NY20260002
BuildingHeavyHighwayDavis-Bacon Act general wage determination for building, heavy, highway construction in New York.
Track NY20260002
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
ASBE0040-002 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| HAZARDOUS MATERIAL HANDLER (DUTIES LIMITED TO PREPARATION WETTING; STRIPPING; REMOVAL; SCRAPPING; VACUUMING; BAGGING; AND DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT FROM MECHANCIAL SYSTEMS) | $41.74 | $27.58 | $69.32 |
| ASBESTOS/INSULATOR WORKER (SCOPE OF WORK: INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE, COVERINGS, COATING AND FINISHING TO ALL TYPES OF MECHANICAL SYSTEMS.) | $41.74 | $27.58 | $69.32 |
BOIL0197-002 Effective 01/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | $43.34 | $27.66 | $71.00 |
BRNY0002-019 Effective 12/03/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER (BRICKLAYERS, STONE MASONS, CEMENT MASONS, PLASTERERS, POINTERS, CAULKERS & CLEANERS) | $41.79 | $22.33 | $64.12 |
CARP0279-006 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTERS: CARPENTERS, MILLWRIGHTS, PILE DRIVERS (HEAVY AND HIGHWAY CONSTRUCTION (COLUMBIA AND GREENE COUNTIES)) | $44.72 | $31.23 | $75.95 |
CARP0291-005 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTERS: (WASHINGTON COUNTY BUILDING) | $36.38 | $24.65 | $61.03 |
| CARPENTERS: (SARATOGA COUNTY BUILDING) | $36.38 | $24.65 | $61.03 |
CARP0291-008 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTERS: HEAVY & HIGHWAY CONSTRUCTION (ALBANY, FULTON, MONTGOMERY, RENSSELAER, SCHENECTADY AND SCHOHARIE COUNTIES) | $44.28 | $24.50 | $68.78 |
| CARPENTERS & SOFT FLOOR LAYERS: BUILDING CONSTRUCTION (EXCLUDING MONTGOMERY COUNTY) (ALBANY, FULTON, MONTGOMERY, RENSSELAER, SCHENECTADY AND SCHOHARIE COUNTIES) | $36.38 | $24.65 | $61.03 |
CARP0291-010 Effective 07/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTERS: DIVERS | $69.28 | $24.50 | $93.78 |
| CARPENTERS: (DIVERS (DRY DAY)) | $45.28 | $24.50 | $69.78 |
| CARPENTERS: (CARPENTERS) | $44.28 | $24.50 | $68.78 |
ELEC0236-001 Effective 06/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (ALBANY; COLUMBIA; FULTON; GREENE (THAT PORTION NORTH OF A LINE FOLLOWING THE SOUTH LIMITS OF THE CITY OF CATSKILL); MONTGOMERY; RENSSELAER, SARATOGA; SCHENECTADY; SCHOHARIE; WASHINGTON) | $48.00 | $32.09 | $80.09 |
ELEC0363-004 Effective 04/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (GREENE COUNTY (PORTION OF)) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY | $46.50 | $40.57 | $87.07 |
ELEC1249-004 Effective 05/05/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) | $49.25 | $31.15 | $80.40 |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Substation:) | $49.25 | $31.15 | $80.40 |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | $49.25 | $31.15 | $80.40 |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable ins | $61.56 | $36.21 | $97.77 |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:) | $61.56 | $36.21 | $97.77 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Substation:) | $49.25 | $31.15 | $80.40 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | $49.25 | $31.15 | $80.40 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installat | $49.25 | $31.15 | $80.40 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | $49.25 | $31.15 | $80.40 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cab | $55.40 | $31.78 | $87.18 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Substation:) | $55.40 | $31.78 | $87.18 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | $55.40 | $31.78 | $87.18 |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) | $35.34 | $30.12 | $65.46 |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Substation:) | $35.34 | $30.12 | $65.46 |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | $35.34 | $30.12 | $65.46 |
| ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) | $64.59 | $42.92 | $107.51 |
| ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Substation:) | $63.14 | $33.82 | $96.96 |
ELEV0035-001 Effective 01/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELEVATOR CONSTRUCTOR (ALBANY; COLUMBIA (TOWNS OF CLAVERACK, HILLSDALE, GHENT, STOCKPORT, AUSTERLITZ, CANAAN, NEW LEBANON, CHATHAM, KINDERHOOK, STYVESANT AND GREENPORT); FULTON; GREENE (TOWNS OF DURHAM, GREENVILLE, NEW BALTIMORE, COXCSACKIE AND ATHENS); MONTGOMERY, RENSSELAER, SARATOGA, SCHENECTADY, SCHOHARIE AND WASHINGTON COUNTIES). FOOTNOTE: A.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY | $57.73 | $38.44 | $96.17 |
ELEV0138-004 Effective 01/01/2026 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELEVATOR MECHANIC (COLUMBIA COUNTY (THE TOWNS OF ANCRAM, CLERMONT, COPAKE, GALLATIN, GERMANTOWN, LIVINGSTON, AND TAGHKANIC); GREEN COUNTY (THE TOWNS OF HUNTER AND CATSKILL)) FOOTNOTE: A.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY | $76.12 | $38.98 | $115.10 |
ENGI0158-008 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GROUP A (1) CRANE, HYDRAULIC CRANES, TOWER CRANE, LOCOMOTIVE CRANE, PILEDRIVER, CABLEWAY, DERRICKS, WHIRLIES, DRAGLINE, BOOM TRUCK (OVER 5 TONS) EXCLUDING MONTGOMERY COUNTY GROUP A(1): CRANE PREMIUMS: 1 OVER 150'- $1.00 2 OVER 200'- $2.00 HAZARDOUS WORK - ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $2.50 PER HOUR OVER REGULAR RATE. MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY | $55.42 | $33.20 | $88.62 |
| POWER EQUIPMENT OPERATOR (BUILDING): GROUP B BACKHOE, (RUBBER-TIRED BACKHOE/LOADER COMBINATION), BULLDOZER, PUSHCAT, TRACTOR, TRAXCAVATOR, SCRAPER, LETOURNEAU GRADER, FORM FINE GRADER, ROAD ROLLER, BLACKTOP ROLLER, BLACKTOP SPREADER, POWER BROOMS, SWEEPERS, TRENCHING MACHINE, BARBER GREEN LOADER, SIDE BOOMS, HYDROHAMMER, CONCRETE SPREADER, CONCRETE FINISHING MACHINE, ONE DRUM HOIST, POWER HOISTING (SINGLE DRUM), HOIST - TWO DRUM OR MORE, THREE DRUM ENGINE, POWER HOISTING (TWO DRUM AND OVER), TWO DRUM AND SWINGING ENGINE, THREE DRUM SWINGING ENGINE, HOD HOIST, A-L FRAME WINCHES, CORD AND WELL DRILLERS (ONE DRUM), POST HOLE DIGGER, MODEL CHB VIBRO-TAMP OR SIMILAR MACHINE, BATCH BIN AND PLANT OPERATOR, DINKEY LOCOMOTIVE, SKID STEER LOADER, TRACK EXCAVATOR 5/8 CU. YD. OR SMALLER (EXCLUDING MONTGOMERY COUNTY) HAZARDOUS WORK - ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $2.50 PER HOUR OVER REGULAR RATE. MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY | $53.91 | $33.20 | $87.11 |
| POWER EQUIPMENT OPERATOR (BUILDING): GROUP A SHOVEL, ALL EXCAVATORS (INCLUDING RUBBER TIRE FULL SWING), GRADALLS, POWER ROAD GRADER, ALL CMI EQUIPMENT, FRONT-END RUBBER TIRE LOADER, TRACTOR-MOUNTED DRILL (QUARRY MASTER), MUCKING MACHINE, CONCRETE CENTRAL MIX PLANT, CONCRETE PUMP, BELCRETE SYSTEM, AUTOMATED ASPHALT CONCRETE PLANT AND TRACTOR ROAD PAVER, BOOM TRUCK (5 TONS AND UNDER), MAINTENANCE ENGINEER, SELF CONTAINED CRAWLER, DRILL-HYDRAULIC ROCK DRILL. (EXCLUDING MONTGOMERY COUNTY) HAZARDOUS WORK - ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $2.50 PER HOUR OVER REGULAR RATE. FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY | $54.93 | $33.20 | $88.13 |
ENGI0158-026 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: GROUP 3 | $53.82 | $33.55 | $87.37 |
| POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 7 MASTER MECHANIC FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY | $58.91 | $33.55 | $92.46 |
| POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 6 CRANES 49 TONS AND BELOW FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY | $60.30 | $33.55 | $93.85 |
| POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 5 CRANES 50 TONS AND OVER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY | $61.80 | $33.55 | $95.35 |
| POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 4 TOWER CRANES FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY | $63.30 | $33.55 | $96.85 |
| POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 2 ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PLANT (NONAUTOMATED), BLAST OR ROTARY DRILL (TRUCK OR TRACTOR MOUNTED), BORING MACHINE, CAGE HOIST, CENTRAL MIX PLANT (NONAUTOMATED) AND ALL CONCRETE BATCHING PLANTS, CHERRY PICKER (5 TONS CAPACITY AND UNDER), CONCRETE PAVER (OVER 16S), CRAWLER DRILL, SELF-CONTAINED, CRUSHER, DIESEL POWER UNIT, DRILL RIGS, TRACTOR MOUNTED, FRONT END LOADER (UNDER 4 CU. YD.), GREASEMAN/LUBRICATION ENGINEER, HIPRESSURE BOILER (15 LBS. AND OVER), HOIST (ONE DRUM), HYDRO-AXE, KOLMAN PLANT LOADER AND SIMILAR TYPE LOADERS, L.C.M. WORK BOAT OPERATOR, LOCOMOTIVE MIXER (FOR STABILIZED BASE SELFPROPELLED), MONORAIL MACHINE, PLANT ENGINEER, PROFILER (105 H.P. AND UNDER), GRINDER, POST HOLE DIGGER AND POST DRIVER, POWER BROOM (TOWED), POWER HEATERMAN, POWER SWEEPER, REVINIUS WIDENER, ROLLER (GRADE AND FILL), SCARIFIER, RIDE-ON, SHELL WINDER, SKID STEER LOADER (BOBCAT OR SIMILAR), SPAN-SAW, RIDE-ON, STEAM CLEANER, PUG MILL, PUMP CRETE READY MIX CONCRETE PLANT REFRIGERATION EQUIPMENT (FOR SOIL STABILIZATION)ROAD WIDENER, ROLLER (ALL ABOVE SUBGRADE), SEA MULE, SELF-CONTAINED RIDE-ON ROCK DRILL, EXCLUDING AIR-TRACK TYPE DRILL, SKIDDER, TRACTOR WITH DOZER AND/OR PUSHER, TRENCHER. TUGGER HOIST, VERMEER SAW (RIDE ON, ANY SIZE OR TYPE), WINCH, WINCH CAT FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY | $56.39 | $33.55 | $89.94 |
| POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 1 ASPHALT CURB MACHINE, SELF PROPELLED, SLIPFORM, AUTOMATED CONCRETE SPREADER (CMI TYPE), AUTOMATIC FINE GRADER, BACKHOE (EXCEPT TRACTOR MOUNTED, RUBBER TIRED), BACKHOE EXCAVATOR FULL SWING (CAT 212 OR SIMILAR TYPE), BACK FILLING MACHINE, BELT PLACER (CMI TYPE), BLACKTOP PLANT (AUTOMATED), BOOM TRUCK , CABLEWAY, CAISSON AUGER, CENTRAL MIX CONCRETE PLANT (AUTOMATED), CONCRETE CURB MACHINE, SELF PROPELLED, SLIPFORM, CONCRETE PUMP, CRANE, CHERRY PICKER, DERRICKS (STEEL ERECTION), DRAGLINE, OVERHEAD CRANE (GANTRY OR STRADDLE TYPE), PILE DRIVER, TRUCK CRANE, DIRECTIONAL DRILLING MACHINE, DREDGE, DUAL DRUM PAVER, EXCAVATOR (ALL PURPOSE HYDRAULICALLY OPERATED) (GRADALL OR SIMILAR), FRONT END LOADER ( 4 CU. YD. AND OVER), HEAD TOWER (SAUERMAN OR EQUAL), HOIST (TWO OR THREE DRUM), HOLLAND LOADER, MAINTENANCE ENGINEER, MINE HOIST, MUCKING MACHINE OR MOLE PAVEMENT BREAKER(SP) WERTGEN; PB-4 AND SIMILAR TYPE, POWER GRADER, PROFILER (OVER 105 H.P.) QUAD 9, QUARRY MASTER (OR EQUIVALENT), SCRAPER, FIREMAN, FORM TAMPER, GROUT PUMP, GUNITE MACHINE, HAMMERS (HYDRAULIC SELF-PROPELLED), HYDRA-SPIKER, RIDE-ON, HYDRAULIC PUMP (JACKING SYSTEM), HYDRO-BLASTER (WATER), MULCHING MACHINE, OILER, PARAPET CONCRETE OR PAVEMENT, SHOVEL, SIDE BOOM, SLIP FORM PAVER, TRACTOR DRAWN, BELTTYPE LOADER, TRUCK OR TRAILER MOUNTED LOG , CHIPPER (SELF FEEDER), TUG OPERATOR (MANNED RENTED EQUIPMENT EXCLUDED), TUNNEL SHOVEL MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY | $57.30 | $33.55 | $90.85 |
IRON0012-011 Effective 07/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKERS:: STRUCTURAL, ORNAMENTAL, RODMAN, MACHINERY MOVER, RIGGER, FENCE ERECTOR, REINFORCING, STONE DERRICKMEN (ALBANY; COLUMBIA; FULTON (ALBIN, BLEECKER, BROAD, JOHNSTOWN, MAYFIELD, NORTHAMPTON AND PERTH); GREENE, MONTGOMERY (AMSTERDAM, CHARLESTON, FLORIDA, GLEN, MOHAWK AND ROOT); RENSSELAER, SARATOGA; SCHENECTADY; SCHOHARIE; AND WASHINGTON COUNTIES:) | $38.50 | $25.48 | $63.98 |
| IRONWORKERS:: SHEETER, BUCKER-UP (ALBANY; COLUMBIA; FULTON (ALBIN, BLEECKER, BROAD, JOHNSTOWN, MAYFIELD, NORTHAMPTON AND PERTH); GREENE, MONTGOMERY (AMSTERDAM, CHARLESTON, FLORIDA, GLEN, MOHAWK AND ROOT); RENSSELAER, SARATOGA; SCHENECTADY; SCHOHARIE; AND WASHINGTON COUNTIES:) | $38.75 | $25.48 | $64.23 |
| IRONWORKERS:: SHEETER (ALBANY; COLUMBIA; FULTON (ALBIN, BLEECKER, BROAD, JOHNSTOWN, MAYFIELD, NORTHAMPTON AND PERTH); GREENE, MONTGOMERY (AMSTERDAM, CHARLESTON, FLORIDA, GLEN, MOHAWK AND ROOT); RENSSELAER, SARATOGA; SCHENECTADY; SCHOHARIE; AND WASHINGTON COUNTIES:) | $38.75 | $25.48 | $64.23 |
IRON0440-007 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER: STRUCTURAL, ORNAMENTAL, RODMAN, MACHINERY MOVER, RIGGER, FENCE ERECTOR, REINFORCEMENT, AND STONE DERRICKMAN (FULTON (TWPS. OF CAROGA, EPHRATAH, OPPENHEIM, STRATFORD); MONTGOMERY (TWPS OF CANAJOHARIE, MINDEN, PALATINE, ST. JOHNSVILLE):) | $35.50 | $31.39 | $66.89 |
LABO0017-001 Effective 07/01/2019 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER GROUP 4: ASBESTOS, TOXIC, LEAD OR HAZARDOUS MATERIAL ABATEMENT FOREMAN (GREENE COUNTY (TOWNSHIP OF CATSKILL) HEAVY & HIGHWAY) FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LINCOLN'S BIRTHDAY, LABOR DAY, ELECTION DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE EMPLOYEE IS AN EMPLOYEE OF THE COMPANY PRIOR TO THE SCHEDULED HOLIDAY AND REPORTS TO WORK THE FIRST DAY FOLLOWING THE HOLIDAY UNLESS PREVENTED FROM DOING SO FOR LEGITIMATE REASONS | $48.00 | $27.15 | $75.15 |
| LABORER GROUP 1: FLAGPERSON, GATEPERSON (GREENE COUNTY (TOWNSHIP OF CATSKILL) HEAVY & HIGHWAY) PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LINCOLN'S BIRTHDAY, LABOR DAY, ELECTION DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE EMPLOYEE IS AN EMPLOYEE OF THE COMPANY PRIOR TO THE SCHEDULED HOLIDAY AND REPORTS TO WORK THE FIRST DAY FOLLOWING THE HOLIDAY UNLESS PREVENTED FROM DOING SO FOR LEGITIMATE REASONS | $34.15 | $27.15 | $61.30 |
| LABORER (ASBESTOS, LEAD, TOXIC AND HAZARDOUS WASTE ABATEMENT AND ANY OTHER ENVIRONMENTAL RELATED WORK) HEAVY & HIGHWAY) GROUP 2- ASBESTOS, TOXIC, BIO-REMEDIATION, PHYTO-REMEDIATION, LEAD OR HAZARDOUS MATERIAL ABATEMENT WHEN PROTECTIVE CLOTHING AND EQUIPMENT IS REQUIRED (COLUMBIA COUNTY (TOWNSHIPS OF GREENPORT, CLAVERACK, CLERMONT, GERMANTOWN, LIVINGSTON, HILLSDALE, TAGHKANIC, GALLATIN, COPAKE, ANCRAM, PHILMONT, AND THE CITY OF HUDSON) | $43.15 | $27.15 | $70.30 |
| LABORER (ASBESTOS, LEAD, TOXIC AND HAZARDOUS WASTE ABATEMENT AND ANY OTHER ENVIRONMENTAL RELATED WORK) HEAVY & HIGHWAY) GROUP 1- ASBESTOS, TOXIC, BIO-REMEDIATION, PHYTO-REMEDIATION, LEAD OR HAZARDOUS MATERIAL ABATEMENT WHEN PROTECTIVE EQUIPMENT AND CLOTHING ARE NOT REQUIRED (COLUMBIA COUNTY (TOWNSHIPS OF GREENPORT, CLAVERACK, CLERMONT, GERMANTOWN, LIVINGSTON, HILLSDALE, TAGHKANIC, GALLATIN, COPAKE, ANCRAM, PHILMONT, AND THE CITY OF HUDSON) HEAVY & HIGHWAY | $38.90 | $27.15 | $66.05 |
LABO0035-001 Effective 07/01/2017 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORERS BUILDING CONSTRUCTION, WAGON DRILL OPERATOR (FULTON (TWPS OF CAROGA, EPHRATA, OPPENHEIM, AND STRAFORD); MONTGOMERY (TWPS OF CANAJOHARIE, MINDEN AND PALATINE, ROOT AND ST. JOHNSVILLE)) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $22.90 | $20.64 | $43.54 |
| LABORERS BUILDING CONSTRUCTION, PIPELAYERS, MOTOR MIXERS, MOTOR BUGGY OPERATOR (WALK BEHIND) POWER LIFT (WALK BEHIND) (FULTON (TWPS OF CAROGA, EPHRATA, OPPENHEIM, AND STRAFORD); MONTGOMERY (TWPS OF CANAJOHARIE, MINDEN AND PALATINE, ROOT AND ST. JOHNSVILLE)). FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $22.65 | $20.64 | $43.29 |
| LABORERS BUILDING CONSTRUCTION, LABORERS (FULTON (TWPS OF CAROGA, EPHRATA, OPPENHEIM, AND STRAFORD); MONTGOMERY (TWPS OF CANAJOHARIE, MINDEN AND PALATINE, ROOT AND ST. JOHNSVILLE)) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $22.50 | $20.64 | $43.14 |
| LABORERS BUILDING CONSTRUCTION, BLASTERS, FORM SETTERS, MOTORBUGGY OPERATOR (RIDER TYPE) (FULTON (TWPS OF CAROGA, EPHRATA, OPPENHEIM, AND STRAFORD); MONTGOMERY (TWPS OF CANAJOHARIE, MINDEN AND PALATINE, ROOT AND ST. JOHNSVILLE)). PAID HOLIDAYS: A. MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY | $23.00 | $20.64 | $43.64 |
| LABORERS BUILDING CONSTRUCTION, ASBESTOS REMOVAL (FULTON (TWPS OF CAROGA, EPHRATA, OPPENHEIM, AND STRAFORD); MONTGOMERY (TWPS OF CANAJOHARIE, MINDEN AND PALATINE, ROOT AND ST. JOHNSVILLE)) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $24.00 | $20.64 | $44.64 |
| LABORERS (HEAVY & HIGHWAY) GROUP 4: BLASTERERS, FORM SETTERS, STONE OR GRANITE CURB SETTERS FULTON (TWPS OF CAROGA, EPHRATA, OPPENHEIM, AND STRAFORD); MONTGOMERY (TWPS OF CANAJOHARIE, MINDEN AND PALATINE, ROOT AND ST. JOHNSVILLE FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $28.65 | $23.74 | $52.39 |
| LABORERS (HEAVY & HIGHWAY) GROUP 3: ALL ROCK OR DRILLING MACHINE OPERATORS (EXCEPT QUARRY MASTER AND SIMILAR TYPE), ACETYLENE TORCH OPERATORS, AND ASPHALT PAVER, POWDERMAN FULTON (TWPS OF CAROGA, EPHRATA, OPPENHEIM, AND STRAFORD); MONTGOMERY (TWPS OF CANAJOHARIE, MINDEN AND PALATINE, ROOT AND ST. JOHNSVILLE) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $28.45 | $23.74 | $52.19 |
| LABORERS (HEAVY & HIGHWAY) GROUP 2: BULL FLOAT, CHAIN SAW, CONCRETE AGGREGATE BIN, CONCRETE BOOTMAN, GIN BUGGY, HAND OR MACHINE VIBRATOR, JACKHAMMER, MASON TENDER, MORTAR MIXER, PAVEMENT BREAKER, HANDLERS OF ALL STEEL MESH, SMALL GENERATORS FOR LABORER'S TOOLS, INSTALLATION OF BRIDGE DRAINAGE, PIPELAYERS, VIBRATOR TYPE ROLLERS, TAMPER, DRILL DOCTOR, TAIL OR SCREW OPERATOR ON ASPHALT PAVER, WATER PUMP OPERATOR (1 1/2"" AND SINGLE DIAPHRAGM), NOZZLE (ASPHALT, GUNNITE, SEEDING AND SAND BLASTING), LABORERS ON CHAIN LINK FENCE ERECTION, ROCK SPLITTER AND POWER UNIT, PUSHER TYPE CONCRETE SAW AND ALL OTHER GAS, ELECTRIC, OIL, AND AIR TOOL OPERATORS, WRECKING LABORERS FULTON (TWPS OF CAROGA, EPHRATA, OPPENHEIM, AND STRAFORD); MONTGOMERY (TWPS OF CANAJOHARIE, MINDEN AND PALATINE, ROOT AND ST. JOHNSVILLE) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $28.25 | $23.74 | $51.99 |
| LABORERS (HEAVY & HIGHWAY) GROUP 1: COMMON LABORERS, FLAGMAN, OUTBOARD AND HAND BOATS FULTON (TWPS OF CAROGA, EPHRATA, OPPENHEIM, AND STRAFORD); MONTGOMERY (TWPS OF CANAJOHARIE, MINDEN AND PALATINE, ROOT AND ST. JOHNSVILLE) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $28.05 | $23.74 | $51.79 |
LABO0157-001 Effective 07/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER HEAVY & HIGHWAY: GROUP 5: HAZARDOUS WASTE REMOVAL FULTON (TWPS. OF BLEEKER, MAYFIELD, NORTHHAMPTON, JOHNSTOWN, BROADALBIN AND PERTH); MONTGOMERY (TWPS. OF MOHAWK, GLEN, CHARLESTON, AMSTERDAM, AND FLORIDA); SARATOGA (TWPS. OF DAY, HADLEY, EDINBURG, CORINTH, MOREAU, SOUTH GLENS FALLS, PROVIDENCE, GREENFIELD, WILTON, NORTHCUMBERLAND, GALWAY, MILTON, SARATOGA SPRINGS, CHARLTON, BALLSTON, MALTA AND CLIFTON PARK); SCHENECTADY AND SCHOHARIE COUNTIES | $41.69 | $26.75 | $68.44 |
| LABORER HEAVY & HIGHWAY: GROUP 4: BLASTERERS, FORM SETTERS, STONE OR GRANITE CURB SETTERS FULTON (TWPS. OF BLEEKER, MAYFIELD, NORTHHAMPTON, JOHNSTOWN, BROADALBIN AND PERTH); MONTGOMERY (TWPS. OF MOHAWK, GLEN, CHARLESTON, AMSTERDAM, AND FLORIDA); SARATOGA (TWPS. OF DAY, HADLEY, EDINBURG, CORINTH, MOREAU, SOUTH GLENS FALLS, PROVIDENCE, GREENFIELD, WILTON, NORTHCUMBERLAND, GALWAY, MILTON, SARATOGA SPRINGS, CHARLTON, BALLSTON, MALTA AND CLIFTON PARK); SCHENECTADY AND SCHOHARIE COUNTIES | $39.79 | $26.75 | $66.54 |
| LABORER HEAVY & HIGHWAY: GROUP 3: ALL ROCK DRILLING MACHINE OPERATORS (EXCEPT QUARRY MASTER AND SIMILAR TYPE), ACETYLENE TORCH OPERATOR, AND ASPHALT PAVER, POWDERMAN FULTON (TWPS. OF BLEEKER, MAYFIELD, NORTHHAMPTON, JOHNSTOWN, BROADALBIN AND PERTH); MONTGOMERY (TWPS. OF MOHAWK, GLEN, CHARLESTON, AMSTERDAM, AND FLORIDA); SARATOGA (TWPS. OF DAY, HADLEY, EDINBURG, CORINTH, MOREAU, SOUTH GLENS FALLS, PROVIDENCE, GREENFIELD, WILTON, NORTHCUMBERLAND, GALWAY, MILTON, SARATOGA SPRINGS, CHARLTON, BALLSTON, MALTA AND CLIFTON PARK); SCHENECTADY AND SCHOHARIE COUNTIES | $39.59 | $26.75 | $66.34 |
| LABORER HEAVY & HIGHWAY: GROUP 1: Common laborers, flagman, outboard & hand boats FULTON (TWPS. OF BLEEKER, MAYFIELD, NORTHHAMPTON, JOHNSTOWN, BROADALBIN AND PERTH); MONTGOMERY (TWPS. OF MOHAWK, GLEN, CHARLESTON, AMSTERDAM, AND FLORIDA); SARATOGA (TWPS. OF DAY, HADLEY, EDINBURG, CORINTH, MOREAU, SOUTH GLENS FALLS, PROVIDENCE, GREENFIELD, WILTON, NORTHCUMBERLAND, GALWAY, MILTON, SARATOGA SPRINGS, CHARLTON, BALLSTON, MALTA AND CLIFTON PARK); SCHENECTADY AND SCHOHARIE COUNTIES | $39.19 | $26.75 | $65.94 |
LABO0190-002 Effective 07/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORERS: HEAVY & HIGHWAY: GROUP 5: HAZARDOUS WASTE REMOVAL ALBANY; RENSSELAER; COLUMBIA (TWPS. OF STUYVESANT, STOCKPORT, KINDERHOOK, NEW LEBANON, CANNAN, GHENT, CHATHAM, AUSTERLITZ). GREENE (EXCEPT CATSKILL TOWNSHIP). WASHINGTON COUNTY. SARATAGO COUNTY (TOWNSHIPS OF STILLWATER, HALFMOON SARATOGA) DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $44.19 | $27.65 | $71.84 |
| LABORERS: HEAVY & HIGHWAY: GROUP 4: BLASTERERS, FORM SETTERS, STONE OR GRANITE CURB SETTERS ALBANY; RENSSELAER; COLUMBIA (TWPS. OF STUYVESANT, STOCKPORT, KINDERHOOK, NEW LEBANON, CANNAN, GHENT, CHATHAM, AUSTERLITZ). GREENE (EXCEPT CATSKILL TOWNSHIP). WASHINGTON COUNTY. SARATAGO COUNTY (TOWNSHIPS OF STILLWATER, HALFMOON SARATOGA) DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $42.29 | $27.65 | $69.94 |
| LABORERS: HEAVY & HIGHWAY: GROUP 3: ALL ROCK AIR DRILLING MACHINE OPERATORS (EXCEPT QUARRY MASTER AND SIMILAR TYPE), ACETYLENE TORCH OPERATORS, AND ASPHALT PAVER, POWDERMAN ALBANY; RENSSELAER; COLUMBIA (TWPS. OF STUYVESANT, STOCKPORT, KINDERHOOK, NEW LEBANON, CANNAN, GHENT, CHATHAM, AUSTERLITZ). GREENE (EXCEPT CATSKILL TOWNSHIP). WASHINGTON COUNTY. SARATAGO COUNTY (TOWNSHIPS OF STILLWATER, HALFMOON SARATOGA) FOOTNOTE: PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $42.09 | $27.65 | $69.74 |
| LABORERS: HEAVY & HIGHWAY: GROUP 1: COMMON LABORERS, FLAGMEN, OUTBOARD AND HAND BOATS ALBANY; RENSSELAER; COLUMBIA (TWPS. OF STUYVESANT, STOCKPORT, KINDERHOOK, NEW LEBANON, CANNAN, GHENT, CHATHAM, AUSTERLITZ). GREENE (EXCEPT CATSKILL TOWNSHIP). WASHINGTON COUNTY. SARATAGO COUNTY (TOWNSHIPS OF STILLWATER, HALFMOON SARATOGA) DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.69 | $27.65 | $69.34 |
LABO0235-006 Effective 05/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORERS: HEAVY & HIGHWAY GROUP 3 ASPHALT RAKER; ASPHALT SCREEDMAN; DRILLERS (ALL); LASER BEAM OPERATOR; FORM SETTER/ALIGNERS; BLASTERS COLUMBIA (TWPS. OF GREENPORT, CLAVERACK, HILLSDALE, LIVINGSTON, GERMANTOWN, TAGHKANIC, COPAKE, CLERMONT, GALLATIN, ANCRAM) FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, PRESIDENTS DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, NOVEMBER ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY | $43.90 | $27.80 | $71.70 |
PAIN0009-013 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| GLAZIER | $37.25 | $33.54 | $70.79 |
PAIN0155-002 Effective 05/01/2021 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PAINTERS:: SPRAY RATE (COLUMBIA AND GREENE COUNTIES) | $36.94 | $24.66 | $61.60 |
| PAINTERS: PAINTER/PAPERHANGER (COLUMBIA AND GREENE COUNTIES) | $35.94 | $24.66 | $60.60 |
| PAINTERS: LEAD ABATEMENT WORK (COLUMBIA AND GREENE COUNTIES) | $35.94 | $24.66 | $60.60 |
| PAINTERS: DRYWALL FINISHER (COLUMBIA AND GREENE COUNTIES) | $35.94 | $24.66 | $60.60 |
PAIN0201-001 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PAINTERS: ZONE 2 (PAINTERS, DRYWALL FINISHERS, SPRAY) ZONE #2 ALL OF WASHINGTON COUNTY | $33.50 | $21.69 | $55.19 |
| PAINTERS: ZONE 2 (LEAD ABATEMENT WORKERS, STRUCTURAL STEEL) ZONE #2 ALL OF WASHINGTON COUNTY | $34.50 | $21.69 | $56.19 |
| PAINTERS: ZONE 1 (PAINTERS, DRYWALL FINISHERS, SPRAY) ZONE #1 ENTIRE COUNTIES OF ALBANY, FULTON, MONTGOMERY, RENNSELAER, SCHOHARIE, SCHENECTADY AND SARATOGA | $33.50 | $21.69 | $55.19 |
| PAINTERS: ZONE 1 (LEAD ABATEMENT WORKERS, STRUCTURAL STEEL) ZONE #1 ENTIRE COUNTIES OF ALBANY, FULTON, MONTGOMERY, RENNSELAER, SCHOHARIE, SCHENECTADY AND SARATOGA | $34.50 | $21.69 | $56.19 |
PAIN0806-002 Effective 10/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PAINTERS: STRUCTURAL STEEL AND BRIDGE (ALBANY, COLUMBIA, FULTON, GREENE, MONTGOMERY, RENNSELAER, SCHOHARIE, SCHENECTADY, SARATOGA AND WASHINGTON) | $56.25 | $55.14 | $111.39 |
PLUM0007-001 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLUMBER/PIPEFITTER (ALBANY; COLUMBIA; FULTON; GREENE; MONTGOMERY; RENSSELAER; SCHENECTADY; SARATOGA (TOWNS OF CHARLTON, CLIFTON PARK, GALWAY, HALFMOON, MILTON, STILLWATER AND WATERFORD)) | $55.26 | $29.12 | $84.38 |
PLUM0112-019 Effective 05/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLUMBER, INCLUDING STEAMFITTING (TOWNSHIPS OF CANAJOHARIE AND MINDEN) | $31.40 | $31.70 | $63.10 |
PLUM0773-002 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLUMBER/PIPEFITTER (SARATOGA (REMAINDER OF COUNTY); WASHINGTON COUNTY:) | $44.88 | $33.60 | $78.48 |
ROOF0203-003 Effective 06/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ROOFER (SCHOHARIE COUNTY:) | $30.50 | $19.84 | $50.34 |
ROOF0241-001 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ROOFER | $38.05 | $24.27 | $62.32 |
SFNY0669-001 Effective 01/01/2026 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SPRINKLER FITTER | $47.85 | $28.94 | $76.79 |
TEAM0294-003 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVERS: GROUP 5 (HEAVY & HIGHWAY) OFF-HIGHWAY TANDEM BACK DUMP, TWIN ENGINE EQUIPMENT AND DOUBLE HITCHED EQUIPMENT WHERE NOT SELF-LOADED MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY | $41.69 | $31.42 | $73.11 |
| TRUCK DRIVERS: GROUP 4 (HEAVY & HIGHWAY) SPECIALIZED EARTH MOVING EQUIPMENT - EUCLID TYPE OR SIMILAR OFF-HIGHWAY EQUIPMENT, WHERE NOT SELF-LOADED, STRADDLE (ROSS) CARRIER, SELF-CONTAINED CONCRETE UNIT FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY | $41.52 | $31.42 | $72.94 |
| VEHICLES, TRUCK MECHANIC, FUEL TRUCK FOOTNOTE: TRUCK DRIVERS: GROUP 3 (HEAVY & HIGHWAY) SEMI-TRAILERS, LOW-BOY TRUCKS, ASPHALT DISTRIBUTOR TRUCKS, AGITATOR, MIXER TRUCKS AND DUMPCRETE TYPE A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY | $41.38 | $31.42 | $72.80 |
| VEHICLES, TRUCK MECHANIC, FUEL TRUCK FOOTNOTE: TRUCK DRIVERS: GROUP 2 (HEAVY & HIGHWAY) TANDEMS, BATCH TRUCKS, MECHANICS FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY | $41.29 | $31.42 | $72.71 |
| VEHICLES, TRUCK MECHANIC, FUEL TRUCK FOOTNOTE: TRUCK DRIVERS: GROUP 1 (HEAVY & HIGHWAY) PICK-UPS, PANEL TRUCKS, FLATBOY MATERIAL TRUCKS (STRAIGHT JOBS), SINGLE AXLE DUMP TRUCKS, DUMPSTERS, RECEIVERS, GREASERS, TRUCK TIREMAN FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY | $41.23 | $31.42 | $72.65 |
TEAM0294-004 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVERS (BUILDING CONSTRUCTION): GROUP 2 EUCLID OR SIMILAR EQUIPMENT, LOWBOY OR LOWBOY TRAILERS (EXCLUDING MONTGOMERY COUNTY) WEEKS VACATION AFTER 5 YEARS | $33.95 | $30.79 | $64.74 |
| TRUCK DRIVERS (BUILDING CONSTRUCTION): GROUP 1 STRAIGHT, WINCH, TRANSIT MIX ON JOB SITE, ROAD OILERS, DUMP, PANEL, PICK-UP, WATER AND FUEL TRUCKS ON SITE (INCLUDING NOZZLE) (EXCLUDING MONTGOMERY COUNTY) FOOTNOTES: A. ONE WEEK VACATION AFTER 1 YEAR; 2 WEEKS VACATION AFTER 5 YEARS | $33.65 | $30.79 | $64.44 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 1 | 01/30/2026 |
| 2 | 05/18/2026 |
Counties Covered
This wage determination applies to 10 counties in New York.
Get notified when NY20260002 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.