NY20260013

Building

Davis-Bacon Act general wage determination for building construction in New York.

Modification 2, revised 05/18/2026 23 trade rates 1 county View on SAM.gov

Track NY20260013

Get an email when this wage determination gets a new modification.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Wage Rates

Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.

BRNY0002-005 Effective 07/01/2024
Trade Rate Fringe Total
MARBLE, TILE & TERRAZZO WORKERS (UTICA CHAPTER) $35.85 $20.37 $56.22
MARBLE, TILE & TERRAZZO FINISHER (UTICA CHAPTER) $28.52 $19.59 $48.11
BRICKLAYER: BRICKLAYERS, STONE MASONS, CEMENT MASONS, PLASTERERS, POINTERS, CLEANERS & CAULKERS (UTICA CHAPTER) $39.24 $22.02 $61.26
CARP0277-028 Effective 07/01/2025
Trade Rate Fringe Total
CARPENTER: PILEDRIVER $32.64 $21.97 $54.61
CARPENTER (CARPENTERS, MILLWRIGHTS) $32.64 $21.97 $54.61
ELEC0043-001 Effective 06/01/2025
Trade Rate Fringe Total
ELECTRICIAN $50.50 $35.03 $85.53
CABLE SPLICER $55.55 $35.03 $90.58
ENGI0158-011 Effective 07/01/2025
Trade Rate Fringe Total
POWER EQUIPMENT OPERATOR LOADER, ROLLER FOOTNOTE: POWER EQUIPMENT OPERATOR (BACKHOE, BULLDOZER, FORKLIFT) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED FIVE CONSECUTIVE WORKING DAYS BEFORE THE HOLIDAY AND THE WORKING DAY AFTER THE HOLIDAY CRANE PREMIUMS (ADD TO GROUP 1 RATE): BOOM LENGTH INCL. JIB OVER 150 PLUS $1.75 BOOM LENGTH INCL. JIB OVER 200 FT PLUS $2.75 BOOM LENGTH INCL. JIB OVER 300 FT PLUS $3.75 $45.99 $31.85 $77.84
IRON0440-001 Effective 07/01/2025
Trade Rate Fringe Total
IRONWORKER: STRUCTURAL, ORNAMENTAL, RODMAN, MACHINERY MOVER, RIGGER, FENCE ERECTOR, REINFORCEMENT, AND STONE DERRICKMAN (REMANINDER OF COUNTY) $35.50 $31.39 $66.89
LABO0035-003 Effective 07/01/2017
Trade Rate Fringe Total
LABORERS:, HAZARDOUS WASTE REMOVAL ((HAZARDOUS WASTE REMOVAL INCLUDES, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACCUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS)) $24.00 $20.64 $44.64
LABORERS: (WAGON DRILL OPERATOR) $22.90 $20.64 $43.54
LABORERS: (PIPELAYERS, MOTOR MIXERS, MOTOR BUGGY OPERATOR (WALK BEHIND), POWER LIFT (WALK BEHIND) WAGON DRILL OPERATOR) $22.65 $20.64 $43.29
LABORERS: (LABORERS) $22.50 $20.64 $43.14
LABORERS: (BLASTERS, FORM SETTERS, MOTOR-BUGGY OPERATOR (RYDER TYPE)) $23.00 $20.64 $43.64
LABORERS: (ASBESTOS REMOVAL) $24.00 $20.64 $44.64
PAIN0004-021 Effective 05/01/2025
Trade Rate Fringe Total
PAINTERS: (SPRAY/SANDBLASTING/STRUCTURAL STEEL) $28.82 $26.88 $55.70
PAINTERS: (BRUSH & ROLLER, DRYWALL TAPING/FINISHING) $28.32 $26.88 $55.20
PAIN0677-002 Effective 05/01/2025
Trade Rate Fringe Total
GLAZIER $30.00 $27.59 $57.59
PLUM0112-005 Effective 05/01/2025
Trade Rate Fringe Total
PLUMBER, INCLUDING STEAMFITTING (NORTHERN ZONE) $45.93 $33.77 $79.70
ROOF0195-001 Effective 07/01/2025
Trade Rate Fringe Total
ROOFER $35.80 $25.99 $61.79
SFNY0669-001 Effective 01/01/2026
Trade Rate Fringe Total
SPRINKLER FITTER $47.85 $28.94 $76.79
SHEE0058-001 Effective 05/01/2025
Trade Rate Fringe Total
SHEET METAL WORKER (PROJECTS OVER $10 MILLION) $46.29 $23.31 $69.60
SHEET METAL WORKER (PROJECTS 10 MILLION OR LESS) $36.29 $23.31 $59.60

Modification History

Modification Publication Date
1 01/30/2026
2 05/18/2026

Counties Covered

This wage determination applies to 1 county in New York.

Get notified when NY20260013 is modified

This determination has been revised 2 times. We'll email you when a new modification is published.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.