NY20260007

BuildingHeavyHighway

Davis-Bacon Act general wage determination for building, heavy, highway construction in New York.

Modification 2, revised 05/18/2026 100 trade rates 4 counties View on SAM.gov

Track NY20260007

Get an email when this wage determination gets a new modification.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Wage Rates

Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.

ASBE0040-003 Effective 05/01/2025
Trade Rate Fringe Total
INSULATOR/ASBESTOS WORKER: (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS) (SULLIVAN AND ULSTER COUNTIES) $41.74 $27.58 $69.32
ASBE0091-002 Effective 06/02/2025
Trade Rate Fringe Total
INSULATOR/ASBESTOS WORKER: (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS) (DUTCHESS AND ORANGE COUNTIES) $46.62 $49.30 $95.92
BRNY0005-001 Effective 06/01/2024
Trade Rate Fringe Total
BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS, HIGHWAY CONSTRUCTION (DUTCHESS, ORANGE (EXCLUDING THE TOWN OF TUXEDO), SULLIVAN AND ULSTER COUNTIES) $46.45 $37.50 $83.95
BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS, HEAVY CONSTRUCTION (ORANGE COUNTY (TOWN OF TUXEDO)) $47.44 $38.00 $85.44
BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS, HEAVY CONSTRUCTION (DUTCHESS, ORANGE (EXCLUDING THE TOWN OF TUXEDO) AND ULSTER COUNTIES) $46.45 $37.50 $83.95
BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS, BUILDING CONSTRUCTION (ORANGE COUNTY (TOWN OF TUXEDO)) $47.44 $38.00 $85.44
BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS, BUILDING CONSTRUCTION (DUTCHESS, ORANGE (EXCLUDING THE TOWN OF TUXEDO) AND ULSTER COUNTIES) $46.45 $37.50 $83.95
CARP0279-005 Effective 07/01/2025
Trade Rate Fringe Total
CARPENTERS:: CARPENTERS, MILLWRIGHTS, PILE DRIVERS (HEAVY & HIGHWAY CONSTRUCTION) $44.72 $31.23 $75.95
CARPENTERS:: CARPENTERS, MILLWRIGHTS, PILE DRIVERS (BUILDING CONSTRUCTION) $44.72 $31.23 $75.95
CARP0740-002 Effective 07/01/2025
Trade Rate Fringe Total
MILLWRIGHT (DUTCHESS AND ORANGE COUNTIES) $47.83 $43.03 $90.86
CARP1556-005 Effective 07/01/2024
Trade Rate Fringe Total
DOCK BUILDER & PILEDRIVERMEN (DUTCHESS AND ORANGE COUNTIES) $60.59 $55.84 $116.43
DIVER TENDER (DUTCHESS AND ORANGE COUNTIES) $55.00 $55.84 $110.84
DIVER (DUTCHESS AND ORANGE COUNTIES) $75.46 $55.84 $131.30
ELEC0363-001 Effective 04/01/2025
Trade Rate Fringe Total
ELECTRICIAN (ORANGE AND DUTCHESS (TOWNSHIPS OF FISHKILL, EAST FISHKILL AND BEACON) COUNTIES). PRESIDENT'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY $51.50 $42.22 $93.72
ELECTRICIAN (DUTCHESS (REMAINING TOWNSHIPS), ULSTER AND SULLIVAN COUNTIES). FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY $51.50 $42.22 $93.72
ELEC1249-004 Effective 05/05/2025
Trade Rate Fringe Total
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) $49.25 $31.15 $80.40
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Substation:) $49.25 $31.15 $80.40
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) $49.25 $31.15 $80.40
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable ins $61.56 $36.21 $97.77
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:) $61.56 $36.21 $97.77
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Substation:) $49.25 $31.15 $80.40
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) $49.25 $31.15 $80.40
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installat $49.25 $31.15 $80.40
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) $49.25 $31.15 $80.40
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cab $55.40 $31.78 $87.18
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Substation:) $55.40 $31.78 $87.18
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) $55.40 $31.78 $87.18
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) $35.34 $30.12 $65.46
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Substation:) $35.34 $30.12 $65.46
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) $35.34 $30.12 $65.46
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) $64.59 $42.92 $107.51
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Substation:) $63.14 $33.82 $96.96
ENGI0137-001 Effective 03/04/2024
Trade Rate Fringe Total
POWER EQUIPMENT OPERATOR GROUP 6 (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILDING CONSTRUCTION) $49.26 $31.32 $80.58
POWER EQUIPMENT OPERATOR GROUP 5B (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILDING CONSTRUCTION) $47.00 $31.32 $78.32
POWER EQUIPMENT OPERATOR GROUP 5A (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILDING CONSTRUCTION) $61.95 $31.32 $93.27
POWER EQUIPMENT OPERATOR GROUP 5 (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILDING CONSTRUCTION) $49.53 $31.32 $80.85
POWER EQUIPMENT OPERATOR GROUP 4B (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILDING CONSTRUCTION) $45.94 $31.32 $77.26
POWER EQUIPMENT OPERATOR GROUP 4A (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILDING CONSTRUCTION) $54.33 $31.32 $85.65
POWER EQUIPMENT OPERATOR GROUP 3B (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILDING CONSTRUCTION) $52.25 $31.32 $83.57
POWER EQUIPMENT OPERATOR GROUP 3A (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILDING CONSTRUCTION) $54.88 $31.32 $86.20
POWER EQUIPMENT OPERATOR GROUP 2A (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILDING CONSTRUCTION) $56.97 $31.32 $88.29
POWER EQUIPMENT OPERATOR GROUP 1B (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILDING CONSTRUCTION) $54.41 $31.32 $85.73
POWER EQUIPMENT OPERATOR GROUP 1A (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILDING CONSTRUCTION) $59.04 $31.32 $90.36
ENGI0137-007 Effective 03/04/2024
Trade Rate Fringe Total
POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 5OILER (POUGHKEEPSIE AND SOUTH THEREOF) NOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY $64.02 $35.25 $99.27
POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 5-A-5 JERSEY-SPREADER, PAVEMENT BREAKER (AIR RAM); POST HOLE DIGGER (POUGHKEEPSIE AND SOUTH THEREOF) NOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY $59.19 $35.25 $94.44
POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 5-A-4 HOIST ENGINEER- STEEL -SUB STRUCTURE (POUGHKEEPSIE AND SOUTH THEREOF) NOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY $70.41 $35.25 $105.66
POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 5-A-3 ENGINEER-- PILE DRIVER (POUGHKEEPSIE AND SOUTH THEREOF) NOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY $75.13 $35.25 $110.38
POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 5-A-2 ENGINEER - ALL TOWER CRANES, ALL CLIMBING CRANES AND ALL CRANES OF 100 TON CAPACITY OR GREATER (3900 MANITOWAC OR SIMILAR) IRRESPECTIVE OF MANUFACTURER AND REGARDLESS OF HOW THE SAME IS RIGGED (EXCEPT FOR PILE RIGS). (POUGHKEEPSIE AND SOUTH THEREOF) NOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY $77.82 $35.25 $113.07
POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 5-A-1 MASTER MECHANIC (POUGHKEEPSIE AND SOUTH THEREOF) NOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY $64.02 $35.25 $99.27
POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 4-A SERVICE MEN (FUEL OR GREASE TRUCK). (POUGHKEEPSIE AND SOUTH THEREOF) NOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY $51.57 $35.25 $86.82
POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 3 A: AIR TRACTOR DRILL; ASPHALT PLANT; BATCH PLANT; BOILER (HIGH PRESSURE; CONCRETE BREAKER; CONCRETE PUMP CONCRETE SPREADER; CURB CUTTER MACHINE; FARM TRACTOR (ALL TYPES); FINISHING MACHINE (CONCRETE); FINE GRADING MACHINE; FIREMAN; FORKLIFT; FORKLIFT (ELECTRIC); JOY DRILL OR SIMILAR TRACTOR DRILLING MACHINE; LOADER - 1 1/2 YARDS AND UNDER; LOCOMOTIVE (ALL SIZES), MAINTENANCE ENGINEER; MACHINE PULLING SHEEPS FOOT ROLLER; MATERIAL HOPPER; MIXER CONCRETE - 21-E AND OVER; MULCHING GRASS SPREADER; PORTABLE ASPHALT PLANT, PORTABLE BATCH PLANT, PORTABLE CRUSHER; POWERHOUSE PLANT; QUARRY MASTER; ROLLER UNDER 4 TON; SPREADING AND FINE GRADING MACHINE; STEEL CUTTING MACHINE; STONE CRUSHER; SWEEPER; TURBOJET BURNER OR SIMILAR; WELL DRILLING MACHINE ; WINCH TRUCK ""A"" FRAME. JOHN HENRY DRILL OR SIMILAR. (POUGHKEEPSIE AND SOUTH THEREOF) NOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY $56.81 $35.25 $92.06
POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 2-B MECHANIC (OUTSIDE) ALL TYPES (POUGHKEEPSIE AND SOUTH THEREOF) NOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY $59.67 $35.25 $94.92
POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 1-B ROAD PAVER, ASPHALT (POUGHKEEPSIE AND SOUTH THEREOF) NOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY $63.70 $35.25 $98.95
POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 1-A AUGER; AUTO GRADER; DYNAHOE AND DUAL PURPOSE AND SIMILAR MACHINES; BOAT CAPTAIN; BORING MACHINE (ALL TYPES); BULL DOZER-ALL SIZES; CENTRAL MIX PLANT OPERATOR; CHIPPER-ALL TYPES; CLOSE CIRCUIT T.V.; COMPACTOR WITH BLADE; CONCRETE PORTABLE HOIST; C.M.I. OR SIMILAR; CONWAY OR SIMILAR MUCKING MACHINES; GRADALL, SHOVEL BACKHOE, ETC. GRADER; DERRICK, (STONE- STEEL; ELEVATOR & CAGE, MATERIALS OR PASSENGERS; FRONT END LOADERS OVER 1 1/2 YDS.; HOIST SINGLE, DOUBLE, TRIPLE DRUM, HOIST PORTABLE MOBILE UNIT; HOIST ENGINEER-CONCRETE (CRANE-DERRICK-MINE HOIST); HOIST ENGINEER-MATERIAL, HYDRAULIC BOOM; LETOURNEAU OR TOURNAPULL (SCRAPERS OVER 20 YDS. STRUCK); LOG SKIDDER; MOVABLE CONCRETE BARRIER TRANSFER & TRANSPORT VEHICLE; MUCKING MACHINES; OVERHEAD CRANE; PAVER (CONCCRETE); PULSEMETER; PUSH BUTTON (BUZZ BOX) ELEVATOR; ROAD MIX MACHINES; ROBOT HAMMER (BROCK OR SIMILAR), ROSS CARRIER AND SIMILAR MACHINES; SHOVELS (TUNNELS); SIDE BOOM; SLIP FORM MACHINE; SPREADER (ASPHALT); SCOOPMOBILE-TRACTOR-SHOVEL OVER 1 1/2 YARDS; TRENCHING MACHINES; TELEPHIES- VERMEER CONCRETE SAW TRENCHER AND/OR SIMILAR; TRACTOR-TYPE DEMOLITION EQUIPMENT, WHIRLY (POUGHKEEPSIE AND SOUTH THEREOF) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY $60.42 $35.25 $95.67
POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 1 BOOM TRUCK; CHERRY PICKER; CLAMSHELL; CRANE (CRAWLER, TRUCK); DRAGLINE; ROUGH TERRAIN CRANE (POUGHKEEPSIE AND SOUTH THEREOF) NOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY $68.63 $35.25 $103.88
ENGI0158-006 Effective 07/01/2025
Trade Rate Fringe Total
POWER EQUIPMENT OPERATORS:: GROUP B BACKHOE (TRACTOR MOUNTED RUBBER TIRED EQUIVALENT TO JOHN DEERE 510 OR LESS), BULLDOZER, PUSHCAT, TRACTOR, TRAXCAVATOR, SCRAPER, LETOURNEAU GRADER, FORM FINE GRADER, ROAD ROLLER, BLACKTOP ROLLER, BLACKTOP SPREADER, POWER BROOMS, SWEEPERS, TRENCHING MACHINE, BARBER GREEN LOADER, SIDE BOOMS, HYDROHAMMER, CONCRETE SPREADER, CONCRETE FINISHING MACHINE, ONE DRUM HOIST, POWER HOSTING (SINGLE DRUM), HOIST - TWO DRUM OR MORE, THREE DRUM ENGINE, POWER HOISTING (TWO DRUM AND OVER), TWO DRUM AND SWINGING ENGINE, THREE DRUM SWINGING ENGINE, HOD HOIST, A-L FRAME WINCHES, CORD AND WELL DRILLERS (ONE DRUM), POST HOLE DIGGER, MODEL CHB VIBRO-TAMP OR SIMILAR MACHINE, BATCH BIN AND PLANT OPERATOR, DINKEY LOCOMOTIVE, SKID STEER LOADER, TRACK EXCAVATOR 5/8 CU. YD. OR SMALLER. (NORTHERN PART OF DUTCHESS (TO THE NORTHEN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE) BUILDING CONSTRUCTION) HAZARDOUS WORK - ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $2.50 PER HOUR OVER REGULAR RATE. FOOTNOTE: A. PAID HOLIDAY: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY $53.91 $33.20 $87.11
POWER EQUIPMENT OPERATORS: GROUP A (1) CRANE, HYDRAULIC CRANES, TOWER CRANE, LOCOMOTIVE CRANE, PILEDRIVER, CABLEWAY, DERRICKS, WHIRLIES, DRAGLINE, BOOM TRUCK (OVER 5 TONS) GROUP A(1): CRANE PREMIUMS 1 OVER 150' :ADD $1.00 2 OVER 200': ADD $2.00 BUILDING CONSTRUCTION NORTHERN PART OF DUTCHESS (TO THE NORTHEN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE) $55.42 $33.20 $88.62
POWER EQUIPMENT OPERATORS: GROUP A SHOVEL, ALL EXCAVATOR (EXCEPT TRACTOR MOUNTED RUBBER TIRED JOHN DEERE 510 OR SMALLER), GRADALLS, POWER ROAD GRADER, ALL CMI EQUIPMENT, FRONT-END RUBBER TIRE LOADER, TRACTOR-MOUNTED DRILL (QUARRY MASTER), MUCKING MACHINE, CONCRETE CENTRAL MIX PLANT, CONCRETE PUMP, BELCRETE SYSTEM, AUTOMATED ASPHALT CONCRETE PLANT AND TRACTOR ROAD PAVER, BOOM TRUCK (5 TONS AND UNDER). (NORTHERN PART OF DUTCHESS (TO THE NORTHEN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE) BUILDING CONSTRUCTION) HAZARDOUS WORK - ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $2.50 PER HOUR OVER REGULAR RATE. FOOTNOTE: A. PAID HOLIDAY: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY $54.93 $33.20 $88.13
ENGI0158-018 Effective 07/01/2025
Trade Rate Fringe Total
POWER EQUIPMENT OPERATOR GROUP 7 (HEAVY & HIGHWAY) MASTER MECHANIC (NORTHERN PART OF DUTCHESS (TO THE NORTHERN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE)) FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY $58.91 $33.55 $92.46
POWER EQUIPMENT OPERATOR GROUP 6 (HEAVY & HIGHWAY) CRANES 49 TONS AND BELOW (NORTHERN PART OF DUTCHESS (TO THE NORTHERN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE)) FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY $60.30 $33.55 $93.85
POWER EQUIPMENT OPERATOR GROUP 5 (HEAVY & HIGHWAY) CRANES 50 TONS AND OVER (NORTHERN PART OF DUTCHESS (TO THE NORTHERN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE)) FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY $61.80 $33.55 $95.35
POWER EQUIPMENT OPERATOR GROUP 4 (HEAVY & HIGHWAY) TOWER CRANES (NORTHERN PART OF DUTCHESS (TO THE NORTHERN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE)) FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY $63.30 $33.55 $96.85
POWER EQUIPMENT OPERATOR GROUP 3 (HEAVY & HIGHWAY) A FRAME WINCH HOIST ON TRUCK , ARTICULATED HEAVY HAULER, AGGREGATE PLANT, ASPHALT OR CONCRETE GROOVING, MACHINE (RIDE ON), BALLAST REGULATOR, RIDE-ON BOILER (USED IN CONJUNCTION WITH PRODUCTION), BITUMINOUS HEATER, SELF-PROPELLED, BOAT (POWERED), CEMENT AND BIN OPERATOR, COMPRESSORS, DUST COLLECTORS, FORK LIFT, GENERATORS, PUMPS, WELDING MACHINES, LIGHT PLANTS, HEATERS (HANDS-OFF EQUIPMENT), CONCRETE PAVEMENT SPREADER AND FINISHER, CONCRETE PAVER OR MIXER (16S AND UNDER), CONCRETE SAW (SELF-PROPELLED), CONVEYOR, DECK HAND, DIRECTIONAL DRILL MACHINE LOCATOR, DRILL, (CORE), DRILL, (WELL,) FARM TRACTOR WITH ACCESSORIES, FINE GRADE MACHINE, TAMPER, RIDE-ON, TIE EXTRACTOR, RIDE-ON, TIE HANDLER, RIDE-ON, TIE INSERTER, RIDE-ON, TIE SPACER, RIDE-ON, TIRE REPAIR, TRACK LINER, RIDE-ON, TRACTOR, TRACTOR (WITH TOWED ACCESSORIES), VIBRATORY COMPACTOR, VIBRO TAMP, WELL POINT (NORTHERN PART OF DUTCHESS (TO THE NORTHERN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE)) MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY $53.82 $33.55 $87.37
POWER EQUIPMENT OPERATOR GROUP 2 (HEAVY & HIGHWAY) ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PLANT (NONAUTOMATED), BLAST OR ROTARY DRILL (TRUCK OR TRACTOR MOUNTED), BORING MACHINE, CAGE HOIST, CENTRAL MIX PLANT (NONAUTOMATED) AND ALL CONCRETE BATCHING PLANTS, CHERRY PICKER (5 TONS CAPACITY AND UNDER), CONCRETE PAVER (OVER 16S), CRAWLER DRILL, SELF-CONTAINED, CRUSHER, DIESEL POWER UNIT, DRILL RIGS, TRACTOR MOUNTED, FRONT END LOADER (UNDER 4 CU. YD.), GREASEMAN/LUBRICATION ENGINEER, HIPRESSURE BOILER (15 LBS. AND OVER), HOIST (ONE DRUM), HYDRO-AXE, KOLMAN PLANT LOADER AND SIMILAR TYPE LOADERS, L.C.M. WORK BOAT OPERATOR, LOCOMOTIVE MIXER (FOR STABILIZED BASE SELFPROPELLED), MONORAIL MACHINE, PLANT ENGINEER, PROFILER (105 H.P. AND UNDER), GRINDER, POST HOLE DIGGER AND POST DRIVER, POWER BROOM (TOWED), POWER HEATERMAN, POWER SWEEPER, REVINIUS WIDENER, ROLLER (GRADE AND FILL), SCARIFIER, RIDE-ON, SHELL WINDER, SKID STEER LOADER (BOBCAT OR SIMILAR), SPAN-SAW, RIDE-ON, STEAM CLEANER, PUG MILL, PUMP CRETE READY MIX CONCRETE PLANT REFRIGERATION EQUIPMENT (FOR SOIL STABILIZATION)ROAD WIDENER, ROLLER (ALL ABOVE SUBGRADE), SEA MULE, SELF-CONTAINED RIDE-ON ROCK DRILL, EXCLUDING AIR-TRACK TYPE DRILL, SKIDDER, TRACTOR WITH DOZER AND/OR PUSHER, TRENCHER. TUGGER HOIST, VERMEER SAW (RIDE ON, ANY SIZE OR TYPE), WINCH, WINCH CAT (NORTHERN PART OF DUTCHESS (TO THE NORTHERN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE)) FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY $56.39 $33.55 $89.94
POWER EQUIPMENT OPERATOR GROUP 1 (HEAVY & HIGHWAY) $57.30 $33.55 $90.85
ENGI0825-007 Effective 07/01/2025
Trade Rate Fringe Total
POWER EQUIPMENT OPERATOR BUILDING, HEAVY & HIGHWAY GROUP 1 $61.72 $37.50 $99.22
POWER EQUIPMENT OPERATOR BUILDING, HEAVY & HIGHWAY GROUP 6 HELICOPTER PILOT (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: HAZMAT PREMIUM 20% HYDROGRAPHIC PREMIUM .50 A. PAID HOLIDAYS: NEW YEARS DAY, WASHINGTON'S BIRTHDAY MEMORIAL DAY, JULY 4TH, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY DURING THE CALENDAR WEEK IN WHICH THE HOLIDAY OCCURS $63.54 $37.50 $101.04
POWER EQUIPMENT OPERATOR BUILDING, HEAVY & HIGHWAY GROUP 5 OILER (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: HAZMAT PREMIUM 20% HYDROGRAPHIC PREMIUM .50 A. PAID HOLIDAYS: NEW YEARS DAY, WASHINGTON'S BIRTHDAY MEMORIAL DAY, JULY 4TH, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY DURING THE CALENDAR WEEK IN WHICH THE HOLIDAY OCCURS $61.72 $37.50 $99.22
POWER EQUIPMENT OPERATOR BUILDING, HEAVY & HIGHWAY GROUP 4 BROOMS AND SWEEPERS; CHIPPERS; COMPRESSORS (SINGLE); CONCRETE SPREADERS (SMALL TYPE); CONVEYOR LOADERS (NOT INCLUDING ELEVATOR GRADERS); ENGINES, LARGE DIESEL (1620 H.P.) AND STAGING PUMP; FARM TRACTORS; FERTILIZING EQUIPMENT (OPERATOR AND MAINTENANCE OF); FINE GRADE MACHINE (SMALL TYPE); FORM LINE GRADERS (SMALL TYPE); FRONT END LOADER (UNDER 1 YD); GENERATOR (SINGLE); GREASE, GAS, FUEL AND OIL SUPPLY TRUCKS; HEATERS (NELSON OR OTHER TYPE INCLUDING PROPANE, NATURAL GAS OR FLOWTYPE UNITS); LIGHTS, PORTABLE GENERATING LIGHT PLANTS; MIXERS, CONCRETE SMALL; MULCHING EQUIPMENT (OPERATION AND MAINTENANCE OF); PUMPS (2 OF LESS THAN 4 INCH SUCTION); PUMPS 94 INCH SUCTION AND OVER INCLUDING SUBMERSIBLE PUMPS); PUMPS (DIESEL ENGINE AND HYDRAULIC); IMMATERIAL OF POWER; ROAD FINISHING MACHINES (SMALL TYPE); ROLLERS, GRADE, FULL OR STONE BASE; SEEDING EQUIPMENT (OPERATION AND MAINTENCE OF); SPRINKLER AND WATER PUMP TRUCKS (USED ON JOB SITE OR IN CONDUCTION WITH JOB SITE); STEAM JENNIES AND BOILERS, IRRESPECTIVE OF USE; STONE SPREADER; TAMPING MACHINES, VIBRATING RIDE ON; TEMPORARY HEATING PLANT (NELSON OR OTHER TYPE, INCLUDING PROPANE, NATURAL GAS OR FLOW TYPE UNITS); WATER AND SPRINKLER TRUCKS (USED ON JOB SITE IN CONDUCTION WITH JOB SITE); WELDING MACHINES-WITHIN 100 FT (GAS, AND /OR ELECTRIC CONVERTERS OF ANY TYPE, SINGLE, TOW OR THREE IN A BATTERY). WELDING SYSTEM, MULTIPLE (RECTIFIER TRANSFORMER TYPE) WELL POINT SYSTEMS (INCLUDING INSTALLATION BY BULL GANG AND MAINTENANCE OF); OFF ROAD BACK DUMPS. (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: HAZMAT PREMIUM 20% HYDROGRAPHIC PREMIUM .50 A. PAID HOLIDAYS: NEW YEARS DAY, WASHINGTON'S BIRTHDAY MEMORIAL DAY, JULY 4TH, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY DURING THE CALENDAR WEEK IN WHICH THE HOLIDAY OCCURS $56.59 $37.50 $94.09
POWER EQUIPMENT OPERATOR BUILDING, HEAVY & HIGHWAY GROUP 2 ""A"" FRAME; BACKHOE (COMBINATION); BOOM ATTACHMENT ON LOADERS (RATE BASED ON SIZE OF BUCKET) NOT APPLICABLE TO PIPEHOOK) BORING AND DRILLING MACHINES, BRUSH CHOPPER, SHREDDER AND TREE SHREDDER TREE SHEARER, CABLEWAYS, CARRY-ALLS, CONCRETE PUMP, CONCRETE PUMPING SYSTEM, PUMPCRETE AND SIMILAR TYPES, CONVEYORS, 125 FT AND OVER; DRILL DOCTOR (DUTIES INCLUDE DUST COLLECTOR, MAINTENANCE), FRONT END LOADER (22 YDS. BUT LESS THAN 2 YDS.), GRADERS (FINISH); GROOVE CUTTING MACHINE (RIDE ON TYPE), HEATER PLANER; HOISTS: (ALL TYPE HOISTS, SHALL ALSO INCLUDE STEAM, GAS, DIESEL, ELECTRIC, AIR HYDRAULIC, SINGLE AND DOUBLE DRUM, CONCRETE, BRICK SHAFT, CAISSON, SNORKEL ROOF, AND OR ANY OTHER SIMILAR TYPE HOISTING MACHINES, PORTABLE OR STATIONARY, EXCEPT CHICAGO BOOM TYPE). LONG BOOM RATE TO BE APPLIED IF HOIST IS ""OUTSIDE MATERIAL LOWER HOIST""; HYDRAULIC CRANES-10TONS AND UNDER; HYDRO-AXE; HYDRO-BLASTER; JACKET (SCREW AIR HYDRAULIC POWER OPERATED UNIT OR CONSOLE TYPE: NOT HAND JACK OR PILE LOAD TEST TYPE), LOG SKIDDER; PANS, PAVERS (ALL) CONCRETE; PLATE AND FRAME FILTER PRESS; PUMPCRETE MACHINES; SQUEEZE CRETE AND CONCRETE PUMPING (REGARDLESS OF SIZE); SCRAPERS; SIDEBOOMS; STRADDLE CARRIER, ROSS AND SIMILAR TYPES; VACUUM TRUCK; WHIP HAMMER; WINCH TRUCKS (HOISTING). (ORANGE, ULSTER AND SULLIVAN COUNTIES) HYDROGRAPHIC PREMIUM .50 A. PAID HOLIDAYS: NEW YEARS DAY, WASHINGTON'S BIRTHDAY MEMORIAL DAY, JULY 4TH, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY DURING THE CALENDAR WEEK IN WHICH THE HOLIDAY OCCURS $60.13 $37.50 $97.63
ENGI0825-008 Effective 07/01/2025
Trade Rate Fringe Total
POWER EQUIPMENT OPERATORS: OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUP 6: HELICOPTER PILOT (ORANGE, ULSTER AND SULLIVAN COUNTIES) HAZMAT PREMIUM 20% TUNNEL PREMIUM .75 WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN CALENDAR WEEK DURING WHICH THE HOLIDAYS OCCURS $64.28 $37.50 $101.78
POWER EQUIPMENT OPERATORS: OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUP 4: COMPRESSOR (SINGLE); DOPE POTS (MECHANICAL WITH OR WITHOUT PUMP); DUST COLLECTORS; PUMPS (4 INCH SUCTION AND OVER); PUMPS (2 OF LESS THAN 4 INCHE SUCTION); PUMPS, DIESEL ENGINE AND HYDRAULIC (IMMATERIAL OF POWER); WELDING MACHINES, GAS OR ELECTRIC CONVERTERS OF ANY TYPE- 2 OR 3 IN BATTERY MULTPLE WELDERS; WELL POINT SYSTEMS (INCLUDING INSTALLATION AND MAINTENANCE); FRAM TRACTORS. (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20% TUNNEL PREMIUM .75 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN CALENDAR WEEK DURING WHICH THE HOLIDAYS OCCURS $57.06 $37.50 $94.56
POWER EQUIPMENT OPERATORS: OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUP 3: BACKFILLER; BROOMS AND SWEEPERS; BULLDOZERS; COMPRESSOR (2 OR 3 IN BATTERY); CHIEF OF PARTY; FRONT END LOADERS (UNDER 2 YDS); GENERATORS; GIRAFFE GRINDERS; GRADERS AND MOTOR PATROLS; MACHNIC; PIPE BENDING MACHINE (POWER);TRACTORS; WATER AND SPRINKLER TRUCKS USED ON JOB SITE OR IN CONDUCTION WITH JOB SITE); WELDER AND REPAIR MECHANIC; CAPTAIN (POWER BOATS); TUG MASTER (POWER BOATS). (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20% TUNNEL PREMIUM .75 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN CALENDAR WEEK DURING WHICH THE HOLIDAYS OCCURS. $58.56 $37.50 $96.06
POWER EQUIPMENT OPERATORS: OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUP 2: ""A"" FRAME; BACKHOE (COMBINATION HOE LOADER); BORING AND DRILLING MACHINES; DITCHING MACHINES, SMALL, DITCHWITCH, VERMEER OR SIMILAR TYPE; FORKLIFTS; FRONT END LOADERS 92 YDS. AND OVER BUT LESS THAN 5 YDS.); GRADERS, FINISH (FINE); HYDRAULIC CRANES 10 TONS AND UNDER (OVER 10 TONS) CRANES RATE APPLIES); SIDE BOOMS: WINCH TRUCKS (HOISTING). (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20% TUNNEL PREMIUM .75 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN CALENDAR WEEK DURING WHICH THE HOLIDAYS OCCURS. $60.70 $37.50 $98.20
POWER EQUIPMENT OPERATORS: OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUP 1: BACKHOE; CRANES (ALL TYPES); DRAGLINES, FRONT END LOADERS (5YDS. AND OVER), GRADALLS, HELICOPTERS (CO-PILOT), HELICOPTERS (COMMUNICATION ENGINEER); SCOOPER (LOADER AND SHOVEL) KOEHRING; TRENCH MACHINES. (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20% TUNNEL PREMIUM .75 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN CALENDAR WEEK DURING WHICH THE HOLIDAYS OCCURS $62.35 $37.50 $99.85
POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION TANK ERECTION GROUP 5: OILER (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: Tunnel Premium .75 Hazmat Premium 20% Hydrographic Premium .50 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS $54.07 $37.50 $91.57
POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION TANK ERECTION GROUP 3: HELICOPTER PILOT ENGINEER (ORANGE, ULSTER AND SULLIVAN COUNTIES NOTES: Tunnel Premium .75 Hazmat Premium 20% Hydrographic Premium .50 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS $64.85 $37.50 $102.35
POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION STEEL ERECTION GROUP 7 HELICOPTER PILOT (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: Hydrographic Premium 50 Hazmat Premium 20% Tunnel Premium .75 FOOTNOTE: a. PAID HOLIDAYS: New Years Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Veteran's Day, Election Day, Thanksgiving Day, and Christmas Day, provided the employee works one day in the calendar week during which the holiday occurs $65.74 $37.50 $103.24
POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION STEEL ERECTION GROUP 6 OILER (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: Hydrographic Premium 50 Hazmat Premium 20% Tunnel Premium .75 FOOTNOTE: a. PAID HOLIDAYS: New Years Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Veteran's Day, Election Day, Thanksgiving Day, and Christmas Day, provided the employee works one day in the calendar week during which the holiday occurs $53.34 $37.50 $90.84
POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION STEEL ERECTION GROUP 2 CRANES (ALL CRANES, LAND OR FLOATING WITH BOOMS INCLUDING JIB LESS THAN 140 FT ABOVE GROUND); DERRICKS, LAND, FLOATING OR CHICAGO BOOM TYPE WITH BOOMS INCLUDING JIB LESS THAN 140 FT ABOVE GROUND). (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: Hydrographic Premium 50 Hazmat Premium 20% Tunnel Premium .75 Washington's Birthday, Memorial Day, Independence Day, Labor Day, Veteran's Day, Election Day, Thanksgiving Day, and Christmas Day, provided the employee works one day in the calendar week during which the holiday occurs $68.58 $37.50 $106.08
POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION STEEL ERECTION GROUP 1 CRANES (ALL CRANES, LAND OR FLOATING WITH BOOMS INCLUDING JIB 140 FT AND OVER, ABOVE GROUND); DERRICKS, LAND, FLOATING OR CHICAGO BOOM TYPE WITH BOOMS INCLUDING JIB 140 FT AND OVER ABOVE GROUND). (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: Hydrographic Premium 50 Hazmat Premium 20% Tunnel Premium .75 Washington's Birthday, Memorial Day, Independence Day, Labor Day, Veteran's Day, Election Day, Thanksgiving Day, and Christmas Day, provided the employee works one day in the calendar week during which the holiday occurs $70.24 $37.50 $107.74
IRON0417-001 Effective 07/01/2025
Trade Rate Fringe Total
IRONWORKER A) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING (UNPAID), CHRISTMAS DAY $42.63 $53.70 $96.33
LABO0235-003 Effective 06/01/2025
Trade Rate Fringe Total
LABORERS: GROUP 3 (BUILDING CONSTRUCTION) BLASTERS, LASER BEAM OPERATOR. (DUTCHESS COUNTY) $43.45 $32.90 $76.35
LABORERS: GROUP 2 (BUILDING CONSTRUCTION) $42.22 $32.90 $75.12
LABORERS: GROUP 1 (BUILDING CONSTRUCTION) MASON TENDERS, CARPENTER TENDERS, LABORER STRIPPING AND CLEANING FORMS, LABORER GRADING AND DIGGING DITCHES, SWEEPERS, CLEANERS. (DUTCHESS COUNTY) $41.10 $32.90 $74.00
LABO0235-005 Effective 05/01/2023
Trade Rate Fringe Total
LABORERS: HEAVY & HIGHWAY GROUP 3 ASPHALT RAKER, ASPHLAT SCREEMAN, DRILLERS (ALL), LASER BEAM OPERATOR, FORM SETTER/ALIGNERS, BLASTERS. (DUTCHESS COUNTY) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, GOOD FRIDAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, THANKSGIVING DAY AND CHRISTMAS DAY AND VETERAN'S DAY $43.90 $27.80 $71.70
PAIN0009-004 Effective 05/01/2025
Trade Rate Fringe Total
GLAZIER (DUTCHESS, ORANGE, SULLIVAN AND ULSTER COUNTIES) $49.20 $57.20 $106.40
PAIN0155-003 Effective 05/01/2021
Trade Rate Fringe Total
PAINTERS: (SPRAY RATE) $36.94 $24.66 $61.60
PAINTERS: (PAINTER/PAPERHANGER) $35.94 $24.66 $60.60
PAINTERS: (LEAD ABATEMENT WORK) $35.94 $24.66 $60.60
PAINTERS: (DRYWALL FINISHERS) $35.94 $24.66 $60.60
PAIN0806-008 Effective 10/01/2024
Trade Rate Fringe Total
PAINTER: STRUCTURAL STEEL AND BRIDGE (DUTCHESS, ORANGE, SULLIVAN AND ULSTER COUNTIES) $56.25 $55.14 $111.39
PLUM0021-005 Effective 05/01/2025
Trade Rate Fringe Total
PLUMBER/PIPEFITTER (ZONE 2 DUTCHESS COUNTY AND THE REMAINDER OF ULSTER COUNTY) $60.66 $45.35 $106.01
PLUM0373-002 Effective 05/01/2025
Trade Rate Fringe Total
REFRIGERATION MECHANIC (ORANGE COUNTY TOWNS OF LAKEVILLE, FOUR CORNERS, STERLING FOREST, TUXEDO PARK, SOUTHFIELDS, ARDEN, NEWBURGH JUNCTION, GREENWOOD LAKE, MONROE, HARRIMAN, WOODBURY FALLS, WOODBURY, WOODBURY STATION, CENTRAL VALLEY, AND THE PALISADES INTERSTATE PARK AND BEAR MOUNTAIN PARK) $41.99 $37.38 $79.37
PLUMBER; STEAMFITTER (ORANGE COUNTY TOWNS OF LAKEVILLE, FOUR CORNERS, STERLING FOREST, TUXEDO PARK, SOUTHFIELDS, ARDEN, NEWBURGH JUNCTION, GREENWOOD LAKE, MONROE, HARRIMAN, WOODBURY FALLS, WOODBURY, WOODBURY STATION, CENTRAL VALLEY, AND THE PALISADES INTERSTATE PARK AND BEAR MOUNTAIN PARK) $53.20 $46.57 $99.77
PLUM0373-003 Effective 05/01/2025
Trade Rate Fringe Total
PLUMBER; STEAMFITTER (SULLIVAN COUNTY (TOWNSHIPS OF LUMBERLAND, FORESTBURGH, HIGHLAND, TUSTEN, MAMAKATING, FALLSBURGH, THOMPSON, BETHEL, COCHECTON, DELAWARE, FREEMONT, CALLICOON, LIBERTY, MONTICELLO, NEVERSINK AND ROCKLAND); ORANGE COUNTY (REMAINING TOWNSHIPS) AND ULSTER COUNTY (TOWNS OF SHAWANGURK, WAWARSING, PLATTEKILL, MARLBORO AND ELLENVILLE UP TO NAPANOCH PRISON)) $53.20 $46.57 $99.77
ROOF0008-002 Effective 05/01/2025
Trade Rate Fringe Total
ROOFER $50.25 $32.62 $82.87
SFNY0669-002 Effective 01/01/2026
Trade Rate Fringe Total
SPRINKLER FITTER $57.20 $32.66 $89.86
SHEE0038-001 Effective 07/01/2025
Trade Rate Fringe Total
SHEET METAL WORKER $55.29 $47.43 $102.72
TEAM0445-001 Effective 05/01/2025
Trade Rate Fringe Total
TRUCK DRIVERS: GROUP 1 DRIVERS ON LETOURNEAU TRACTORS, DOUBLE BARREL EUCLIDS, ATHEY WAGONS AND SIMILAR EQUIPMENT (EXCEPT WHEN HOOKED TO SCRAPERS), I-BEAM AND POLE TRAILERS, DRIVERS OF ROAD OIL DISTRIBUTORS, TIRE TRUCKS AND TRACTORS AND TRAILERS WITH 5 AXLES AND OVER, ARTICULATED BACK DUMPS AND ARTICULATED WATER TRUCKS. FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LABOR DAY, PRESIDENT'S DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY, DECORATION DAY, INDEPENDENCE DAY, THANKSGIVING DAY AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS TWO DAYS IN ANY CALENDAR WEEK DURING WHICH THE HOLIDAYS OCCURS $37.91 $46.37 $84.28

Modification History

Modification Publication Date
1 01/30/2026
2 05/18/2026

Counties Covered

This wage determination applies to 4 counties in New York.

Get notified when NY20260007 is modified

This determination has been revised 2 times. We'll email you when a new modification is published.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.