BOIL0007-001 Effective 01/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | $39.35 | $33.18 | $72.53 |
BRNY0045-002 Effective 07/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POINTER, CLEANER AND CAULKER | $36.82 | $31.33 | $68.15 |
| MARBLE MASON | $36.85 | $30.80 | $67.65 |
| TILE, MARBLE & TERRAZZO FINISHER | $34.71 | $17.54 | $52.25 |
| TILE & TERRAZZO WORKER | $37.85 | $31.80 | $69.65 |
| BRICKLAYER, STONEMASON | $37.44 | $32.71 | $70.15 |
| POINTER, CLEANER AND CAULKER | $36.82 | $31.33 | $68.15 |
| MARBLE MASON | $36.85 | $30.80 | $67.65 |
| TILE, MARBLE & TERRAZZO FINISHER | $34.71 | $17.54 | $52.25 |
| TILE & TERRAZZO WORKER | $37.85 | $31.80 | $69.65 |
| BRICKLAYER, STONEMASON | $37.44 | $32.71 | $70.15 |
BRNY0045-002 Effective 07/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POINTER, CLEANER AND CAULKER | $36.82 | $31.33 | $68.15 |
| MARBLE MASON | $36.85 | $30.80 | $67.65 |
| TILE, MARBLE & TERRAZZO FINISHER | $34.71 | $17.54 | $52.25 |
| TILE & TERRAZZO WORKER | $37.85 | $31.80 | $69.65 |
| BRICKLAYER, STONEMASON | $37.44 | $32.71 | $70.15 |
| POINTER, CLEANER AND CAULKER | $36.82 | $31.33 | $68.15 |
| MARBLE MASON | $36.85 | $30.80 | $67.65 |
| TILE, MARBLE & TERRAZZO FINISHER | $34.71 | $17.54 | $52.25 |
| TILE & TERRAZZO WORKER | $37.85 | $31.80 | $69.65 |
| BRICKLAYER, STONEMASON | $37.44 | $32.71 | $70.15 |
CARP0276-015 Effective 07/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER: PILEDRIVER | $41.19 | $31.55 | $72.74 |
| CARPENTER | $41.19 | $29.81 | $71.00 |
ELEC0237-001 Effective 05/26/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIANS | $44.20 | $32.90 | $77.10 |
ELEC1249-004 Effective 05/05/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) | $49.25 | $31.15 | $80.40 |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Substation:) | $49.25 | $31.15 | $80.40 |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | $49.25 | $31.15 | $80.40 |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable ins | $61.56 | $36.21 | $97.77 |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:) | $61.56 | $36.21 | $97.77 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Substation:) | $49.25 | $31.15 | $80.40 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | $49.25 | $31.15 | $80.40 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installat | $49.25 | $31.15 | $80.40 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | $49.25 | $31.15 | $80.40 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cab | $55.40 | $31.78 | $87.18 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Substation:) | $55.40 | $31.78 | $87.18 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | $55.40 | $31.78 | $87.18 |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) | $35.34 | $30.12 | $65.46 |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Substation:) | $35.34 | $30.12 | $65.46 |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | $35.34 | $30.12 | $65.46 |
| ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) | $64.59 | $42.92 | $107.51 |
| ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Substation:) | $63.14 | $33.82 | $96.96 |
ENGI0017-007 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GROUP A HEAVY AND HIGHWAY CONSTRUCTION NOTES: HAZARDOUS WASTE 2.50 ZONE PAY: CRANE BOOM PREMIUM FOR BOOM AND JIB 100-199 FT (1.00 OVER GROUP A) CRANE BOOM PREMIUM FOR BOOM AND JIB 100-199 FT (1.50 OVER GROUP A) CRANE BOOM PREMIUM FOR BOOM AND JIB 100-199 FT (2.00 OVER GROUP A) | $47.39 | $34.84 | $82.23 |
| POWER EQUIPMENT OPERATOR MASTER MECHANIC (HEAVY AND HIGHWAY CONSTRUCTION) NOTES: HAZMAT PREMIUM 3.00 ZONE PAY: ADD $1.00 TO GROUP A - LONG BOOM CRANE PREMIUM 100 FT - 199 FT ADD $1.50 TO GROUP A- LONG BOOM CRANE PREMIUM 200 FT - 299 FT ADD $2.00 TO GGROUP A - LONG BOOM CRANE PREMIUM 300 FT AND OVER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY PROVIDED EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY. TUNNEL AND SHAFT CLASSIFICATIONS | $48.46 | $34.84 | $83.30 |
| POWER EQUIPMENT OPERATOR GROUP B (HEAVY AND HIGHWAY CONSTRUCTION) AIR COMPRESORS (OVER 165 CU. FT), BOBCAT TYPE SKID LOADER, COMPRESSORS WHEN USED IN BANKS OF TWO AND NOT OVER THREE WITHIN A FIFTY FOOT RADIUS AND IF FUEL IS STORED, IT WOULD BE STORED WITHIN THE SAME RADIUS, CONCRETE BLOWERS, CONCRETE PUMPS, CONVEYORS, CRAWLER OR RUBBER TIRE TRACTOR (SMALL FARM TYPEWITH BLADE OR BUCKET NOT TO EXCEED 0.5 YD CAPACITY), EARTH DRILLS (ALL), ELEVATORS (ALL), FORKLIFT WHILE USED TO LIFT MATERIAL NOT OVER 25 FT, GUNNITE MACHINES, HEATERS (GASOLINE -USE IN BANKS OF TWO AND NOT OVER THREE WITHIN AN AREA OF ONE HUDNRED FOOT RADIUS, HIGHLIFT HOISTS WHILE USED TO LIFT MATERIAL NOT OVER 25 FT, MATERIAL HOISTS, SINGLE DRUM HOIST FOR HOISTING MATERIALS OTHER THAN STEEL, LATOURNEAU TURNATRAILERS, LIGHT AND POWER SYSTEMS 9 GAS OR DIESEL DRIVEN - TEMPORARY 25 KW CAPACITY OR OVER), LOADERS 9 SMALL FRONT OR BACK), LOCOMOTIVE, PARTS ROOM - WHEN A PARTS ROOM IS MANNED IT SHALL BE AN ENGINEER, PAVEMENT BUSTERS, PIN PULLSER, POST DRIVERS 9 TRUCK MOUNTED), PUG MACHINE, PUMS OVER 4 INCHES, (ROAD ROLLERS EXCEPT ON FINISH BALCKTOP, ROAD WIDENER MOUNTED ON A LOADER, ROLLES (SELF PROPELLED - NOT ON FINISH BLACKTOP AND UNDER 7 TONS), SCOOPMOBILES - WHEN USED AS A STATION ARY HOIST, OR ONE USED TO LIFT MATERIAL NOT IN EXCESS OF 25 FEET, SNOW-GO, STONE CRUSHERS AND WINCH HOISTS MOUNTED ON TRUCKS, TRACTORS, TRENCHERS EXCAVATING UP TO 6 FT DEEP), TRENCHERS ON THE BACK OF A JEEP, WELDING MACHINES (FOR 2 BUT NOT OVER 3 GASOLINE OR DIESEL DRIVEN), WINCH TRACTORS NOTES: HAZARDOUS WASTE 2.50 ZONE PAY: CRANE BOOM PREMIUM FOR BOOM AND JIB 100-199 FT (1.00 OVER GROUP A) CRANE BOOM PREMIUM FOR BOOM AND JIB 100-199 FT (1.50 OVER GROUP A) CRANE BOOM PREMIUM FOR BOOM AND JIB 100-199 FT (2.00 OVER GROUP A) | $42.89 | $34.84 | $77.73 |
| POWER EQUIPMENT OPERATOR GROUP A1 (HEAVY AND HIGHWAY CONSTRUCTION) BACKFILLERS, BACKHOES, AUTOMATIC BATCH PLANT OPERATOR, BLACK-TOP SPREADERS, BULLDOZERS, CMI GRADING MACHINES, CABLEWAYS, CLAMBUCKETS, COMBINATION HOE BOOM OR SHOVEL BOOMATTACHED (EXCEPT FARM TYPE CRAWLER OR RUBBER TIRED TRACTOR UNLESS USED WITH HYDRAULIC BACK-HOE), COMPRESSOR (WITH PAING BREAKER ATTACHED), CONCRETE MIXERS (ONE YARD AND OVER), CONCRETE PLANNER, CONCRETE PUMP (TRUCK MOUNTED), CONCRETE SPREADER OPERATOR, CRANE WORK, CRANES (OVERHEAD OR BRIDGE), CRANE OPERATOR (OVER 100, 200, 300 FEET BOOMS EARN PREMIUMS AS NOTED HEREIN), DERRICKS, DRAGLINES, EUCLID TYPE BELT LOADERS, FINISHING MACHINE OPERATORS, FORK-LIFTS AND HOISTS 9 WHEN LIFTING MATERIAL AT AN ELEVATION HIGHER THAN TWENTY-FIVE FEET), FORM PULLER, GENERATOR AND COMPRESSOR (POWER DRIVEN-WHEN USED SIMULTANEOUSLY AND FOR ANY MAKE OF PORTABLE CONCRETE BATCHING MACHINE), GRADERS, GRADERS (WITH BULLDOZER BLADES), HOISTS (MULTIPLE DRUM WITH AIR COMPRESOR WHEN USED SIMULTANEOUSLY FOR MORE THAN ONE PURPOSE), HOISTS - SINGLE DRUM WHEN USED TO HOIST STEEL), HYDRAULIC CONCRETE JOINT HAMMERS, HYDRAULIC ROCK DRILL (INGERSOLL-RAND LM 500 TYPE), HYDRO-AXE, KOLMAN LOADERS, LOADERS (FRONT & BACK - EXCEPT SMALL TYPE), LUBRICATION ENGINEERS, MECHANIC, PAVEMENT BREAKER (EXCEPT HAND OPERATED PAVEMENT BREAKERS), PILE DRIVING RIGS, PIPE PUSHING RIGS, PIPE PUSHING MACHINES (MECHANICL AND HYDRAULIC), POST DRIVERS (EXCEPT TRUCK MOUNTED POST DRIVERS), REAPIR WORK ON MAINTENANCE WORK UNDER THE SUPERVISION OF A MASTER MECHANIC, ROLLERS (ALL) (ON FINISH BLACKTOP), SCOOPMOBILES (ALL), SCRAPTER (EITHER DOUBLE OR SINGLE BOWL), S-240 LAZER-GUIDED SCREED, SHOVELS, SNOW-LOADER, STEEL ERECTION, STONE CRUSHERS (PORTABLE), STONE SPREADERS (POWER DRIVEN), TRACTORS USE DIN CONJUNCTION WITH SCRAPER WAGONS (ALL), TREE BANDIT OR SIMILAR CHIPPER, TRANCHERS (WHEN EXCAVATION OVER SIX FEET IN DEPTH), TUNNEL MUCKING MACHINES, VIBRATORS (SELF-PROPELLED RIDING), WELDER NOTES: HAZARDOUS WASTE 2.50 ZONE PAY: CRANE BOOM PREMIUM FOR BOOM AND JIB 100-199 FT (1.00 OVER GROUP A) CRANE BOOM PREMIUM FOR BOOM AND JIB 100-199 FT (1.50 OVER GROUP A) CRANE BOOM PREMIUM FOR BOOM AND JIB 100-199 FT (2.00 OVER GROUP A) | $47.39 | $34.84 | $82.23 |
ENGI0017-008 Effective 07/01/2016 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| FORM CARRIER, TRUCK CRANE OILER, WELL POINT NOTES: POWER EQUIPMENT OPERATOR:, TUNNEL AND SHAFT: GROUP C COMRPESSORS (4 NOT TO EXCEED 2,000 C.F.M. COMBINED CAPACITY OR 3 OR LESS WITH MORE THAN 1,200 C.F.M. BUT NOT TO EXCEED 2,000 C.F.M. WITH A DISTANCE FOR COMPRESSORS), DUST COLLECTORS, GENERATORS, PUMPS, WELDING MACHINES (4 OF ANY TYPE OR COMBINATION) WITH A DISTANCE NOT TO EXCEED 1,500 FEET; CONVEYOR, ELECTRIC PUMP USED INCONJUNCTION WITH WELL POINT SYSTEM GROUT PUMP OVER 5 CUBIC FEET (MANUFACTURER'S RATING), HYDRO-BLASTER, MOTORIZED HAZMAT PREMIUM 3.00 ZONE PAY: ADD $1.00 TO GROUP A - LONG BOOM CRANE PREMIUM 100 FT - 199 FT ADD $1.50 TO GROUP A- LONG BOOM CRANE PREMIUM 200 FT - 299 FT ADD $2.00 TO GGROUP A - LONG BOOM CRANE PREMIUM 300 FT AND OVER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY PROVIDED EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY | $28.53 | $28.10 | $56.63 |
| FORM CARRIER, TRUCK CRANE OILER, WELL POINT NOTES: POWER EQUIPMENT OPERATOR:, TUNNEL AND SHAFT: GROUP B AUTOMATED CENTRAL MIX CONCRETE PLANT, BACKHOE (TOPSIDE), BORING MACHINE, COMPRESSORS (4 OR LESS, EXCEEDING 2,000 C.F.M. COMBINED CAPACITY, BUT NOT TO EXCEED 5,000 C.F.M. WITH A DISTANCE NOT TO EXCEED 1,500 FEET), CONCRETE PUMP, CRANE (TOPSIDE, FRONT END LOADER (TOPSIDE), GRAYCO EPOXY MACHINE, HOIST (2 OR 3 DRUM -- TOPSIDE), MAINTENANCE ENGINEER (TOPSIDE), MAINTENANCE GREASE MAN, PERSONNEL HOIST, PUMP CRETE, SHOTCRETE MACHINE, SHOVEL (TOPSIDE) NOTES: HAZMAT PREMIUM 3.00 ZONE PAY: ADD $1.00 TO GROUP A - LONG BOOM CRANE PREMIUM 100 FT - 199 FT ADD $1.50 TO GROUP A- LONG BOOM CRANE PREMIUM 200 FT - 299 FT ADD $2.00 TO GGROUP A - LONG BOOM CRANE PREMIUM 300 FT AND OVER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY PROVIDED EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY | $34.58 | $28.10 | $62.68 |
| FORM CARRIER, TRUCK CRANE OILER, WELL POINT NOTES: POWER EQUIPMENT OPERATOR:, TUNNEL AND SHAFT: GROUP A1 CRANE (UNDERGROUND), FRONT END LOADER (TUNNEL AND SHAFT), HOIST (2 OR 3 DRUM), MAINTENANCE ENGINEER (TUNNEL AND SHAFT), MINING MACHINE (MOLE AND SIMILAR TYPES), MOTOR MAN, MUCKING MACHINE, SHOVEL, TRIPPER/MAINTENANCE ENGINEER (TUNNEL AND SHAFT), TUNNEL SHOVEL NOTES: HAZMAT PREMIUM 3.00 ZONE PAY: ADD $1.00 TO GROUP A - LONG BOOM CRANE PREMIUM 100 FT - 199 FT ADD $1.50 TO GROUP A- LONG BOOM CRANE PREMIUM 200 FT - 299 FT ADD $2.00 TO GGROUP A - LONG BOOM CRANE PREMIUM 300 FT AND OVER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY PROVIDED EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY | $39.29 | $28.10 | $67.39 |
IRON0009-003 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKERS: (SHEETER) | $36.25 | $33.12 | $69.37 |
| IRONWORKER | $36.25 | $33.12 | $69.37 |
LABO0091-002 Effective 07/01/2017 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER GROUP 9 (HEAVY & HIGHWAY CLASSIFICATIONS) SUPPLIED AIR RESPIRATORS FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY | $31.00 | $35.96 | $66.96 |
| LABORER GROUP 8 (HEAVY & HIGHWAY CLASSIFICATIONS) GRADE CHECKER & BLASTER FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY | $28.60 | $35.96 | $64.56 |
| LABORER GROUP 7 (HEAVY & HIGHWAY CLASSIFICATIONS) CHEMICAL WASTE - MEN WORKING WITH HAZARDOUS WASTE & TOXIC MATERIALS OR IN AREAS OF RADIOACTIVE MATERIAL & ASBESTOS; THE REMOVAL OF ASBESTOS FROM ROOFS, CEILINGS, PIPES, WALLS, BOILERS ETC., AND ALL MACHINERY, & THE RECOVERING OF SAME; REMOVAL OF LEAD FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY | $28.00 | $35.96 | $63.96 |
| LABORER GROUP 6 (HEAVY & HIGHWAY CLASSIFICATIONS) WELDERS; WAGON DRILL & AIR TRACK DRILL; SELF CONTAINED DRILL; RESPIRATOR REQUIRED DUE TO ATMOSPHERIC CONDITIONS (EXCLUDING RESPIRATORS REQUIRED FOR HAZARDOUS WASTE & TOXIC MATERIALS, ASBESTOS ABATEMENT OR LEAD ABATEMENT) FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY | $27.00 | $35.96 | $62.96 |
| LABORER GROUP 5 (HEAVY & HIGHWAY CLASSIFICATIONS) LASER BEAM OPERATOR FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY | $26.85 | $35.96 | $62.81 |
| LABORER GROUP 4 (HEAVY & HIGHWAY CLASSIFICATIONS) FORM SETTER; ROAD FINISHER; GUNNITE NOZZLEMAN; SANDBLASTERS; BURNING TORCH; CONCRETE SAW OPERATORS; UTILITY PILE DRIVER; TREE TOPPER; GROUT MACHINE AND GROUT PUMP OPERATOR FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY | $26.60 | $35.96 | $62.56 |
| LABORER GROUP 3 (HEAVY & HIGHWAY CLASSIFICATIONS) RESPIRATOR REQUIRED FOR BUSTING FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY | $26.50 | $35.96 | $62.46 |
| LABORER GROUP 2 (HEAVY & HIGHWAY CLASSIFICATIONS) POTMAN, PIPELAYERS, PAVEMENT BREAKERS OR BUSTERS, JACKHAMMER OPERATORS; BARCO RAMMERS; CHAIN SAW; POWDER MONKEY; BLACK TOP RAKERS; SCALERS; DRILL TENDERS; MORTAR MIXERS; CONCRETE POLISHING MACHINE; OPERATION & MAINTENANCE OF ALL ROBOTIC REMOTE SYSTEMS IN HAZARDOUS ENVIRONMENT; MEN WORKING FROM SWINGING SCAFFOLD BO'SNS CHAIR, SUSPENDED CAGE OR BUCKET; ALL OTHER OPERATORS OF MECHANICAL TOOLS, INCLUDING VIBRATORS REGARDLESS OF TYPE OF POWER AND BOAT MEN; OPERATION OF ALL TYPES OF VIDEO MACHINERY USED IN THE INSPECTION OF PIPE; WORK IN CAISSONS BELOW 8 FEET; CONCRETE MOTOR BUGGY FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY | $26.30 | $35.96 | $62.26 |
| LABORER GROUP 1 (HEAVY & HIGHWAY CLASSIFICATIONS) COMMON LABORERS, MULTI-TRADE TENDER, DECONTAMINATION OF ALL MACHINES, HORIZONTAL DIRECTIONAL DRILL/LOCATOR; ALL TERRAIN VEHICLES WITH ATTACHMENTS/ALL WHEEL OR TRACK TYPES MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY | $26.00 | $35.96 | $61.96 |
| LABORER COMPRESSED AIR GROUP 1 TOP LABORERS MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY | $26.00 | $35.96 | $61.96 |
PAIN0004-002 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PAINTERS: HEAVY & HIGHWAY CONSTRUCTION: WALLCOVERING (TOWNSHIPS OF HARTLAND, LOCKPORT NORTH TONAWANDA, NEWFANE, PENDLETON, ROYALTON, SOMERSET AND THE EASTERN HALVES OF CAMBRIA AND WILSON) | $33.00 | $28.21 | $61.21 |
| PAINTERS: HEAVY & HIGHWAY CONSTRUCTION: DRYWALL/TAPING (TOWNSHIPS OF HARTLAND, LOCKPORT NORTH TONAWANDA, NEWFANE, PENDLETON, ROYALTON, SOMERSET AND THE EASTERN HALVES OF CAMBRIA AND WILSON) | $34.00 | $28.51 | $62.51 |
| PAINTERS: HEAVY & HIGHWAY CONSTRUCTION: BRUSH & ROLLER (TOWNSHIPS OF HARTLAND, LOCKPORT NORTH TONAWANDA, NEWFANE, PENDLETON, ROYALTON, SOMERSET AND THE EASTERN HALVES OF CAMBRIA AND WILSON) | $33.00 | $28.21 | $61.21 |
PAIN0004-005 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PAINTERS: TAPERS (TOWNSHIPS OF LEWISTON, NIAGARA FALLS, PORTER, WHEATFIELD AND THE WESTERN HALVES OF CAMBRIA AND WILSON) | $34.00 | $28.51 | $62.51 |
| PAINTERS: SPRAYING, PAPERHANGERS, SAND-BLASTING, SWINGING SCAFFOLD (TOWNSHIPS OF LEWISTON, NIAGARA FALLS, PORTER, WHEATFIELD AND THE WESTERN HALVES OF CAMBRIA AND WILSON) | $33.00 | $28.21 | $61.21 |
| PAINTERS: PAINTERS (TOWNSHIPS OF LEWISTON, NIAGARA FALLS, PORTER, WHEATFIELD AND THE WESTERN HALVES OF CAMBRIA AND WILSON) | $33.00 | $28.21 | $61.21 |
PAIN0004-011 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| GLAZIER | $34.68 | $27.64 | $62.32 |
PLAS0111-002 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CEMENT FINISHER | $33.55 | $34.17 | $67.72 |
PLUM0022-005 Effective 04/29/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLUMBER AND STEAMFITTER (ZONE 1) | $42.20 | $29.80 | $72.00 |
ROOF0074-002 Effective 06/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ROOFERS: SLATE & TILE | $35.11 | $26.03 | $61.14 |
| ROOFERS: COMPOSITION | $34.96 | $26.03 | $60.99 |
SFNY0669-001 Effective 01/01/2026 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SPRINKLER FITTER | $47.85 | $28.94 | $76.79 |
SHEE0071-002 Effective 05/27/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SHEET METAL WORKER | $39.50 | $29.18 | $68.68 |
TEAM0449-003 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVERS: INCLUDES SINGLE AXLE DUMP AND OFF-HIGHWAY DUMP TRUCKS (HEAVY & HIGHWAY) WORK ON A HAZARDOUS WASTE SITE THEN ADDITIONAL $2.00 PER HOUR. FOOTNOTE: A. PENSION $54.00 PER DAY B. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE EMPLOYEE HAS WORKED THE WORKING DAY BEFORE AND AFTER THE HOLIDAY | $49.23 | $8.75 | $57.98 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 1 | 01/30/2026 |
| 2 | 05/18/2026 |
Counties Covered
This wage determination applies to 1 county in New York.
Get notified when NY20260011 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.