LABO0077-008 Effective 07/01/2012
Trade Rate Fringe Total
LABORER: MASON TENDER: CEMENT/CONCRETE $29.35 $23.07 $52.42
PAIN0711-023 Effective 05/01/2023
Trade Rate Fringe Total
PAINTERS: (WORK ON BRIDGES (MAJOR BRIDGES DESIGNED FOR COMMERCIAL NAVIGATION)) $58.28 $33.85 $92.13
PAIN0711-024 Effective 05/01/2017
Trade Rate Fringe Total
PAINTERS: BRUSH AND ROLLER (REPAINT WORK, ON PROJECTS ON WHICH NO MAJOR ALTERATIONS OCCUR.) $29.05 $18.91 $47.96
PAINTERS: BRUSH AND ROLLER (NEW CONSTRUCTION) $40.19 $22.72 $62.91
PLUM0274-012 Effective 05/01/2022
Trade Rate Fringe Total
PIPEFITTER (WARREN COUNTY (TOWNSHIP OF ALLAMUCHY; BOROUGH OF ALPHA; TOWNSHIP OF BLAIRSTOWN; TOWNSHIP OF FRANKLIN (DOES NOT INCLUDE THE TOWNS OF ASBURY AND NEW VILLAGE); TOWNSHIP OF FRELINGHUYSEN; TOWN OF HACKETTSTOWN; TOWNSHIPS OF HARDWICK, INDEPENDENCE, KNOWLTON, LIBERTY AND MANSFIELD; TOWNSHIP OF POHATCONG (DOES NOT INCLUDE THE TOWNS OF CARPENTERSVILLE, RIEGELSVILLE AND WARREN GLEN); BOROUGH OF WASHINGTON; TOWNSHIP OF WASHINGTON)) $57.97 $40.22 $98.19
PLUM0475-023 Effective 05/01/2025
Trade Rate Fringe Total
PIPEFITTER (WARREN COUNTY (TOWN OF BELVIDERE; TOWNSHIP OF FRANKLIN (TOWNS OF ASBURY AND NEW VILLAGE ONLY); TOWNSHIPS OF GREENWICH, HARMONY, HOPE, LOPATCONG AND OXFORD; TOWN OF PHILLIPSBURG; TOWNSHIP OF POHATCONG (TOWNS OF CARPENTERSVILLE, RIEGELSVILLE AND WARREN GLEN ONLY); TOWNSHIP OF WHITE)) $56.34 $50.80 $107.14

Modification History

Modification Publication Date
0 01/02/2026
1 05/18/2026
2 05/20/2026

Counties Covered

This wage determination applies to 1 county in New Jersey.

Get notified when NJ20260066 is modified

This determination has been revised 3 times. We'll email you when a new modification is published.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.