NY20260009

HeavyHighway

Davis-Bacon Act general wage determination for heavy, highway construction in New York.

Modification 2, revised 05/18/2026 55 trade rates 3 counties View on SAM.gov

Track NY20260009

Get an email when this wage determination gets a new modification.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Wage Rates

Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.

BOIL0175-001 Effective 01/01/2021
Trade Rate Fringe Total
BOILERMAKER $35.23 $26.61 $61.84
CARP0277-007 Effective 07/01/2025
Trade Rate Fringe Total
CARPENTERS: (HEAVY & HIGHWAY CONSTRUCTION) A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY $39.52 $27.16 $66.68
ELEC0910-005 Effective 04/01/2025
Trade Rate Fringe Total
ELECTRICIAN $43.50 $28.38 $71.88
ELEC1249-004 Effective 05/05/2025
Trade Rate Fringe Total
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) $49.25 $31.15 $80.40
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Substation:) $49.25 $31.15 $80.40
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) $49.25 $31.15 $80.40
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable ins $61.56 $36.21 $97.77
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:) $61.56 $36.21 $97.77
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Substation:) $49.25 $31.15 $80.40
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) $49.25 $31.15 $80.40
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installat $49.25 $31.15 $80.40
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) $49.25 $31.15 $80.40
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cab $55.40 $31.78 $87.18
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Substation:) $55.40 $31.78 $87.18
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) $55.40 $31.78 $87.18
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) $35.34 $30.12 $65.46
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Substation:) $35.34 $30.12 $65.46
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) $35.34 $30.12 $65.46
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) $64.59 $42.92 $107.51
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Substation:) $63.14 $33.82 $96.96
ENGI0158-010 Effective 07/01/2017
Trade Rate Fringe Total
POWER EQUIPMENT OPERATOR GROUP 4 (BUILDING) MASTER MECHANIC (LEWIS AND ST LAWRENCE COUNTIES) PREMIUMS: HAZMAT WORK 2.50 QUAD 9 BULLDOZER OR MULTIBOWL SCRAPER .50 CRANE PREMIUMS (ADD TO GROUP 1 RATE): ALL LATTICE BOOM CRANES (65 TON CAPACITY AND OVER) GROUP 1 RATE PLUS 1.75 ALL HYDRAULIC CRANES (100 TON CAPACITY AND OVER) GROUP 1 RATE PLUS 1.75 ALL HYDRAULIC CRANES (80 TON CAPACITY TO 99 TON CAPACITY) GROUP 1 RATE PLUS 1.25 ALL HYDRAULIC CRANES (65 TON CAPACITY TO 79 TON CAPACITY) GROUP 1 RATE PLUS 1.10 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY PROVIDED THE EMPLOYEE HAS WORKED FIVE CONSECUTIVE WORKING DAYS BEFORE AND THE WORKING DAY AFTER THE HOLIDAY $38.84 $23.80 $62.64
POWER EQUIPMENT OPERATOR GROUP 3 (BUILDING) COMPRESSOR (UP TO 500 C.F.), CONCRETE PAVER OR MIXER (UNDER 16S), CONCRETE PAVEMENT SPREADERS AND FINISHERS (NOT AUTOMATED), CONVEYOR (OVER 12 FT), ELECTRIC SUBMERSIBLE PUMP (4"" AND OVER), FARM TRACTOR WITH OR WITHOUT ACCESSORIES, FINE GRADE MACHINE (NOT AUTOMATED), FIREMAN, FORM TAMPER, GENERATOR (2,500 WATTS AND OVER), GROUT PUMP, HYDRAULIC PUMP, MECHANICAL HEATERS (MORE THAN 2 MECHANICAL HEATERS OR ANY MECHANICAL HEATER OR HEATERS WHOSE COMBINED OUTPUT EXCEEDS 640,000 BTU PER HOUR (MANUFACTURER'S RATING) PLUS ONE CONTAINED HEATING UNIT (I.E. SUNDOG, AIR HEAT TYPE, NEW HOLLAND HAY DRYER TYPE EXCLUDED), MULCHING MACHINE, OILER, POWER DRIVEN WELDING MACHINE - 300 AMP. AND OVER (OTHER THAN ALL ELECTRIC), POWER HEATERMAN (HAY DRYER), PUMP (UNDER 4""), REVINUS WIDENER (ROAD WIDENER), SINGLE LIGHT PLANT, STEAM CLEANER OR JENNY, TRACTOR WITH OR WITHOUT TOWED ACCESSORIES (LEWIS AND ST LAWRENCE COUNTIES) PREMIUMS: HAZMAT WORK 2.50 QUAD 9 BULLDOZER OR MULTIBOWL SCRAPER .50 CRANE PREMIUMS (ADD TO GROUP 1 RATE): ALL LATTICE BOOM CRANES (65 TON CAPACITY AND OVER) GROUP 1 RATE PLUS 1.75 ALL HYDRAULIC CRANES (100 TON CAPACITY AND OVER) GROUP 1 RATE PLUS 1.75 ALL HYDRAULIC CRANES (80 TON CAPACITY TO 99 TON CAPACITY) GROUP 1 RATE PLUS 1.25 ALL HYDRAULIC CRANES (65 TON CAPACITY TO 79 TON CAPACITY) GROUP 1 RATE PLUS 1.10 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY PROVIDED THE EMPLOYEE HAS WORKED FIVE CONSECUTIVE WORKING DAYS BEFORE AND THE WORKING DAY AFTER THE HOLIDAY $30.68 $23.80 $54.48
POWER EQUIPMENT OPERATOR GROUP 2 (BUILDING) ""A"" FRAME TRUCK, BLACKTOP PLANT (NON AUTOMATIC), ALL BACK DUMPS, BORING MACHINE, BULLDOZER, CAGEHOIST, CARRY-ALL SCRAPER, CENTRAL MIX PLANT (NON AUTOMATED), CHERRY PICKER 15 TONS AND UNDER), COMPRESSOR (500 C.F. AND OVER), CONCRETE PAVER (SINGLE DRUM OVER 16S), CONCRETE PUMP, CORE BORING MACHINE, DRILL RIGS (TRACTOR MOUNTED), ELEVATOR (AS A MATERIAL HOIST), FORK LIFT (ALL OTHERS), FRONT END LOADER (UNDER 4 C.Y.), GUNITE MACHINE, HIGH PRESSURE BOILDER 15 LBS & OVER), HOIST (ONE DRUM), HYDRAULIC BREAKING HAMMER (DROP HAMMER), KOLMAN PLANT LOADER (SCREENING GRAVEL), MAINTENANCE GREASE MAN, MIXER FOR STABILIZED BASE (SELF PROPELLED SEAMAN MIXER), MONORAIL MACHINE, PARAPET CONCRETE OR PAVEMENT GRINDER, POST HOLE DIGGER (TRUCK OR TRACTOR MOUNTED), POWER SWEEPER (WAYNE OR SIMILAR), PUMP (4"" AND OVER, PUMP-CRETE OR SQEEZE-CRETE, ROAD WIDENER (FRONT END OF GRADER OR SELF PROP.), ROLLER, SELF CONTAINED HYDRAULIC BENCH DRILL, SHELL WINDER (MOTORIZED), SNORKEL (OVERHEAD ARMS), SNOWBLOWER CONTROL MAN, TRENCHING MACHINE (DIGGING CAPACITY OF 4 FT OR LESS), TUGGER HOIST, VIBROTAMP, WELL DRILL, WELL POINT SYSTEM, WINCH (MOTOR DRIVER),WINCH CAT, WINCH TRUCK (SUBMERSIBLE PUMPS WHEN USED IN LIEU OF WELL POINT SYSTEM (LEWIS AND ST LAWRENCE COUNTIES) PREMIUMS: HAZMAT WORK 2.50 QUAD 9 BULLDOZER OR MULTIBOWL SCRAPER .50 CRANE PREMIUMS (ADD TO GROUP 1 RATE): ALL LATTICE BOOM CRANES (65 TON CAPACITY AND OVER) GROUP 1 RATE PLUS 1.75 ALL HYDRAULIC CRANES (100 TON CAPACITY AND OVER) GROUP 1 RATE PLUS 1.75 ALL HYDRAULIC CRANES (80 TON CAPACITY TO 99 TON CAPACITY) GROUP 1 RATE PLUS 1.25 ALL HYDRAULIC CRANES (65 TON CAPACITY TO 79 TON CAPACITY) GROUP 1 RATE PLUS 1.10 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY PROVIDED THE EMPLOYEE HAS WORKED FIVE CONSECUTIVE WORKING DAYS BEFORE AND THE WORKING DAY AFTER THE HOLIDAY $34.78 $23.80 $58.58
POWER EQUIPMENT OPERATOR GROUP 1 (BUILDING) $36.84 $23.80 $60.64
ENGI0158-020 Effective 07/01/2025
Trade Rate Fringe Total
POWER EQUIPMENT OPERATORS: GROUP 3 $51.69 $33.40 $85.09
POWER EQUIPMENT OPERATORS: GROUP 2 ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PLANT (NONAUTOMATED), BLAST OR ROTARY DRILL (TRUCK OR TRACTOR MOUNTED), BORING MACHINE, CAGE HOIST, CENTRAL MIX PLANT (NONAUTOMATED) AND ALL CONCRETE BATCHING PLANTS, CHERRY PICKER (5 TONS CAPACITY AND UNDER), CONCRETE PAVER (OVER 16S), CRAWLER DRILL, SELF-CONTAINED, CRUSHER, DIESEL POWER UNIT, DRILL RIGS, TRACTOR MOUNTED, FRONT END LOADER (UNDER 4 CU. YD.), GREASEMAN/LUBRICATION ENGINEER, HIPRESSURE BOILER (15 LBS. AND OVER), HOIST (ONE DRUM), HYDRO-AXE, KOLMAN PLANT LOADER AND SIMILAR TYPE LOADERS, L.C.M. WORK BOAT OPERATOR, LOCOMOTIVE MIXER (FOR STABILIZED BASE SELFPROPELLED), MONORAIL MACHINE, PLANT ENGINEER, PROFILER (105 H.P. AND UNDER), GRINDER, POST HOLE DIGGER AND POST DRIVER, POWER BROOM (TOWED), POWER HEATERMAN, POWER SWEEPER, REVINIUS WIDENER, ROLLER (GRADE AND FILL), SCARIFIER, RIDE-ON, SHELL WINDER, SKID STEER LOADER (BOBCAT OR SIMILAR), SPAN-SAW, RIDE-ON, STEAM CLEANER, PUG MILL, PUMP CRETE READY MIX CONCRETE PLANT REFRIGERATION EQUIPMENT (FOR SOIL STABILIZATION)ROAD WIDENER, ROLLER (ALL ABOVE SUBGRADE), SEA MULE, SELF-CONTAINED RIDE-ON ROCK DRILL, EXCLUDING AIR-TRACK TYPE DRILL, SKIDDER, TRACTOR WITH DOZER AND/OR PUSHER, TRENCHER. TUGGER HOIST, VERMEER SAW (RIDE ON, ANY SIZE OR TYPE), WINCH, WINCH CAT FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE EMPLOYEE HAS WORKED THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY $54.97 $33.40 $88.37
POWER EQUIPMENT OPERATORS: GROUP 1 ASPHALT CURB MACHINE, SELF PROPELLED, SLIPFORM, AUTOMATED CONCRETE SPREADER (CMI TYPE), AUTOMATIC FINE GRADER, BACKHOE (EXCEPT TRACTOR MOUNTED, RUBBER TIRED), BACKHOE EXCAVATOR FULL SWING (CAT 212 OR SIMILAR TYPE), BACK FILLING MACHINE, BELT PLACER (CMI TYPE), BLACKTOP PLANT (AUTOMATED), BOOM TRUCK , CABLEWAY, CAISSON AUGER, CENTRAL MIX CONCRETE PLANT (AUTOMATED), CONCRETE CURB MACHINE, SELF PROPELLED, SLIPFORM, CONCRETE PUMP, CRANE, CHERRY PICKER, DERRICKS (STEEL ERECTION), DRAGLINE, OVERHEAD CRANE (GANTRY OR STRADDLE TYPE), PILE DRIVER, TRUCK CRANE, DIRECTIONAL DRILLING MACHINE, DREDGE, DUAL DRUM PAVER, EXCAVATOR (ALL PURPOSE HYDRAULICALLY OPERATED) (GRADALL OR SIMILAR), FRONT END LOADER ( 4 CU. YD. AND OVER), HEAD TOWER (SAUERMAN OR EQUAL), HOIST (TWO OR THREE DRUM), HOLLAND LOADER, MAINTENANCE ENGINEER, MINE HOIST, MUCKING MACHINE OR MOLE PAVEMENT BREAKER(SP) WERTGEN; PB-4 AND SIMILAR TYPE, POWER GRADER, PROFILER (OVER 105 H.P.) QUAD 9, QUARRY MASTER (OR EQUIVALENT), SCRAPER, FIREMAN, FORK LIFT, FORM TAMPER, GROUT PUMP, GUNITE MACHINE, HAMMERS (HYDRAULIC SELF-PROPELLED), HYDRA-SPIKER, RIDE-ON, HYDRAULIC PUMP (JACKING SYSTEM), HYDRO-BLASTER (WATER), MULCHING MACHINE, OILER, PARAPET CONCRETE OR PAVEMENT, SHOVEL, SIDE BOOM, SLIP FORM PAVER, TRACTOR DRAWN, BELTTYPE LOADER, TRUCK OR TRAILER MOUNTED LOG , CHIPPER (SELF FEEDER), TUG OPERATOR (MANNED RENTED EQUIPMENT EXCLUDED), TUNNEL SHOVEL INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE EMPLOYEE HAS WORKED THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY $55.85 $33.40 $89.25
IRON0440-005 Effective 07/01/2025
Trade Rate Fringe Total
IRONWORKER, STRUCTURAL, ORNAMENTAL, RODMAN, MACHINERY MOVERS & RIGGER, FENCE ERECTOR, REINFORCING, STONE DERRICKMAN (LEWIS AND ST. LAWRENCE COUNTIES BUILDING/HEAVY/HIGHWAY CONSTRUCTION) $35.50 $31.39 $66.89
LABO1822-004 Effective 07/01/2023
Trade Rate Fringe Total
LABORERS: HEAVY & HIGHWAY GROUP 5 $34.27 $27.80 $62.07
LABORERS: HEAVY & HIGHWAY GROUP 4 $31.67 $27.80 $59.47
LABORERS: HEAVY & HIGHWAY GROUP 3 $31.47 $27.80 $59.27
LABORERS: HEAVY & HIGHWAY GROUP 2 $31.27 $27.80 $59.07
LABORERS: HEAVY & HIGHWAY GROUP 1 $31.27 $27.80 $59.07
PAIN0004-022 Effective 05/01/2023
Trade Rate Fringe Total
PAINTER, BRIDGE BRIDGES (HEAVY & HIGHWAY CONSTRUCTION) $42.06 $30.59 $72.65
PAINTER: SPRAY/SANDBLASTING/STRUCTURAL STEEL (BUILDING CONSTRUCTION) LEWIS COUNTY (TOWNSHIPS OF HIGH MARKET, LEWIS, LEYDEN, LYONSDALE, OSCEOLA, TURIN AND WEST TURIN) $27.77 $26.23 $54.00
PAINTER: BRUSH & ROLL, DRYWALL TAPING/FINISHING (BUILDING CONSTRUCTION) LEWIS COUNTY (TOWNSHIPS OF HIGH MARKET, LEWIS, LEYDEN, LYONSDALE, OSCEOLA, TURIN AND WEST TURIN) $27.27 $26.23 $53.50
PAINTER, BRIDGE BRIDGES (HEAVY & HIGHWAY CONSTRUCTION) $42.06 $30.59 $72.65
PAINTER: SPRAY/SANDBLASTING/STRUCTURAL STEEL (BUILDING CONSTRUCTION) LEWIS COUNTY (TOWNSHIPS OF HIGH MARKET, LEWIS, LEYDEN, LYONSDALE, OSCEOLA, TURIN AND WEST TURIN) $27.77 $26.23 $54.00
PAINTER: BRUSH & ROLL, DRYWALL TAPING/FINISHING (BUILDING CONSTRUCTION) LEWIS COUNTY (TOWNSHIPS OF HIGH MARKET, LEWIS, LEYDEN, LYONSDALE, OSCEOLA, TURIN AND WEST TURIN) $27.27 $26.23 $53.50
PAIN0004-022 Effective 05/01/2024
Trade Rate Fringe Total
PAINTER, BRIDGE BRIDGES (HEAVY & HIGHWAY CONSTRUCTION) $42.06 $30.59 $72.65
PAINTER: SPRAY/SANDBLASTING/STRUCTURAL STEEL (BUILDING CONSTRUCTION) LEWIS COUNTY (TOWNSHIPS OF HIGH MARKET, LEWIS, LEYDEN, LYONSDALE, OSCEOLA, TURIN AND WEST TURIN) $27.77 $26.23 $54.00
PAINTER: BRUSH & ROLL, DRYWALL TAPING/FINISHING (BUILDING CONSTRUCTION) LEWIS COUNTY (TOWNSHIPS OF HIGH MARKET, LEWIS, LEYDEN, LYONSDALE, OSCEOLA, TURIN AND WEST TURIN) $27.27 $26.23 $53.50
PAINTER, BRIDGE BRIDGES (HEAVY & HIGHWAY CONSTRUCTION) $42.06 $30.59 $72.65
PAINTER: SPRAY/SANDBLASTING/STRUCTURAL STEEL (BUILDING CONSTRUCTION) LEWIS COUNTY (TOWNSHIPS OF HIGH MARKET, LEWIS, LEYDEN, LYONSDALE, OSCEOLA, TURIN AND WEST TURIN) $27.77 $26.23 $54.00
PAINTER: BRUSH & ROLL, DRYWALL TAPING/FINISHING (BUILDING CONSTRUCTION) LEWIS COUNTY (TOWNSHIPS OF HIGH MARKET, LEWIS, LEYDEN, LYONSDALE, OSCEOLA, TURIN AND WEST TURIN) $27.27 $26.23 $53.50
PAIN0004-026 Effective 05/01/2023
Trade Rate Fringe Total
PAINTERS: BRIDGE (JEFFERSON COUNTY; LEWIS COUNTY (TOWNSHIPS OF DIANA, CROGHAN, NEW BREMEN, WATSON, GREIG, MARTINSBURG, LWVILLE, DENMARK, HARRISBURG, MONTAGUE AND PINCKNEY); ST. LAWRENCE COUNTY) $42.06 $30.59 $72.65
PAIN0677-001 Effective 05/01/2025
Trade Rate Fringe Total
GLAZIER $31.05 $31.55 $62.60
PLUM0073-003 Effective 05/01/2019
Trade Rate Fringe Total
PLUMBER AND STEAMFITTER (JEFFERSON, LEWIS (TWPS OF DIANA, CROGHAN, NEW BREMEN, WATSON, GREIG, MARTINSBURG, LEWISVILLE, DENMARK, HARRISBURG, MONTAGUE, PINKNEY, HIGHMARKET, OSCELLIA, AND TURIN) AND ST. LAWRENCE COUNTIES) $31.43 $23.61 $55.04
PLUM0112-004 Effective 05/01/2025
Trade Rate Fringe Total
PLUMBER, INCLUDING STEAMFIITTING (LEWIS COUNTY TOWNSHIPS OF LEWIS, LEYDEN, LYONSDALE, WEST TURIN) $45.93 $33.77 $79.70
ROOF0195-001 Effective 07/01/2025
Trade Rate Fringe Total
ROOFER $35.80 $25.99 $61.79
SFNY0669-001 Effective 01/01/2026
Trade Rate Fringe Total
SPRINKLER FITTER $47.85 $28.94 $76.79
SHEE0058-004 Effective 05/01/2025
Trade Rate Fringe Total
SHEET METAL WORKER: PROJECTS OVER $10 MILLION (LEWIS AND ST. LAWRENCE COUNTIES) $46.29 $23.31 $69.60
SHEET METAL WORKER: INCL. HVAC DUCT (LEWIS AND ST. LAWRENCE COUNTIES) $36.29 $23.31 $59.60
TEAM0687-001 Effective 07/01/2025
Trade Rate Fringe Total
TRUCK DRIVERS: GROUP 2 (HEAVY & HIGHWAY) SPECIAL EARTH MOVING QUIPMENT (EUCLID TYPE), OR SIMILAR OFF HIGHWAY EQUIPMENT, WHERE NOT SELF LOADED, STRADDLE (ROSS) CARRIER, AND SELF CONTAINED CONCRETE MOBILE UNIT, OFF HIGHWAY TANDEM BACK DUMP, TWIN ENGINE EQUIPMENT AND DOUBLE HITCHED EQUIPMENT WHERE NOT SELF LOADED FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY $35.03 $27.02 $62.05
TRUCK DRIVERS: GROUP 1 (HEAVY & HIGHWAY) PICK-UPS, PANEL TRUCKS, FLATBOY MATERIAL TRUCKS (STRAIT JOBS), SINGLE AXLE DUMP TRUCKS, DUMPSTERS, GREASERS, TRUCK TIREMEN,, PARTS CHASER, TANDEMS AND BATCH TRUCKS, MECHANICS, SEMI TRAILER, LOWBOY TRUCKS, ASPHALT DISTRIBUTOR TRUCKS AND AGITATOR, MIXER TRUCKS AND DUMPCRETE TYPE VEHICLES, TRUCK MECHANIC, FUEL TRUCK AND BUS FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY $34.81 $27.02 $61.83

Modification History

Modification Publication Date
1 01/30/2026
2 05/18/2026

Counties Covered

This wage determination applies to 3 counties in New York.

Get notified when NY20260009 is modified

This determination has been revised 2 times. We'll email you when a new modification is published.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.